Source to Sea Cleanup

Archived Posts from this Category

A Connecticut River Day of Mourning: STANDOUT this Sat. Apr. 2

Posted by on 30 Mar 2022 | Tagged as: 1872, Connecticut River, Connecticut River blog, Connecticut River Conservancy, Connecticut River ecosystem, Connecticut River Watershed Council, Conte National Fish & Wildlife Refuge, Death-Sewer, Eversource, FERC, FirstLight Power, Greenfield Recorder, Jesse Leddick, Julie Crocker, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Mark Tisa, Martin Suuberg, Massachusetts Division of Fish & Wildlife, Mr. Jesse Leddick, Mr. Mark S. Tisa, New Hampshire, NMFS, no license to kill, Northeast Utilities, Northfield Mountain Pumped Storage Station, NU/WMECO, PSP Investments, Public Sector Pension Investments, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, State of Delaware, Turners Falls, Turners Falls dam, USFWS, Vermont, Vernon Dam Fishway

A CONNECTICUT RIVER DAY OF MOURNING:

NO RIVER SHOULD EVER DIE IN THE DARK!

Standout on: Saturday April 2, 2022, 11 a.m. – 1 p.m.

WHERE:Turners Falls, on the TF Gill/Montague Bridge just off Rt. 2 East above the Connecticut River in Massachusetts.

A heartbreaking, river-betraying, FirstLight-filed Agreement in Principle has been signed by the US Fish & Wildlife Service, MA Division of Fisheries and Wildlife, National Marine Fisheries, and MA Natural Heritage, and sent to FERC.

It’s a CAPITULATION, a soulless document WITHOUT PRINCIPLE.
* READ IT at the END OF THIS POST.*

Come, WEAR BLACK, stand up for the SOUL of OUR RIVER:
Saturday, April 2, 2022, 11 am – 1 pm.

Please, everyone who has ever fought for the truth about this river, the life of this river—all of you who have marched, stood out, written and shouted publicly “NO LICENSE TO KILL” for our ancient Connecticut and its living waters, come to the Gill/Montague Bridge above the River on April 2nd.

https://vtdigger.org/2022/03/30/karl-meyer-a-connecticut-river-day-of-mourning-will-be-held-april-2/

We will stand in honor of the soul of this Valley–above FirstLight’s TF dam, controlled from inside Northfield Mountain, 5 miles away. We’ll be across from US Fish & Wildlife Service-funded and MA Division of Conservation and Recreation-run, Great Falls Discovery Center. Each one of these entities is culpable for allowing a four-state ecosystem to be turned into our river’s 23-mile MORTUARY by Northfield’s brutality in the Commonwealth of Massachusetts. Come, stand together and bear witness. NO RIVER SHOULD DIE IN THE DARK!

Please WEAR BLACK, and perhaps bring signs that name the names of those responsible. If you have an old shoe box or something small that can stand-in as symbolic coffin for the 20 miles of dead river here, cover it in black and place a single-page cut-out of a DEAD FISH inside–to illustrate the murderous continuation of Northfield’s license. Symbolically, we’ll feed a few into a shredder as witness to this failed ecosystem.

Northfield Mountain, Northfield MA, graveyard where Our Connecticut River Ecosystem Dies… Photo Copyright © 2022 by Karl Meyer

WHY?: Because the Northfield Mountain Pumped Storage Station, the most murderous, wasteful, river-reversing parasite ever licensed to kill on New England’s Great River was betrayed by the US Fish & Wildlife Service, Massachusetts Division of Fisheries & Wildlife, MA Natural Heritage & Endangered Species, and the National Marine Fisheries Service on St. Patrick’s Day, March 17, 2022. Behind closed doors they signed a heartbreakingly-grim Agreement in Principle (AIP) toward granting a new FERC license that will re-enshrine and continue the most brutal, murderous, river-reversing flows and ecosystem-dismemberment—occurring unabated here in Massachusetts since Northfield came on line in 1972.

This document, *LINKED AND INCLUDED AT THE END OF THIS POST*, is literally an agreement WITHOUT PRINCIPLE, as they are our guardians of the Public Trust—encumbered to protect our river, its fish and the coming generations who must depend on a living river ecosystem. In a cheap bit of grandstanding, the Connecticut River Watershed Council(CRC), in business since 1952—who should have stopped this killer from being built 50 years ago, made a show of walking away without signing this AIP. After signing another one..

Fifty years late they appear to have found the courage to mildly label Northfield as a killer–after staying mum and taking the power company’s cash for decades. Here is Director Andy Fisk’s new-found outrage about this River’s conveyor belt of death, a half century after the fact: “…Northfield Mountain has been operating for many years without any protection against fish being killed by the turbines.” Wow Andy, nice catch… It’s killed virtually EVERYTHING it’s sucked in–during all the 50 years the Connecticut River Watershed Council/Conservancy has been in business…


The deadly, suctioning, parasitic intake of FirstLight/PSP Investment’s Northfield Mountain Pumped Storage Project–the most efficient electric predator ever sanctioned to operate in this 4 state ecosystem. Photo Copyright © 2022 by Karl Meyer

In their watchdog claims of 70 years, they are perhaps the most complicit. They never did a protector’s job; never took the corporations or state and federal agencies to court for violations of some of the most basic environmental laws and river and fish protections dating back to 1872. This new “in it but not of it” posture should be wholly condemned. It’s a CRC version of alternative facts. They are a failed NGO, one that has let 50 years of the unconscionable annual slaughter of literally 100s of millions of fish eggs, juvenile and adult fish and developing larvae of some 24 different species from 3 states be suctioned to their deaths by Northfield, built by CRC’s great benefactor and BFF, NU/Eversource, in 1972. No staff lawyers, no bark, no TEETH!

In 2022, CRC finally makes a bland public statement recognizing that at Northfield there are “fish being killed by the turbines.” That half century of slaughter is on their watch.

Getting back to the public trust, the new Agreement WITHOUT Principle was signed under the directorship of US Fish & Wildlife Service Region 5 head Wendi Weber; Mark Tisa sanctioned it as MA Division of Fish & Wildlife Director, Jesse Leddick inked-in directly as leader of the MA Natural Heritage & Endangered Species Program, and Julie Crocker, NOAA/National Marine Fisheries Service ESA Fish, Ecosystems and Energy Branch Chief also agreed to let that promissory note of their legal intent to a new Northfield license be signed.

And who are they selling our ecosystem out to? Why it’s come-lately venture capital’s FirstLight Power, a subsidiary of Canada’s Public Sector Pension Investments. PSP/FirstLight arrived as big-budget bargain investment shoppers, buying up the Northfield Mountain Pumped Storage Station and Turners Falls Hydro Projects at basement rates in 2016. Then, in a marvelous vulture-capital-esque move, they quickly divided their MA assets in 2018, and reregistered them into Delaware tax shelters. Now–with the cowardly 50 years of no-show protection from federal and state agencies here, FirstLight will have the killer keys to 20-plus miles of the Connecticut—impacting three New England states, for decades.

As their constituents, they have failed US. At a time when the Earth is foundering, they’ve agreed to allow a river system to be strangled, reversed and culled of virtually all its aquatic life daily at Northfield. Meanwhile PSP/FirstLight will likely have execs walking off with hefty million dollar bonuses and golden parachutes, as our public trust agents stay in the shadows as abject failures.

After 50 years, this murderous slaughter is being renewed AGAIN, on their watch!

If these agencies were corporations, obligated to produce RESULTS for the benefit of all of us as public trust constituents—there would be massive outcries for resignations from the likes of Ms. Weber, Mr. Tisa, Mr. Leddick, and Ms. Crocker. Instead, they’ll likely have the option to retire years before their abject failure on behalf of the Connecticut River in three states becomes fully visible. Perhaps a few will do the right thing now, plus Mr. Fisk.

* * LASTLY: HERE is that Agreement in Principle–the document signalling the ABANDONMENT of a LIVING CONNECTICUT RIVER ECOSYSTEM
CLICK ON THIS LINK:

* * * RiverSALE-20220318-5004-1 * * *

The Connecticut River NOW! Defenders are taking their case directly to FERC; here’s why!

Posted by on 23 Jan 2022 | Tagged as: Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River ecosystem, CRC, CRWC, Delaware LLC, Extinction, Federal Energy Regulatory Commission, FERC, FERC Comments, FERC license, FirstLight, Jo Comerford, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Natalie Blais, Nation's best landscaped sewer, National Marine Fisheries Service, net-loss power, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, US Environmental Protection Agency, US Fish & Wildlife Service, USFWS

DON’T BE DIVERTED: The Connecticut River NOW! Defenders taking their case directly to FERC; here’s why!

* * * POST UPDATE: letter from today’s (Tues. 1/25/22) Greenfield Recorder. It nicely outlines FirstLight/Northfield’s massive impacts on a SINGLE town: https://www.recorder.com/ltr-field-ConcernsAboutPumpingStation-44673061


Federal and state agency reps, plus CRC’s Andy Fisk at a meeting of the Connecticut River Atlantic Salmon Commission. The US Fish & Wildlife Service, MA Fisheries & Wildlife, and the Connecticut River Conservancy have all signed in FirstLight’s non-disclosure agreement as they meet in secret.

With scores of citizens stepping up to defend our ecosystem, FirstLight’s secret January deal plans for the river have been thwarted. And more are writing in… These are folks who understand that–while many of the planet’s ecosystems seem to be foundering, if you are offered ONE CHANCE to turn the light’s BACK ON after a half-century of a massively broken Connecticut River ecosystem at Northfield Massachusetts, you DO NOT SQUANDER THE OPPORTUNITY. Certainly not for those who come after…

* * * ALSO UPDATED: Please see the TWO latest FERC testimonies sent directly–and on-the-record to FERC, at the end of this post. * *

ALSO, tomorrow, TUESDAY, at 4 p.m., I speak with attorney Buz Eisenberg on: The Afternoon Buzz | Shows | WHMP 101.5 / 1240 & 1400 AM.


Some of my personal river heroes…

DON’T BE DIVERTED! A new, out-of-the-box, save our river “opportunity” is today being pedaled to the public by two non-profits–one of which has signed FirstLight’s non-disclosure agreement. It’s a vague, dangerous idea at this critical juncture–belatedly promising that a sleek state legal angle can magically be employed over the next year to rescue the Connecticut River at Northfield from another 50 years of ecosystem strangulation AFTER a FirstLight federal settlement deal has been sent along to FERC with state agency signatures.

Right now, the US Fish & Wildlife Service, Massachusetts Dept. of Environmental Protection, the National Marine Fisheries Service, and MA Div. Fisheries & Wildlife are meeting in secret negotiating sessions with Canadian-owned, Delaware LLC-registered FirstLight Power to try an ink a grizzly “settlment” agreement to relicense the deadly operation of the Northfield Mountain Pumped Storage Station for the next 50 years. They’d wanted to have a signed deal by now that they could forward to the Federal Energy Regulatory Commission for approval. But strident public protest to FERC appears to be keeping state and federal agents from caving-in to another half century of a strangled Connecticut River.

The people are denying FirstLight from getting its way here.

This just-launched, last minute, state-pressure ploy comes off as both ridiculous and self-serving. THIS HAS BEEN A DECADE-LONG FEDERAL PROCESS–the tail won’t be wagging the dog here in Massachusetts on this four-state river system.

Once the SECRET DEAL in this slogging 10 year FERC process is inked at the highest levels–there will be NO magic mechanism at the MA wetlands level that has a snowballs-prayer-in hell to retrieve this crippled river from another half century of venture-capital devastation at Northfield. New England’s Great River will continue on as the “nation’s best landscaped” DEADLY sewer” here in Massachusetts. MA Dept. of Environmental Protection is at the backroom table in this process! Let’s be honest here…

Believing the brutal disruption, chaos and massive aquatic killing by FirstLight’s Northfield Mountain can be legislated ONCE a closed-door settlement deal is signed with the federal/state agencies meeting with Firstlight, is irresponsible MAGICAL THINKING. Some are even clinging to the notion that FERC will make a ruling ordering that BILLIONS AND BILLIONS of dollars must be spent to site, engineer and build a whole new Northfield reservoir that would exclude the use of river water. Think about that! Who would do it? Who would pay? It’s just not possible–or true.

BUT ALAS! FL is being thwarted in their plans by citizen input sent directly to FERC, with new, on-the-record statements demanding no new license be issued for deadly operations at Northfield, not another half century wasting massive amounts of energy to pull our river into reverse–literally for miles, in a buy-low/sell high 50 year profit scheme here in the Massachusetts.

AGAIN, if you haven’t yet submitted testimony–or know of others who want to defend our River’s right to survive as a living system, here’s the FERC formula to share:

Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

* * * HERE IS JUST THE LATEST citizen testimony entered into the record at the Federal Energy Regulatory Commission:

Document Accession #: 20220125-5000 Filed Date: 01/25/2022
Andy Rothschild, Greenfield, MA.

Given the environmental challenges that our planet and its inhabitants face today and the increasing challenges that it will face over the next fifty years, it doesn’t make any sense to me to relicense the Northfield Station. The system requires more energy input to power itself than the energy that it will create. All the while, doing damage to the Connecticut River, its banks, and the fish within it. Please think long and hard about the damage
that would be done in the present and for the next crucial fifty years of our planet’s existence. Thank you.

Document Accession #: 20220124-5001 Filed Date: 01/24/2022
Anna, Arlington, MA.

I strongly oppose the relicensing of the Northfield Mountain hydroelectric plant. While shifting energy production to renewables is a pertinent step in battling the climate crisis, such a transition must be done in a manner that takes necessary precautions. This hydro plant reverses river flow and disrupts essential ecosystems of the Connecticut River. It is powered by
natural gas. These two facts alone are reason enough to reconsider calling this project “green” or, even remotely sustainable. The Connecticut River, home to globally significant tidelands and 10 federally threatened aquatic species, is a watershed that spans four different states: VT, NH, MA, and CT. An estimated 2 million people live in the CR watershed. It is with utmost importance that we protect the river, not further degrade it’s well-being. The Northfield Mountain hydro plant should therefore be denied
recertification.
Thank you.

Document Accession #: 20220121-5069 Filed Date: 01/21/2022
Christopher “Monte” Belmonte, Turners Falls, MA.

I live between the mighty Connecticut River and the Turners Falls Power Canal in a little island neighborhood called “The Patch.” The canal runs right past my backyard. I am a big believer in creating clean, fossil-fuel-free energy and I know that some of what First Light is doing is toward that end.
But it is unconscionable how much water is drawn from the river to keep the canal flush. I watch it go from a gorgeous raging river to a trickle from one day to the next, creating an ecological disaster for the aquatic life in that river. Specifically, the federally endangered shortnose sturgeon. Down the street from my house on the river at the so-called â€oeRock Dam†is one of
the best known, if not only, spawning locations of this endangered fish. And yet First Light continues to interfere with the flow of the river, even during spawning season. They might wipe out an entire species. And yet there is little to no acknowledgement of their risking ruining spawning year after year.

And no clear plan to stop under the new proposed license.
Further, the ecological disaster known as the Northfield Pump Storage station, which literally sucks the river flow backwards up to a mile away as it pumps, is also decimating what fish do manage to make it over their currently ineffective Fish Ladder in Turners Falls. While I’m pleased there will be a new way for fish to pass over the dam, until Northfield Mountain’s facility becomes a closed circuit, rather than a river sucking, fish massacring machine, First Light should not be granted a new license.
We have one chance left to save the shortnose sturgeon. If First Light is granted this license, as it is written, it’s game over for that federally endangered fish. This is a federal license. There is a fundamental disconnect in not doing our utmost to protect a federally endangered fish. And the disconnect between what good Northfield claims it provides, contrasted with
the uncountable millions of fish it is killing there each year is more than we who love our river can bear. Please reconsider this current license. Please make sure First Light is held to account and changes course before it changes the course of our river and its watershed.

More Connecticut River citizens’ defense

Posted by on 13 Jan 2022 | Tagged as: America's best landscaped sewer, American shad, Clean Water Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River blog, Connecticut River Conservancy, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, Endangered Species Act, EPA, ESA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, fish kill, Holyoke Co. v Lyman, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, Nation's best landscaped sewer, National Marine Fisheries Service, NMFS, NOAA, Northeast Utilities, Northfield Mountain, Northfield Mountain Pumped Storage Station, NU/WMECO, P-2485, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, US Fish & Wildlife Service

THE CONNECTICUT RIVER’S CITIZEN DEFENSE continues:
While FirstLight’s secret January license “settlement” talks continue–centered around leaky net ideas and spit-and-glue window dressing at Northfield Mountain, the public is demanding that its 50 years of devastation cease.

https://www.youtube.com/watch?v=ybwy8MBiy9I
* * NOTE: ABOVE is a link to a Wilbraham Public Library ecology lecture series I was asked to take part in last November. The title of my presentation was: “LIVING RIVERS FLOW DOWNSTREAM.” IT IS A KEY HISTORIC PERSPECTIVE to understanding why we live in a broken ecosystem… * *

https://www.gazettenet.com/my-turn-meyer-LastLightCtRiver-44127152

FirstLight led closed-door bargaining with state and federal fish and environment agencies are continuing here in MA, while an ongoing flood of citizen testimony to end Northfield Mountain’s license to kill continues at the Federal Energy Regulatory Commission.

THOSE DEMANDS–from no less than 77 people since November 13th, are also sending a very clear signal to the MA Division of Fish & Wildlife, MA DEP, the US Fish & Wildlife, and National Marine Fisheries Service:

DON’T SELL OUT New England’s Great River for another half-century!

* Read the latest public testimony targeting Northfield lethal ecosystem destruction entered into the FERC record further below.*

BUT FOR THE LONG VIEW, HERE’S A LITTLE ILLUMINATING HISTORY:

Only living rivers flow downstream. But that’s not what you find on the Connecticut River in the Commonwealth of Massachusetts. Here, 150 years after the US Supreme Court guaranteed safe upstream and downstream passage of migratory fish to and from New Hampshire and Vermont—and a full half century after the enacting of the Clean Water Act and Endangered Species Act, the Northfield Mountain Pumped Storage Station continues to chew-through, reverse and obliterate the key living ecosystem functions of New England’s critical central artery here in northern Massachusetts.

The grim prospects of allowing Northfield to be built were widely known by federal and state agencies half a decade before it began its deadly, net-power loss, river-reversing ecosystem damage. Here, from the same agencies that are today’s MA Fish & Wildlife, US Fish & Wildlife Service, and the National Marine Fisheries Service (the entities still publicly responsible for environmental enforcement and river fish protection), are their words from a key, signed, 1967 document:

“Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River Basin”

“Based on the present fragmentary data available on the Northfield Pump Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae, and young fish of both anadromous and resident species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water. Studies, designed to minimize the potential adverse effects to fishery resources, should be undertaken in development of the design for the Northfield Pump Storage Project. In related studies, fish screens, barriers and deflectors, and flow regimen must be thoroughly investigated.”

Those agencies’ inaction, their failure to protect–while instead indulging in a massive frenzy to recreate an extirpated salmon hybrid in place of a fish not seen here since 1809, proved disastrous for the river’s still-living fish runs and species in this four-state ecosystem. Today, absurdly, a deadly Northfield Mountain soldiers on, while—50 years later those same agencies dicker with foreign owners over emplacing a new band-aid of a barrier net—one full of holes, upstream of that deadly, river-reversing suction.

In the “library” at the Connecticut River Watershed Council—today’s “Conservancy”, there is a boxed, mid-1960s promotional document from WMECO/Northeast Utilities. NU is today does business as Eversource, the perennial chief sponsor of the Conservancy’s Source to Sea Cleanup. That half-century old box contains a glossy booklet promoting the future construction of a Northfield Mountain Pumped Storage Station. The booklet includes several scenarios and options to premise how of its net-loss power pumping operations might be deployed.

One of them was a glaring red flag for the river, its fish, and an entire ecosystem…

The Watershed Council HQ has a private library within…

THAT SHUTDOWN OPTION, never implemented, was that Northfield’s impacts would be so detrimental to the river and life cycles of its migratory fish that it would have to be shut it down during fish migration season. But here again, no watchdog ever emerged to stand up and fight for a living Connecticut River in Massachusetts. Basically, the only protection ever offered was a net to protect their mythical, teeny, hatchery-bred baby salmon, leaving all the river’s other species to fend for themselves.

Thus Northfield’s gargantuan and lethal water and fish appetite still strangles New England’s four-state ecosystem today. And, half a century later, those same public agencies are allowing a power company to dangle the grim bait of temporary fish barrier net before them once more.

ABOVE IS AN EPA-ORDERED “silt barrier” mandated to be kept in place at FirstLight’s Northfield intake after they were caught flagrantly and clandestinely dumping a mountain of muck directly into the river for over 90 days straight in gross violation of the Clean Water Act. Looking closely, you can see it has FAILED, its anchors useless, and its floats flapping in the breeze along the shoreline downstream of Northfield’s sucking intake. Photo taken 10/2/2010.

Even two years after Northfield came on-line the Federal Power Commission–today’s FERC, still had not been given answers to information they’ requested of WMECO–today’s Eversource, including describing flows on a reversing river. This is a Xeroxed document from FERC:

20010120-0656 FERC PDF (Unofficial) 09/10/2014: January 22, 1974, from the Federal Power Commission to WMECO:

Robert E. Barrett, Jr.,President.
Western Massachusetts Electric Company
West Springfield, Massachusetts 01089

Dear Mr. Barrett:
The Commission staff is presently preparing the Draft Environmental Impact Statement for the Turners Falls Project (No. 1889) and requests the following information:
(1) In the revised Fxhibit W of the application (page 43, second paragraph), reference is made to the continuing resident fish study being conducted in Turners Falls Reservoir. Please provide a copy of the results obtained since the last Progress Report. If the study has not been completed, please indicate the date you expect a report to be available.

(2) In Exhibit W (pages 19, 20, and Figure 5), the conditions expected to produce flow reversals in the Turners Falls ‘Reservoir as a result of Northfield operation were set forth. Since the Northfield Mountain Project became operational, which of the conditions described have been observed to produce reverse flows? Based on operational experience, are there any observed or anticipated changes in the patterns, durations, or velocities of the flows described therein? Your early response in providing this information would be appreciated.
Very truly yours,
Secretary

On October 16, 1974, WMECO’s lawyers finally replied in the negative to the Federal Power Commission’s questions, stating they still had not implemented the required study which would offer answers to questions about the impacts of reversing the flow of the Connecticut:

“Staff also inquired whether the Company had a study on the effect of hydrology caused by the pumping of Northfield Mountain project this year. The Northfield Licensees have not made a formal study but are accumulating data with respect to Pond elevations, flows and other operating data.”

EVERYBODY KNEW 50 YEARS AGO: yet nobody came to the Connecticut’s rescue…

BUT TODAY CITIZENS are standing up for the living river owed future generations. SEE BELOW for the latest entries into the FERC public record…

BUT FIRST, here’s how it can be done:
Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

HERE ARE THE LATEST:

Document Accession #: 20220111-5033 Filed Date: 01/11/2022
Elizabeth J Erickson, Colrain, MA.

As a long time resident of Franklin County I have for a long time been very concerned about the environmental and ecosystem destruction at Northfield mountain because of the power generating plant there. I have been following the research about the decline in fish populations in the Connecticut River nearby because of the turbines and am strongly opposed to the reicensing of the First Light hydropower plant there. I’m actually shocked that the relicensing is even being considered given all that is now known about how destructive the plant is. Please deny any future license of power generation of Northfield Mountain.

thank you,
Elizabeth Erickson
Colrain, Massachusetts

Document Accession #: 20220111-5005 Filed Date: 01/11/2022
John Hoffman, Shelburne Falls, MA.

I am writing to ask that you deny a continuation of the license for FirstLight Hydro Generating Company. The project began as a way to make use of excess power from the Vernon Nuclear Power Plant. That plant is now closed. This license is now simply a vehicle for FirstLight to use its capitol to make a profit.

That profit comes at the expense of the Connecticut River, one of the glories of New England, and the source of outstanding agricultural soils in the Connecticut River valley. Now that we possess a vastly more sophisticated understanding of river ecology, the damage to the river is elaborately documented.

By sucking large volumes of water out of the river and then disgorging them back, the company erodes the river banks which in turn damages water quality. The turbines through which water is sucked destroy aquatic life, from adult fish, to their young and down to their eggs.

This is a primitive way to treat a river. No company in our present era should be allowed to inflict such damage. This river is a part of the commonwealth of Massachusetts. We the citizens ask you to protect the invaluable ecosystem of our preeminent river and deny FirstLight its license.
Future generations will thank you.

Document Accession #: 20220111-5004 Filed Date: 01/11/2022
Molly Freeland, Gill, MA.

To whom it may concern,
I am a resident of Gill Massachusetts and I request that you do not let Northfield Mountain Pump Station renew their license. The pump station is killing all life it sucks up from the river. Millions of fish are dyeing every year, including endangered short nose sturgeon. The pump station causes major erosion in the river banks which then spreads pollution. The pump station is escalating climate change when we need to be looking to renewable energy sources. Please say no to the pump station for our children, grandchildren, all life and the planet.
Sincerely,
Molly Freeland

Document Accession #: 20220111-5002 Filed Date: 01/11/2022
Irma Lorraine Pearson, Greenfield, MA.

If we, residing in the Democratic heart of our country, cannot save the only large river we have, and all the life in it, we are putting our imprimature on the destruction of our planet for the sake of building private fortunes.

The cautionary tale of Midas and his gold works very well here.
Let’s try another path, of freeing the rivers of dams and reversals, and saving 50% of our ecosystem as wilderness.

The Connecticut River, Extinction Rebellion and its local connections…

Posted by on 03 Nov 2021 | Tagged as: cleanup, climate change, climate-scorching, Connecticut River, Connecticut River Conservancy, Connecticut River Watershed Council, Conte National Fish & Wildlife Refuge, Eversource, Extinction, Extinction Rebellion, Federal Energy Regulatory Commission, FERC license, FirstLight, Greenfield, ISO-NEW ENGLAND, Natural Gas, New Hampshire, Northeast Utilities, Northfield Mountain, Northfield Mountain Pumped Storage Station, NU/WMECO, pumped storage, river cleanup, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, US Fish & Wildlife Service, Vermont, Vermont Yankee

The Connecticut River, Extinction Rebellion and its local connections…

Photo Copyright © 2021 by Karl Meyer

…to EXTINCTION, EVERSOURCE, CLIMATE, FIRSTLIGHT, CO-2 and the “CONSERVANCY”

ON SATURDAY, NOVEMBER 6, AT 11:OO a.m., Extinction Rebellion demonstrators will take to the Greenfield Town Common to rally against the ravaging of the climate and the extinction of species through massive extraction and burning of fossil fuels. This comes exactly two weeks after the NO LICENSE TO KILL rally on the Common. That rally demanded FirstLight’s Northfield Mountain Pumped Storage Station not be issued a new decades-long license to continue killing hundreds of millions of fish and aquatic animals annually–while erasing all natural characteristics of a living river and functioning ecosystem in Massachusetts.

Counter to all common sense–and wildly contrary to popular belief, Northfield Mountain is an electricity consumer. It has been running primarily on climate scorching natural gas since its original electric power source–the Vermont Yankee nuclear plant, shut down in 2014.

In fact, looking at the sources powering the ISO-New England power grid this morning, November 3, 2021, Northfield has been laying waste to the river on 72% natural gas, another 11% imported nuclear from the CT and NH coasts, and 8% actual hydro (imported from Canada), plus another 8% from actual renewable sources. Thus, for the last SEVEN years since VY closed, this deadly electric machine has been a major source of CO-2 planetary waste and invisible climate destruction.

Northfield is a river-vacuuming electric toilet, parasitically-powering itself directly off the New England power grid to suck the life out of a 20 mile reach of the Connecticut daily, pulling it backward and uphill to a 4 billion gallon reservoir. That lifeless water is later released in thundering morning and afternoon pulses to become brief, peak-priced, second-hand electricity sold to us ratepayers as their deadly-profitable river offering.

Northfield is not what any thinking person would ever define as HYDRO POWER. Even the industry keeps it in a separate category–as it is actually a net-loss electric glutton that appears in negative percentages on the daily power grid. Nor can its deadly output ever be labeled “clean” or “renewable” energy, despite clever industry marketing.

So, when Extinction Rebellion appears on the Greenfield Common on Saturday–two weeks after the No License to Kill rally against FirstLight-Northfield, it bears pointing out that they will be assembling just yards away from the Connecticut River Watershed Council, today doing business as the Connecticut River Conservancy.


Connecticut River Conservancy’s HQ, adjacent to the Greenfield Common. Photo Copyright © 2021 by Karl Meyer

Just six weeks back the “Conservancy” had their 25th Source to Sea Cleanup—majorly and annually funded by none other than WMECO/Northeast Utilities–today doing business as Eversource. It was WMECO/NU that actually built FirstLight’s Northfield Mountain–the drop-dead, deadliest machine that continues operating today on an extended Federal Energy Regulatory Commission license (one that expired in 2018), right in the midst of the Connecticut River S.O. Conte Connecticut River National Fish & Wildlife Refuge and the platitudinous Connecticut River National Blueway here in Massachusetts. Lacking a real river watchdog and any enforcement of existing environmental law…those designations mean absolutely NOTHING.

Yesterday, November 2nd at polling booths in East Boston, citizens overwhelmingly voted to prevent Eversource from building a new natural gas pipeline in their city, citing climate impacts and lack of necessity. You see Eversource–the Conservancy/Watershed Council’s BFF for ages, is today a major natural gas company, having taken over Columbia Gas—famous for their pipeline explosions in Lawrence, and, just a few years back in Springfield MA, with its own major gas explosion, right downtown.

The Conservancy/Council’s ole buddy Eversource/WMECO/NU–through its long history of deep-pockets-funding and CRC Board memberships, is now planning to build a new natural gas pipeline extension through Longmeadow and into Springfield. It is another grim push toward a critically baking planet—one that Eversource expects to charge ratepayers $33 million to put in place. Currently, the City of Springfield has demands out for the accruing years and some $44 million in back taxes it says Eversource has not paid. Springfield citizens are now pushing back on the giving Eversource yet another free pass through town. Both East Boston and Springfield have long histories of community racial, economic and environmental injustice. This new natural gas monopoly angling appears to continue that legacy.


Photo Copyright © 2021 by Karl Meyer

So, No License to Kill, Extinction Rebellion, and a whole lot of people in Western Massachusetts and New England have plenty of reason to gather on the Greenfield Common on Saturday. There is injustice aplenty, green-washed and collaborated on between Eversource-NU-WMECO, FirstLight, the Conservancy, the Commonwealth of Massachusetts and the byzantine natural gas consortium… all of which all circle back to Eversource and its green-washing “friends”…

Did you help with CRC’s (EVER)Source to Sea Cleanup this September?? The Conservancy and FirstLight employees actually made a clever video together…
Now that’s collaboration!

A 2021 Brown University study named Eversource as MA’s largest energy spender against clean energy and climate legislation: https://ibes.brown.edu/sites/g/files/dprerj831/files/MA-CSSN-Report-1.20.2021-Corrected-text.pdf

Still with headquarters in Hartford, below is a CT list of their largely invisible holding and affiliate companies, etc–though their Columbia Gas ownership does not show up here:

The following companies operate as “wholly owned subsidiaries” of Eversource:
Connecticut Light & Power, Public Service Company of New Hampshire, PSNH Funding LLC 3, NSTAR Electric Company, Harbor Electric Energy Company, Yankee Energy System, Inc., Yankee Gas Service, NSTAR Gas Company of Mass.(EGMA), Hopkinton LNG Corp., Eversource Gas Transmission II LLC, Eversource Holdco Corporation, Eversource Investment LLC, Eversouce Investment Service Company LLC, Aquarion Company, Aquarion Water Company, Aquarion Water Company of Connecticut, Aquarion Water Company of Massachusetts, Inc., Aquarion Water Capital of Massachusetts, Inc., Aquarion Water Company of New Hampshire, Inc., NU Enterprises, Inc., IP Strategy LLC, Eversource Energy Service Company, The Rocky River Realty Company, Holyoke Water Power Company. Eversource has residual interest in nuclear plants they’ve sold: Seabrook NH and Millstone CT.

Part ownership in: Alps to Berkshires LLC, 50% in transmission line to NY State, 15% ownership in Algonquin Gas Transmission LLC, BSW Holdco LLC, BSW ProjectCo LLC, Bay State Holdco LLC, Bay State Wind LLC, Northeast Wind Energy LLC, North East Offshore, LLC, New England Hydro-Transmission Electric Company, New England Hydro-Transmission Corp. Eversource also has interest and ownership in companies that own and manage decommissioned nuclear plants they once owned, including: Connecticut Yankee Atomic Power Company, 65%, Maine Yankee Atomic Power Company, 24%, Yankee Atomic Electric Company, 52%. SOURCE: https://www.eversource.com/content/wma/about/about-us/doing-business-with-us/affiliates/list-of-affiliates

CONNECTICUT RIVER: maybe not left for DEAD after all

Posted by on 04 May 2021 | Tagged as: American shad, Anadromous Fish Conservation Act, Andrew Fisk, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River Watershed Council, Conte National Fish & Wildlife Refuge, CRC, Daniel McKiernan: Director MA Division of Marine Fisheries, Delaware LLC, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Julie Crocker, Kathleen Theoharides, MA Division of Fish and Wildlife, Martin Suuberg, Martin Suuberg: Commissioner MA Department of Environmental Protection, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Ron Amidon: Commissioner MA Dept. of Fish and Game, Source to Sea Cleanup, State of Delaware, The Greenfield Recorder, Traprock Center for Peace and Justice, US Fish & Wildlife Service, USFWS, Wendi Weber

CONNECTICUT RIVER: maybe not left for DEAD after all

Following the Great Earth Week Walk for River Survival to the Northfield Mountain Pumped Storage Project on April 24th, it’s been inspiring to see people publicly raising their voices to pull the grim, daily carnage of that power-hungry machine out from the shadows. One of particular insight was written by Susan Olmsted and appeared in The Recorder on April 30:
https://www.recorder.com/my-turn-olmsted-NorthfieldHydroStation-40211638 . Later, Ms. Olmsted relayed those same points into the public record of Federal Energy Regulatory Commission’s relicensing comments for the Northfield docket: FERC P-2485. Those are the routes to raising the public profile of our endlessly crippled River—its fate all but buried under confidentiality agreements and generations of inaction by the responsible agencies and so-called protectors. They all continue to lay low in a process that will decide our river’s ultimate viability for decades.


At the NMPS Intake. Photo Copyright © 2021 by James Smethurst

I again must thank the Traprock Center for Peace and Justice and Anna Gyorgy for organizing the event. Having written about this broken river for decades, and now having served on the Fish and Aquatics Study Team in this endless FERC process since 2012, it was an honor to speak up for the river with a caring and determined crowd in attendance. As I’ve noted to several people, last October I witnessed MA Energy Secretary Kathleen Theoharides and Watershed Council/Conservancy Director Andy Fisk launch a PR canoe tour for elected officials–directly upstream of the killer suction pipes of Northfield. In grim, self-serving fashion neither stepped up to the TV cameras or spoke with attendant reporters to proclaim, “This thing is our river’s greatest killer, it should be closed; this company, FirstLight, wholly re-registered these holdings out of state into Delaware as tax shelters two years back—they have no business here.” Shame on them both.

Watershed Council/CRC Director Andy Fisk, in vest, Chairs the Connecticut River Atlantic Salmon Commission 12/10/2018

BTW, we spoke at some depth on the Walk about the NU/Eversource building-of, and current massive connections to NMPS–and also the long-standing financial and Source to Sea greenwashing links between the Watershed Council/Conservancy and Eversource? Well, here’s a little late-breaking Eversource monopoly news: https://www.eenews.net/stories/1063731537

Personally, I would feel I’d failed our Great River, this ecosystem and coming generations had I never stood in front of this killer to bear witness to the truth. NMPS is a killer, and no configuration that leaves its grim sucking mouth open for ANY part of the year will retrieve it from being the most lethal machine ever deployed on the Connecticut. After so many years I am grateful that I had that opportunity–to stand up with other people and keep faith with our river–and link with those who will depend on its living waters in the future.


Revival Walk Crowd April 24, 2021 Photo Copyright © 2021 by David Keith

I don’t think a single person in attendance that day believes the snake-oil logic for continuing NMPS: that wasting massive amounts of energy to actually pull a river backward for miles–sucking 100s of millions of fish to their deaths as it wrenches its deadened water up a mountain, will ever be any kind energy “clean” or “green” solution on a heating-up planet whose ecosystems are unraveling. FirstLight’s will merely continue the laying-waste to our long-crippled river. It has nourished life here for millennia; they want to trade that in for their few hours of peak-priced energy.


MA Secretary of Energy & Environmental Affairs Kathleen Theoharides talks to the media–just yards away from Northfield’s deadly intake on a fluff PR tour on the river, October 2020. Photo Copyright © 2021 by Karl Meyer

It’s important to remember that this machine’s emplacement ran counter to one of the most significant landmark environmental decisions ever from the US Supreme Court, centered right here on the Connecticut River in 1872. In Holyoke Company v. Lyman the Court decided private operators of dams and facilities on the Connecticut—and thence, for all rivers, must provide safe upstream and downstream passage for migratory fish. Nearly 150 years later, this machine continues crushing millions of migratory fish—among them federal trust American shad, blueback herring and American eels. That killing occurs for eggs, larvae, juveniles and adult fish across the many months of their full migratory life cycles.

With the presence of a real watchdog, NMPS’s illegal presence never would have arisen here. There were decades to have sued for its shutdown. Today, neither its operation–nor FirstLight’s thin mitigation proposal to put up a partial, temporary net across its mouth annually that might spare some adult shad and eels from its suction just two months out of their killing year, even remotely passes the smell test for legal operation in a US Fish & Wildlife Refuge.

Raising public voices and flushing the buried dealings in this race-to-the-bottom FERC relicensing process is now the key to having some real impact in saving the Connecticut.

This Great River still feeds bodies and souls. It’s been struggling for well over half a century without an entity taking on the necessary mandate to “enforce” and take on the employ of a day-to-day legal team worthy of facing down predator corporations. This is an ecosystem destined to failure if citizens stay on the sidelines. But people are getting it; and standing up. Maybe this critical life-line of a river can be revived for the coming half century, to again nourish those of the future.

WORTH NOTING: Massachusetts and federal agency officials responsible for securing a living Connecticut River for your great, great, grand kids–upstream and down, through to Vermont and New Hampshire:

Kathleen Theoharides: Sec. of MA Energy & Environmental Affairs
Martin Suuberg: Commissioner MA Department of Environmental Protection
Ron Amidon: Commissioner MA Dept. of Fish & Game
Daniel McKiernan: Director MA Division of Marine Fisheries
Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA (endangered CT River shortnose sturgeon habitat)

GREAT CONNECTICUT RIVER SURVIVAL WALK DRAWS BIG MULTI-STATE CROWD

Posted by on 27 Apr 2021 | Tagged as: 1872, American shad, Bellows Falls VT, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Refuge, Conte National Fish & Wildlife Refuge, Daniel McKiernan, Delaware LLC, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, Haddam nuclear plant, Holyoke Dam, ISO New England, Julie Crocker, Kathleen Theoharides, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Martin Suuberg, Martin Suuberg:, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Millstone 1, National Marine Fisheries Service, National Marine Fisheries Service, net-loss power, NMFS, NOAA, Northeast Utilities, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, NU/WMECO, P-2485, PSP Investments, Public Sector Pension Investments, river cleanup, Riverkeeper, salmon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, State of Delaware, Treasury Board of Canada, Uncategorized, United States Supremed Court, US Fish & Wildlife Service, Vermont, Vermont Yankee

GREAT CONNECTICUT RIVER SURVIVAL WALK DRAWS BIG MULTI-STATE CROWD

Claire Chang of the Solar Store of Greenfield speaks to attendees. Note: see http://solarisworking.org/. Photo Copyright © 2021 by James Smethurst. All Right Reserved

Northfield MA. The biggest story on the 410-mile long Connecticut River this Earth Week did not center on yet another promo video or soft news story about people doing trash cleanups. It took place on Saturday, April 24th, when more than 70 people of all ages–from as far as Springfield, South Hadley and Northampton MA–all the way upstream to Putney VT, turned out for a 3-mile river walk to learn about the 50 years of devastation that the Northfield Mountain Pumped Storage Station has wrought on their four-state ecosystem.

THE DAY’S SPEAKERS BEARING WITNESS

Attendees heard from host, Traprock Center for Peace and Justice’s Anna Gyorgy, about the long, deep connection of this river killing to nearly 50 years of nuclear power excess and damages (www.traprock.org). They heard from Claire Chang of the Solar Store of Greenfield about alternative energy, solar installation and bulk storage alternatives to destroying whole ecosystems. And, I spoke at length about the long, grim and deadly history that has brought us to a crossroads for a living future for the Connecticut River vs. this massively violent machine.

WHERE THE RUBBER NEVER MET THE ROAD

What people heard about was that shutting up NMPS’s killer intake pipes is the only river cleanup that matters. Doing just that would have saved a now-crippled ecosystem–had there been an actual watchdog organization on the Connecticut in 1972–or again, when Vermont Yankee’s license expired in 2012. Those are the cleanups that would have spared an entire ecosystem, decade-upon-decade of this hide-in-plain-sight sucking wound.

THE LEGACY OF FAILURES

They learned the Commonwealth Massachusetts has endlessly failed this ecosystem, facilitating its exploitation to the detriment of 3 other New England states by not protecting it. And, that the federal and state fish agencies have failed it as well by first chasing, then never relinquishing, their long-failed salmon experiment, for a fish not seen here since 1809. And also that the NGO claiming guardianship here since 1952, massively failed New England’s River–never stepping up to challenge and prosecute the devastation of the power companies, nor calling out or suing government agencies charged to protect it under state and federal law.

LANDMARK SUPREME COURT DECISION 1872: HOLYOKE CO. v. LYMAN

Living rivers do not flow backwards. People walked a mile and a half to the intake pipes of a deadly machine that has laid waste to billions upon billions of fish across a half century—literally suctioning them to death while pulling miles of river current into reverse. Folks learned that building of this net-power-loss, river-gorging appliance and the deadly impacts it created on migrating fish, particularly American shad—actually flew in the face of the 1872 landmark Supreme Court decision in Holyoke Company v. Lyman, a full century before NMPS was built. Given that law, it had no right to exist here at all.</strong>

Photo Copyright © 2021 by Robert Flaherty All Rights Reserved.

What did that landmark decision require of dam system owners and private companies operating on the Connecticut–and on all rivers of the United States a century and a half ago? It said all must provide safe fish passage, upstream and down of their facilities, as “public rights.” Visitors also learned that the Canadian owners of this 365-day-a-year slicing machine want only to provide a flimsy net, part way across its killer mouth, for just over two months out of the year. That will largely leave the eggs, larvae and juveniles of most species—including migrants, in full peril. Names of agency leaders charged with saving the river for our grandkids were supplied.

NOTE:text below derives from a The GREAT RIVER WALK handout

NO NEW LICENSE TO KILL: THE NORTHFIELD MOUNTAIN PUMPED STORAGE STATION: A HALF CENTURY OF WASTE, DEATH AND ECOSYSTEM DESTRUCTION.</strong> Notes from Karl Meyer, FERC relicensing Stakeholder and Intervener since 2012

To COMMENT: Federal Energy Regulatory Commission Project License P-2485 (www.ferc.gov E-comments) Include your name, address, project # P-2485 and a brief. specific remedy for FERC to apply.

Owner:venture-capital firm PSP Investments, a Canadian Crown Corporation.
Operating in MA as: FirstLight Power Resources.
Current tax sheltering llc registration since 2018 out of MA & New England: in Dover, Delaware

NMPS is an energy consumer. It has never produced a single watt of virgin electricity. Every day this machine consumes huge pulses of electricity from the power grid to suck massive gulps from the Connecticut backward and uphill for hours on end at a rate of up to 15,000 cubic feet per second(cfs). That sucking pulls the Connecticut backward at times for over 3 miles downstream. SOURCE: FERC P-2485 relicensing Study 3.3.9 appendices.

This is not a hydropower plant; it is an energy wasting machine operating exactly like an electric toilet. It runs on imported electricity, profiting on the buy-low/re-sell high model.

RUNNING BACKWARD FOR DECADES

**VIEW Federal Power Commission document with link HERE FPC 1974 flow reversals

That 15,000 cfs is the equivalent of 60, seven-bedroom mansions being swallowed each minute, for hours on end—with everything from tiny fish eggs to full sized American eels obliterated by its turbines. Twenty-four species are subject to that suction. For shad alone it’s estimated that over 2 million juveniles and 10 million eggs and larvae die here annually. That’s just one species. How many billions of fish die annually, across all species—and now across 49 years? A fixed, monitored, year-round barrier screen, fully across its mouth was required.

NMPS then later sends that deadened water back down in peak-priced pulses for a few hours in the morning and afternoon at up to 20,000 cfs. A living river goes in, all that comes out is dead. The Northfield Mountain Pumped Storage Station does its killing in the heart of the Silvio O. Conte Connecticut River National FISH & Wildlife Refuge. This Canadian company is operating in the heart of a four-state ECOSYSTEM, crippling and pulling it apart daily. It should be relegated to rare emergency use.

The scheme to pair this eviscerating machine with future ocean wind is a nightmare—fully a Greek tragedy. Ocean wind sent to kill its river babies. Future generations require a living river.

Energy should be consumed close to where it is produced. That is where the load is. In New England that load is at the coast. Large-scale compressed air plants can be built at New Bedford, Everett, Boston, Somerset and Middltown RI for large-scale wind energy storage. If FERC allows massive LNG export farms to be built at the coast, it can require space for “local” energy storage—right near all those current “natural” gas tank farms of today.Storage needs to be adjacent to those metro cities where it is consumed. That battery storage can be constructed is a given.

In the age of Climate disruption the goal of an electricity network–one safe from mass outages due to cyber attacks and wind and flood events–disrupting the current corporate mega-grid built for huge area energy relays, should be micro-grids and distributed generation.

That decreases vulnerability and will encourage CONSERVATION—never mentioned by the Federal Energy Regulatory Commission or ISO-New England. That is the formula that begins to tackle climate disruption. It is time for Re-Regulation of the power grid. It is time for TRANSPARENCY in the Commonwealth’s energy policy–done behind closed doors with monopoly capital interests running the ISO-NE and NEPOOL table, while excluding even journalists from meetings. This plant squeezes the life out of approximately 1-1/2 billion gallons of Connecticut River water daily—its deadened re-sale power for export—for “load” consumers far from the small towns and cities of this 4 –state ecosystem.

NMPS was built by WMECO/Northeast Utilities(NU) to run off the bloated excess juice of their Vermont Yankee nuclear plant, 15 miles upriver. VY closed forever in 2014. NU today remains massively wired into and out of this facility’s energy resale loop. Today NMPS deadly consumption continues on 50% climate scorching natural gas, 25% nuclear from NH and CT, and 10% actual hydropower from Canada.


The massively fouled Connecticut River and NMPS’s intake tunnels on September 6, 2010. Photo Copyright © 2021 by Karl Meyer

In 2010 NMPS choked on its own effluent, and unexpectedly did not run for over half a year after fouling its massive tunnels with silt and muck. Shut down from May 1st thru early November– after being hit with a “cease and desist” order from the EPA for secretly and illegally dumping that grim effluent directly into the Connecticut for months, in gross violation of the Clean Water Act. Nobody lost power during NMPS’s surprise shutdown for over half a year. That’s despite arguments from grid operator ISO-New England about how necessary its killer, daily re-sale juice is to keeping the lights on. Even during record-breaking summer heat in 2010—when VT Yankee even shut down for refueling, the power grid held together just fine.

What did happen in the 4-state ecosystem—quieted without Northfield’s massive disruption, was that dismal fish passage for American shad just downstream at Turners Falls dam shot up 800% above yearly averages for the previous decade. That was the ugly decade when NMPS began operating differently—after Massachusetts decided to deregulate electricity markets.

NMPS is an ecosystem-crippling, anti-gravity machine, gobbling vast amounts of energy to send a river into reverse and uphill—a buy-low/re-sell-high, cash cow regenerating set-up.

This machine is a crime against nature.

At a time when the planet is dying, you revive ecosystems. This river belongs to our grandchildren and the future, not to greedy foreign investment firms. The corporate concern here is merely the weight of water—live fish and living rivers are nuisance expenses. What would suffice here would be a bunch of pulleys and a giant anvil, like a Roadrunner cartoon. Stop killing the future for our kids.

ORIGINAL OWNER/BUILDER: WMECO/Northeast Utilities—completed in 1972 to run off the excess electricity from its sister plant, Vermont Yankee nuclear station, completed in 1972. NU also had ownership in VT Yankee. Today NU/Northeast Utilities is “doing business as” Eversource. Eversource remains massively wired into and out of NMPS/FirstLight facilities.
Eversource/NU never left us. They just decided to dump their creaky and massively-fined nuclear plants at Millstone and Haddam, to become a bigger, more concealed monopoly. What they did was transfer emphasis to T & D–Transmission and Distribution. They would make their bucks by CONTROLLING THE ENERGY TOLL ROAD. Note the massive new wire structures and the some 18-line-long laundry list of charges on your energy bill for simply for T & D. They have as yet not figured out how to get a kick back for delivering STATIC ELECTRICITY.

Eversource is perennially green-washed through its major-money sponsorship of the Connecticut River Watershed Council/Conservancy’s “Source to Sea Cleanup.” NU/Eversource and the Council (founded 1952) have a long, close, deep-pocketed history. Thus, this green-washed, river-killing apparatus has been quietly-enabled for decades.

A 2021 Brown University study named Eversource as MA’s largest energy spender against clean energy and climate legislation: https://ibes.brown.edu/sites/g/files/dprerj831/files/MA-CSSN-Report-1.20.2021-Corrected-text.pdf

The following companies are now in business as “wholly owned subsidiariesof Eversource:
Connecticut Light & Power, Public Service Company of New Hampshire, PSNH Funding LLC 3, NSTAR Electric Company, Harbor Electric Energy Company, Yankee Energy System, Inc., Yankee Gas Service, NSTAR Gas Company of Mass.(EGMA), Hopkinton LNG Corp., Eversource Gas Transmission II LLC, Eversource Holdco Corporation, Eversource Investment LLC, Eversouce Investment Service Company LLC, Aquarion Company, Aquarion Water Company, Aquarion Water Company of Connecticut, Aquarion Water Company of Massachusetts, Inc., Aquarion Water Capital of Massachusetts, Inc., Aquarion Water Company of New Hampshire, Inc., NU Enterprises, Inc., IP Strategy LLC, Eversource Energy Service Company, The Rocky River Realty Company, Holyoke Water Power Company. Eversource has residual interest in nuclear plants they’ve sold: Seabrook NH and Millstone CT.

Part ownership in: Alps to Berkshires LLC, 50% in transmission line to NY State, 15% ownership in Algonquin Gas Transmission LLC, BSW Holdco LLC, BSW ProjectCo LLC, Bay State Holdco LLC, Bay State Wind LLC, Northeast Wind Energy LLC, North East Offshore, LLC, New England Hydro-Transmission Electric Company, New England Hydro-Transmission Corp. Eversource also has interest and ownership in companies that own and manage decommissioned nuclear plants they once owned, including: Connecticut Yankee Atomic Power Company, 65%, Maine Yankee Atomic Power Company, 24%, Yankee Atomic Electric Company, 52%. SOURCE: https://www.eversource.com/content/wma/about/about-us/doing-business-with-us/affiliates/list-of-affiliates

RESPONSIBLE FOR SECURING A LIVING RIVER FUTURE FOR OUR KIDS:

Kathleen Theoharides: Sec. of MA Energy & Environmental Affairs
Martin Suuberg: Commissioner MA Department of Environmental Protection
Ron Amidon: Commissioner MA Dept. of Fish & Game
Daniel McKiernan: Director MA Division of Marine Fisheries
Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA

It is time to break up the monopolies, re-regulate energy in Massachusetts for our children’s sake—and:RESTORE the CONNECTICUT RIVER ECOSYSTEM.

A Connecticut River return to the bad old days?

Posted by on 18 Oct 2020 | Tagged as: American shad, Cabot Woods, Clean Water Act, Connecticut River, Connecticut River Conservancy, Connecticut River riverbank failure, Connecticut River shortnose sturgeon, Endangered Species Act, Eversource, Farmington River, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FirstLight, FirstLight Power, Greenfield Community College, Northeast Utilities, Northfield Mountain Pumped Storage Project, pumped storage, Relicensing, Rock Dam, Rock Dam Pool, Society of Environmental Journalists, Source to Sea Cleanup, The Recorder, The Revelator, Turners Falls, Turners Falls dam, Turners Falls power canal, Uncategorized, US Geological Survey's Conte Fish Lab, Vermont Digger, Vernon Dam Fishway

The riverbanks at Rock Dam
Photo
Copyright © 2020 by Karl Meyer

Note: the following piece appeared recently in VTDigger, www.vtdigger.org, https://vtdigger.org/2020/10/18/karl-meyer-a-connecticut-river-return-to-the-bad-old-days/ and in the The Recorder, www.recorder.com, (no story link posted)

                        A Connecticut River return to the bad old days?

Copyright © 2020 by Karl Meyer All rights reserved

On September 1st, FirstLight Power petitioned the Federal Energy Regulatory Commission for a 3rd delay in submitting final license applications to run Northfield Mountain Pumped Storage Station and their Turners Falls hydro sites in Massachusetts. In a process now in its 9th year, the Canadian-owned company wants 4 more months to restudy NMPS’s water release impacts on endangered tiger beetles 30 miles downstream. It was bad news capping a dismal year for a Connecticut River that’s not seen any semblance of natural flows in the Bay State for half a century.

Despite recent on-air, print and social media stories of cleanup heroism, secret swimming holes, baby lamprey rescue and adult lamprey barbecues, our river seems headed back toward its time as “the nation’s best landscaped sewer.”

In August hundreds of thousands of gallons of raw sewage overflows enter its main stem, fouling it from Springfield to Middletown CT. In June, for the second time in a year, toxic PFAS entered waterways at Bradley Airport triggering fish consumption warnings and menacing water supplies on the Farmington all the way to its meeting with the Connecticut. A year ago–almost exactly 19 years after a factory spill killed thousands of North River fish, that grizzly Colrain kill was replicated when sulfuric acid again flowed from that site into that same tributary. 

In Vermont this year structural problems at Vernon Dam likely led to the big downturn in American shad reaching central New England. At Vernon this spring structural problems at that fishway likely led to the big downturn in American shad passing upstream there to central New England. The partial blockage might have been caught–and repaired, had two students downriver at Greenfield Community College fulfilled their weekly fish counting obligations. Important tallying, via downloaded video, just didn’t happen–leaving the problem at Vernon Dam undetected for a full migration season.

Meanwhile in Turners Falls riverbanks were collapsing—some oozing grim puss that’s leaching to the most endangered habitat in the ecosystem. The Rock Dam is an in-river ledge that’s provided refuge to federally endangered shortnose sturgeon for centuries. It’s their sole documented natural spawning site. Pink-orange slurry has been flushing from the banks there for a year–running into the river’s cobble bed where early life stage sturgeon shelter and develop.

A red slurry enters the Connecticut at the Rock Dam
Photo
Copyright © 2020 by Karl Meyer

Visitors to the river at Rock Dam off “Migratory Way” in Cabot Woods will see a 30 foot hemlock and saplings being eaten by a sinkhole now big enough for a Mini-Cooper. Banks there slump to a series of nasty, yards-wide, gashes—one with a dumped tire in its center. Slime squeezing from them sloughs in weeping riverlets that flow the final few yards to the river’s sturgeon nursery as a rusty precipitate of oxidizing iron, manganese and other unknown agents. In a drought year, the adjacent muck-choked canal is clearly the destabilizing water source.

Upriver failing FirstLight banks are threatening Millers Falls Road and houses on a buff there. Pipe failure is said to be a culprit. The town made expensive repairs, dumping rubble on that hillside at a sharp river curve called The Narrows. Failures at such nearby sites might merit closer examination. The Narrows is where current pushes against the outer riverbanks–a classic place for surging water to create erosional impact. Northfield Mountain creates big suck-and-surge cycles just 4 miles upstream–sending down powerful pulses that cause daily 3 foot “tides” at Turners Falls Dam. Some can reach 9 feet.

NMPS was completed in 1972 by Northeast Utilities. Rebranded as Eversource and now expanding into natural gas, they are still New England’s grid monopoly and perennial major sponsor of the Source to Sea Cleanup. NMPS is a now 48 year-old FirstLight holding, but still sending its surges down the Narrows to that dam. There, they get shunted into the power canal, ultimately exerting pressure against its massively muck-choked outer bank–adjacent and just 400 feet from those dissolving banks at Rock Dam. Ironically, any flow the canal can’t swallow gets flushed over the dam in channel-ramping surges to the starved, oft-empty riverbed below. That parch-and-flood cycle further impacts Rock Dam’s shores; then heads to endangered Puritan tiger beetle habitat 30 miles away.

The muck-choked outer bank of the drawn-down Turner Falls power canal on Sept. 14, 2020 Photo Copyright © 2020 by Karl Meyer

The US Geological Survey’s Conte Anadromous Fish Research Center sits 250 yards from Rock Dam. Shortnose sturgeon and their critical Rock Dam pool were extensively studied by their researchers there for decades. Now debased and failing, it is ignored. What about the Endangered Species Act, the Clean Water Act? That lab sits on a bank opposite Greenfield, home to the 68 year-old, recently-rebranded Connecticut River Conservancy. Why isn’t CRC testing that Rock Dam slurry at their water lab? Have they sent any slime samples out for analysis? Where’s their Streambank Erosion Committee? Why would a federal lab abandon the long-term endangered species research site at its door?

As self-described champions of “Science for a Changing World” and “Healthy habitats,” neither has steered a reporter or video crew to that elephant in the room. Perhaps it’s their admission of powerlessness. CRC, dependent on various federal and state fish and environmental agencies for grant monies won’t likely be calling out their failures anytime soon. They have no enforcement mandate and employ no staff lawyers. Thus they never challenge the big dogs, and power companies know it.

If a river could talk I think it would say cleanups look nice, but they won’t save rivers. That requires an unencumbered 21st century organization—one with lawyers and an enforcement mandate corporations can’t ignore.