Fish Futures on a Broken River

Posted by on 04 Nov 2017 | Tagged as: 5-year FERC licensing process, American shad, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, Daily Hampshire Gazette, Dr. Boyd Kynard, Endangere Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, fish passage, Holyoke Fish Lift, National Marine Fisheries Service, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Station, PSP Investments, Rock Dam Pool, Rutland Herald, shad, Shortnose Stout, shortnose sturgeon, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, USFWS, Vermont, Vermont Digger

Copyright © 2017 by Karl Meyer, All RIGHTS RESERVED

FISH FUTURES ON A BROKEN RIVER

(NOTE: the following appeared in The Rutland Herald, wwww.rutlandherald.com, and on the pages of Vermont Digger, www.vtdigger.org in October)

It’s been decades since migratory fish on New England’s Great River got a break–bleak since deregulation came to federally-licensed electricity plants on the Connecticut beginning in 1998.

Deregulation turned a regional market into a venture capital free-for-all, opening the door to speculators and foreign interests controlling public resources. In less than 20 years the Vernon hydro station changed hands three times. The Vermont Yankee nuclear plant next door is currently courting a third owner. Downstream the Northfield Mountain Pumped Storage Station and Turners Falls hydro complex flipped four times between investors. Further south, the Holyoke hydro station sold only once in 2002.

None of this proved healthy for an ecosystem.

The post-deregulation decade saw a steep slide in American shad passing Holyoke Dam. After two decades of averages well above 300,000 fish, yearly numbers plunged to near half that—a far cry from the 720,000 passed in 1992. Things were even more desperate at Turners Falls Dam. There, impacted by the massive water appetite and violent, peaking flows sent downstream by the Northfield Mountain Pumped Storage Station, passage dropped below 1% some years. For a decade, just 3 or 4 migrating shad in 100 were tallied emerging alive upstream. Today’s numbers languish near 1980s levels.

The federal license signed by Holyoke Gas & Electric in 2002 required they complete lift improvements at Holyoke by 2008 to pass endangered shortnose sturgeon upriver. Sturgeon were literally unable to spawn–blocked at that dam from reaching their only documented natural spawning site, a fail-safe refuge known as the Rock Dam Pool at Turners Falls. Year-in, year-out, that mandate went unenforced. It was finally met last year.

(Note: below, the flow-starved CT in Turners Falls looking downstream toward Rock Dam.CLICK, THEN CLICK AGAIN TO ENLARGE)

In 2004 federal fish biologist Dr. Boyd Kynard handed results of 15 years of Connecticut River shortnose sturgeon research to the National Marine Fisheries Service. He and colleagues had documented that that Rock Dam spawning site for the only federally-endangered migratory fish on the river was being decimated by industrial practices. Yearly gatherings failed for the few dozen spawning-ready sturgeon surviving upstream of Holyoke—as they attempted to continue a tenuous 200 million year-old genetic line. But NMFS didn’t come to their aid; no watchdog intervened.

Ultimately, decades of research by Kynard and company was compiled into Life History and Behaviour of Connecticut River Shortnose and other Sturgeons, published by the World Sturgeon Conservation Society. After experts at the Europe-based WSCS published the book in early 2012, the US Geological Service (where Kynard retired as a federal fish scientist) began making belated objections, halting all publication for a time. Their objections caused a de facto embargo of its sale in the U.S through that spring.

USGS cited editorial and style concerns in “recalling” three chapters on sturgeon biology and spawning—including the data and text showing industrial flows caused spawning failure at Turners Falls. Nearly a dozen state, federal, and university contributors to the book cried foul, citing censorship and the public’s right to government information. In June, concurrent with press inquiries and a letter from Congressman John Olver questioning the withholding of public science, USGS suddenly withdrew all its objections—days before an article highlighting the issues appeared in The Daily Hampshire Gazette. Federal agencies now had the facts. Yet despite the Endangered Species Act, none took action.

In spring of 2014 a popular beer, Shortnose Stout, debuted in the region. Its label displayed Kynard’s website and highlighted spawning conditions at Turners Falls. The Connecticut River Watershed Council soon stepped up to collect donated profits from its sale, yet those sturgeon were left hanging once more. Today conditions at Rock Dam remain as ruinous as when the first 2004 findings were released.

In 2015 the controversial chapters from Kynard’s book got entered into the public record in the current Federal Energy Regulatory Commission’s relicensing process for Northfield Mountain and Turners Falls. With that science on the record, things changed at federal proceedings. Sturgeon spawning became a key factor in flow discussions for future FERC licenses there mandating river conditions. This June, new restoration targets to meet failed 50 year-old federal Anadramous Fish Conservation Act requirements were released by the US Fish & Wildlife Service. With passage failed for half a century at Turners Falls, new shad targets mandate 397,000 fish passing annually. New owner, Canada Public Pension Investments, will be on the hook to build lifts and safeguard sturgeon spawning.

In August a fisherman near Vernon landed an endangered shortnose sturgeon–a fish thought not to exist above Turners Falls. He took a photo and released the fish, sending the picture to officials who confirmed it; then forwarded it to the National Marine Fisheries Service. There is reason to believe that landing may not be an isolated occurrence. NMFS is taking the confirmed capture seriously. Is a remnant shortnose population clinging to life in Vermont and New Hampshire waters? Did someone release them there? Either way, federal law requires owners at Vernon Dam, VT Yankee and Northfield Mountain to protect the migratory fish of the United States as a public trust. After decades of speculation, it’s high time our fish had their day.

NOTE: author Karl Meyer was the idea-creator and author of the beer brand Shortnose Stout. He neither requested or received any compensation or recognition for his work, which was solely aimed at getting important information to the public.

Shortnose Sturgeon Revival Celebration

Posted by on 20 Apr 2017 | Tagged as: Connecticut River ecosystem, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, endangerd shortnose sturgeon, Endangered Species Act, Rock Dam, Rock Dam Pool, Shortnose Stout, shortnose sturgeon, Turners Falls, Turners Falls power canal

Shortnose Sturgeon Revival Celebration, Sunday, April 23, 10:30 am – 12:30 pm
(Click, then click again to enlarge.)

Spring 2017 marks this species’ first free-swimming access from below the 1849 Holyoke Dam to its ancient, upstream Rock Dam spawning site in Turners Falls in 168 years! Join Amherst sturgeon expert and author Dr. Boyd Kynard and environmental journalist Karl Meyer for a visit to the Rock Dam in Turners Falls. The Rock Dam is the only documented natural spawning site for the federally-endangered shortnose in the Connecticut River ecosystem. Kynard covers this ancient creature’s life history and biology. Meyer covers the human and natural history of the spectacular Rock Dam site. Involves a short walk; steep dirt paths. Wear sturdy shoes.

Sunday, April 23rd, 10:30 a.m.–12:30 p.m. Rain or shine; no pre-registration required.
Directions: Cross the 11th St. Bridge in Turners Falls; at first stop sign turn left down G Street. Meet at public lot at end of G Street, just before the entrance sign for the US Conte Fish Lab.

CAN NEW ENGLAND’S GREAT RIVER SURVIVE MORE DECADES OF PUMPED STORAGE GENERATION?

Posted by on 12 Mar 2017 | Tagged as: 5-year FERC licensing process, American shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Dr. Boyd Kynard, ecosystem, endangerd shortnose sturgeon, EPA, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC licensing process, FirstLight, Montague Reporter, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Vermont Digger, vtdigger.org, WBUR

NOTE: The following piece first appeared on the website of vtdigger.org in late February. It also appeared in print in the Montague Reporter, montaguereporter.org in early March.

Copyright © 2017 by Karl Meyer

Can New England’s Great River survive more decades of pumped storage generation? Long-term FERC licensing could lock out new river-sparing energy storage choices.

Dr. Boyd Kynard, retired federal expert on the Connecticut River’s migratory fish and endangered shortnose sturgeon, tells a story about bass fishing in Massachusetts around 1990. He was drifting near the French King Bridge, a mile downstream of the Northfield Mountain Pumped Storage Station’s subsurface tunnels when he glanced up and realized his boat had switched directions. It was being pulled upstream, “And at a pretty good clip.” Turbines at that Northfield MA plant had sucked New England’s river into reverse for at least a mile. This was nothing new, save that in this instance there was a daytime witness.

October 2, 2010, EPA ordered dredging at the site of Northfield Mountain Pumped Storage Station’s underground suction tunnels on the Connecticut.(CLICK TO ENLARGE, THEN CLICK AGAIN.)

In December a radio feature from Boson’s WBUR entitled “New England’s Largest Battery is Hidden Inside a Mass. Mountain” was rebroadcast widely in the Northeast. Referencing Ben Franklin, James Bond, even the Bat Cave, it painted a rosy future for the 1200 quick-start megawatts stored in a reservoir at the Northfield Mountain Pumped Storage Station. Roaring turbines were noted as company spokespeople staked claim to the plant’s “green” future as they bid to lock-in a new 50 year Federal Energy Regulatory Commission license. The occasional ring of an old phone connected directly to ISO New England–the grid’s “independent system operator,” was described as “the sound of money.”

Altogether missing in that story was NMPS’s violent mining of the Connecticut River. That ecosystem artery was never identified as the sole water source enabling it to regenerate electricity. Prior to Northfield construction the Connecticut had forever run seaward from the Canadian border to the tidal zone near today’s Hartford, CT. But 12,000 years of New England natural history changed in 1972, on the day NMPS came on line.

On January 22, 1974, two years after it began operation using overproduced nuclear megawatts then available on the grid at night to fill a 5 billion gallon reservoir, the Federal Power Commission (today’s FERC) notified Western Massachusetts Electric Company it required their “earliest response” on Northfield’s impacts for a Draft Environmental Impact Statement: “Since the Northfield Mountain Project became operational, which of the conditions described have been observed to produce reverse flows?” WMECO’s lawyers belatedly replied on October 16, 1974, they didn’t have the information. Questions about environmental impacts and reversing rivers went unanswered.

In 1967 a federal Connecticut River migratory fisheries program to restore American shad to historic upstream reaches in Vermont and New Hampshire got underway. That same year the embattled Connecticut River shortnose sturgeon was listed under the Endangered Species Act. Exactly fifty years later recovery goals for hundreds of thousands of spawning shad and thousands of shortnose sturgeon remain utterly unfulfilled. Spawning habitat access for both are impacted by Northfield’s suck and surge flows, which also create daily bank-eroding 4-foot “tides” along this reach, sometimes reaching to 10 feet.

Pictured in a less glowing light, NMPS is a 45 year-old dinosaur–a formerly nuclear-powered, net-loss energy transfer machine hacked out of the bowels of a mountain. With the region’s nukes now shuttered, it runs daily on imported electricity and has never produced a watt of virgin power. Today it’s a quick-start, high-profit operation relying on boatloads of fossil-fueled megawatts purchased in bulk on the wholesale market. Suctioning the river uphill, it later releases those waters down through its turbines in dense pulses—pumping out 25 percent less juice than the virgin power it consumes.

NMPS is not renewable energy, nor anything resembling the public’s idea of hydropower. It reproduces just a fraction of New England’s power at peak times, and peak prices, but can only generate for eight hours maximum. After that it is literally dead, its reserves spent. The Canadian-owned plant must then start consuming juice by reversing its turbines anew, yanking the river backward, sideways, and a mile uphill for hours into its reservoir.

That pumping occurs nightly at rates of up to 15,000 cubic feet per second. Picture 15,000 milk crates filled with a living river–every second for hours at a time. For more than two-thirds of the year the Connecticut’s “natural routed flow”—the water moving into and through this reach, is less than 15,000 cfs. Thus this plant is consuming more water than is entering the river. That’s how to turn an ecosystem on its head. The result is the evisceration of all manner of aquatic life, juiced twice through those turbines—tens of thousands of resident and migrating fish, millions of developing eggs, and their young. There’s nothing more violent you can do to a river.

Now the Canada Public Pension Investment Fund—latest in the decade’s revolving door of four different venture-capital owners of the FirstLight Power Resources-branded plant, is angling to lock those ecosystem assaults in place for another half century through the Federal Energy Regulatory Commission’s 5-year hydro relicensing process.

In its planning stages one model would’ve required Northfield to shut down during fish migration season due to impacts. That didn’t happen. Still, a chance experiment in 2010 gave a belated glimpse of those potential benefits. For half a year, from mid-spring through a hot summer into early November, NMPS sat broken, sanctioned and off-line. But seven miles downstream the migrating shad normally impacted by its violent suck-and-flush flows made great and unexpected gains in tandem with that spring break. Having languished for decades, the federal program to move American shad upstream into Vermont and New Hampshire saw a stunning boost at Turners Falls Dam. Shad passage jumped over 700 percent above the previous ten year average–16,440 shad swam past the dam in 2010, compared to the 2,260 annually over the previous ten years. Though meager, it was by far the best result since MA energy deregulation came to the NMPS reach of river in 1999.

The 5 billion gallon Northfield Mountain Pumped Storage Reservoir, as it sat emptied and idle from May 1st through early November 2010.
(CLICK TO ENLARGE, THEN CLICK AGAIN.)

On that May 1, 2010, NMPS had choked on the tons of silt and eroded riverbanks it constantly sucks into its reservoir. In attempting to clear that mucked-in lake a mile of mud-slumped tunnels resulted. Desperate, they began dumping it directly into the Connecticut at a rate equaling 30-40 dump truck loads a day. FirstLight’s sludge turned a mile of river brown for weeks. A contractor died when a suction hose broke loose.

One of thousands of dump truck loads of sludge the EPA ordered FirstLight to dredge back out of the Connecticut River. (CLICK TO ENLARGE, THEN CLICK AGAIN.)

Severe thunderstorms on May 27, 2010 resulted in tens of thousands of western New England power outages, many lasting for days. Yet as a back-up energy plant, Northfield’s sole output that week was more of the 45,000 cubic square yards of muck they’d eventually dump directly into the river. They succeeded for over 90 days, until they got caught. On August 10, 2010, the EPA issued a cease-and-desist order citing FirstLight for “polluting the navigable waters of the United States” under the Clean Water Act.

Major dredging operations continued for months at Northfield where FirstLight had dumped their sludge in the Connecticut for 90 straight days.(CLICK TO ENLARGE, THEN CLICK AGAIN.)

Throughout NMPS’s half-year off-line–and record-breaking summer heat in the Northeast, the purportedly ever-hungry, ever-fragile grid ISO New England claims makes Northfield’s dense, quick-start functions so indispensible, never faltered or failed—not even when the nearby( now closed) Vermont Yankee nuclear plant went down in June to refuel.

NMPS’s main claim to its indispensability came 14 years ago during the 2003 August Blackout. Its quick start power was employed by ISO New England to smooth out Massachusetts’ reconnection to the New York sector of the Northeast’s mega-grid—which had failed due to a computer glitch in Ohio. That sprawling network would have been reenergized regardless, but Northfield’s dense energy provided a convenient assist and made ISO’s job easier. But are rare-hour emergencies enough to justify more decades of NMPS daily destructive use? In truth–what would amount to virtual energy storage monopoly, need not be locked-in, de facto, by FERC as this region’s energy future for decades to come. There are other options.

“Pumped hydro is the most cost-effective way to store electricity,” that story stated flatly. But in September of 2016 the MA Department of Energy Resources and the MA Clean Energy Center released a study: “Massachusetts Energy Storage Initiative: State of Charge.” It noted the Bay State lags behind in innovation and deployed energy storage, ranking 23rd nationally. However, comparing new storage technologies now available to the costs of pumped storage, it noted three that will all readily out-compete pumped storage costs by 2018: Lithium Ion, Flow Battery and Compressed Air Storage.

These local/regional storage solutions are already coming into use in New England. They create distributed generation and safer, more reliable micro-grids—less vulnerable to mass outages and mega-grid cyber attack and failure. They also create jobs. Certainly they are more attractive to consumers than sending local solar and wind across New England to recharge a river-crippling machine—and repurchase that juice later at inflated consumer prices.

That story mentioned Northfield’s 18,000 panel solar array–enough for a few hundred homes. But that tax-deductable FirstLight solar field actually covers the huge scar leftover from acres of EPA-mandated settling ponds—sludge pools required in 2010 when they had to dredge their mountain of muck back out of the river. Also not mentioned were handsome payments NMPS collects when it chooses not to generate any power. They accrue through a FERC mechanism known as “capacity fees.” If “spot market” prices aren’t sweet enough, FirstLight can simply sit their plant idle, collecting ratepayer cash just for their “capacity” to potentially generate. With NMPS as its chief hydro asset, former owner GDF-Suez once told investors 40% of its annual profits had been realized through capacity fees.

FirstLight’s EPA-ordered sludge settling pools and drying pile at the Rt. 63 site covered by a solar panel installation today. (CLICK TO ENLARGE, THEN CLICK AGAIN.)

Gus Bakas, FirstLight’s Massachusetts operations director, stated his goal for the 45 year-old plant is to someday see it running wholly on “green” power–solar and wind relayed to it from legions of regional rooftop panels and turbines. That would align with Massachusetts’ new “Energy Storage Initiative,” a 10-year effort purportedly aimed at saving ratepayers “hundreds of millions of dollars” while making the grid more reliable and reducing greenhouse gasses. But wind runs strongest at night and is not plentiful in western New England, while all solar is generated by day. With NMPS’s peak-demand profit model based on sucking up bulk power and the river at night, something seems missing from the equation. Unless there are now plans to again run the river backward by day, when migrating fish are most vulnerable to entrainment.

The Federal Energy Regulatory Commission is charged with supplying reliable electricity at fair costs to the public, while fostering competition and protecting against energy monopolies. All licensing decisions from FERC must also comply with federal law including conditions set under the National Environmental Policy Act, the Fish and Wildlife Coordination Act, the Endangered Species Act, and the Clean Water Act. The operation of NMPS continues to prove a stumbling block to the successful execution of these federal acts and policies.

In the near-term, for rare big-grid emergencies, a summer heat-wave or winter cold snap, NMPS remains a credible back-up tool. But Northfield otherwise continues today as an expensive, profoundly-damaging energy relay device whose net-loss operations chew apart a critical four-state artery daily. Given its violent year-round ecosystem impacts, its drag on federal trust and endangered species restoration programs–and the market’s current and emerging alternative energy storage solutions, FERC should not sanction NMPS long-term, as its dominant, de facto, New England energy storage monopoly.

End

Writer and journalist Karl Meyer lives in Greenfield, MA. He has been participating as a stakeholder and member of the Fish and Aquatics Study Team in the five-year FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2013. He is a member of the Society of Environmental Journalists.

Karl Meyer: Connecticut River power storage plant is an ecological, economic and energy disaster

http://www.wbur.org/bostonomix/2016/12/02/northfield-mountain-hydroelectric-station

Rolling over on a River: the real cost of pumped storage energy

Posted by on 26 Oct 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River ecosystem, Connecticut River Watershed Council, Daily Hampshire Gazette, ecosystem, Entrainment, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, federally-endangered shortnose sturgeon, FERC, fossil fuels, Greenfield Recorder, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, nuclear power, Public Comment period, public trust, pumped storage, Relicensing, shad, shortnose sturgeon, Society of Environmental Journalists, The Recorder, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2016 by Karl Meyer

(Note: this essay appeared in September and October in these MA and VT media and newspaper outlets: Vermont Digger, www.vtdigger.org ; The Daily Hampshire Gazette; and The Recorder.)

besttfemptybed

The de-watered CT below Turners Falls Dam that few people see. (Click, then click again to enlarge.)

Rolling over on a river

Since time began rivers have been the Earth’s arteries—the foundation of its ecosystems. Here in New England it’s “last chance” time for our Great River. On April 30, 2018 the fate of the long-foundered Connecticut River migratory fisheries restoration—and the survival of a four-state river ecosystem, will be decided for what’s essentially forever. New Federal Energy Regulatory Commission hydro licenses are expected to be signed then by government agencies and the Canada Pension Plan Investment Board–latest purchaser of the Turners Falls and Northfield Mountain projects. That company’s stated investor mandate is “to maximize investment returns without undue risk of loss.”

Over two generations ago public-trust mistakes were made favoring power companies, fish hatcheries, and high-end salmon-fishing interests that rendered eight miles of the Connecticut in Massachusetts a massively-suctioned, partially-dewatered flush sink. Sanctioned by fisheries agencies and non-profits, those decisions, severed an ecosystem in two. They forced all migrating fish into a deadly power canal, leaving three emptied miles of riverbed below Turners Falls Dam, while four turbines at the Northfield Mountain Pumped Storage Station five miles upstream consumed massive amounts of nuclear energy to suck a river backward and uphill to a mountaintop reservoir.

Those turbines were built to run on the promised endless supply of overproduced juice generated nightly at the local, now-closed, Vermont Yankee nuke, 15 miles away. Today, running on giant slugs of imported fossil fuel, they continue to spin, sucking the river up in endless gulps into a 4 billion gallon pool a mile up Northfield Mountain. That daily suctioning creates riverbank eroding “tides” higher than those at Hyannisport, MA—with some rivaling the ten-foot fluctuations of Fundy Bay.

Back then, predecessors of today’s National Marine Fisheries Service, the US Fish & Wildlife Service, Massachusetts’ Fish & Wildlife and the Connecticut River Watershed Council signed off on an agreement with the Federal Power Commission and Western Massachusetts Electric that strangled the river in northern Massachusetts. It resulted in the failure of migratory fish passage and a promised renewal of the river’s ancient seafood resources upstream to Vermont, New Hampshire, and northern Mass. Few American shad emerged alive after diversion into that canal. It also failed the shortnose sturgeon—this river’s only federally endangered migratory fish, leaving it without flow or monitoring at its only documented natural spawning site.

Upstream at Northfield the destruction was yet more complete. The suck and gush appetite of that nuclear-charged contraption virtually disassembled the river. It gulped flow at a rate of 15,000 cubic feet per second, often for hours at a time—drawing on the river pool above Turners Falls Dam where, 70% of the time, the Connecticut’s natural routed flow is less than 15,000 cfs. Boaters a mile downstream could find themselves drifting upriver via Northfield’s unearthly pull. All fish and organisms drawn up through the sphere of that suction were deemed “functionally extirpated”–dead to the ecosystem by virtue of being sieved twice through the turbines. It was evolution in reverse, a river ripped away from its eternal run to the sea.

Today, climate-blind FERC labels Northfield as a source of “renewable clean” energy—but there’s nothing clean, renewable or sustainable about its imported, twice-produced, peak-priced electricity crippling this river. ISO New England, FERC’s Northfield-cheering, ever-energy-hungry cousin, also ignores climate and its environmental dismemberment. “Pumped storage” is not hydropower—not even by the industry’s own technical terminology. Northfield-produced power in fact represents the heavy planetary burden of fossil fuel used to push a mountain of water uphill, merely as a weight to produce high-cost, second hand electricity. It cares nothing of rivers, fish or ecosystems.

If bureaucrats again fail the public trust and don’t demand critical habitat protections, flows, and the day-to-day monitoring needed to fulfill U.S. environmental statutes, Canadian pension speculators will be left as the de facto controlling interests on our river. The new owners have asked FERC to merge two separate licenses for Northfield and Turners Falls into a single new license dubbed the “Northfield Project.” What’s represented as mere bureaucratic streamlining would actually enshrine, by precedent–next time and forever, river-killing pumped storage.

Any responsible environmental agency should deny this single-license merger, and seek to have Northfield kept in use as emergency infrastructure only—with the ultimate remedy it’s dismantling in tandem with a move to a decentralized, far less vulnerable system than today’s expanding mega-grid. Massachusetts legislators are currently signing onto backroom energy deals for a glut of future hydropower from Quebec. Some 1,200 megawatts of those penciled-in imports could easily replace the few hours of daily juice Northfield puts out–while keeping it available for rare emergencies. Though the new Canadian power imports largely ignore conservation and innovation, they could be employed to end the river carnage here and begin restoring a future for a critical New England ecosystem.

(Note: timely public comment on licensing issues is carefully considered by FERC. Go to: http://ferc.gov/docs-filing/ecomment.asp and use “E-Comment.” Check “Hydro” and address to Secretary Kimberly D. Bose, using the required identifiers “P-2485” and “P-1889” for Northfield and Turners Falls.)

Karl Meyer lives in Greenfield MA. He is participating in the FERC relicensing process and is a member of the Society of Environmental Journalists.

Citizens win: back science and re-water CT’s Dead Reach

Posted by on 25 Jul 2016 | Tagged as: 5-year FERC licensing process, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Dead Reach, endangerd shortnose sturgeon, Federal Energy Regulatory Commission, Federal Energy Regulatory Commission Chairman, FERC, FERC Chairman Norman C. Bay, fish passage, New Hampshire, Senator Bernie Sanders, shortnose sturgeon, Test flows, Turners Falls, Turners Falls dam, Vermont

P1000358
Flow through the DEAD REACH at Rock Dam, (click to enlarge).

**2016-07-19BERNIE SANDERS-FERC CHAIR BAY**

If you have a moment, CLICK and read the document **highlighted** immediately above and read carefully. NOTE: you’ll have to click, then click again in new window.

If you do, you will see a significant victory for the Connecticut River ecosystem. The Dead Reach of the river has been strangled by power company flows diverted out of the riverbed here for generations. Essentially, with just 400 cubic feet per second of flow mandated in the river below Turners Falls Dam for the last 44 years, the Connecticut has been left for dead when it comes to upstream migrants and endangered shortnose sturgeon each spring. Its been the great ugly secret of New England’s Great River for generations, kept quiet by fisheries agencies and watchdog groups alike.

But this year, when FERC relicensing study flows were proposed that would potentially destroy any chance of spawning success in the Dead Reach for the endangered Connecticut River shortnose sturgeon at Rock Dam, citizens stood up for published state and federal science, while fish agencies and NGOs stood on the sidelines.

The result: 40% more water was ultimately reintroduced into that desperately de-pauperized Dead Reach habitat throughout May and into early June–water that should have been demanded for fisheries protection decades ago. Instead of releasing just 1500 cfs into that reach, citizen input caused that number to be raised to 2,500 cfs as the minimum amount FirstLight would have to let flow through the ancient channel.

This was a victory for the river–and not one engineered by Senator Sanders(though his letter of inquiry was a welcome addition), who didn’t send his query to FERC until mid-June. FERC commenters were concerned folks from around the region. A close look at the files shows most were local Bay Staters simply looking out for their home river. They understood what you do when there is key information available: you don’t play politics; you stand up for good science.

This represents a victory for the implementation of long-range, public research findings taking precedence in the decision-making process on river flows. And it occurred despite any agency or NGO backing, or input.

Any increase in flows in this broken stretch of the Connecticut is a victory. However, 40% of very little, is simply not enough. That 2,500 cfs represents the ABSOLUTE bare minimum amount of water necessary just to have migratory fish move upstream upstream here, and allow sturgeon the possibility of remaining on their only documented natural spawning ground in this ecosystem to attempt reproduction. Much more flow is needed to restore this habitat, nourish passage of spring migrants to Vermont and New Hampshire, and allow shortnose sturgeon to successfully spawn and raise young, beginning their long road to recovery.

Politics and wimpy advocacy here, rather than solid science and public input, have been allowing the Connecticut to be run into the ground for generations now. This spring was a little different.

HOLYOKE HOISTS RECORD SHAD NOS; TURNERS FALLS FOUNDERING ON ALL FRONTS

Posted by on 13 May 2016 | Tagged as: American shad, Connecticut River, federally-endangered shortnose sturgeon, GDF-Suez FirstLight, Greenfield Community College, Holyoke Fish Lift, National Marine Fisheries Service, New Hampshire, NOAA, Rock Dam, salmon, shad, shad fishing, shortnose sturgeon, Test flows, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont

P1000397

Copyright © 2016 by Karl Meyer

According to USFWS Connecticut River Coordinator Ken Sprankle on Thursday, May 12, 2016, the Holyoke Fishway lifted more fish—specifically 54,006 American shad, than on any single day in the fish lift’s 61 years of operation. In 1955, something simple and sensible came into being on the Connecticut. It was a fish passage set-up that brought shad directly upstream in the riverbed via upstream attraction flows, and drew them into an elevator that gave them a lift directly above South Hadley Falls. Once there they could head upstream toward open spawning habitat in Vermont and New Hampshire. For three generations, Holyoke has been the single largest fish passage success site and story for American shad on the entire East Coast.

Sadly, just 36 miles upstream, those shad met with the fish passage restoration boondoggle-disaster of all-time—a three-ladder fish passage puzzle that forced all fish into a 2.7 mile long power canal at Turners Falls. Steered out of the river, and forced to negotiate a turbine lined canal in order to make it upstream beyond the Turners Falls Dam, the average annual success rate was 4 fish out of 100. To focus in a bit more on the present, what Holyoke passed yesterday was nearly the equivalent of all the shad that made it past Turners Falls Dam last year: 58,000.

The Turners Falls Power Canal remains the dead end, adjacent to the Connecticut River’s Dead Reach, where the federal/state Connecticut River migratory fisheries program has lingered in a comatose—nearly frozen state, since those ladders were built in 1980.

Given the brief nature of spring spawning conditions, it’s likely—at minimum, 25,000 of yesterday’s shad from Holyoke will be attempting that torturous labyrinth in Turners Falls by midday today (Friday). Most won’t make it past, and most will expend over a week of their precious spawning energies in the attempt. A high, though poorly studied or documented percentage, will ultimately be cut up in the turbines of the Turners Falls Power Canal.

Such is the legacy of non-intervention on behalf of the public’s fish, and the 45 year focus on creating a hatchery strain of salmon on a river system where the species had been extinct since 1809. So, again, Vermont, New Hampshire, and northern Massachusetts—sorry, but your fish are stuck down here in the miseries of a power canal and the Connecticut’s Dead Reach lacking suitable flows and fish passage.

On that note: it’s now six weeks since we had the first fish passage numbers reported from Holyoke Dam. Here at Turners Falls, we have nothing from GDF-Suez FirstLight and the Greenfield Community College students hired to tally them. The public’s fish, and the information as to their whereabouts, remains in private hands—most of it in the murky environs of a private power canal.

I’ll give you an on-the-ground update from my visits. At Rock Dam, just after midday on Tuesday, three anglers were working the site for shad. Curiously, there was a very clear “tide” line in the sand at the site—which is also the natural spawning ground for endangered shortnose sturgeon. The very recent high water mark was between 10 and 25 feet wide leading down to the water’s edge. It indicated a recent and significant change in flow there. One of the gentlemen said the drop came quickly, and had only happened “fifteen minutes ago.” Such “ramping” up and down of flows by the power company has huge implications for migrating and spawning fish. In fact, ramping at this site is one of the key reasons for spawning failure for endangered sturgeon. But, who’s watching?

Anyway, the three anglers reported that the shad were running here before the flow drop—there were several in two buckets, but they had disappeared once flow conditions changed.

I returned to Rock Dam on Wednesday, and there was just a lone guy and his dog present. His name was Shawn, and he’s lived nearby for the past year, but this was his first outing for shad. He looked to be in his early 20s.

There must’ve been plenty of shad trying to pass upstream at Rock Dam—with extra “test” flow water being released at the dam for federal relicensing studies. It wasn’t a minute after I clambered up the rocks to speak with him that he hooked his first fish. I obliged and took his photo with it. While there, I also took a minute to explain that shad don’t survive handling well, and they do best if handled very gently and while right in the water at the shore line.

I only tarried only for five more minutes–in which time Shawn landed two more fish, and four new anglers had scrambled down to join the shad run at the Rock Dam.

The latest Connecticut River shortnose sturgeon count at Holyoke Dam: 15 fish—ostensibly on spawning runs to that self-same Rock Dam spawning haven, have been lifted in the fish ladder this spring–and stopped abruptly once reaching the top floor. Every one of them has been slapped on the nose with a newspaper, told “NO!” and been dropped back in the drink below the dam. “Wait till next year..!” Hey, National Marine Fisheries Service: that is award-worthy endangered species protection through genetic deprivation! Kind of makes you miss David Letterman and his Stupid Pet Tricks…

No “Springtime for Sturgeon in Holyoke…”

Posted by on 06 May 2016 | Tagged as: Connecticut River, Connecticut River ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, Holyoke Fish Lift, Holyoke Gas & Electric, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Rock Dam Pool, shortnose sturgeon, Turners Falls, US Fish & Wildlife Service, USFWS

SHadFalls2MtTom
HG&E’s Holyoke Dam with Mt. Tom in background(click to enlarge)

No “Springtime for Sturgeon in Holyoke…” Unenforced FERC License continues the woes for the Connecticut’s only federally endangered migratory fish

Copyright © 2016 by Karl Meyer

For endangered shortnose sturgeon on the Connecticut River this year has been the best thing and the worst thing to happen to them since 1849. In an infinitely promising development over a dozen sturgeon(13 thus far)have found their way into the retooled Holyoke Fish Lift this spring—and all were lifted 30 feet toward upstream spawning habitats at the facility. However, in a most ugly turn of events for a creature listed under the Endangered Species Act since 1967, every one of those sturgeon was subsequently dropped back downstream by humans working there. They literally gained ten yards… after 167 years. Sorry kids, wait ‘til next year–or maybe the one after that.

In 2002 Holyoke Gas and Electric was issued a FERC license under which they were required to complete construction of a fish lift providing up- and downstream access for endangered sturgeon by 2008. FERC, responsible for enforcing those license requirements as well as the tenets of the ESA, failed to enforce their requirements, leaving those improvements unconstructed, year after year. The National Marine Fisheries Service, US Fish & Wildlife Service, and MA Division of Fisheries & Wildlife sat on their hands respecting their responsibilities to act. Nor did any so-called “watchdog” group fulfill their role–to make the enforcers enforce.

This was just the latest failure in a foundering Connecticut River ecosystem steered by money and politics rather than legal obligations, science, and enforcement of the public trust. Just consider that one of the Connecticut River Watershed Council’s Board Members has worked for Holyoke Gas & Electric at their fish lift for a decade… Then consider the resounding silence on enforcement.

This year–a full 9 springs beyond their license obligations, HG&E finally completed that mandated construction at the Holyoke Fish Lift. That says a mouthful about FERC, their licensing process, private industry, and whether anyone is actually protecting the public’s fish and river.

Grimly this spring, when the most sturgeon embarking on upstream spawning runs since the building of the railroads made it to the top of those South Hadley Falls, all were captured and “released downstream” of Holyoke Dam. This bit of brilliance comes via the orders—or lack thereof, of NOAA’s National Marine Fisheries Service. Their failure to act again denies any new genetic input into the tiny upstream population keeping this species’ flickering spark alive across the centuries up at their sole natural spawning site, the Rock Dam in Turners Falls.

Below Holyoke, generation after generation of these long-lived fish have been relegated to simply growing to maturity, repeatedly attempting to return upstream, and ultimately expiring without ever having the chance to pass on their genes. That goes back to the time of President Zachery Taylor.

In one very cruel act of fate, any shortnose sturgeon finding themselves downstream of the newly constructed Holyoke Dam in 1849, were forever barred from reaching their sole natural spawning site in the river system—that ancient Rock Dam pool in Turners Falls. What that has meant is that hundreds upon hundreds of these fabulously evolved fish–across more than a century and a half, have been relegated to the status of “reproductive nulls,” unable to spawn in their natal river system.

Pick your favorite bad actor in this failed scenario–there are a half-dozen choices.

Shortnose sturgeon: ignoring published research

Posted by on 04 Apr 2016 | Tagged as: Connecticut River shortnose sturgeon, Dr. Boyd Kynard, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, FERC Comments, Jack Buckley, John Bullard, Julie Crocker, Kimberly D. Bose, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Rock Dam Pool, Secretary Kimberly Bose, shortnose sturgeon, US Fish & Wildlife Service, USFWS, Vince E. Yearick, Wendi Weber

KM-Rock Dam program 4-23-16P1000433

TOP: Rock Dam program, 4-23-16 (click to enlarge)

Bottom: The ROCK DAM: shortnose sturgeon spawning site (click to enlarge)

The following testimony was submitted on March 18, 2016, to the Federal Energy Regulatory Commission on behalf of the biological needs of the federally-endangered Connecticut River shortnose sturgeon at its sole documented natural spawning site in the Connecticut River ecosystem.

Karl Meyer, M.S.

85 School Street # 3

Greenfield, MA  01301                                       March 18, 2016

 

The Honorable Kimberly D. Bose, Secretary

Federal Energy Regulatory Commission

88 First Street, NE

Washington, DC  20426

 

SUPPLEMENTAL INFORMATION: RE: P-1889-081 and P-2485-063, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

Attach to: PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

This additional information is being submitted subsequent to my receipt of a March 15, 2016 letter from Mr. Vince Yearick, Director, Division of Hydropower Licensing, restating FERC’s intention to sanction spring 2016 test flows that are documented to result in spawning failure and displacement of federally-endangered Connecticut River shortnose sturgeon(SNS), at their sole natural spawning site in this river system. Those findings come from 20 years of research conducted by government scientists from both the US Fish & Wildlife Service and the US Geological Survey.

I am submitting an index and key chapters from this exhaustive body of shortnose sturgeon research published in LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4. Chapter 3 directly addresses SNS spawning failure and displacement at the Rock Dam in the Connecticut’s By Passed Reach, and clearly indicates that test flows of 1500 cfs will not be protective of a species listed since 1967 under the federal Endangered Species Act.

From P. 107 (PDF-page numbers and numbers in the actual text are the same), “Spawning failure in unregulated rivers likely occurs, but it should be rare because females have adapted to natural fluctuations in the river discharge. Spawning failure (when fish were present) occurred at MontSR due to river regulation, but spawning did not fail due to peaking operations. Regulation created bottom velocities that were too low or exceeded the preference of females or created a low discharge that either prevented female access to the RockD or failed to attract them.”

Findings and data from pages 101 and 102 should provide further guidance to FERC in reexamining this decision. In his response Mr. Yearick argues that the low test flow of 1500 cfs put forth for Study 3.3.19 is somehow key in making correlations to last year’s American shad passage tests from Study 3.3.2. However, that is by no means clear (note–the 3.3.2 results have yet to be made available to Stakeholders) as that study also included tests flows of 1000 cfs and 6300 cfs—flows also not being included in order to make any useful correlation with Study 3.3.19.

Further, in regard to the failure or oversight in the protective responsibilities of the National Marine Fisheries Service to submit objections in this instance (as well as the USFWS and MA Division of Fisheries and Wildlife, who also have federal and state ESA mandates), those failures in no way release the FERC from its own responsibilities under the federal Endangered Species Act. In FERC’s own words, from: Hydropower Relicensing-Get Involved, A GUIDE FOR THE PUBLIC: “Is the Commission subject to other federal laws? Yes. The Commission must comply with a variety of federal laws, such as the Clean Water Act (to protect water quality), the Endangered Species Act (to protect threatened and endangered plant and animal species) and the National Historic Preservation Act (to protect culturally significant places and historic properties).”

Regarding Mr. Yearick’s citing of Article 34 as permitting the harming of protected species in the current license, he fails to note the following tenets included in that self-same Article regarding continuous minimum flows and modifications thereof: “These flows may be modified temporarily: (1) during and to the extent required by operating emergencies beyond the control of the Licensee; and (2) in the interest of recreation and protection of the fisheries resources, upon mutual agreement of the Licensees for Projects 1889 and 2485 and the Massachusetts Division of Fisheries and Wildlife.”

Please also note that, with the marked improvements shown in American shad passage at Turners Falls in 2015 which appear to correlate well with the significant increases in flow through the By Passed Reach, it is highly unlikely that any of the Stakeholder Agencies would consider requesting a Licensed flow of 1500 cfs when the biological needs and passage of both federal-trust and federally-endangered migratory fish require significantly more volume to fulfill their spawning requirements.

Lastly, 8 years in arrears of its license agreement signed in 2002 for FERC P-2004–to have completed upstream access for federally endangered Connecticut River shortnose sturgeon by 2008, Holyoke Gas & Electric has completed modifications to its fishway. That should allow SNS their first access and reintroduction to their natural spawning grounds in 168 years. In my mind, it would be patently criminal to greet these endangered fish on their first spawning trip upstream since 1849 with sanctioned flows guaranteed to displace them and cause spawning failure.

Thank you for your careful attention to this critical matter.

Sincerely,

Karl Meyer, Fish and Aquatics Study Team, P-2485 and P-1889

Please see attached chapters in PDF format, as well as included index and book cover.

Cc’d via email to:

Brandon Cherry, FERC

William Connelly, FERC

James Donohue, FirstLight

Julie Crocker, NOAA

Bjorn Lake, NOAA

John Warner, USFWS

Caleb Slater, MA Division of Fisheries & Wildlife

John Bullard, Regional Administrator, NOAA Fisheries Greater Atlantic Region

Wendi Weber, Director, USFWS Region 7

Jack Buckley, Director, Massachusetts Division of Fisheries & Wildlife

Dr. Boyd Kynard

CASHING IN ON A CASH COW

Posted by on 15 Jan 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River shortnose sturgeon, Daily Hampshire Gazette, endangerd shortnose sturgeon, Endangered Species Act, Energy Capital Partners, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, fossil plant, GDF-Suez FirstLight, ISO, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, non-renewable, Northfield Mountain, Northfield Mountain Pumped Storage Station, Rock Dam, shortnose sturgeon, The Greenfield Recorder, The Pioneer, The Recorder, Turners Falls dam, Uncategorized, US Fish & Wildlife Service, USFWS, Vermont

The following piece appeared in the Daily Hampshire Gazette(www.gazettenet.com) and the Recorder(www.recorder.com) in the first week of January 2016.

CASHING IN ON A CASH COW

Copyright © 2015 by Karl Meyer

Ever dreamed of owning your own bank? I got a deal for you! Northfield Mountain Pumped Storage Project is for sale again, along with the Turners Falls canal and dam—and a string of little assets down in Connecticut. But Northfield’s the cash cow. Fourth time in a decade they’re unloading this golden calf–always at a tidy chunk of change. A quickie corporate win-win! It’s really like an A.T.M., run at the expense of the Connecticut River ecosystem.

Place works like a giant toilet–suck huge amounts of the river backward and uphill, then flush it all back and—viola, money spews out the other end. Could be ours! They’re holding bidder tours as we speak. I just need a few partners with ready credit. We go in on short-money and cash-in on the no-brainer electricity “spot market” for a few years. Then, with inflated power-price futures in play, we offload this puppy for a final cash-out of 30%–maybe 50%!

Here’s how it goes down. With the cheerleading of Northfield’s not-so-silent partner, ISO New England–the “independent” system operator (created by the Federal Energy Regulatory Commission), we simply slow dance this darlin’ past the banks, the FTC and FERC. Then, in 2016, its sweet business-as-usual—maybe with new shirts for employees.

Trust me, this works every time. Everyone walks away with full pockets—without the public knowing what hit them. Northfield got wholesaled in 2006 by Northeast Generations Services(formerly WMECO—formerly of Northeast Utilities, now Eversource—you follow?) They grabbed a quick $1.34 billion for the package, slipping it to a trio of Jersey venture capitalists, Energy Capital Partners. ECP renamed their little project FirstLight Energy. Those smartest-guys-in-the-room hung-in and grabbed Northfield’s peaking spot-market profits for two years, before off-loading it for a nifty $1.89 billion in that crazy year, 2008.

With that, GDF-Suez, third owner in four years, swept in–the world’s largest private energy corporation, based in France. They’ve been gobbling up contracts to run water systems across the US under the name Suez United Water. But GDF-Suez recently did a clever name-change to Engie, keeping the public totally confused. They got game! The true costs of these premium-priced plant sales get buried in the list of acronyms on electric bills. It’s like owning a 25-mile stretch the Connecticut River to dip into for cash any time you please.

This is a turn-key operation–with us, the new guys, pushing the buttons. The joke is that the public thinks Northfield is a hydropower operation, while this baby has never produced a single watt of its own energy. It’s imported!–huge swatches of bulk electricity now run-in from outside the region to suck a mountain’s worth of flow from the Connecticut up to a reservoir. Then, dump it out on the power lines when prices peak. It’s hugely inefficient, now largely carbon-based—and massively damaging to the river. But amazingly profitable!

That’s where we come in. Sure it was built as a sister to the region’s nukes to gobble up their monstrous stream of unused electricity–because nukes can’t shut down their feverish output at night. That’s how you get to put in a giant straw and suck the Connecticut uphill at a rate of 15,000 cubic feet per second–more than enough to pull the river backward for a mile downstream under low flow conditions. But who’s watching? When the region’s last nuke shut down, nobody said ‘boo!’ with Northfield going fossil. What climate change?

And when it became clear years back that Northfield operations were imperiling spawning success for the federally-endangered shortnose sturgeon at the Rock Dam in Turners Falls–their singular natural spawning site going back into pre-history, again, nobody came forward. Not the US Fish & Wildlife Service, the National Marine Fisheries Service or the MA Division of Fish & Wildlife—or any river protection group. No bureaucrats, no suits–nobody. At Turners Falls—instead of 70% of migratory fish heading upstream toward Vermont and New Hampshire, they squeeze out 4%. We have it made!

Still skeptical? ISO and FERC are addicted to Northfield—even though its power-flush characteristics might come into play maybe a handful of times a year, if at all. For this they let owners cash in on the river whenever y they want. In 2012, the owners of this “asset” collection of 1500 megawatts(of which over 1100 MW derived from Northfield alone) told investors a full 40% of their profits were realized from “Capacity Fees.” What that means is you get paid for holding back the Connecticut! They’re not required to use it at all if they don’t want to—just flush when prices are high. Paid for being you! Of course another 50% of profit comes from generating, though the public doesn’t know it only operates a few hours a day when prices are highest.

Here’s the kicker: in 2014, after a cry-wolf energy deficit winter that never materialized, FERC–with ISO as cheerleader, sanctioned the doubling of those “capacity fees”. Plants are now collecting 2X the amount they were two years back, for having the potential to dump some power on the lines—not for actually generating. Paid for being you! With 1100 potential megawatts at Northfield, how quick can you say “windfall at the public’s expense?” Lastly, Northfield petitioned FERC the last two winters to increase its reservoir storage by a full 25%, with ISO their biggest cheerleader. FERC agreed, twice. Double-dip with a cherry, anyone?

This thing’s a cinch! Even with all the nukes shut—when this should have been moth-balled to emergency use as more climate-warming, spent nuclear junk, it soldiers on as a virtual river monopoly with the blessings of FERC and ISO. Trust me, no one goes to court. Ecosystem damage, costs to the public? Fuggetaboutit!

Got credit? Give a call!

New comments to the Federal Energy Regulatory Commission

Posted by on 16 Nov 2015 | Tagged as: 5-year FERC licensing process, American shad, canal shad, Connecticut River, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, Extinction, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC license, FERC licensing process, FirstLight, GDF-Suez FirstLight, migratory delay, power canal studies, Public Comment period, Relicensing, Revised Study Plan, Rock Dam, Rock Dam Pool, shad, shad fishing, shortnose sturgeon, Station 1, Turners Falls, Turners Falls dam, Turners Falls power canal, Vermont

The following comments were submitted to the Federal Energy Regulatory Commission on November 13, 2015, respecting relicensing studies occurring at the Northfield Mountain Pumped Storage Station and at the Turners Falls Dam and Canal. They are designated, respectively as: P-2485; and P-1889.

Karl Meyer, M.S. Environmental Science
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 November 13, 2014

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

ILP COMMENTS on Updated Study Reports—including Disagreements/Modifications to Study/Propose New Study on Turners Falls Hydroelectric Project P- 1889, and Northfield Mountain Pumped Storage Project P-2485.

Dear Secretary Bose,

The Turners Falls Hydroelectric Project, P-1889, and the Northfield Mountain Pumped Storage Project, P-2485, are currently undergoing studies through the 5-year FERC relicensing process. The majority of the fish and aquatics studies remain incomplete at this time. However, having attended the recent study update meetings with FirstLight’s consultants, and as a member of the Fish & Aquatics Studies Team for P-2485 and P-1889, please accept these brief comments on the USR and proposals for modifications and new studies needed in the FERC ILP for these projects. As studies are brought to completion and data and results are shared with Stakeholders I will submit further comments.

3.3.2 Evaluate Upstream and Downstream Passage of American Shad

Needed information from this study: from personal observations I noted many days when Station 1 was in operation. I visited the site, took some photos, and interviewed a fisherman who was busy catching shad at the Station 1 Outflow on 5/24/2015. In good light, and without the advantage of polarizing sunglasses, I observed dozens of shad stacked up like cordwood, treading water there. The gentlemen noted that whenever Station 1 is running “there are always fish here.” The report should include information about tagged fish delayed in this false attraction water. It is also critical to delineate the number of days during testing that Station 1 was in operation.

3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the Area of the Northfield Mountain and Turners Falls Projects.

In their update the applicant’s team stated that “because minimal shad spawning was observed in the Turners Falls Canal, no spawning areas in the canal were identified for further examination.”

Needed information from this study: at what hour, on what dates, and under what conditions were these “minimal” spawning observations made? Did they return to the site again under different, or more favorable conditions? What was the water temperature? Was it raining? Windy? Cloudy? Was Cabot Station running at the time-and how many units? Was Station 1 in operation on the nights they made their observations?

These are basic questions that require adequate answers as the TF Canal has been the bottleneck for the shad run up through Northern Massachusetts and into Vermont and New Hampshire these last 40 years. The canal appears to be culling off part of the run as a spawning trap. A thorough understanding of why fish are lingering there, and clear assessment of the numbers and delays of fish attempting to spawn in the canal is necessary for informed decision making.

3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms.

Needed information from this study: This study needs to be extended for another year. On October 5, 2015, I took a 20-minute walk through a small segment of the canal at 7:00 a.m. on the morning the canal had drained. On the flats far–from the thalweg where most of the 2014 assessment appears to have taken place, thousands of fish lay struggling, stranded, and dead in the drying pools. These included juvenile American shad, yellow perch, juvenile and “transformer” sea lamprey, one 8-inch chain pickerel, one crayfish, and thousands of tiny, unidentified YOY fish in drying pools and rills that led to nowhere.

These observations were made crossing just a few—out of the many acres, of silt and muck “shoulder habitat” that occurs away from the main channel on both the east and west sides of the TF Canal. A more thorough mortality assessment needs to be made across these habitats to have a full understanding of the impacts of the canal drawdown migrating and resident fish.

REQUEST for New Study: Tagging and Spawning Study of the Connecticut River Shortnose Sturgeon at the Rock Dam Pool in Turners Falls.

The USFWS’s fish passage and dam specialist John Warner reports that both downstream and upstream modifications for fish passage at Holyoke Dam will be completed this winter. New entrances and exits allowing CT River SNS to move upstream beyond that site will be working in spring 2016.

In light of the construction at Holyoke and the 2016 continuation of test flows evaluations on spring migrants in the By-Pass Reach at Turners Falls, testing of spawning success for SNS should be done at their documented natural spawning site–the Rock Dam in Turners Falls, in spring 2016. Regardless of any fine tuning needed at the Holyoke facility, some SNS will return to the Rock Dam pool by the last week of April, and the chance to study their spawning success in light of regulated test flows presents a unique opportunity for the only federally endangered migratory fish on the Connecticut River.

If this fish is ever to benefit from new genetic input, a full understanding of suitable flows at Rock Dam to accommodate spawning is necessary information going forward for a fish that has been decades on the cusp of extinction. It’s an opportunity to restore a part of the public trust.

For further information on longstanding research at this site without required test flows, see Kynard, B. and Kieffer, M.C., et al: Life History and Behaviour of Connecticut River shortnose and other sturgeons, published in 2102 by the World Sturgeon Conservation Society, ISBN 978-3-8448-2801-6.

Thank you for the opportunity to comment on the USR for these projects.

Sincerely,
Karl Meyer, M.S. Environmental Science
Greenfield, MA