THIS GREAT AND BROKEN RIVER

Posted by on 28 Apr 2020 | Tagged as: 5-year FERC licensing process, American shad, Bellows Falls VT, blueback herring, Canada, climate-heating, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, FirstLight Power, Holyoke Dam, Holyoke Fish Lift, Holyoke Gas & Electric, Massachusetts Division of Fish & Wildlife, Micah Kieffer, migratory fish, National Marine Fisheries Service, New Hampshire, Northfield Mountain, Northfield Mountain Pumped Storage Project, pumped storage, Rock Dam, Rock Dam Pool, shad, shortnose sturgeon, State of Delaware, The Great Eddy, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Vermont, Vermont Yankee

THIS GREAT AND BROKEN RIVER

Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED.

Issue # 1, First Daylight for an Embattled Run

The tiniest spark of life reentered New England’s Great River on Tuesday, April 21, 2020. According to Ken Sprankle, Connecticut River Project Leader for the US Fish & Wildlife Service, the fish lifts began operating that morning at the Holyoke Dam, 82 miles from the sea. And on that day the first two migrating American shad of the spawning season were lifted upstream.


Holyoke Dam. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x3.

I got that fragile bit of good news on Earth Day, and it was truly a bright spot in what seems a very distant and fragile time for people, ecosystems, and our beleaguered planet. And during this Covid pandemic, while our warming atmosphere is experiencing a brief respite from the particulate pummeling of jets and cars, the Connecticut is being brutalized as catch basin for all the chemicals, chlorine and antibiotics that are currently being flushing out into–and right through, our sewage treatment plants to the River… As such, the Connecticut had little to celebrate on the 50th Anniversary of Earth Day.

Nonetheless those two fish meant there would at least be some vestige of the spring run that once fed river communities for hundreds of miles along this central artery for untold centuries into the past.

It’s the public’s river, and these are the public’s fish. Those are the facts that I always keep in mind whenever I write or speak about the Connecticut. But there’s also this basic tenet for me: a river is a living system; it exists of its own right and its right to survive and thrive should thus be an unquestioned part of its existence. We humans have a moral obligation to protect the life of rivers, just as they have nourished, protected and supported the very ecosystems we’ve relied on for time immemorial.

For me, to kill a river is an immoral act. To flaunt any part of the legal framework that federal and state law has put in place protecting them is both criminal and repugnant. But maybe that’s just me…

Holyoke Dam looking toward Fish Lifts. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x3.

Now two shad aren’t much in many minds, I’ll admit. But what those two shad—likely early males meant, was that the Connecticut had actually become a living river once more. At least a part of it. That tenuous little reconnection was completed when one fat, industrial bucket of river water was pulled from the downstream side of Holyoke Dam and dumped on the upstream side. Two living, blue-green American shad swam out into 35 miles of upstream river that all downstream fish are denied access to for some six months out of every year. That’s way less than a half-living river.

But what that tiny spark meant, more than symbolically was that—on the most basic level, the Connecticut was reopened along a tiny stretch as a true river–a TWO-WAY highway where migrating and resident fish can move both upstream and down as part of this ancient ecosystem highway.

The Holyoke Dam is historic for two reasons: First, it is the barrier at the center of the 1872 landmark US Supreme Court decision in Holyoke Company v. Lyman that established that dam owners and operators must provide passage for migratory fish—both upstream, and downstream, of their barriers. Second, though imperfect and of the simplest most basic design—i.e. upstream, in-river attraction flows leading migrating fish to be corralled in a closeable, industrial bucket and lifted over the dam–those Holyoke Fish lifts have remained the most successful fish passage on the entire East Coast since 1955.

For the next few months Holyoke’s industrial buckets will facilitate a stuttering recreation of the former Connecticut as a living, 2-way river while American shad, sea lamprey, shortnose sturgeon and blueback herring attempt to access ancient spawning grounds. For many that open habitat reaches all the way to the dam between Bellows Falls VT and Walpole NH–nearly 90 miles upriver. That ancient destination, however, remains a cruel impossibility for all but a fortunate few migrants…

The Great Eddy at Bellows Falls Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x 3.

Once again this spring the vast majority of those hundreds of thousands of fish passing upstream at Holyoke will be thwarted from reaching the wide open spawning habitat anywhere above the Turners Falls Dam. That dam sits just 35 miles upstream of the Holyoke lifts. It’s an easy swim for most– just a day, maybe two.

But once they approach that river reach and barrier there won’t be accommodating riverbed flows or any lifts offering suitable passage upstream. They’ll encounter vacillating, confused flows and a series of obstacle-filled fish ladders that funnel all migrants into the grim habitats of the Turners Falls power canal before any get an outside chance to squeeze past the dam itself. Most never do. Perhaps one fish in ten will succeed–leaving the next 68 miles of Connecticut River habitat impoverished and all but empty of its ancient migrants.

And for shortnose sturgeon, one of this river’s most ancient species and the only federally-endangered migrant in this ecosystem, prospects are yet more dire. With the actual riverbed in the 2 miles below Turners Falls Dam sporadically deluged and emptied of suitable natural current, these fish are all vulnerable to being again robbed of what should be an annual, slam-dunk spawning aggregation at their only documented natural spawning site in the ecosystem–the Rock Dam in Turners Falls. Another season will go by without life-giving mandated flows to this critical habitat due an absence of enforcement protection and license requirements.

Of course, that was to have changed two years back.

The Federal Energy Regulatory Commission licenses for operation of the Turners Falls/Cabot Station hydro sites and the Northfield Mountain Pumped Storage Project expired two years back on April 30, 2018. New flows and fish passage requirements should have been re-nourishing the endlessly pummeled and impoverished river in the beleaguered miles above and below Turners Falls Dam since that time. However, for the crippled run here, there is literally nothing new. Fish at Turners Falls today are almost as effectively blocked from moving upstream into Vermont, New Hampshire and northern Massachusetts waters as they were when the first dam across the Connecticut there blocked these runs beginning in 1798.

Today, the crushing suck-and-surge impacts of Northfield Mountain’s net-energy-loss, peak-price/peak-demand operations continue brutalizing the grimmest 10 miles in the entire ecosystem–cannibalizing the river’s fish runs and chewing through young-of-the-year. Pumped storage is not renewable energy, nor is it anything like the conventional river hydropower much of the public thinks it generates. Northfield Mountain consume vast amounts of virgin electricity from the grid here—most if it generated through imported natural gas, to pump the Connecticut backwards and a mile uphill. NMPS is in reality an energy consumer. It’s massive pull off the grid gets tallied in negative megawatts.

Today, the revival and protection of those long-ago, lawfully mandated runs remains stuck at Turners Falls and Northfield Mountain. The so-called FERC 5-year Integrated Licensing Process(ILP) that should have given them their two basic necessities for survival—water, and a safe, timely route upstream and down, actually began in the fall of 2012. It drags on to this day.

The day after FirstLight at long-last submits its final license application for examination to FERC–and the federal fisheries agencies with conditioning authority on the Connecticut, it will be September. September signals the beginning of the 9th year this supposed stream-lined FERC ILP has been malingering on this river system. FirstLight left off negotiations over a year ago with the US Fish & Wildlife Service, National Marine Fisheries Service, and the Massachusetts Division of Fisheries & Wildlife for required new river conditions and construction of fish lifts. There has been no movement since that time.

Any delay in the construction of a fish lift at Turners Falls, and the requirement for real, life-sustaining flows in the riverbed, benefits this recently-arrived power company. Their interest is in stakeholder and corporate profit—and this is a Canadian-owned outfit that re-registered all of these assets out of Massachusetts, chopping them into a series of tax sheltered Delaware LLCs in late-2018. FERC continues to allow FL “extensions of time” to make their license-required filings, delaying what have long-been federally required mandates for river and migratory fish protections.


The de-watered Rock Dam Pool where shortnose sturgeon attempt to spawn, just after 6:00 a.m., May 17, 2019. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x 3.

FL is now citing that restructuring as another reason for delay in submitting their “final license application” until August 31, 2020—that’s two years and four months of operating and profiting from a destructive and river de- pauperizing extended license. The current extension still requires only 400 cubic feet per second to be released into the Connecticut River bed in the spring migration season through which shad attempt to move upstream in—and embattled,federally-endangered shortnose sturgeon attempt to spawn in. That’s the equivalent of substituting a small brook for a river. Sturgeon spawning fails at the Rock Dam site most years, often caused by the abrupt ratcheting of those spring flows down to little more than that trickle.

Studies and investigations by the federal fish agencies show that a massive increase in sustained spring flows are baseline requirements for a living river here. Last year n the first week of May spring flows of some 10,000 cubit feet per second were coursing down the Connecticut’s “dead reach” here–and right through the Rock Dam pool. Shad anglers were landing fish by the dozen. On May 10, 2019, USGS Conte Lab researcher Micah Kieffer put out a research net overnight in that pool. Then next morning he found 48 federally-endangered shortnose sturgeon weighing it down—the largest aggregation ever recorded there. Kieffer continued his successful sturgeon netting through the following week, until coming up empty on Friday, May 17, 2019. He got “skunked” that day after flows through the Rock Dam reach were abruptly cut by FL to a relative trickle, exposing the cobble-lined shores of that pool where embryos and young develop.

Clearly, those 10,000 cfs flows are what are necessary to restore life to this river. They are required and long overdue—at a season when electricity demand is at some of its lowest points in the year.

The first year license extension by FERC was allowed because of the shuttering of the Vermont Yankee nuclear plant upstream. VY’s excessive, night nuclear megawatts were the grim, 40 year engine that enabled Northfield Mountain to suck the river into reverse and pump it up into a 4 billion gallon reservoir to later re-create second-hand electricity at high prices.

Now restructured, FL appears in no hurry to move ahead with new licenses. Their study results have often been delayed in being handed over to the federal fisheries agencies and study teams in this relicensing–or handed in on the very last day the process requires. They seem happy to tread water and realize profits–while NMPS’s fish-eating, net-energy loss operations continue running along, largely fueled via the imported, climate-scorching, natural gas generated electricity now bloating the grid.

The longer you don’t have to put a shovel in the ground or give this US River its flows for federally-required fish passage, the more money you keep. It’s time FERC stopped letting them off the hook. Stop stringing this process along. It’s time this river was brought into compliance with 1872’s Holyoke Company v. Lyman; it’s time to comply with the federal Endangered Species Act of 1973. It is the public’s river; these are the public’s fish.

Addendum: on Friday, April 24th, USFWS’s Ken Sprankle sent a note that the Holyoke Gas & Electric had shut down its fish lifts due to accumulating debris in its assembly. They would not operate through the weekend, and a fix would be attempted on Monday. Thus, the Connecticut became a one-way stream again anywhere above South Hadley Falls, leaving the next 88 empty miles of river still in midst of an endless vigil–awaiting the migratory runs guaranteed by the Supreme Court 148 years ago. Hopefully, for those migrating shad—and perhaps other early migrants wasting another week’s precious spawning-energy reserves while knocking on Holyoke’s door, those lifts are again operating and in full motion today.

CONNECTICUT RIVER ALERT: FERC deadline looms

Posted by on 24 Jan 2019 | Tagged as: Canada, Connecticut River ecosystem, Connecticut River Refuge, Connecticut River shortnose sturgeon, Conservation Law Foundation, Endangere Species Act, Federal Energy Regulatory Commission, Federal Recovery Plan, federal trust fish, FERC, FERC Commissioner Neil Chatterjee, FERC licensing process, First Light Hydro Generating Company, FirstLight, Greenfield Community Television, ISO New England, MA Division of Fish and Wildlife, Maura Healey, Natalie Blais, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Paul Mark, Public Comment period, public trust, Rock Dam, shad, Treasury Board of Canada, Turners Falls dam, USFWS, Vermont, Vermont Yankee, Yankee Rowe Nuclear Plant

While federal fisheries stakeholders from the US Fish & Wildlife Service and National Marine Fisheries Service are shut out of the FERC relicensing process by the government shutdown, Canada-owned FirstLight Hydro Generating Company has maneuvered to split its assets on the Connecticut River. This is a slick move, and a punch in the gut to all that have been working in good faith on the understanding throughout–since 2012,that these long-co-run plants were to be covered by a single new license: per the power company’s standing, 5 year-old request.

Copy and paste link directly below to see a half hour on this suspect 12th hour maneuver, filmed for later airing on Greenfield Community Television.

NOTE: FERC has extended the COMMENT, PROTEST, and INTERVENTION deadline for Stakeholder to file Motions with them until February 8, 2019. Go back to www.karlmeyerwriting.com/blog and see second blog post following this on this one on how to submit at FERC.gov on Ecomments.

“Clean, renewable” labels don’t apply

Posted by on 01 Oct 2018 | Tagged as: Ashuelot River, Bellows Falls, blueback herring, canal shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, crippled ecosystem, Dead Reach, ecosystem, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC Commissioner Neil Chatterjee, FERC license, FirstLight, Fish and Aquatics Study Team, fish counts, fish kill, fish kill on the Connecticut, fish passage, fishway windows, Holyoke Fish Lift, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, nuclear power, PSP Investments, Public Law 98-138, pumped storage, Relicensing, resident river fish, Saxtons River, Scott Pruitt, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2018 by Karl Meyer All Rights Reserved.

NOTE: the following piece appeared in VTDigger, www.vtdigger.org in September under the heading “Clean, renewable” labels don’t apply when crippling an ecosystem.”

TERMS OF ENTRAINMENT: a Connecticut River History


NOTE:in this photo are over 170 juvenile shad, among the many thousands killed in the recent de-watering of the Turners Falls Power Canal. The power canal is where the bulk of the Connecticut River is diverted into for most months of the year. So, when they drain it, they are killing the river. However, if you look at this photo and multiply that death toll by 10,000 you begin to get some idea of the mortality counts for young-of-the-year shad entrained annually–and un-tallied across nearly five decades, at the Northfield Mountain Pumped Storage Station. (CLICK, then CLICK twice more to enlarge photos.)

At 2:41 p.m. on May 20, 2018, a lone blueback herring appeared in the windows at Turners Falls Dam among a school of larger American shad. It was a small miracle. Barely a foot long, it was the first blueback here since 2005, and there would not be another this spring. Like those shad, its life had already spanned four springs, swimming thousands of ocean miles in shimmering schools. It re-crossed bays and estuaries of seven states and two provinces before reaching this Connecticut River juncture. In doing so it had survived sprawling drift nets and repeated attacks from sharks, bluefish, spiny dogfish, cormorants, seals and striped bass.

All these fish were seeking to spawn and give their young a head start as far upriver as currents, time and temperature would allow. Unfortunately, five miles upstream sat the Northfield Mountain Pumped Storage Station, a river vacuuming machine capable of out-killing all their natural predators. For the next 20 miles they’d be vulnerable to its impacts.

NMPS has inhaled river fish of all species and sizes daily for nearly half a century. Results from a river sampling study Juvenile Shad Assessment in the Connecticut River, were released in June by the US Fish & Wildlife Service and MA Division of Fisheries & Wildlife. They estimated NMPS’s 2017 operations resulted in losses of some 15 million shad eggs and larvae, plus the deaths of between 1 and 2-1/2 million juvenile shad. That’s for just one species.

On April 20, 1967, years before Northfield was built, federal agencies and four states signed the Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River, agreeing to restore runs of American shad, salmon and blueback herring upstream to Bellows Falls, Vermont and beyond. The migratory shortnose sturgeon had already been listed as endangered. Continuing today under Public Law 98-138, its mandate requires utilization of “the full potential of the fishery resources of the Connecticut River including both anadromous and resident species,” providing “high quality sport fishing,” and meeting “the long term needs of the population for seafood.”

American shad are still commercially fished today just 60 miles downriver. They’ve provided seafood to this valley for ages, yet most people in Vermont, New Hampshire and Massachusetts don’t know they were promised a “just share of the fishery harvest” back in 1967. All remain without, while shad continue to grace dinner and restaurant tables in Connecticut every spring.

Running on imported power via the buy-low/sell-high model, Northfield can suck the river into reverse for up to a mile downstream. It devours everything captured in that vortex at 15,000 cubic feet per second. Think 15,000 milk crates, for hours, to fill a 5 billion gallon mountain reservoir. The result is 100% mortality for all fish entrained. During peak-use and/or peak-price times—or both, it sends the deadened water back through its turbines as twice-produced electricity.

NOTE: more of the TF Canal kill here in another location–including mostly juvenile shad, but also a bluegill, several mud-puppies, and a young sea lamprey. Again, this is just a whisper of the year round fish kill occurring upstream at Northfield Mountain.

Northfield was built to run off Vermont Yankee’s excess nuclear megawatts. But even after VY closed in 2014, its carnage continued, unchallenged, rather than being relegated to emergency use. Having never produced a watt of its own power, its 46 years of accumulating carnage are yet to be tallied. That herring might have been heading for New Hampshire’s Ashuelot or Vermont’s Saxtons River, and those shad were perhaps steering for the Great Eddy at Bellows Falls. Regardless, any progeny would later face Northfield’s net-loss-power impacts heading downriver come fall.

Currently it pumps mostly at night when Canadian owners PSP Investments can purchase cheap electricity to suction the river uphill. Later it’s released as second-hand juice at peak-of-the-day profits. Promoters claim the benefits of dispersed solar and wind power can’t be realized without first relaying their renewable energy across the region to this lethal storage machine for later resale in markets far beyond the Connecticut Valley. “Clean, renewable” labels don’t apply when crippling an ecosystem.

NMPS boosters include (now-former) EPA Director Scott Pruitt, who made a sweetheart visit there last Valentine’s Day along with Federal Energy Regulatory Commissioner Neil Chatterjee. That occurred as PSP was requesting to suction yet more water from the Connecticut and applying for a new long-term FERC license. The next day FERC announced a major policy shift, potentially increasing both Northfield’s daytime use and its profits.

Since an 1872 landmark Supreme Court ruling indemnifying Holyoke Dam, all hydro facilities have been required to safely pass the public’s fish, upstream and down. But that 1967 agreement had this warning: “Based on the present fragmentary data available on the Northfield Mountain Pumped Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae and young fish of both resident and anadromous species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water.” Today the 20 mile reach hosting Northfield remains a migration minefield—while some 30 miles of open Vermont/New Hampshire spawning habitat above Vernon Dam sits essentially empty.

Holyoke Dam has annually lifted hundreds of thousands of shad and herring upstream since the 1970s. In 2017 it recorded its second highest shad numbers ever, 537,000 fish. Each spring, half or more of those shad attempt to pass Turners Falls. Less than 10-in-100 will succeed. Of those, some 50% drop from tallies and are never re-counted at Vernon Dam after entering the 20 miles impacted by Northfield. The blueback herring record at Turners Falls was 9,600 in 1986, out of the 517,000 counted 36 miles downstream at Holyoke that year. Of those 9,600 Turners herrings, just 94 reached Vernon Dam. Turners Falls saw another 7,500 blueback herring in 1991; just 383 reappeared upstream at Vernon.

Any new long-term FERC license must comply with federal and state law protecting endangered and public-trust fish. In seeking a new license, PSP’s main proposal for limiting Northfield’s massive carnage has been the test-anchoring of a few yards of Kevlar netting in the riverbed in front of the plant’s suction-and-surge tunnel. Those flag-sized yards of mesh, after a few months deployment, are supposed to effectively model how a 1,000 foot-long “exclusion net”–deployed seasonally in the river over the next decades, might halt the entrainment deaths of out-migrating adult–and millions of juvenile young-of-the year fish, heading back to the sea. Presumably, Northfield’s mouth would remain wide open to the ecosystem’s fish throughout the rest of the year.

In light of longstanding research the US Fish & Wildlife Service, Atlantic States Marine Fisheries Commission and Connecticut River Atlantic Salmon Commission have set shad passage goals requiring that a minimum of 397,000 pass Turners Falls; and a minimum of 226,000 pass Vernon Dam. It’s a certainty that a new fish lift will be required at Turners Falls under any new license, modeled on the long-term success of Holyoke’s lifts. But the ultimate question is this: can Northfield comply with federal and state law protecting the four-state ecosystem’s fish in order to be granted a new FERC license?

END

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

ONE LAST CHANCE FOR THE CONNECTICUT RIVER

Posted by on 03 Sep 2018 | Tagged as: American shad, blueback herring, Clean Water Act, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Endangered Species Act, ESA, Federal Energy Regulatory Commission, FERC, FERC licensing process, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, PSP Investments, Rock Dam Pool, shad, Society of Environmental Journalists, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Yankee, Vernon Dam Fishway, Walpole

ONE LAST CHANCE FOR THE CONNECTICUT RIVER

Copyright © 2018, by Karl Meyer. All Rights Reserved.

Empty CT River bed below Turners Falls Dam on September 2, 2018 (CLICK, then CLICK AGAIN, to ENLARGE)

Northfield MA. On Wednesday, September 5, 2018, New England gets one final chance for a restored Connecticut River ecosystem, promised by federal and state fisheries agencies way back in 1967. That’s the day when the National Marine Fisheries Service, US Fish & Wildlife Service and MA Division of Fisheries & Wildlife meet at the Northfield Mountain Pumped Storage Project for precedent-setting, backroom settlement negotiations to decide the ultimate fate of this ecosystem–long-crippled by the impacts of Northfield’s river-suctioning, power re-generation. They will be representing the public on behalf of New England’s Great River against the interests of FirstLight/PSP Investments of Canada, latest venture capital owners of NMPS. Future generations deserve the living river system promised here long ago.

Closed river gates at Turners Falls Dam, September 2, 2018. (CLICK, the CLICK AGAIN to ENLARGE)

The last time similar negotiations took place was in the 1970s when the agencies misplaced their priorities and Northfield’s nuclear-powered (NMPS was built to run off the excess megawatts produced by the now-closed Vermont Yankee nuclear plant, 15 miles upstream) assault on the river was ignored, scuttling prospects for a river restoration in Vermont, New Hampshire, and northern Massachusetts. Those negotiations led to federal fish hatcheries and ladders for an extinct salmon strain, leaving miles of the Connecticut emptied of flow in Massachusetts, while all migratory shad, blueback herring and lamprey were forced into the industrial labyrinth of the Turners Falls power canal. That also succeeded in leaving the federally-endangered Connecticut River shortnose sturgeon with no protections at all on its critical spawning ground.

Worst of all back then, the agencies failed to protect migratory and resident fish from the year-round deadly assault of NMPS, which sucks the river backward and uphill at 15,000 cubic feet per second. Its vortex can actually yank the Connecticut’s flow into reverse for up to a mile downstream, pulling everything from tiny shad eggs to juvenile fish and adult eels into its turbines on a certain-death Northfield Mountain Sleigh Ride. A USFWS study found that Northfield killed up to 15 million American shad eggs and swallowed between 1 – 2-1/2 million juvenile shad in 2017.

Northfield’s Canadian owners are seeking a new, generations-long operating license from the Federal Energy Regulatory Commission. The relicensing process has now completed its 6th year, with the serious work of safeguarding New England’s largest ecosystem just now coming into focus. This plant is an energy consumer, and has never produced a single watt of its own energy. It’s a bulk-grid power storage and transfer station that can only run for about 6 hours full tilt before it is completely spent and dead in the water. Then, it must go out and suck new virgin power from the bulk grid to begin refilling its reservoir with deadened river water. Its regenerated power is marketed and resold to entities far beyond the borders of the Connecticut River Valley.

New Hampshire, Vermont and Massachusetts have a lot a stake here. Way back in 1967 they were promised a just share of a restored seafood harvest of American shad, all the way upstream to Bellows Falls VT and Walpole NH. Safe passage of fish, upstream and down, has been mandated on US rivers since a 1872 Supreme Court case. But no meaningful runs of shad and blueback herring ever materialized upstream of the brutal industrial impacts and flows created at Northfield Mountain and Turners Falls Dam. In 1967 when these agencies signed that Cooperative Fisheries Restoration agreement, 750,000 American shad was the target for passage above Vernon Dam to wide-open Vermont and New Hampshire habitats. The best year, 1991, saw just 37,000 fish.

Northfield’s giant Intake and Entrainment Tunnel (CLICK, then CLICK AGAIN to ENLARGE)

As for those shortnose sturgeon? Well, investigations continue to see if there is a remnant of this river’s population surviving upstream near Vernon. But, in Massachusetts their protection from interference and guaranteed spawning access and flows should have been enforced decades back in the 2-1/2 miles below PSP’s Turners Falls dam. But none of the federal and state agencies took action.

And here, the only non-profit river groups on the Connecticut have long been power-company-friendly and connected–and still accepting their corporate money. Other major river systems have watchdogs without ties to the corporations that cripple them–putting staff lawyers and their enforcement commitments and responsibilities front and center. These go to court repeatedly–the only method leading to lasting, meaningful results. Here, no one takes corporations to court for license violations or requirements under the Endangered Species Act or Clean Water Act. Others might have led a campaign to shut down an ecosystem killing plant the day the Vermont Yankee nuclear plant shut down forever in December 2014.

4-barrel floats above a few yards of experimental test netting that’s supposed to emulate how a 1000 foot-long net might be deployed seasonally over the coming decades to keep millions of baby fish from going on a Northfield Mountain Sleigh Ride. (CLICK, then CLICK AGAIN to ENLARGE)

Thus, it is really is now-or-never time on for a living Connecticut River ecosystem. So, the big question is: are the key agencies going to stand firm under federal and state environmental statute and law, and fulfill their mandate on behalf of future generations?

Here are some of the key questions to be decided at the table that will ultimately tell the four-state Connecticut River ecosystem’s future:

Can Northfield Mountain Pumped Storage Station—which literally kills millions of fish annually, be operated in such a way that it complies with long-standing federal and state environmental law in order to receive a new FERC license?

Will the US Fish & Wildlife Service and National Marine Fisheries require PSP’s operations to cease during critical times in the spawning cycles of the river’s fish—and only operate as an emergency power source at those times, rather than as a net-power loss, buy-low/sell high profit machine? (This happens on other river systems.)

Will National Marine Fisheries require the necessary 6,500 cubic feet per second flows now absent below Turners Falls Dam—from April through June, to protect the federally endangered shortnose sturgeon in its critical spawning ground?

Will the Massachusetts Division of Fisheries & Wildlife at last stand up for river protections in that same 2-1/2 miles of beleaguered river to safeguard over a dozen threatened and endangered plant, fish and aquatic species?

Will the National Marine Fisheries Service and the Commonwealth of Massachusetts protect the full spawning cycle of the shortnose sturgeon by barring all rafts and watercraft from landing on any of the islands in this stretch—and banning all disembarking in the critical Rock Dam Pool spawning area to safeguard young fish, rare plants and freshwater clams?

In deference to recognized New England Native American Peoples, will Massachusetts’s Natural Heritage Program leaders, the Massachusetts Historical Commission and the US Fish & Wildlife ban access to the Connecticut River islands in that embattled 2-1/2 mile reach, where several Tribes have a documented presence and ancient connection to these extremely sensitive sites?

Ultimately, the questions that will soon be answered are these:

Does the river belong to the corporation, or to the people?
Do endangered species matter?
Do ecosystems matter?
Do federal and state environmental laws matter?
And, finally: DO RIVERS MATTER?

Coming generations may soon have their answers on the Connecticut River.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists. Due to the non-disclosure agreements requested to take part in these private meetings with PSP Investments, he is not participating in these closed-door settlement discussions. The public is entitled to know.

Rolling over on a River: the real cost of pumped storage energy

Posted by on 26 Oct 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River ecosystem, Connecticut River Watershed Council, Daily Hampshire Gazette, ecosystem, Entrainment, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, federally-endangered shortnose sturgeon, FERC, fossil fuels, Greenfield Recorder, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, nuclear power, Public Comment period, public trust, pumped storage, Relicensing, shad, shortnose sturgeon, Society of Environmental Journalists, The Recorder, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2016 by Karl Meyer

(Note: this essay appeared in September and October in these MA and VT media and newspaper outlets: Vermont Digger, www.vtdigger.org ; The Daily Hampshire Gazette; and The Recorder.)

besttfemptybed

The de-watered CT below Turners Falls Dam that few people see. (Click, then click again to enlarge.)

Rolling over on a river

Since time began rivers have been the Earth’s arteries—the foundation of its ecosystems. Here in New England it’s “last chance” time for our Great River. On April 30, 2018 the fate of the long-foundered Connecticut River migratory fisheries restoration—and the survival of a four-state river ecosystem, will be decided for what’s essentially forever. New Federal Energy Regulatory Commission hydro licenses are expected to be signed then by government agencies and the Canada Pension Plan Investment Board–latest purchaser of the Turners Falls and Northfield Mountain projects. That company’s stated investor mandate is “to maximize investment returns without undue risk of loss.”

Over two generations ago public-trust mistakes were made favoring power companies, fish hatcheries, and high-end salmon-fishing interests that rendered eight miles of the Connecticut in Massachusetts a massively-suctioned, partially-dewatered flush sink. Sanctioned by fisheries agencies and non-profits, those decisions, severed an ecosystem in two. They forced all migrating fish into a deadly power canal, leaving three emptied miles of riverbed below Turners Falls Dam, while four turbines at the Northfield Mountain Pumped Storage Station five miles upstream consumed massive amounts of nuclear energy to suck a river backward and uphill to a mountaintop reservoir.

Those turbines were built to run on the promised endless supply of overproduced juice generated nightly at the local, now-closed, Vermont Yankee nuke, 15 miles away. Today, running on giant slugs of imported fossil fuel, they continue to spin, sucking the river up in endless gulps into a 4 billion gallon pool a mile up Northfield Mountain. That daily suctioning creates riverbank eroding “tides” higher than those at Hyannisport, MA—with some rivaling the ten-foot fluctuations of Fundy Bay.

Back then, predecessors of today’s National Marine Fisheries Service, the US Fish & Wildlife Service, Massachusetts’ Fish & Wildlife and the Connecticut River Watershed Council signed off on an agreement with the Federal Power Commission and Western Massachusetts Electric that strangled the river in northern Massachusetts. It resulted in the failure of migratory fish passage and a promised renewal of the river’s ancient seafood resources upstream to Vermont, New Hampshire, and northern Mass. Few American shad emerged alive after diversion into that canal. It also failed the shortnose sturgeon—this river’s only federally endangered migratory fish, leaving it without flow or monitoring at its only documented natural spawning site.

Upstream at Northfield the destruction was yet more complete. The suck and gush appetite of that nuclear-charged contraption virtually disassembled the river. It gulped flow at a rate of 15,000 cubic feet per second, often for hours at a time—drawing on the river pool above Turners Falls Dam where, 70% of the time, the Connecticut’s natural routed flow is less than 15,000 cfs. Boaters a mile downstream could find themselves drifting upriver via Northfield’s unearthly pull. All fish and organisms drawn up through the sphere of that suction were deemed “functionally extirpated”–dead to the ecosystem by virtue of being sieved twice through the turbines. It was evolution in reverse, a river ripped away from its eternal run to the sea.

Today, climate-blind FERC labels Northfield as a source of “renewable clean” energy—but there’s nothing clean, renewable or sustainable about its imported, twice-produced, peak-priced electricity crippling this river. ISO New England, FERC’s Northfield-cheering, ever-energy-hungry cousin, also ignores climate and its environmental dismemberment. “Pumped storage” is not hydropower—not even by the industry’s own technical terminology. Northfield-produced power in fact represents the heavy planetary burden of fossil fuel used to push a mountain of water uphill, merely as a weight to produce high-cost, second hand electricity. It cares nothing of rivers, fish or ecosystems.

If bureaucrats again fail the public trust and don’t demand critical habitat protections, flows, and the day-to-day monitoring needed to fulfill U.S. environmental statutes, Canadian pension speculators will be left as the de facto controlling interests on our river. The new owners have asked FERC to merge two separate licenses for Northfield and Turners Falls into a single new license dubbed the “Northfield Project.” What’s represented as mere bureaucratic streamlining would actually enshrine, by precedent–next time and forever, river-killing pumped storage.

Any responsible environmental agency should deny this single-license merger, and seek to have Northfield kept in use as emergency infrastructure only—with the ultimate remedy it’s dismantling in tandem with a move to a decentralized, far less vulnerable system than today’s expanding mega-grid. Massachusetts legislators are currently signing onto backroom energy deals for a glut of future hydropower from Quebec. Some 1,200 megawatts of those penciled-in imports could easily replace the few hours of daily juice Northfield puts out–while keeping it available for rare emergencies. Though the new Canadian power imports largely ignore conservation and innovation, they could be employed to end the river carnage here and begin restoring a future for a critical New England ecosystem.

(Note: timely public comment on licensing issues is carefully considered by FERC. Go to: http://ferc.gov/docs-filing/ecomment.asp and use “E-Comment.” Check “Hydro” and address to Secretary Kimberly D. Bose, using the required identifiers “P-2485” and “P-1889” for Northfield and Turners Falls.)

Karl Meyer lives in Greenfield MA. He is participating in the FERC relicensing process and is a member of the Society of Environmental Journalists.

Redeem the promise at Great Falls

Posted by on 16 Nov 2015 | Tagged as: 5-year FERC licensing process, American shad, bald eagle, canal shad, Captain William Turner, Connecticut River, Connecticut River ecosystem, Connecticut River Refuge, Connecticut River shortnose sturgeon, Conte, Conte National Fish & Wildlife Refuge, Daily Hampshire Gazette, endangerd shortnose sturgeon, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC license, FERC licensing process, Greenfield Recorder, Holyoke Fish Lift, New Hampshire, Northfield Mountain Pumped Storage Station, Relicensing, Rock Dam, Rock Dam Pool, shad, shad fishing, shortnose sturgeon, The Greenfield Recorder, The Recorder, Turners Falls, Turners Falls dam, Turners Falls power canal, USFWS, Vermont, Vermont Yankee, wildlife refuge

The following piece, with edits, appeared in the Daily Hampshire Gazette and The Recorder on November 12, 2015 as: “Federal wildlife service must preserve the promise at Great Falls,” and “River restoration retreat”

The US Fish & Wildlife Service’s recent abandonment of their flagship Conte National Fish & Wildlife Refuge Visitor Center at Turners Falls defies all logic. In August they abruptly withdrew their on-site interpreter and funding for The Great Falls Discover Center. That center was located above the falls two decades back precisely because of the site’s importance as an ecological refuge—perched at a river crossroads critical to the success of their new “watershed-based” refuge.

Back then bald eagles had just returned to Turners Falls; it was once again the place that hundreds of thousands of migrating American shad surged to each spring. And just downstream was the sole natural site where the only federally-endangered migratory fish in the watershed–the ancient Connecticut River shortnose sturgeon, attempted to spawn each May. Known as the Rock Dam, its an ancient geological formation that remains a premiere retreat for spring shad anglers. For its biological and historic importance alone, Rock Dam should have long ago been offered the Refuge’s first “in-river” sanctuary designation.

Yet today, USFWS seems ready to walk away from its core mission and long history on the river at Turners Falls. Doing so would be no less an historic retreat than that of Captain Turner and his battalion after their pre-dawn attack on hundreds of Native American women, children and old men seeking refuge at that very site nearly 340 years ago. On May 19, 1676–having accomplished their grizzly goal with the loss of just one man, they were sent in reeling retreat when the first counter-attacking Native warriors arrived from a downstream island encampment opposite today’s Rock Dam. They’d been stationed there to intercept the teeming May shad runs to help feed their people. Turner and 37 of his troops died in the ensuing rout.

Today, Turners Falls remains the site of the US Fish & Wildlife’s biggest regional blunder in a mission to protect a nation’s fish and wildlife resources on New England’s Great River. In the late 1970s they signed off on the plan resulting in a series of fish ladders being built there. It forced all migratory fish out of the river and into the Turners Falls Power Canal. That resulted in a half century of failed fisheries and habitat restoration—largely drawing the curtain down on a spring ocean-connection for riverine habitats in Vermont, New Hampshire, and northern Massachusetts. That 1967 USFWS/four-state migratory fisheries restoration compact for the Connecticut River still founders at Turners Falls today.

That is why the recent USFW’s retreat from their ecologically and historically unique flagship perch remains inexplicable. Currently federal hydro-relicensing studies of dam and canal operations at Turners Falls are taking place. Their outcomes will determine environmental conditions governing the Connecticut River in this reach for two generations to come. The USFWS is playing a key role in these studies as the lead agency empowered to define and require changes at Turners respecting the protection and restoration of the public’s federal-trust and federally-endangered fish species there. In short, they’re at a crossroads. They are the key player able to restore past mistakes and make the Conte Connecticut River Watershed National Fish and Wildlife Refuge a true refuge for annual migrants passing from Connecticut to Massachusetts; then Vermont and New Hampshire.

That long-awaited success would occur at the doorstep of the Great Falls Discovery Center–replete with its life-sized displays of watershed fish and wildlife, and its accessible public auditorium. It’s a huge opportunity at a site virtually on the river, easily reachable by visitors from a broad swath of southern New England travelling the I-91/Route 2 Corridor. Great Falls is the only brick and mortar place for the public to regularly interact with USFW staff and a diversity of displays of characterizing watershed habitats for 80 miles in any direction. What’s more it’s the only publicly-funded flagship Refuge site where admission is free.

Without a touchstone site in this populous reach of the watershed, most citizens will remain unaware of the restoration and conservation work of the USFWS. They’ll be left to surmise instead that Conte is more a theoretical Refuge—a concept and an amorphous jumble of disparate parts lacking any true core.

In practice and in theory, Turners Falls and the Discovery Center site represent the best of opportunities for the US Fish & Wildlife Service to succeed in their core missions of conservation, restoration, public access and education. A second retreat at Turners Falls would be an historic failure. This fabulously rich reach of the Connecticut is uniquely situated to showcase the Service’s long-awaited success in river restoration on the public’s behalf. Many mistakes could be redeemed with the right decisions at this time. Don’t abandon the Great River at the Great Falls.

Public comments are being accepted through November 13th on the USFWS’s plans for Conte Refuge priorities for the next 15 years at: www.fws.gov/refuge/silvio_o_conte/

Karl Meyer
Greenfield

From the Rutland Herald: Where our fish are trapped

Posted by on 16 Nov 2015 | Tagged as: 5-year FERC licensing process, American shad, Bellows Falls, Connecticut River, Connecticut River migratory fisheries restoration, False attraction, Federal Energy Regulatory Commission, FERC licensing process, New Hampshire, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, Rutland Herald, shad, shad fishing, The Great Eddy, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont Yankee, Vernon Dam Fishway


The following piece, with edits, appeared in the Rutland Herald on November 12, 2015.

Dear Vermont and New Hampshire:

Sorry, but your fish are down here in Massachusetts. With Vermont Yankee’s heated discharges no longer clouding issues, that’s become clear. We’re talking hundreds of thousands annually. This year a quarter million might’ve reached Vernon and Hinsdale had we not corralled them. A hundred thousand in the Great Eddy at Bellows Falls might’ve been a possibility.

And these aren’t small fry. These are free-swimming American shad straight from the briny Atlantic—wild fish that snap at lures and offer anglers an honest fight. Fresh caught and sweet, they’re a homegrown harvest for anyone taking the time to debone them or put them in the slow roaster. You could’ve been enjoying all that.

Actually you were promised them by the US Fish & Wildlife Service and state fisheries agencies back in 1967. They’d arrive in the 1980s–when much-touted fish passage facilities got built downstream. Each successive dam would pass 75% of the fish passed by the dam below it. Yet only excuses arrived. You weren’t told your fish got caught in a trap—that the Turners fish ladder diversion was a disaster; that your shad run dies in a muck-filled power canal. That’s where your bounty is still driven from the river today—where fish get diverted into a last-chance canal from which few emerge upstream.

We’ve now had the first spring where VY’s discharge has not intercepted spring runs. It appears the nuke played a smaller role than long-rumored concerning dismal fish passage at Turners. Heated effluent ain’t great for any species–but fish deprived of a river are an unending ecosystem disaster.

The 2-1/2 miles below Turners Falls Dam are that disaster. Down here government agencies don’t require anything approaching sustaining nature-like flows in the Connecticut’s bed. It’s either deluge or desert—much of it produced by the mega-flushing and pumping flows Northfield Mountain Pumped Storage Station sends downstream. Part of that blistering regime gets re-diverted into the power canal 5 miles south—a trap each upstream migrant is funneled into.

That canal is where a great migration dies—where fish get delayed; fatigued, entrapped and eviscerated. Not one in ten shad have made it beyond Turners Falls across the decades. It’s not rocket science to understand–in fact, the math just got a little simpler.

The years 2013 and 2014 were the final years Vermont Yankee was heating the river. Of the 393,000 American shad passing Holyoke Dam in 2013, just 9% or 35,000 fish made it past Turners. Yet of those 35,000 fish, 18,000 or 51% swam safely past Vernon–20 miles upstream. Similarly in 2014 of the 371,000 shad passing Holyoke, just 40,000 or 11% were able to get through the canal past TF Dam. But of the 40,000 that made it, a full 28,000 or 69%, swam beyond Vernon toward upstream destinations.

Turners’ fishways opened in 1980; Vernon’s in-river fishway in 1981. Across the decades the annual average of shad passing Holyoke that make it past Turners is 4%. In the same span, Vernon averaged passage of 40% of the shad arriving from Turners. Passage at Turners hovered near 1% for the decade beginning in 2000 when deregulation began allowing Northfield Mountain to pump and profit from the river according to price peaks on the electricity “spot market.” Those peaking pulses decimate river habitats below Turners Falls.

Which is why 2015 proved interesting. This spring, with VY silent, the Federal Energy Regulatory Commission ordered a series of nature-like test flows to be sent through the gates at Turners Falls Dam into the impoverished riverbed–to gauge their impact on the public’s fish runs. It’s part of the 5-year FERC licensing process for Northfield and Turners. At Holyoke 413,000 shad passed upstream, while at Turners just 14% or 58,000 shad passed the dam. Yet 20 miles north, 69% or 40,000 of those fish, swam past Vernon Dam—an all-time record for shad passage there.

So here’s some math: Turners passed 9% in 2013; 11% in 2014, and 14% in 2015. Vernon passed 51% of their shad in 2013, 69% in 2014, and 68% in 2015. The difference between a year with VY’s heated effluent, and one without—was insignificant, a 1% change with shad passage actually dropping a fraction with Yankee silenced. Yet they still set a new shad passage record.

It’s noteworthy the 34 year-old Vernon record was broken the first time more in-river flow was required below Turners Falls Dam, supplying a direct route upstream during FERC’s May-June test flows. It clearly spared some fish the energy costs of industrial entrapment and the dangers of weeks in a turbine-lined canal.

The problem is that canal, and a decimated river at Turners Falls. You’ve been owed fish totaling in the millions across the decades–and an ancient connection to the sea all kids should know. They’re not the power company’s fish, they’re yours. Demand federal and state fisheries directors sue for those fish—and for the Connecticut River refuge your grandkids deserve.

With apologies,
Karl Meyer, Greenfield, MA

Writer Karl Meyer is participating in the FERC hydro relicensing studies for MA facilities on the Connecticut River. He is a member of the Society of Environmental Journalists.

A look inside the FERC licensing process

Posted by on 06 Jan 2015 | Tagged as: 5-year FERC licensing process, Drew Huthchison, Federal Energy Regulatory Commission, FERC, FERC license, FERC licensing process, fracked gas licensing, GDF-Suez FirstLight, ISO New England, Kinder Morgan, Kinder Morgan pipeline, Mt. Tom Coal Plant, National Marine Fisheries Service, NOAA, Northfield Mountain Pumped Storage Project, shad, shad larvae, Turners Falls power canal, US Fish & Wildlife Service, US Geological Service’s Silvio O. Conte Anadromous Fish Lab, USFWS, Vermont Yankee, Yankee Rowe Nuclear Plant

In mid-December I was interviewed on Greenfield Community Television’s Local Bias feature by Mark Wisniewski, former Greenfield City Council President. In a wide-ranging talk we discussed my experiences with the ongoing Federal Energy Regulatory Commission licensing process as both a journalist and stakeholder in the hydro projects at Northfield Mountain and the Turners Falls Power Canal on the Connecticut River. The FERC licensing process is a cumbersome and lengthy ordeal–transpiring over a 5- year swatch of time.

Anyone interested in–or involved as a citizen in, the deluge of FERC projects currently affecting our region, might gain some insight by tuning in: from fracked-gas pipelines, to hydro, nuclear, climate and ecosystem impacts.

Local Bias airs beginning Wednesday, at 5:30 pm, and repeats on Thursday and Saturday nights at 9 pm throughout the month of January 2015.

Local Bias is produced and directed by Drew Hutchison.

Try the link below,.. or go to look up GCTV, Local Bias to connect to a copy of the show.

http://gctv.org/videos/local-bias-karl-meyer-121514

The Hidden Costs of Northfield Mountain Pumped Storage

Posted by on 01 Sep 2014 | Tagged as: Connecticut River, Connecticut River ecosystem, ecosystem, Entrainment, Federal Energy Regulatory Commission, FirstLight, GDF-Suez FirstLight, Haddam nuclear plant, Ludington Pumped Storage Plant, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, resident river fish, US Fish & Wildlife Service, USFWS, Vermont Yankee, Yankee Atomic, Yankee Rowe Nuclear Plant

Copyright © 2014 by Karl Meyer

The hidden costs of Northfield Mountain Pumped Storage: after Vermont Yankee closes, FirstLight wants to ramp up pumping and profits

(a version of this piece first appeared in the Greenfield Recorder, August 23, 2014)

Vermont Yankee, the last of the region’s nuclear plants, will close in December. In response, GDF-Suez FirstLight’s Northfield Mountain Pumped Storage plant is looking to change its stripes. On June 27th it applied to the Federal Energy Regulatory Commission for a “temporary” license amendment to allow it broad new freedoms to consume unprecedented amounts of the Connecticut River from December 1, 2014 through March 31, 2015. That plan would add an additional 22 feet of pumping capacity to its 5-billion gallon reservoir, sucked directly from the river. More pumping is certain to create more riverbank erosion and draw more silt into that reservoir. It will also kill untold thousands of the public’s resident river fish.

The unprecedented request defies logic. Northfield was built specifically to use energy from local nuclear plants to push water up to its reservoir. In its request FirstLight also cited the closing of the 330 megawatt Salem Harbor coal plant as rationale for why it should be allowed to pump more, and grow larger. FirstLight Hydro Compliance Director John Howard stated, “The requested increase in operational flexibility is needed to provide ISO-New England with additional resources to deal with a potential shortage of energy in the Northeast this winter.” However Andrea Donlon of the Connecticut River Watershed Council found that ISO-New England, the grid’s Independent System Operator, had made no requests concerning Northfield, stating it expected to have adequate energy supply this winter.

FirstLight’s application failed to mention is that it is shutting down its own 135 megawatt Mt. Tom Coal Plant this October. Rather than the “peaking energy” and “emergency resource” plant it’s been since coming on-line in 1972, Northfield seems to be implying it will somehow serve as a replacement for those 24/7 “baseload” energy plants. The other logic-defying reality is that it would be consuming more baseload energy to create more brief pulses of high-priced energy to re-sell to us at “spot” market prices.

Northfield was fashioned during the nuclear build-out in the late 1960s to use the excess power generated at night from nuclear plants in Rowe, Vernon, VT and Haddam, CT to gulp giant slugs of the Connecticut up to its reservoir. When demand “peaked” during mornings or late afternoons it would release that stored nuclear energy—our river, back to its bed through massive turbines. It could produce some 1,000 megawatts in just minutes, great for short-term needs and emergencies. But it could only store enough water to produce 6-8 hours of electricity, total. Depleted, it then waited to re-start the process.

In her book “Inventing Niagara” Ginger Strand described the inefficiencies and rationale behind selling pumped storage electricity to the public as a textbook case of corporate capitalism: buy low, sell high. Northfield has never been a renewable hydro source. It is inefficient and operates at a net-energy loss. While its impacts on the river ecosystem are profound, its brief, staggering pulses of violent, high-volume output are no more efficient than that of legacy electric producers, just more short-term profitable.

Northfield only makes sense while it operates as a designated nuclear adjunct, run on the excesses of the region’s short-lived and now-shuttered nuclear fleet. But now it wants to soldier on, utilizing imported power and climate-changing resources. Meanwhile the river pays an as-yet unstudied price–as the public is asked to accept yet more “peak” energy, repackaged and re-sold at “peak” prices culled from bidding boards on the “spot” market.

FirstLight’s FERC request sparked official replies from entities involved in the current 5-year relicensing of Northfield. The National Marine Fisheries Service’s William McDavitt noted to John Howard “the timing of this temporary amendment application is a bit unfortunate as the proposed change could bear some impact on proposed 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability. Were the proposed changes to go into effect, it seems as though the duration that NMPS pumps or generates could be changed.”

MA Fish and Wildlife made no objections to the up-rate, but the Watershed Council noted that fish kills there–known as “entrainment”, are worrisome, “Currently the entrainment impact of the NMPS facility during the winter is not well understood, which the pending appeal by USFWS regarding the sufficiency of FirstLight’s proposed entrainment study well illustrates,” further noting, “So until such time as we have a much better understanding of the entrainment impacts of NMPS, it seems inappropriate to request additional pumping capacity.”

In 1995 the owners of the Ludington(MI) Pumped Storage Plant agreed to a $172 million dollar settlement for its killing of the public’s fish across the previous two decades. There, according to the Ludington Daily News, they at least had the benefit of a one-time study showing LPSP “in a single year, killed 440,000 salmon and trout, 85,000 perch and millions of forage fish that served as food for valuable game.”

Since 1972 it’s been a free ride up at Northfield.

Karl Meyer is a member of the Society of Environmental Journalists.

The curious nucelar history of Northfield Mountain Pumped Storage Station

Posted by on 08 May 2014 | Tagged as: American shad, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, ecosystem, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC license, FirstLight, GDF-Suez FirstLight, Haddam nuclear plant, Millstone 1, Montague Nuclear Station, Northfield Mountain, Northfield Mountain Pumped Storage Station, right-to-know, shad, shad larvae, US Fish & Wildlife Service, USFWS, Vermont Yankee, Yankee Atomic

Copyright © 2014, by Karl Meyer

The curious nuclear history of Northfield Mountain’s pumped storage plant

(The following piece first appeared on April 30, 2014 in The Recorder in Greenfield, MA, under: Follow the power currents; How the pumping station once fit)

GDF-Suez FirstLight has applied for a new 30-year license from the Federal Energy Regulatory Commission for its Northfield Mountain Pumped Storage plant on the Connecticut.  In this 5-year relicensing process US Fish & Wildlife Service has requested a study to protect a public resource: they want to know the mortality impacts NMPS has on eggs and larvae of migratory American shad.  But FirstLight wants FERC to substitute data from a 22 year-old Northfield study–their counsel has argued that eggs and larvae aren’t technically migratory, and thus have no right to protection at NMPS. 

Pumped storage is a most inefficient form of generating “hydro” electricity, and NMPS is not what it once was.  When proposed, Northfield was to be a nuclear-charged plant designed to gulp-up massive amounts of the Connecticut River, pushing it uphill to a reservoir carved into a mountain.  This would be done purchasing cheap, otherwise-wasted, night-generated nuclear energy from a fleet of soon-to-be-built local plants–which don’t switch off at night.

Once the net-loss task of pushing water uphill was accomplished via nuclear megawatts and reversing turbines, they’d send that water charging downhill to generate large pulses of energy during peak-use times.  Profits would come from reselling that energy back into the electric grid when demand and prices were highest, with consumers picking up the tab. 

But a river system also bore the hidden costs of NMPS and now USFWS wants to know what they are. FirstLight today doesn’t dispute NMPS kills all adult and juvenile shad drawn into its plant.  But that’s just one species.  FERC itself is mandated to protect federal trust fish, and the public is entitled to information on NMPS’s impacts.  Researchers report it sometimes draws so much river water that boats 5 miles downstream are pulled backward.    

Because of the limits of physics NMPS can only operate for 6 – 8 hours.  Then, water-depleted and power-less—it must again purchase new outside electricity to pump water uphill.  It was new technology when NMPS was proposed–technically “hydro” electricity, but not in the way people commonly understood it. 

During mid-1960s Federal Power Commission hearings, questions arose about the proposed NMPS plant’s impacts on the ecosystem.  One option, never implemented, was that it would cease operating during migration season to avoid slicing up the public’s fish in accordance with goals of the federal Anadromous Fish Conservation Act of 1965.

Back then just one local nuclear plant was operating, Yankee Atomic, 20 miles away in Rowe, MA.  But big, local, nuclear build-out plans were in the offing—the lion’s share of which would come to be owned by Northeast Utilities.  Fifteen miles upstream Vermont Yankee was under construction.  It opened in 1972 in lock-step with the completion of Northfield.  As VY and NMPS began tandem, nuclear-powered operation, plans were already underway for NU to build two reactors at a new Montague Nuclear Station, five miles from Northfield.

By fall of 1973 a 500 foot tower loomed over the Montague Plains, testing humidity, temperature, and prevailing winds in preparation for construction.  That tower was toppled in an act of civil disobedience by Sam Lovejoy the following February, helping bolster opposition to the plants.  But NU rebuilt the tower and collected the mandated data by 1975.  By then however, the playing field was changing.

Environmental questions were raised about the effects of Montague Nuclear Station’s drawing huge amounts of river water and dumping heated effluent back into the Connecticut on the federally-endangered Connecticut River shortnose sturgeon.  Questions also arose about the cumulative effects of entraining various life stages of American shad into the intake systems of two Montague plants and NMPS. 

Meanwhile, NU moved ahead on planned nuclear plants for the heavily-populated I-95 Providence-/New Haven corridor–some 100 and 125 miles distant from Northfield.  Four got built, but just two operate today. Their Haddam nuclear plant on our river was shut permanently in 1996 for safety and equipment failures.  So too in 1998 was Millstone Unit I in Waterford, CT.  In 1999 NU to accepted the largest nuclear fine to that time–$10 million for operational failures at those plants. 

Opposition, environmental impacts, soaring costs, and a partial meltdown at Three Mile Island saw NU abandon Montague Station in 1980.  Thus the Connecticut River basin doesn’t today host a forth, de-facto, nuclear waste dump.  Rowe’s Yankee Atomic closed in 1992—it’s now repository to hundreds of tons of spent nuclear fuel.  Vermont Yankee will close in December.  Entergy Nuclear has yet to fully endow their mandated decommissioning fund. 

Local nuclear power to push a river up Northfield Mountain is today nearly nonexistent.  The net-loss “hydro” generating process now taking place there essentially derives from a non-renewable, climate-warming mix of oil, coal and natural gas, plus some nuclear and even pulses of conventional hydropower purchased from as far away as Quebec. Beyond the yet-to-be-examined costs to the public’s ecosystem and fish, consumers are paying dearly for Northfield’s twice-sold electricity.  A fair relicensing process requires robust public information on the lethal aspects of Northfield’s operations.  FERC will decide the issue by early May.

Greenfield writer and journalist Karl Meyer has contributed written and oral testimony in the FERC relicensing process for the Northfield Mountain and Turners Falls power stations.