Vermont

Archived Posts from this Category

ENDGAME LOOMS FOR NEW ENGLAND’S GREAT RIVER

Posted by on 10 Sep 2020 | Tagged as: American shad, Anadromous Fish Conservation Act, Atlantic salmon, blueback herring, climate-destroying, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Conte National Fish & Wildlife Refuge, endangerd shortnose sturgeon, Endangered Species Act, ESA, Federal Energy Regulatory Commission, FERC, FERC licensing process, FirstLight, FirstLight Power Resources, Fish and Aquatics Study Team, GHG, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, pumped storage, right-to-know, Rock Dam, shad, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, The Revelator, The Society of Environmental Journalists, Turners Falls, Turners Falls dam, Turners Falls power canal, Uncategorized, US Fish & Wildlife Service, USFWS, Vermont

Endgame Looms for England’s Great River Copyright © 2020 by Karl Meyer


The impoverished Connecticut River looking downstream to Turners Falls Dam. The run stops here. Photo Copyright © 2020 by Karl Meyer All Rights Reserved. (CLICK x 3 to enlarge)

NOTE: The following piece first appeared as an Op-Ed in The Revelator, an initiative of the Center for Biological Diversity on August 26, 2020. www.therevelator.org

FURTHER NOTE: * On September 1, 2020, after this piece first appeared, FirstLight petitioned FERC for an open-ended date to extend the filing of their Final License Applications citing a need for new test data to respond to the USF&WS. If FERC agrees, that would add another 4 months and possibly another full year, to this endless process–without any long-awaited relief for a flow starved Connecticut River. It’s time for FERC to wrap this up.

After a half-century of failures, the recovery of the Connecticut River ecosystem hangs in the balance. Will authorities finally act to save it?

Rivers should not die in the dark.

On Aug. 31 FirstLight Power Resources is expected to file its final license applications with the Federal Energy Regulatory Commission to continue operating three hydro facilities profiting off massive water diversions from the Connecticut River in Massachusetts. The conditions written into FERC licenses can last up to 50 years.

These applications signal the beginning of the final chapter in determining the future of the four-state river at the heart of the Silvio O. Conte National Fish and Wildlife Refuge, founded to protect a 7.2-million-acre watershed. Their rendering will decide the future of migratory fish, river flows and a host of embattled ecosystem conditions on New England’s longest river, some running counter to laws in place since 1872.

When decisions affecting a river for decades are being made, the public has a right to know of the stakes, the players and the key decision makers. In this case the public knows little of issues potentially affecting 2.4 million people in a sprawling watershed.

One of the failed fish ladders sending all spring migrants into the Turners Falls power canal maize. Across 45 years just 5 shad in 100 have succeeded in passing the Turners Falls Dam–leaving 50 miles of spawning habitat in 3 states largely empty. Photo Copyright © 2020 by Karl Meyer All Rights Reserved.

The U.S. Fish and Wildlife Service, National Marine Fisheries Service and Massachusetts Division of Fisheries and Wildlife have been at the table in this FERC license-determining process since 2012. But three years back, all parties signed nondisclosure agreements with FirstLight — ostensibly to facilitate settlement discussions on flows, habitat, dismal fish passage and endless mortality cycles at these Massachusetts hydro sites. Those NDAs have kept these issues largely out of the media, even as initial settlement talks broke off a year and a half ago.

*Since 2012 I’ve been a FERC-recognized intervener in the relicensing process. I chose not to sign the company’s confidentiality agreement in order to preserve the right to address and highlight the critical, long-term decisions being made about the Connecticut River in a process that remains largely out of public view.

FirstLight is part of the giant Canadian investment outfit PSP Investments, which arrived in Massachusetts four years back to buy up these facilities from GDF Suez. In 2018 it quickly reregistered the facilities as limited liability tax shelters in Delaware. Regardless of their state of incorporation, the licenses they now vie for will each be subject to current federal and state environmental laws, under terms mandated by the fish agencies and FERC.

Entranceway to the “Great Falls Discovery Center” where, most days out of the year, there are literally no great falls running here at all… The sprawling rocky riverbed is an emptied bowl. Photo Copyright © 2020 by Karl Meyer.

Of more than 500 U.S. refuges, Conte is one of just three with “fish” in its name. Today hopes for the long-term protections of its fish and the river comprising its central artery rest heavily in the hands of the U.S. Fish and Wildlife Service, National Marine Fisheries Service and Massachusetts Division of Fisheries and Wildlife. They have “conditioning authority” in these relicensings — mandates to protect the life in this river system. FERC, the ultimate relicensing umpire here, is also mandated to ensure compliance with environmental laws. For the fish agencies this is their one chance to redeem some far-reaching mistakes made by their predecessors.

Forty-five years ago these agencies — operating on limited information and pursuing dreams of reprising a salmon not seen on this river since 1809 — signed agreements with different owners of these facilities. That hobbled, for generations, a four-state migratory fisheries restoration for American shad and river herring and a recovery for federally endangered shortnose sturgeon. They sanctioned the daily use of the massive river-reversing pumped storage facility still chewing through generations of migratory and resident fish today. Concurrently they left two miles of the river emptied downstream, its flow diverted into a turbine-lined power canal that all migrants must negotiate in order to access the next 50 miles of open spawning habitat. Just 5 shad in 100 have ever succeeded. Perhaps worse, the river’s only documented natural spawning habitat for the endangered shortnose sturgeon was left without life-sustaining flow.

A Tale of Two Salmon, a River Without Fish

The last wild salmon run on the Connecticut River was recorded in 1809.

Science later revealed the salmons’ end was likely a combination of warming temperatures following the unusually cold period known as the Little Ice Age coupled with modern dam building.

For 165 years there were no salmon. Then, in 1974, a single fish arrived at Holyoke Dam. Far from being a native of the Connecticut River, this was a new hybrid — a returning fish produced at one of several federal hatcheries completed five years prior. This salmon’s genes, like the genes of all the fish that would return in subsequent years, were cobbled together using salmon from several still-surviving runs in northern New England.

This past June 30 marked a different milestone on the river. It ended the first season in 46 years when not a single hatchery-derived Atlantic salmon returned past Massachusetts’ Holyoke Dam.

That unnatural history event passed with little fanfare. Its silent-spring absence marked the end of a half-century-old program that consumed hundreds of millions of dollars and ate up far too much room in a badly broken ecosystem. The U.S. Fish and Wildlife Service abandoned its hatchery program at the end of the 2012 migration season, but across its 43 years — which saw the annual release of millions of fry and smolts to tributaries in Connecticut, Massachusetts, Vermont and New Hampshire — so few adults returned that no one was ever allowed to catch one.

This second salmon ending highlights the fish agencies’ last shot at returning ancient ocean connections to the river’s still-viable, age-old runs of American shad, blueback herring and federally endangered shortnose sturgeon in three states.

All these species have been guaranteed safe passage on U.S. rivers, going back to the landmark Supreme Court decision in Holyoke Company v. Lyman in 1872. That finding centered on the dam in Holyoke, Massachusetts and held that private dam owners operating on U.S. rivers must provide for the free movement, upstream and down, of migratory fish past their facilities.

Looking west across the CT to the Holyoke Dam fish lift complex. Since 1955 it is one of the East Coast’s few fish passage successes. Photo Copyright © 2020 by Karl Meyer All Rights Reserved.

Its implementation on New England’s river is now 148 years overdue.

A River Run in Reverse

What’s ultimately at issue here is flow.

Having taken a back seat for generations, wild runs of shad, herring and sturgeon remain in desperate need of passage and consistent, exponentially increased river flow in FirstLight’s hydro-complex dominated reach. It’s literally the weight of water that matters most to FirstLight. It’s money in the bank. And where flow diversion is concerned, it’s been pretty much a free ride for companies here for the past 50 years.

The 20 miles of river backed up into Vermont and New Hampshire behind Turners Falls Dam are massively suctioned for hours at up to 15,000 cubic feet per second to fill the 4-billion-gallon reservoir above the Northfield Mountain Pumped Storage Station.

Northfield’s suction is so violent it literally reverses the Connecticut’s current for up to a mile downstream at times, erasing the essence of a living river system. The station kills everything it sucks in, from tiny fish eggs to full-size eels. In pumping mode it suctions the equivalent of 3,600 seven-bedroom mansions, each filled with the aquatic life of a river, vaporized every hour, for hours on end. Agency studies on America shad show tens of millions of eggs and larvae extinguished at Northfield annually, plus the deaths of over 2 million juvenile shad sucked in on migrations back to the sea. Five migrant species are subjected to Northfield. In all 24 species live here, most unstudied.

Warning floats on the CT at the entranceway to Northfield Mountain Pumped Storage Station’s massive subsurface suctioning site. Photo Copyright © 2020 by Karl Meyer All Rights Reserved.

Northfield’s operations are nothing like classic hydro, operating to produce virgin electricity via a dam in or adjacent to a river. It’s actually an electric appliance, built to take advantage of excess, unused megawatts produced nightly at the nearby Vermont Yankee nuclear station. Northfield burns electricity to pump water from the river a mile uphill to into its reservoir tank, which was created by blasting off the top of a mountain. The company’s original owners would buy up Vermont Yankee’s cheap electricity to power its giant, reversible turbines. Later, during peak energy times, that now-lifeless river water would get sent back through the turbines to generate hours-long pulses of energy at peak market prices.

It’s a buy-low, sell-high operation, still running at the expense of a river system six years after Vermont Yankee shut down.

Idle bulldozers sit in the emptied bed of the giant NMPS reservoir on June 27, 2010–the year they broke their giant appliance by fouling the pumps with muck and silt. Sanctioned by the EPA for a cover-up and massively dumping the muck from their mile-long intake tunnel directly into the river, Northfield didn’t operate for over half a year. Photo Copyright © 2020 by Karl Meyer. All Rights Reserved. (Click x3 to enlarge.)

Northfield is a net-loss energy machine — a giant underground appliance consuming massive amounts of grid electricity, half of it now generated by the climate-scorching natural gas that dominates New England’s power grid today. The station consumes 25% to 33% more juice than the secondhand megawatts it sends back by dumping deadened river water back through its turbines. It and a smaller pumped storage station in Connecticut are responsible for gobbling up 1.4% percent of the region’s energy in order to reproduce the few hours of secondhand juice they regenerate. According to grid operator ISO-New England, they are the only facilities whose operations flush out as negative input in the regional power mix.

Northfield has never generated a single watt of its own electricity. And though it may be fine as blunt instrument for use during the occasional power grid slump or rare emergency blackout, its endless, river-crippling, pump-and-purge cycle of regenerated megawatts is unnecessary for the daily operation of the New England grid. While its owners brag of being able to power a million homes for a few hours, they never mention having already burned through the energy of 1.25 million homes to do so. After its daily flush, Northfield is virtually dead in the water and must begin pulling from the grid and sucking life from the river all over.

Past mistakes not only allowed for this massive upstream disruption, they sanctioned diversion of nearly all flow, as well as all migrating fish, into a downstream power canal that on average just 5% of shad have ever successfully negotiated. That left another two miles of New England’s river dysfunctional, with the company providing just a dribble flow of 400 cubic feet per second in the riverbed in spring, when fish are moving upriver. That riverbed remains emptied of all flow more than half the other days of the year.

The most critical time for sustaining flows and the river’s migrants is April through June, when New England’s energy consumption is at its low annual ebb. But federal and state studies and in-river findings show that spring flows will need to be increased by a factor of 20, supplying 8,000 cfs rather than the current brook-like drizzle of 400 cfs. That’s what it will take to guide shad and blueback herring upstream in the river past Turners Falls Dam. That will also provide this river’s only endangered migrant the consistent flows required to successfully allow the shortnose sturgeon to spawn and ensure its larvae can develop in the cobbles at an ancient river pool in that impoverished reach.

Flow starved Connecticut River at the Rock Dam–critical shortnose sturgeon spawning and rearing site, May 13, 2018. Photo Copyright © 2020 by Karl Meyer All Rights Reserved.

Back in 1967, when four New England states and these agencies signed the “Statement of Intent for the Cooperative Fishery Restoration Program for the Connecticut River Basin,” they projected some 38,000 salmon would return annually to this four-state ecosystem. For salmon, a pinnacle of sorts was reached in 1981, when 592 were tallied passing Holyoke. But for a hybrid fish whose wild prototype disappeared 160 years prior, it was downhill from there. Most years fewer than 100 salmon returned to the river.

That 1967 agreement also set annual run targets of one million American shad heading upstream, with 850,000 shad passing Turners Falls and 750,000 entering Vermont and New Hampshire habitats above Vernon Dam. The highest shad return saw 720,000 passing Holyoke in 1992. Sadly, they’ve never made it much farther.

The Run Stops in Massachusetts.

Just 36 miles upstream of Holyoke, all semblance of a successful restoration ends when the annual shad run reaches Turners Falls Dam. Of the 537,000 shad that passed Holyoke in 2017, just 48,000 — a mere 9% — squeezed back into the river beyond Turners Falls.

Vernon Dam between Vernon VT and Hinsdale NH, March 2020. Photo Copyright © 2020 by Karl Meyer

The annual inversion at the next upstream dam in Vermont illustrates the perils on this broken river. In 2017 29,000 or 59% of the shad that survived the miseries of Turners Falls were subsequently counted passing Vernon Dam, 20 miles upriver. That inverted interstate ratio has been the case since 1975, with few shad managing to break out beyond the brutal ecosystem conditions in Massachusetts.

Why the Restoration Failed

The current restoration, congressionally authorized in 1967 and still operating today under the moniker of the Connecticut River Atlantic Salmon Commission, made their biggest blunder in 1975 when they signed off on new license requirements for upstream fish passage. They ultimately chose a design based on hydro project fish ladders on Washington State’s giant Columbia River, known for huge Pacific salmon runs. What got built was a three-ladder fish passage that forced all migrants out of their ancient river highway and into the byzantine maze of the company’s power canal, while leaving two miles of riverbed all but emptied of flow.

Scaled down and put in place at Turners Falls, it worked fine for the program’s few successfully returning hybrid salmon but failed immediately for 95% of the hundreds of thousands of migrating shad. No big run has ever passed that site, leaving three states without their promised bounties. Vermont and New Hampshire remain this river’s shad deserts today.

The Prescription

It’s now 2020. At this late date, corporate re-registrations can’t hide what’s legally required and a half-century overdue on New England’s river. The last opportunity to undo those festering mistakes for the Connecticut now rest in the hands of the National Marine Fisheries Service, U.S. Fish and Wildlife Service and Massachusetts Division of Fish and Wildlife. They are the people’s gatekeepers, mandated to guard the public trust — agencies with the authority to change to the generations-old crippling conditions here in Massachusetts.

Across 45 years of tracking fish runs passing upstream at successive dams on the Connecticut, shad counts have averaged 315,369 at Holyoke, 17,579 at Turners Falls, and just 9,299 at the Vernon Dam in Vermont. But recently long-term federal and state studies on passage and juvenile survival for American shad have led to new minimum benchmarks for fish passage at each dam to ensure the long-term survival of the river’s runs.

Using those findings, the Atlantic States Marine Fisheries Commission, National Marine Fisheries Service, U.S. Fish and Wildlife Service and the four states have formally adopted new Connecticut River fish passage goals. They include annual minimums of 687,000 shad passing Holyoke, 297,000 passing Turners Falls, and 227,000 at Vernon Dam annually. Those federal and state targets are now part of the public record in the current FERC relicensings. Their implementation would also ensure the endangered shortnose sturgeon gets the flows needed to begin its recovery here.

It’s time to return flow to the Connecticut River below Turners Falls. Photo Copyright © 2020 by Karl Meyer All Rights Reserved.

The time has come for facilities operating and profiting off the life of New England’s river to come into compliance with the laws of the land, including the Supreme Court’s 1872 finding in Holyoke Company v. Lyman, the Anadromous Fish Conservation Act of 1965, the Endangered Species Act of 1973 and a host of others. For the fisheries agencies charged with protecting a river’s bounty, standing up for their implementation is the sole prescription for success in a four-state restoration undertaken when back Lyndon Johnson was president.

By law, by right and by the public trust, the Connecticut River’s time has come.

Karl Meyer has been a member of the Fish & Aquatics Studies Team and an intervener in the Federal Energy Regulatory Commission relicensing process for three Massachusetts facilities on the Connecticut River since 2012. He lives in Greenfield, Massachusetts. Meyer is a member of The Society of Environmental Journalists.

* * FINAL NOTE from the author: if all this history is new and troubling to you it must be considered that: this is the only river in the Northeast with several federal designations that has remained the only major waterway without an independent and effective watchdog–one with a full legal team on staff, and a mandate to investigate, enforce, and go to court. The generations-long mistakes and brutal conditions that have existed here would’ve long ago been challenged in court had there been an effective organization protecting the integrity of this river system. If the Connecticut River is to have a future as a living ecosystem, a new model will have to come into being.

A RIVER in HEATSTROKE: A Photo Portrait on July’s Hottest Day

Posted by on 21 Jul 2020 | Tagged as: Clean Water Act, climate-destroying, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Conte National Fish & Wildlife Refuge, endangerd shortnose sturgeon, Endangered Species Act, FirstLight, Great Falls, Peskeomscutt Island, Rock Dam, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Turners Falls dam, Turners Falls power canal, US Geological Survey's Conte Fish Lab, Vermont

A RIVER in HEATSTROKE: A Photo Portrait on July’s Hottest Day
Story and pictures Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

The above photo of the “Great Falls” at Turners Falls was taken at approximately 6:45 am, on July 19, 2020, the hottest day on a boiling-out planet this year. The riverbed below was simply left to bake in this reach until just after 4 pm. (CLICK x 3 to enlarge; BACK ARROW to return)
Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

I continued downstream on this, the most critical and imperiled reach in the entire Silvio O. Conte National Fish & Wildlife Refuge, through the two desperate miles of abused river channal, all the way to the Rock Dam, critical spawning site for the federally endangered Connecticut River shortnose sturgeon.

Locked-down river, starved in front of the “tainter gates” on the Gill side of the river. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


The stilled-water graveyard, just downstream of the TF Dam on the Gill side of the Connecticut. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Starving, de-oxygenated river on the Turner Falls side, looking downstream, with Peskeomscutt Island–now, no longer an island, de-watered and attached by tilted shales to the land. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


The entire flow of the Connecticut (save for a dribble of 125 cubic feet per second mandated to enter from a chute 100 feet downstream of the dam to keep shortnose sturgeon from stranding and dying in the baking pools) is shunted into the muck and sludge accumulating Turners Falls power canal. Pictured here, the canal downstream adjacent to Cabot Woods, back in 2009, the last time it was mucked out by the heavy machinery pictured. (Click x3)
Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


Here is the same area, pictured above, with the shunted Connecticut flow moving listlessly by the sludge-catching silt banks on the morning of July 19, 2020. This is the canal and just part of the grim habitats that ALL migratory fish must must face before emerging upstream of Turners Falls Dam. USGS Conte Fish Lab is visible in the background. Few fish ever manage to survive the puzzled and emerge to spawn in wide open upstream habitats stretching beyond Bellows Falls VT. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Another look from a similar vantage with the Fish Lab in the background and a grim canal substituted for a living river. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


View from the opposite side–from the rail trail, July 19, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


And, lastly, just some of the Campbell’s Tomato Soup-looking sludge bleeding down FirstLight’s failing riverbanks at Cabot Woods–adjacent to their sludge-choked canal, and into the endangered shortnose sturgeon’s Rock Dam spawning site and nursery for developing young on July 19, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


A closer look, 07/19/2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


And another, 07/19/2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


And, just yards away, the slurry connection–where the grim soup enters the most critically endangered site in the entire river ecosystem: the Rock Dam, on July 19, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

That riverbank soup was already assaulting Rock Dam habitats back in September 2019. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Ten months has passed since this photo was taken. The banks continue to fail, the site continues to be assaulted through pollution, and outright neglect and flaunting a ESA protections.
Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Issue # 3: The River Emptied at Spring

Posted by on 13 May 2020 | Tagged as: American shad, Bellows Falls VT, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, FERC, FERC license, FirstLight, Greenfield Recorder, Holyoke Dam, Holyoke Fish Lift, migratory fish, Narragansett, Nipmuck, Northfield Mountain, Norwottuck, Pocumtuck, Rock Dam, Rock Dam Pool, shad, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Turner Falls Massacre, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, USFWS, Vermont, Walpole

THIS GREAT AND BROKEN RIVER III

Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED.

Issue # 3: The River Emptied at Spring

Dismal Mother’s Day flow at Turner’s Falls Dam and Fishway Copyright © 2020 by Karl Meyer (Click X 3 for closeup, click back arrow to return to text)

It was a grim Mother’s Day weekend for the Connecticut River in Massachusetts. The only current left in the riverbed below Turners Falls Dam amounted to little more than a thin, spreading soup winding a shallow path around successive ridges of drying ledge as it threaded together a downstream path along it’s ancient, impoverished bed. Anyone with a pair of rubber boots could’ve easily walked across the Connecticut just a few hundred feet below that dam without much risk of getting wet to the knees–smack in the middle of fish migration and spawning season in the heart of the Silvio O. Conte Connecticut River National Fish and Wildlife Refuge.

There’s something soulless in starving a river of its flow—particularly in the spring when the shadbush is in bloom, the columbine have sprouted, and the fish are in the river. This year, with the corona virus draining spirits and sapping energy during March and April, the presence of a living river in Western New England’s back yard was something to anticipate come May. The light returned, the trees were in flower, birds were making music, and energy use was in its usual seasonal retreat—demand being down ever since a warmer than normal winter.


Days Earlier Flow over Turners Falls Dam May 5, 2020 Copyright © 2020 by Karl Meyer (Click X 3, back arrow to return to text)

This should have been a promising early May on New England’s Great River. But no–not here in northern Massachusetts–not this Mother’s Day weekend. For migrating American shad seeking a route upstream here, the river was literally a road to nowhere. As of Monday, May 11th, though some 18,000 shad had passed upstream at the Holyoke Fishway, 36 river miles to the south, not a single shad had been tallied managing to pass beyond the grim maze of a power canal and several ladders to emerge above Turners Falls Dam. By Monday not a single migrant from the ocean had been tallied passing that dam–thus none were present moving upstream to open Vermont, New Hampshire and northern Massachusetts habitats. The public has no access to the fishway this year, and FirstLight has not provided a simple video feed for people to see their fish. At Turners Falls, the power company alone, is left to monitor itself and report on the public’s fish.


Shad Anglers below Holyoke Dam May 7, 2020 Copyright © 2020 by Karl Meyer

But, most grimly again this May, river conditions on Mother’s Day were altogether devastating for federally-endangered Connecticut River shortnose sturgeon attempting to spawn and nurture young in the currents at their ancient Rock Dam spawning pool–a mile and a half downstream of the dam. Vital river flows at a natural basalt, in-stream formation known as Rock Dam–which had been accommodating for spawning sturgeon just a week before, were shut down to the point where the cobble shoals that shelter eggs and developing young were now visible along a receded shoreline.

Hopeful shad anglers from the adjacent USGS Conte Lab and nearby US Fish & Wildlife Service in Sunderland were present to witness the impacts. This year’s potential progeny–at the sturgeon’s only documented natural spawning site in the ecosystem, were once more left to desiccate–starved of life-giving, oxygenating water as the sun warmed the prematurely exposed, rocky shallows. Though not fishing on this Mother’s Day morning, one of the leaders of the local Nolumbeka Project stopped to inquired of me if the sturgeon had been able to successfully spawn this year. I had to tell him no.

For the second year running FirstLight Power had squeezed the bascule gates closed at Turners Fall Dam, leaving just a curtain of a few hundred cubic feet per second (cfs) of flow entering the starved riverbed below Turners Falls Dam. The Federal Energy Regulatory license for FL’s Turners Falls and Northfield Mountain operations expired two years back on April 30, 2018. . Conditions in a new license would have hopefully increased that dribbling flow at the dam by a factor of 20. Grimly, the starving of this Great River is occurring at the exact site where women, children and elders of the Nipmuck, Pocumtuck, Norwottuck and Narragensett People were set upon and slaughtered in their pre-dawn sleep in the Turners Falls Massacre on May 19, 1676.

But FERC stepped in on FirstLight’s behalf, and has now offered two years of license extensions to this Canadian-owned, Delaware-registered company, allowing these grim impacts to continue. In doing so it has now green-lighted these conditions for three consecutive spawning seasons–allowing crippling industrial practices put in place 52 years back to choke the life out of four-state migratory fish runs, and crushing the spawning prospects for those sturgeon–literally the Connecticut’s only federally endangered migratory fish species. This, in an ecosystem that should have had connected and sustaining flows and fish passage upstream to Bellows Falls VT and Walpole NH long ago.

The flows present in the river on Mother’s Day are flows that force endangered sturgeon to default downstream to attempt spawning in the pulsing industrial flows churning out of the Cabot Station powerhouse a half mile downstream. There, any spawned and developing young-of-the-year will have no defense against the scouring-out hydro surges pulsing canal water back into the riverbed below once fertilized young are dispersed in the flows to shelter in rocky shallows .

Those tamped-down Mother’s Day flows from the dam also create conditions that keep American shad in an endless Groundhog Day cycling at Rock Dam–circling and re-circling in the depleted currents at a pool where depths become too shallow to find a flow offering a negotiable upstream path. Anglers sometimes do quite well at this migratory cull-de-sac where agitated, circling shad snap at darts while wasting hours and energy in this suspended-migration.

But those same tamped down flows diverted at TF Dam also cause just-arriving American shad from Holyoke to be led directly to the false upstream currents exiting the power canal at Cabot Station. Sensing that upstream attraction flow, those unlucky fish get drawn into a ponderous and exhausting fish ladder there. There they are diverted entirely out of the riverbed and into a concrete chute where they must attempt to better an impossible series of steps, twists, and turns that will ultimately dump them into the alien and un-river-like environs of the Turners Falls power canal. Once they enter that industrial habitat, many end their upstream migrations altogether, spending weeks in the labyrinth of that walled corridor without finding a way out and upstream.

Grimly, this year was nearly a carbon copy of the brutal conditions visited below Turners Falls the week of Mother’s Day 2019. Last year at this time researchers tallied the largest-ever catch of spawning-run endangered sturgeon gathered at their Rock Dam nursery pool, corralling 48 fish in a morning survey of a biologist’s net. Days later, at the height of shortnose spawning season, FirstLight abruptly cut off life giving flows to the site. Those same banks and cobbles were exposed, and the spawning run sturgeon were sent packing—forced to abandon the site, with any embryos and young that might have proved viable left withering in the shallows.


FL’s Locked Entrance at Cabot Woods & Rock Dam mid-afternoon May 5, 2020 Copyright © 2020 by Karl Meyer

You might have expected more from FirstLight this year. This is a Canadian shareholder company seeking a new federal license to operate these facilities on the Connecticut River in Massachusetts after recently re-registering them in Delaware as tax shelters. But, now that FERC continues to allow them to profit off the grim and antiquated tenets of a license written under the Federal Power Commission 52 years ago, they seem in no particular hurry to become relicensed neighbors operating for profit on a four-state US river that is the centerpiece of a National Fish and Wildlife Refuge.

These ongoing grim flow regimes fly in the face of mandates long-ago included in the Endangered Species Act and the Anadramous Fish Conservation Act, here, in the most biologically important and critical habitat in the entire Connecticut River ecosystem. They also feel like a thumbing of the nose at Massachusetts taxpayers—as well as all the deserving citizens in the three states from Montague MA to Walpole NH, who also pay taxes and are certainly entitled to a living river. It is a form of public theft.

As the Connecticut River is left starved, its ancient fish runs foundering, there is no movement to bring to a close the Federal Energy Regulatory Commission’s “5-year” relicensing process—begun here in 2012 and lingering on, laughably unfinished. The power company continues to pocket profits, while the FERC is led by a stilted and hand-picked majority happy to feed the corporations what they want, to the benefit of foreign shareholders far from New England. Sadly, there is no state or federal environmental agency that appears willing to challenge this endless delay. And, as noted here before—this four-state river lacks a true NGO watchdog with a mission-mandate and staff lawyers protecting it. See The Greenfield Recorder: https://www.recorder.com/New-England-s-great-river-without-a-watchdog-33291778

FISH CAM: Let the People See Their FISH!

Posted by on 05 May 2020 | Tagged as: American shad, blueback herring, Connecticut River, FirstLight, FirstLight Power, FISH CAM, Great River Hydro, Holyoke Dam, Holyoke Fish Lift, migratory fish, Northfield Mountain, sea lamprey, shad, shortnose sturgeon, Turners Falls, Vermont, Vernon Dam Fishway

THIS GREAT AND BROKEN RIVER II

Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED.

Issue # 2, FISH CAM: Let the People See Their FISH!

Covid-19 shouldn’t be an excuse to cancel everything–especially when you owe something to an isolated and deserving public. If you’re a power company profiting from a resource like the Connecticut River, isn’t it just the minimum of responsibility and common courtesy when things are taken away, to offer something in its place? I’m not seeing that on New England’s Great River. But I am certain all will be seeing new electricity bills this month–the companies seeking payment while so many are out of work.

Holyoke Fishway w/Shad Debry sign. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED.Click X 3.(NOTE: then hit the BACK BUTTON)

Yet there will be no spring family trips to the River to see the great fish migration through Holyoke Gas & Electric’s viewing windows at the South Hadley Falls. No moms will be receiving a little public relations carnation for visiting there this Mother’s Day. And scores of anglers will go wanting there too. The company-sponsored annual Shad Derby won’t be held on successive weekends this spring either. The Fishway lot at Holyoke Dam will be gated and locked.


TF Fishway Gate Locked. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click X 3.

Upstream at Turners Falls, FirstLight’s little fish-viewing cavern just above the ancient falls will be locked down tight as well. There will be no family or school program visits; no access to the churning river at its most dynamic season. Just further upstream, FirstLight has closed Barton Cove to all camping, kayak rentals, and hiking. Five miles further on they’ve cancelled all riverboat tours, use of the Riverview boat launch, plus all use of the extensive trail system on FirstLight’s sprawling Northfield Mountain recreation property. It’s quite a cancellation laundry list. They want us safe—noting, as others, the state safety guideline for Covid 19.

Turners Falls Dam, May 25, 2019. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click X 3.

If you were thinking—maybe a bit further upstream in Vermont you might get to witness the great migration of American shad, sea lamprey and blueback herring at Great River Hydro’s Vernon Dam Fishway, well, you’re again out of luck. The padlock remains on the gates there too. Nobody will be entering that bunker where bubble-filled windows sometimes offer a steady stream of passing shad, and close-up looks at the pulsing gills of lamprey—suctioning mouths glued to the glass, resting a minute before continuing upstream. Only the nesting phoebes in the dark corner of that cavern will have free access in that chained-off place.

Vernon Dam March 19, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click X 3.

Phoebe’s nest at Vernon Fishway. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click X 3.

But don’t these for-profit and shareholder-owned companies have a responsibility to the local citizenry as they bill them to benefit stockholders who likely have no physical and intimate connection to the far-off Connecticut River they profit from? The truth is–the activities they won’t be providing for the public this year because of the Covid virus are actually required by law, as part of their federal and state operating licenses.

Conversely, these companies will not be carrying the payroll obligations for all their seasonal employees. There won’t be fishway guides and Shad Derby officials staffing Holyoke; nor will there be seasonal employees hired and staffing the Turners Falls Fishway, Barton Cove Campground, their kayak rentals—nor staffing and running the riverboat, the Visitors Center, nor staff maintaining those mileS of extensive trails and Riverview Picnic area, nor the Munn’s Ferry camp sites. All closed. That’s a considerable Covid-19 savings, and great loss to a cooped-up public…

TF Fishway, Simple Snapshot–its that easy! Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click X 3.

Can’t something be done to give the public back their river access in this Covid-skewed spring? Is the public owed nothing more than an electric bill?

Well here’s a suggestion—and it’s not even thinking outside the corporate box. It’s time to offer the public FISH CAM, at each of these privatized falls and fish passage sites on the Connecticut. They fish cams in Virginia, Minnesota and elsewhere—heck, we even have a turn-key-ready version of it that could be hooked up in a minute at the Turners Falls Fishway. There, for decades, the company got great public relations for broadcasting Eagle Cam, a simple camera feed trained on the nest of the Barton Cove eagles and offered to an eager and enthusiastic public audience near and far.

It could be again reinstituted in a heartbeat at Turners Falls. And nobody would have to climb up into the nest to secure a camera—just put a video cam in those fish viewing windows and let the public have the delightful and comforting views of the Connecticut’s great spring migrations, right from the confinement of their homes. Just set it, and forget it. This would be great therapy for all those hungry for diversion and a river connection—and, wonderful for kids and student’s alike. It’s at least something they can do–and they have all the wires and electricity anyone could ever want. Local CCTV stations would surely help get it going at all these river sites, and viewers would likely tune in with grateful enthusiasm.

The Connecticut’s great migratory fish migration is just picking up steam now. Typically the runs begin moving toward peak in the several weeks following Mother’s Day, and continue right through June. Let’s give the public–the moms, dads, and kids something back during this greatly deprived spring. Hey Holyoke Gas & Electric; hey FirstLight—hey, Great River Hydro, please—it’s time to honor those obligations to the public on the public’s river. No excuses while shareholders profit. This is the simplest and quickest way to give just one thing back. With today’s technology you wouldn’t imagine this couldn’t be done by just aiming a laptop at the fish-viewing windows at Holyoke and Vernon, where an Eagle Cam never existed. It’s of out-of-the-box technology, to fulfill just one of the many unoffered public obligations this spring. Zoom in on the fish!

Please, no more telling the folks what won’t be offered or done in this bright season—now’s the time—and the place–and the season, for Fish Cam. If Minnesota and Virginia figured this out years ago, we should have it here on the Connecticut. It should be the standard. It’s a small gesture at a tiny cost–giving back a bit of comfort to those isolated at home or unable to get to the river. It’s a win-win, for all involved. Let the people tune in; let the public see their fish!

THIS GREAT AND BROKEN RIVER

Posted by on 28 Apr 2020 | Tagged as: 5-year FERC licensing process, American shad, Bellows Falls VT, blueback herring, Canada, climate-heating, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, FirstLight Power, Holyoke Dam, Holyoke Fish Lift, Holyoke Gas & Electric, Massachusetts Division of Fish & Wildlife, Micah Kieffer, migratory fish, National Marine Fisheries Service, New Hampshire, Northfield Mountain, Northfield Mountain Pumped Storage Project, pumped storage, Rock Dam, Rock Dam Pool, shad, shortnose sturgeon, State of Delaware, The Great Eddy, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Vermont, Vermont Yankee

THIS GREAT AND BROKEN RIVER

Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED.

Issue # 1, First Daylight for an Embattled Run

The tiniest spark of life reentered New England’s Great River on Tuesday, April 21, 2020. According to Ken Sprankle, Connecticut River Project Leader for the US Fish & Wildlife Service, the fish lifts began operating that morning at the Holyoke Dam, 82 miles from the sea. And on that day the first two migrating American shad of the spawning season were lifted upstream.


Holyoke Dam. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x3.

I got that fragile bit of good news on Earth Day, and it was truly a bright spot in what seems a very distant and fragile time for people, ecosystems, and our beleaguered planet. And during this Covid pandemic, while our warming atmosphere is experiencing a brief respite from the particulate pummeling of jets and cars, the Connecticut is being brutalized as catch basin for all the chemicals, chlorine and antibiotics that are currently being flushing out into–and right through, our sewage treatment plants to the River… As such, the Connecticut had little to celebrate on the 50th Anniversary of Earth Day.

Nonetheless those two fish meant there would at least be some vestige of the spring run that once fed river communities for hundreds of miles along this central artery for untold centuries into the past.

It’s the public’s river, and these are the public’s fish. Those are the facts that I always keep in mind whenever I write or speak about the Connecticut. But there’s also this basic tenet for me: a river is a living system; it exists of its own right and its right to survive and thrive should thus be an unquestioned part of its existence. We humans have a moral obligation to protect the life of rivers, just as they have nourished, protected and supported the very ecosystems we’ve relied on for time immemorial.

For me, to kill a river is an immoral act. To flaunt any part of the legal framework that federal and state law has put in place protecting them is both criminal and repugnant. But maybe that’s just me…

Holyoke Dam looking toward Fish Lifts. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x3.

Now two shad aren’t much in many minds, I’ll admit. But what those two shad—likely early males meant, was that the Connecticut had actually become a living river once more. At least a part of it. That tenuous little reconnection was completed when one fat, industrial bucket of river water was pulled from the downstream side of Holyoke Dam and dumped on the upstream side. Two living, blue-green American shad swam out into 35 miles of upstream river that all downstream fish are denied access to for some six months out of every year. That’s way less than a half-living river.

But what that tiny spark meant, more than symbolically was that—on the most basic level, the Connecticut was reopened along a tiny stretch as a true river–a TWO-WAY highway where migrating and resident fish can move both upstream and down as part of this ancient ecosystem highway.

The Holyoke Dam is historic for two reasons: First, it is the barrier at the center of the 1872 landmark US Supreme Court decision in Holyoke Company v. Lyman that established that dam owners and operators must provide passage for migratory fish—both upstream, and downstream, of their barriers. Second, though imperfect and of the simplest most basic design—i.e. upstream, in-river attraction flows leading migrating fish to be corralled in a closeable, industrial bucket and lifted over the dam–those Holyoke Fish lifts have remained the most successful fish passage on the entire East Coast since 1955.

For the next few months Holyoke’s industrial buckets will facilitate a stuttering recreation of the former Connecticut as a living, 2-way river while American shad, sea lamprey, shortnose sturgeon and blueback herring attempt to access ancient spawning grounds. For many that open habitat reaches all the way to the dam between Bellows Falls VT and Walpole NH–nearly 90 miles upriver. That ancient destination, however, remains a cruel impossibility for all but a fortunate few migrants…

The Great Eddy at Bellows Falls Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x 3.

Once again this spring the vast majority of those hundreds of thousands of fish passing upstream at Holyoke will be thwarted from reaching the wide open spawning habitat anywhere above the Turners Falls Dam. That dam sits just 35 miles upstream of the Holyoke lifts. It’s an easy swim for most– just a day, maybe two.

But once they approach that river reach and barrier there won’t be accommodating riverbed flows or any lifts offering suitable passage upstream. They’ll encounter vacillating, confused flows and a series of obstacle-filled fish ladders that funnel all migrants into the grim habitats of the Turners Falls power canal before any get an outside chance to squeeze past the dam itself. Most never do. Perhaps one fish in ten will succeed–leaving the next 68 miles of Connecticut River habitat impoverished and all but empty of its ancient migrants.

And for shortnose sturgeon, one of this river’s most ancient species and the only federally-endangered migrant in this ecosystem, prospects are yet more dire. With the actual riverbed in the 2 miles below Turners Falls Dam sporadically deluged and emptied of suitable natural current, these fish are all vulnerable to being again robbed of what should be an annual, slam-dunk spawning aggregation at their only documented natural spawning site in the ecosystem–the Rock Dam in Turners Falls. Another season will go by without life-giving mandated flows to this critical habitat due an absence of enforcement protection and license requirements.

Of course, that was to have changed two years back.

The Federal Energy Regulatory Commission licenses for operation of the Turners Falls/Cabot Station hydro sites and the Northfield Mountain Pumped Storage Project expired two years back on April 30, 2018. New flows and fish passage requirements should have been re-nourishing the endlessly pummeled and impoverished river in the beleaguered miles above and below Turners Falls Dam since that time. However, for the crippled run here, there is literally nothing new. Fish at Turners Falls today are almost as effectively blocked from moving upstream into Vermont, New Hampshire and northern Massachusetts waters as they were when the first dam across the Connecticut there blocked these runs beginning in 1798.

Today, the crushing suck-and-surge impacts of Northfield Mountain’s net-energy-loss, peak-price/peak-demand operations continue brutalizing the grimmest 10 miles in the entire ecosystem–cannibalizing the river’s fish runs and chewing through young-of-the-year. Pumped storage is not renewable energy, nor is it anything like the conventional river hydropower much of the public thinks it generates. Northfield Mountain consume vast amounts of virgin electricity from the grid here—most if it generated through imported natural gas, to pump the Connecticut backwards and a mile uphill. NMPS is in reality an energy consumer. It’s massive pull off the grid gets tallied in negative megawatts.

Today, the revival and protection of those long-ago, lawfully mandated runs remains stuck at Turners Falls and Northfield Mountain. The so-called FERC 5-year Integrated Licensing Process(ILP) that should have given them their two basic necessities for survival—water, and a safe, timely route upstream and down, actually began in the fall of 2012. It drags on to this day.

The day after FirstLight at long-last submits its final license application for examination to FERC–and the federal fisheries agencies with conditioning authority on the Connecticut, it will be September. September signals the beginning of the 9th year this supposed stream-lined FERC ILP has been malingering on this river system. FirstLight left off negotiations over a year ago with the US Fish & Wildlife Service, National Marine Fisheries Service, and the Massachusetts Division of Fisheries & Wildlife for required new river conditions and construction of fish lifts. There has been no movement since that time.

Any delay in the construction of a fish lift at Turners Falls, and the requirement for real, life-sustaining flows in the riverbed, benefits this recently-arrived power company. Their interest is in stakeholder and corporate profit—and this is a Canadian-owned outfit that re-registered all of these assets out of Massachusetts, chopping them into a series of tax sheltered Delaware LLCs in late-2018. FERC continues to allow FL “extensions of time” to make their license-required filings, delaying what have long-been federally required mandates for river and migratory fish protections.


The de-watered Rock Dam Pool where shortnose sturgeon attempt to spawn, just after 6:00 a.m., May 17, 2019. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x 3.

FL is now citing that restructuring as another reason for delay in submitting their “final license application” until August 31, 2020—that’s two years and four months of operating and profiting from a destructive and river de- pauperizing extended license. The current extension still requires only 400 cubic feet per second to be released into the Connecticut River bed in the spring migration season through which shad attempt to move upstream in—and embattled,federally-endangered shortnose sturgeon attempt to spawn in. That’s the equivalent of substituting a small brook for a river. Sturgeon spawning fails at the Rock Dam site most years, often caused by the abrupt ratcheting of those spring flows down to little more than that trickle.

Studies and investigations by the federal fish agencies show that a massive increase in sustained spring flows are baseline requirements for a living river here. Last year n the first week of May spring flows of some 10,000 cubit feet per second were coursing down the Connecticut’s “dead reach” here–and right through the Rock Dam pool. Shad anglers were landing fish by the dozen. On May 10, 2019, USGS Conte Lab researcher Micah Kieffer put out a research net overnight in that pool. Then next morning he found 48 federally-endangered shortnose sturgeon weighing it down—the largest aggregation ever recorded there. Kieffer continued his successful sturgeon netting through the following week, until coming up empty on Friday, May 17, 2019. He got “skunked” that day after flows through the Rock Dam reach were abruptly cut by FL to a relative trickle, exposing the cobble-lined shores of that pool where embryos and young develop.

Clearly, those 10,000 cfs flows are what are necessary to restore life to this river. They are required and long overdue—at a season when electricity demand is at some of its lowest points in the year.

The first year license extension by FERC was allowed because of the shuttering of the Vermont Yankee nuclear plant upstream. VY’s excessive, night nuclear megawatts were the grim, 40 year engine that enabled Northfield Mountain to suck the river into reverse and pump it up into a 4 billion gallon reservoir to later re-create second-hand electricity at high prices.

Now restructured, FL appears in no hurry to move ahead with new licenses. Their study results have often been delayed in being handed over to the federal fisheries agencies and study teams in this relicensing–or handed in on the very last day the process requires. They seem happy to tread water and realize profits–while NMPS’s fish-eating, net-energy loss operations continue running along, largely fueled via the imported, climate-scorching, natural gas generated electricity now bloating the grid.

The longer you don’t have to put a shovel in the ground or give this US River its flows for federally-required fish passage, the more money you keep. It’s time FERC stopped letting them off the hook. Stop stringing this process along. It’s time this river was brought into compliance with 1872’s Holyoke Company v. Lyman; it’s time to comply with the federal Endangered Species Act of 1973. It is the public’s river; these are the public’s fish.

Addendum: on Friday, April 24th, USFWS’s Ken Sprankle sent a note that the Holyoke Gas & Electric had shut down its fish lifts due to accumulating debris in its assembly. They would not operate through the weekend, and a fix would be attempted on Monday. Thus, the Connecticut became a one-way stream again anywhere above South Hadley Falls, leaving the next 88 empty miles of river still in midst of an endless vigil–awaiting the migratory runs guaranteed by the Supreme Court 148 years ago. Hopefully, for those migrating shad—and perhaps other early migrants wasting another week’s precious spawning-energy reserves while knocking on Holyoke’s door, those lifts are again operating and in full motion today.

Justice for New England’s Embattled River

Posted by on 22 Mar 2019 | Tagged as: American shad, Anadromous Fish Conservation Act, Bellows Falls, Bellows Falls VT, Cabot Station, Canada, Connecticut River, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, Endangered Species Act, Federal Energy Regulatory Commission, FERC, First Light Hydro Generating Company, FirstLight, Greenfield Recorder, Holyoke Dam, MA Division of Fish and Wildlife, National Marine Fisheries Service, New Hampshire, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, PSP Investments, Public Sector Pension Investments, shad, shad fishing, Society of Environmental Journalists, Treasury Board of Canada, Turners Falls, Turners Falls dam, United State Supreme Court, US Fish & Wildlife Service, US Fish and Wildlife Coordination Act, Vermont


Above: FirstLight’s sign along Greenfield Road in Turners Falls MA highlighting their historically combined operations with the Northfield Mountain Pumped Storage Station. Photo Copyright © 2019 by Karl Meyer. All Rights Reserved. (CLICK, then click again to enlarge).

NOTE: an edited version of this piece appeared in The Greenfield Recorder on March 20, 2019, www.recorder.com .

Copyright © 2019 by Karl Meyer. All Rights Reserved.

Justice for New England’s Embattled River

In a shockingly-belated move on December 20, 2018, Canada’s FirstLight Hydro Generating Company petitioned the Federal Energy Regulatory Commission for “expedited consideration” of their last minute request to transfer the licenses of its Northfield Mountain and Turners Falls Projects on the Connecticut River into separate LLC holding companies. They further requested the just-minted corporations be substituted as the new license applicants in the ongoing federal hydro relicensing process, begun here in September 2012. FirstLight is wholly owned under the Treasury Board of Canada as Public Sector Pension Investments, a venture capital corporation.

For over half a decade stakeholders including the US Fish & Wildlife Service, the National Marine Fisheries Service, MA Division of Fish & Wildlife, and nearly a dozen assorted stakeholders and town governments have been meeting and negotiating with a single entity, FirstLight Hydro. All have been working toward a FL-requested single new license—one mandating river protections for the synchronized generating operations of Northfield Mountain and Turners Falls/Cabot Station along 10 miles of the Connecticut.

FL’s petition arrived just eight days after they’d quietly reregistered their conjoined operations in the State of Delaware as two separate, new, “limited liability” corporations—asking FERC to substitute their new LLCs as applicants for separate licenses.

FirstLight’s “expedited” request came just two days before stakeholders including the USFWS and National Marine Fisheries Service–agencies with “conditioning authority” in this relicensing, were sidelined by the government shutdown. FL wanted a decision no later than February 28th. Fortunately FERC extended the deadline. A decision is now expected by March 28th.

Turners Falls Dam crippled this ecosystem the day it was completed way back in 1798. Controlled for decades from a room inside the Northfield Mountain, it continues enabling crushing impacts on this four-state ecosystem artery, namesake of the Silvio O. Conte Connecticut River National Fish & Wildlife Refuge. New Englanders have long-awaited their rights to their River. Yet Massachusetts, Vermont and New Hampshire all remain essentially without upstream and downstream fish passage and protections at Northfield and Turners Falls—required of owners of all federally-licensed dams in the United States since the landmark Supreme Court decision in Holyoke Company vs. Lyman since 1872.

That landmark ruling should have dramatically changed conditions here beginning on April 30, 2018, when the current license for the NMPS—controller of Turners Falls dam, expired. But a new license has yet to be signed; and FERC has since extended the current license. Still, any corporation–foreign or domestic, must comply-with protections under the Anadromous Fish Conservation Act, the Endangered Species Act, the US Fish and Wildlife Coordination Act and Clean Water Act, among others.

Results from a Connecticut River study released last June by the US Fish & Wildlife Service and MA Fisheries & Wildlife estimated that NMPS’s 2017 operations resulted in losses of some 15 million shad eggs and larvae, plus the deaths of between 1 and 2-1/2 million juvenile shad. That’s for just one species.

NMPS sucks the river’s aquatic life into its turbines for hours at a time at 15,000 cubic feet per second–killing virtually everything it inhales. For two years running, NMPS consumed 33% more virgin power from the grid than it later returned in peak-priced, second-hand bursts. Though it can regenerate pulses of up to 1,100 megawatts for 6-8 hours—once emptied of its deadened reservoir waters, Northfield is virtually dead itself, and must begin sucking new virgin power from the grid, shredding more life.

Recent studies find that 80% percent of the shad tagged in the lower river and later recorded passing Holyoke Dam were again recorded reaching the Turners Falls project, some 35 miles upriver. They were still heading upstream. Holyoke has passed an average of 316,000 shad upstream annually since 1976. During that time, just 1-in-10 shad ever swam beyond the miseries created via Turners Falls Dam. Over 250,000 of this ecosystem’s shad are likely turned away annually on the doorstep to Greenfield, Montague, Gill, Millers Falls, Erving and Northfield—barred from the rest of New England all the way Bellows Falls VT as well.

In 2017, the 2nd biggest shad run ever passed Holyoke Dam: 537,000 edible, catchable fish. Fewer than 49,000 passed Turners Falls.

So perhaps it’s time to remind our Canadian-FirstLight guests—recently reregistered in Delaware, that when they purchased some hardware and hydro assets in Massachusetts nearly three years back, they didn’t purchase New England’s great river. They merely bought rights to lease some of our river’s water until the current federal license expired on April 30, 2018. After that time, how much, how often–and at what cost they might continue to operate via a new leased portion of some our river’s flow would be subject to all the laws and regulations of the United States and those of the Commonwealth of Massachusetts.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

NOTE: the piece below appeared at www.vtdigger.org in January.

Karl Meyer: Connecticut River dam owners pulling a fast one

CONNECTICUT RIVER ALERT: FERC deadline looms

Posted by on 24 Jan 2019 | Tagged as: Canada, Connecticut River ecosystem, Connecticut River Refuge, Connecticut River shortnose sturgeon, Conservation Law Foundation, Endangere Species Act, Federal Energy Regulatory Commission, Federal Recovery Plan, federal trust fish, FERC, FERC Commissioner Neil Chatterjee, FERC licensing process, First Light Hydro Generating Company, FirstLight, Greenfield Community Television, ISO New England, MA Division of Fish and Wildlife, Maura Healey, Natalie Blais, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Paul Mark, Public Comment period, public trust, Rock Dam, shad, Treasury Board of Canada, Turners Falls dam, USFWS, Vermont, Vermont Yankee, Yankee Rowe Nuclear Plant

While federal fisheries stakeholders from the US Fish & Wildlife Service and National Marine Fisheries Service are shut out of the FERC relicensing process by the government shutdown, Canada-owned FirstLight Hydro Generating Company has maneuvered to split its assets on the Connecticut River. This is a slick move, and a punch in the gut to all that have been working in good faith on the understanding throughout–since 2012,that these long-co-run plants were to be covered by a single new license: per the power company’s standing, 5 year-old request.

Copy and paste link directly below to see a half hour on this suspect 12th hour maneuver, filmed for later airing on Greenfield Community Television.

NOTE: FERC has extended the COMMENT, PROTEST, and INTERVENTION deadline for Stakeholder to file Motions with them until February 8, 2019. Go back to www.karlmeyerwriting.com/blog and see second blog post following this on this one on how to submit at FERC.gov on Ecomments.

“Clean, renewable” labels don’t apply

Posted by on 01 Oct 2018 | Tagged as: Ashuelot River, Bellows Falls, blueback herring, canal shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, crippled ecosystem, Dead Reach, ecosystem, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC Commissioner Neil Chatterjee, FERC license, FirstLight, Fish and Aquatics Study Team, fish counts, fish kill, fish kill on the Connecticut, fish passage, fishway windows, Holyoke Fish Lift, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, nuclear power, PSP Investments, Public Law 98-138, pumped storage, Relicensing, resident river fish, Saxtons River, Scott Pruitt, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2018 by Karl Meyer All Rights Reserved.

NOTE: the following piece appeared in VTDigger, www.vtdigger.org in September under the heading “Clean, renewable” labels don’t apply when crippling an ecosystem.”

TERMS OF ENTRAINMENT: a Connecticut River History


NOTE:in this photo are over 170 juvenile shad, among the many thousands killed in the recent de-watering of the Turners Falls Power Canal. The power canal is where the bulk of the Connecticut River is diverted into for most months of the year. So, when they drain it, they are killing the river. However, if you look at this photo and multiply that death toll by 10,000 you begin to get some idea of the mortality counts for young-of-the-year shad entrained annually–and un-tallied across nearly five decades, at the Northfield Mountain Pumped Storage Station. (CLICK, then CLICK twice more to enlarge photos.)

At 2:41 p.m. on May 20, 2018, a lone blueback herring appeared in the windows at Turners Falls Dam among a school of larger American shad. It was a small miracle. Barely a foot long, it was the first blueback here since 2005, and there would not be another this spring. Like those shad, its life had already spanned four springs, swimming thousands of ocean miles in shimmering schools. It re-crossed bays and estuaries of seven states and two provinces before reaching this Connecticut River juncture. In doing so it had survived sprawling drift nets and repeated attacks from sharks, bluefish, spiny dogfish, cormorants, seals and striped bass.

All these fish were seeking to spawn and give their young a head start as far upriver as currents, time and temperature would allow. Unfortunately, five miles upstream sat the Northfield Mountain Pumped Storage Station, a river vacuuming machine capable of out-killing all their natural predators. For the next 20 miles they’d be vulnerable to its impacts.

NMPS has inhaled river fish of all species and sizes daily for nearly half a century. Results from a river sampling study Juvenile Shad Assessment in the Connecticut River, were released in June by the US Fish & Wildlife Service and MA Division of Fisheries & Wildlife. They estimated NMPS’s 2017 operations resulted in losses of some 15 million shad eggs and larvae, plus the deaths of between 1 and 2-1/2 million juvenile shad. That’s for just one species.

On April 20, 1967, years before Northfield was built, federal agencies and four states signed the Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River, agreeing to restore runs of American shad, salmon and blueback herring upstream to Bellows Falls, Vermont and beyond. The migratory shortnose sturgeon had already been listed as endangered. Continuing today under Public Law 98-138, its mandate requires utilization of “the full potential of the fishery resources of the Connecticut River including both anadromous and resident species,” providing “high quality sport fishing,” and meeting “the long term needs of the population for seafood.”

American shad are still commercially fished today just 60 miles downriver. They’ve provided seafood to this valley for ages, yet most people in Vermont, New Hampshire and Massachusetts don’t know they were promised a “just share of the fishery harvest” back in 1967. All remain without, while shad continue to grace dinner and restaurant tables in Connecticut every spring.

Running on imported power via the buy-low/sell-high model, Northfield can suck the river into reverse for up to a mile downstream. It devours everything captured in that vortex at 15,000 cubic feet per second. Think 15,000 milk crates, for hours, to fill a 5 billion gallon mountain reservoir. The result is 100% mortality for all fish entrained. During peak-use and/or peak-price times—or both, it sends the deadened water back through its turbines as twice-produced electricity.

NOTE: more of the TF Canal kill here in another location–including mostly juvenile shad, but also a bluegill, several mud-puppies, and a young sea lamprey. Again, this is just a whisper of the year round fish kill occurring upstream at Northfield Mountain.

Northfield was built to run off Vermont Yankee’s excess nuclear megawatts. But even after VY closed in 2014, its carnage continued, unchallenged, rather than being relegated to emergency use. Having never produced a watt of its own power, its 46 years of accumulating carnage are yet to be tallied. That herring might have been heading for New Hampshire’s Ashuelot or Vermont’s Saxtons River, and those shad were perhaps steering for the Great Eddy at Bellows Falls. Regardless, any progeny would later face Northfield’s net-loss-power impacts heading downriver come fall.

Currently it pumps mostly at night when Canadian owners PSP Investments can purchase cheap electricity to suction the river uphill. Later it’s released as second-hand juice at peak-of-the-day profits. Promoters claim the benefits of dispersed solar and wind power can’t be realized without first relaying their renewable energy across the region to this lethal storage machine for later resale in markets far beyond the Connecticut Valley. “Clean, renewable” labels don’t apply when crippling an ecosystem.

NMPS boosters include (now-former) EPA Director Scott Pruitt, who made a sweetheart visit there last Valentine’s Day along with Federal Energy Regulatory Commissioner Neil Chatterjee. That occurred as PSP was requesting to suction yet more water from the Connecticut and applying for a new long-term FERC license. The next day FERC announced a major policy shift, potentially increasing both Northfield’s daytime use and its profits.

Since an 1872 landmark Supreme Court ruling indemnifying Holyoke Dam, all hydro facilities have been required to safely pass the public’s fish, upstream and down. But that 1967 agreement had this warning: “Based on the present fragmentary data available on the Northfield Mountain Pumped Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae and young fish of both resident and anadromous species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water.” Today the 20 mile reach hosting Northfield remains a migration minefield—while some 30 miles of open Vermont/New Hampshire spawning habitat above Vernon Dam sits essentially empty.

Holyoke Dam has annually lifted hundreds of thousands of shad and herring upstream since the 1970s. In 2017 it recorded its second highest shad numbers ever, 537,000 fish. Each spring, half or more of those shad attempt to pass Turners Falls. Less than 10-in-100 will succeed. Of those, some 50% drop from tallies and are never re-counted at Vernon Dam after entering the 20 miles impacted by Northfield. The blueback herring record at Turners Falls was 9,600 in 1986, out of the 517,000 counted 36 miles downstream at Holyoke that year. Of those 9,600 Turners herrings, just 94 reached Vernon Dam. Turners Falls saw another 7,500 blueback herring in 1991; just 383 reappeared upstream at Vernon.

Any new long-term FERC license must comply with federal and state law protecting endangered and public-trust fish. In seeking a new license, PSP’s main proposal for limiting Northfield’s massive carnage has been the test-anchoring of a few yards of Kevlar netting in the riverbed in front of the plant’s suction-and-surge tunnel. Those flag-sized yards of mesh, after a few months deployment, are supposed to effectively model how a 1,000 foot-long “exclusion net”–deployed seasonally in the river over the next decades, might halt the entrainment deaths of out-migrating adult–and millions of juvenile young-of-the year fish, heading back to the sea. Presumably, Northfield’s mouth would remain wide open to the ecosystem’s fish throughout the rest of the year.

In light of longstanding research the US Fish & Wildlife Service, Atlantic States Marine Fisheries Commission and Connecticut River Atlantic Salmon Commission have set shad passage goals requiring that a minimum of 397,000 pass Turners Falls; and a minimum of 226,000 pass Vernon Dam. It’s a certainty that a new fish lift will be required at Turners Falls under any new license, modeled on the long-term success of Holyoke’s lifts. But the ultimate question is this: can Northfield comply with federal and state law protecting the four-state ecosystem’s fish in order to be granted a new FERC license?

END

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

ONE LAST CHANCE FOR THE CONNECTICUT RIVER

Posted by on 03 Sep 2018 | Tagged as: American shad, blueback herring, Clean Water Act, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Endangered Species Act, ESA, Federal Energy Regulatory Commission, FERC, FERC licensing process, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, PSP Investments, Rock Dam Pool, shad, Society of Environmental Journalists, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Yankee, Vernon Dam Fishway, Walpole

ONE LAST CHANCE FOR THE CONNECTICUT RIVER

Copyright © 2018, by Karl Meyer. All Rights Reserved.

Empty CT River bed below Turners Falls Dam on September 2, 2018 (CLICK, then CLICK AGAIN, to ENLARGE)

Northfield MA. On Wednesday, September 5, 2018, New England gets one final chance for a restored Connecticut River ecosystem, promised by federal and state fisheries agencies way back in 1967. That’s the day when the National Marine Fisheries Service, US Fish & Wildlife Service and MA Division of Fisheries & Wildlife meet at the Northfield Mountain Pumped Storage Project for precedent-setting, backroom settlement negotiations to decide the ultimate fate of this ecosystem–long-crippled by the impacts of Northfield’s river-suctioning, power re-generation. They will be representing the public on behalf of New England’s Great River against the interests of FirstLight/PSP Investments of Canada, latest venture capital owners of NMPS. Future generations deserve the living river system promised here long ago.

Closed river gates at Turners Falls Dam, September 2, 2018. (CLICK, the CLICK AGAIN to ENLARGE)

The last time similar negotiations took place was in the 1970s when the agencies misplaced their priorities and Northfield’s nuclear-powered (NMPS was built to run off the excess megawatts produced by the now-closed Vermont Yankee nuclear plant, 15 miles upstream) assault on the river was ignored, scuttling prospects for a river restoration in Vermont, New Hampshire, and northern Massachusetts. Those negotiations led to federal fish hatcheries and ladders for an extinct salmon strain, leaving miles of the Connecticut emptied of flow in Massachusetts, while all migratory shad, blueback herring and lamprey were forced into the industrial labyrinth of the Turners Falls power canal. That also succeeded in leaving the federally-endangered Connecticut River shortnose sturgeon with no protections at all on its critical spawning ground.

Worst of all back then, the agencies failed to protect migratory and resident fish from the year-round deadly assault of NMPS, which sucks the river backward and uphill at 15,000 cubic feet per second. Its vortex can actually yank the Connecticut’s flow into reverse for up to a mile downstream, pulling everything from tiny shad eggs to juvenile fish and adult eels into its turbines on a certain-death Northfield Mountain Sleigh Ride. A USFWS study found that Northfield killed up to 15 million American shad eggs and swallowed between 1 – 2-1/2 million juvenile shad in 2017.

Northfield’s Canadian owners are seeking a new, generations-long operating license from the Federal Energy Regulatory Commission. The relicensing process has now completed its 6th year, with the serious work of safeguarding New England’s largest ecosystem just now coming into focus. This plant is an energy consumer, and has never produced a single watt of its own energy. It’s a bulk-grid power storage and transfer station that can only run for about 6 hours full tilt before it is completely spent and dead in the water. Then, it must go out and suck new virgin power from the bulk grid to begin refilling its reservoir with deadened river water. Its regenerated power is marketed and resold to entities far beyond the borders of the Connecticut River Valley.

New Hampshire, Vermont and Massachusetts have a lot a stake here. Way back in 1967 they were promised a just share of a restored seafood harvest of American shad, all the way upstream to Bellows Falls VT and Walpole NH. Safe passage of fish, upstream and down, has been mandated on US rivers since a 1872 Supreme Court case. But no meaningful runs of shad and blueback herring ever materialized upstream of the brutal industrial impacts and flows created at Northfield Mountain and Turners Falls Dam. In 1967 when these agencies signed that Cooperative Fisheries Restoration agreement, 750,000 American shad was the target for passage above Vernon Dam to wide-open Vermont and New Hampshire habitats. The best year, 1991, saw just 37,000 fish.

Northfield’s giant Intake and Entrainment Tunnel (CLICK, then CLICK AGAIN to ENLARGE)

As for those shortnose sturgeon? Well, investigations continue to see if there is a remnant of this river’s population surviving upstream near Vernon. But, in Massachusetts their protection from interference and guaranteed spawning access and flows should have been enforced decades back in the 2-1/2 miles below PSP’s Turners Falls dam. But none of the federal and state agencies took action.

And here, the only non-profit river groups on the Connecticut have long been power-company-friendly and connected–and still accepting their corporate money. Other major river systems have watchdogs without ties to the corporations that cripple them–putting staff lawyers and their enforcement commitments and responsibilities front and center. These go to court repeatedly–the only method leading to lasting, meaningful results. Here, no one takes corporations to court for license violations or requirements under the Endangered Species Act or Clean Water Act. Others might have led a campaign to shut down an ecosystem killing plant the day the Vermont Yankee nuclear plant shut down forever in December 2014.

4-barrel floats above a few yards of experimental test netting that’s supposed to emulate how a 1000 foot-long net might be deployed seasonally over the coming decades to keep millions of baby fish from going on a Northfield Mountain Sleigh Ride. (CLICK, then CLICK AGAIN to ENLARGE)

Thus, it is really is now-or-never time on for a living Connecticut River ecosystem. So, the big question is: are the key agencies going to stand firm under federal and state environmental statute and law, and fulfill their mandate on behalf of future generations?

Here are some of the key questions to be decided at the table that will ultimately tell the four-state Connecticut River ecosystem’s future:

Can Northfield Mountain Pumped Storage Station—which literally kills millions of fish annually, be operated in such a way that it complies with long-standing federal and state environmental law in order to receive a new FERC license?

Will the US Fish & Wildlife Service and National Marine Fisheries require PSP’s operations to cease during critical times in the spawning cycles of the river’s fish—and only operate as an emergency power source at those times, rather than as a net-power loss, buy-low/sell high profit machine? (This happens on other river systems.)

Will National Marine Fisheries require the necessary 6,500 cubic feet per second flows now absent below Turners Falls Dam—from April through June, to protect the federally endangered shortnose sturgeon in its critical spawning ground?

Will the Massachusetts Division of Fisheries & Wildlife at last stand up for river protections in that same 2-1/2 miles of beleaguered river to safeguard over a dozen threatened and endangered plant, fish and aquatic species?

Will the National Marine Fisheries Service and the Commonwealth of Massachusetts protect the full spawning cycle of the shortnose sturgeon by barring all rafts and watercraft from landing on any of the islands in this stretch—and banning all disembarking in the critical Rock Dam Pool spawning area to safeguard young fish, rare plants and freshwater clams?

In deference to recognized New England Native American Peoples, will Massachusetts’s Natural Heritage Program leaders, the Massachusetts Historical Commission and the US Fish & Wildlife ban access to the Connecticut River islands in that embattled 2-1/2 mile reach, where several Tribes have a documented presence and ancient connection to these extremely sensitive sites?

Ultimately, the questions that will soon be answered are these:

Does the river belong to the corporation, or to the people?
Do endangered species matter?
Do ecosystems matter?
Do federal and state environmental laws matter?
And, finally: DO RIVERS MATTER?

Coming generations may soon have their answers on the Connecticut River.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists. Due to the non-disclosure agreements requested to take part in these private meetings with PSP Investments, he is not participating in these closed-door settlement discussions. The public is entitled to know.

VALID LICENSE REQUIRED

Posted by on 14 Jun 2018 | Tagged as: 5-year FERC licensing process, American shad, Connecticut River, Connecticut River migratory fisheries restoration, federally-endangered Connecticut River shortnose sturgeion, FERC, Fish and Aquatics Study Team, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, Northfield Mountain Pumped Storage Station, shortnose sturgeon, Society of Environmental Journalists, US Fish & Wildlife Service, USFWS, Vermont

Copyright © 2018 by Karl Meyer

(Note: the following piece appeared under “News Analysis” on the front page of The Montague Reporter‘s May 24, 2018 issue. www.montaguereporter.org)

VALID LICENSE REQUIRED

Is FirstLight Power Resources attempting an end run around the Federal Energy Regulatory Commission relicensing process for its Northfield Mountain Pumped Storage station on the Connecticut River? FirstLight’s parent owner, Canada’s Public Sector Pension Investments, is now offering up use of the giant power re-generation and transfer machine in a bidding process that won’t begin delivering electricity until 2023. The actual bidder is Deepwater Wind, in a partnership with British energy giant National Grid. One option included in their proposal is to relay clean, renewable wind power generated off Martha’s Vineyard, 125 miles across New England to be stored for peak-price regeneration back into the grid at Northfield. This offer is being floated despite the fact that NMPS won’t have a new FERC license requiring long-overdue river protections under federal and state environmental law until at least mid-2019.


Above: surface boom on the Connecticut at the intake of the Northfield Mountain Pumped Storage Station which inhales the river at 15,000 cubic feet per second for hours on end. Results are the “functional extirpation” of all aquatic life pulled in–ultimately shot twice through the turbines on a Northfield Mountain sleighride. It’s sucking vortex reaches over halfway across the Connecticut. (Click, click again, and AGAIN to enlarge).

For 46 years Northfield Mountain has lived off the Connecticut River, its operations subsidized at public expense by the host of deadened aquatic life it chokes from a four-state ecosystem. Just days from now Massachusetts officials are expected to choose among a handful of proposals for the future delivery of up to 1600 future megawatts of “clean, renewable” wind power. But would an agreement including NMPS be legal and binding without a full vetting and understanding of those future license requirements for coming decades? Wouldn’t it be subject litigation by the state and federal agencies now working on studies and agreements for that license? Is there any connection to this proposal with the all-but-secret Valentine’s Day visit by embattled EPA chief Scott Pruitt and FERC Commissioner Neil Chatterjee with NMPS officials?

There’s great irony in this proposed “clean energy” marriage-of-convenience, given that NMPS virtually kills all life it encounters by sucking the Connecticut backward, aside and uphill at the ponderous rate of 15,000 cubic feet per second. Think 15,000 milk crates each second for hours at a time. Everything from tiny fish eggs to adult resident and migratory fish get sent on a two mile-long Northfield Mountain sleigh ride, twice through the turbines. The accepted term for everything drawn into that suction cone is “functionally extirpated.” Dead.

In 2010, Northfield sat stilled and broken for over half a year–sanctioned by the EPA for gross violation of the Clean Water Act and its FERC operating license. The region’s electric grid held together just fine, while American shad passage success skyrocketed at Turners Falls dam toward Vermont and New Hampshire. That migration run, profoundly impacted by NMPS operations, soared to 700 percent above the decade’s yearly averages.

Northfield’s extreme environmental downsides should render it an ineligible option for long-term, wind power storage at this time. A half decade from now, new distributed electricity generation and state-of-the-art micro-grid storage options will be standard configurations for combating the security risks of bulk grid power storage and climate disruption in energy delivery. Unlike pumped storage, these options will feature the instantaneous, millisecond reaction and response times necessary to balance computer-age power glitches.

Northfield, a one-trick pony, is a bulk system designed long ago to profit from a buy-low/sell-high scheme by running off the cheap, overproduced megawatts cranked out by the now-closed Vermont Yankee nuclear plant. In 2016, in the midst of relicensing, Canada’s PSP Investments became NMPS’s third venture capital purchaser in just over a decade. Today it runs on fossil fuel-produced electricity as it sucks massive gulps of the Connecticut into its 5 billion gallon reservoir. A hike to that reservoir will illustrate what the stilled-water sound of a silent spring is.

Little was known about Northfield’s deadly future when its construction began in 1967, in tandem with Vermont’s only nuclear plant. Despite that black hole, this plant that can literally suck the Connecticut into reverse for a mile downstream under low flow conditions began operating just 10 miles from the Vermont/New Hampshire border in 1972. The Federal Power Commission granted it what became a license to kill at public expense—without a basic knowledge of its crippling impacts on shad and blueback herring under the 1965 Anadromous Fish Conservation Act, or its role in imperiling the spawning success of the federally-endangered Connecticut River shortnose sturgeon under the Endangered Species Act.

When demand and prices are high, NMPS sends its deadened river water back downhill through the turbines again, cranking out a few hours of peak-priced, secondhand electricity in a final juicing of all it’s inhaled. That net-energy-loss process is wholly subsidized by mining the life from critical reaches of a four-state ecosystem. Once its reservoir is emptied, NMPS itself is literally dead in the water, and must import new, virgin electricity to begin the process again. Northfield is an energy consumer and will never produce a single watt of its own power. The more often it runs the more river life it will kill into the future.

FirstLight/PSP Investments would do well to understand their giant electric appliance cannot be relicensed without stakeholders–from federal and state fisheries agencies to the Federal Energy Regulatory Commission, ensuring a new license adheres to all federal and state environmental laws of the United States. Without a signed license, Bay State officials should leave this proposal on the table. There are other fish in the sea.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.