Connecticut River blog: source of a salmon sham; how the public can steer a river’s future

Posted by on 21 Jul 2021 | Tagged as: 5-year FERC licensing process, Brian Harrington, Catherine Carlson, climate change, Connecticut River Atlantic Salmon Commission, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, CRASC, Daniel McKiernan, David Cameron, Donna Wieting, E-Comments, Environmental Protection Agency, EPA, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Comments, FERC Commissioner Richard Glick, FERC Secretary Kimberly D. Bose, FirstLight, FirstLight Power, Gordon van Welie, Holyoke Co. v Lyman, ISO-NEW ENGLAND, Jesse Leddick, Julie Crocker, Kathleen Theoharides, Kimberly D. Bose, Landmark Supreme Court Decision 1872, Local Bias, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, Northfield Mountain Pumped Storage Project, P-1889, P-2485, Peter Brandien, Public Comment period, Public Sector Pension Investments, Rock Dam, Sam Lovejoy, Sean McDermott, shad, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Steven Mattocks, Timothy L. Timmermann, Turners Falls, US Fish & Wildlife Service, Vermont, Wendi Weber

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future Copyright © 2021 by Karl Meyer

Kathleen Theoharides, Massachuetts’ Secretary of the Executive Office of Energy & Environmental Affairs before launching on a PR kayak tour of the river at FirstLight’s dock next to the intake of the Northfield Mountain Pumped Storage Project, October 2020. Photo Copyright © 2020 by Karl Meyer

NOTE: as a journalist and citizen I’ve been a participating stakeholder for nearly a decade in the ongoing Federal Energy Regulatory Commission relicensing process for the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot hydro operations. In that light, I encourage people to first view the half-hour segment of Local Bias, linked below. Then, return to this post and its resource list below for ways to participate in the critical decisions now being made about the Connecticut River. They will impact its currently crippled ecosystem for generations to come.

LOCAL BIAS link: https://youtu.be/IX2Rv2NYq3s

Since 1872 the US Supreme Court has made it the law of the land that migratory fish on US Rivers are guaranteed safe upstream and downstream passage at dams and industrial river sites. That decision was centered on a Massachusetts case at the Holyoke Dam. One hundred forty-nine years later that law remains essentially unfulfilled at an endangered species’ critical spawning and nursery site on the Connecticut River at Montague, MA, as well as at the Turners Falls Dam in that town.

Further, that law remains glaringly unenforced and unimplemented at the Northfield Mountain Pumped Storage Project in Northfield MA, where the river is literally sucked into reverse, and millions of eggs and downstream running juvenile American shad are pulled to their “functional extirpation”(vacuumed to their deaths) yearly, on their way to the ocean from Vermont and New Hampshire spawning reaches. The Commonwealth of Massachusetts has now owed Vermont and New Hampshire—and really all of New England, a living river for almost exactly a century and a half.

Warning sign announcing the dangers of Northfield’s massive intake suction. Photo Copyright © 2021 by Karl Meyer

The current Canadian parent-owners of that net-loss power regeneration/resale site are proposing only an ineffective, seasonal “barrier net” at the vacuum mouth of this facility, the very ‘solution’ that leaves this monstrous sucking in place to kill all those Vermont and New Hampshire produced eggs and baby shad, crippling the prospects for returning adult shad to those states from the Atlantic four years in the future.

The donuts and coffee were on FirstLight for the state officials and representatives taking part in last October’s little PR kayak tour. Photo Copyright © 2020 by Karl Meyer

Northfield Mountain’s net-power-loss energy consumption literally swallows and squanders the entire annual energy equivalents of whole cities and counties as it ravages the Connecticut River, using it as a crushing and deadly energy relay switch.

FirstLight is applying to FERC—backed up by a power-hungry, ecosystem-and-climate-indifferent ISO-New England, for a license to kill for decades to come. Northfield Mountain wastes monstrous amounts of grid energy, while ravaging New England’s critical main ocean connection and planetary cooling artery…

Below are resources available to the public for interacting and participating with the Federal Energy Regulatory Commission in licensing decisions, and government agency officials charged with implementing the public trust on the Connecticut River.

www.karlmeyerwriting.com/blog

NOTE: the landmark US Supreme Court environmental decision centered on the Connecticut River came back in 1872 in Holyoke Company v. Lyman, requiring safe up- and down-stream protection for migratory fish.

Send public comments on relicensing of the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot Hydro Stations to the Federal Energy Regulatory Commission. The “project numbers” must be included, as well as your name and address, in order to become part of the public record. They should be concise, citing specifics in a paragraph or two, noting Northfield Mountain P-2485 and Turners Falls/Cabot P-1889.

Send via www.ferc.gov, usingE-comment, with the salutation going to: “Kimberly D. Bowles, Secretary.” Those comments can also include a cc to the current chair of the Federal Energy Regulatory Commission: Richard Glick.

Decisions concerning foreign interests and use of the Connecticut River are happening at this time, and the river in Massachusetts has sat largely emptied or dead here for half a century—a situation enabled by the Commonwealth and its officials’ enduring, ugly and pointed environmental neglect.

To gain effect, letters can be cc’d to federal-and-state officials who are the vested stakeholders representing the public in the protection of the river and resources. Those publicly recorded FERC entries can also be forwarded to local newspapers and media outlets.

LIST of executives–plus officials from federal and state agencies who represent the public in protecting the Connecticut, its migratory fish, aquatic animals and habitats through their “conditioning authority” powers:

ENERGY executives in the private/quasi-public sphere:

Mr. Gordon van Welie, President and CEO, ISO-New England, the “independent” system operator:
Phone (413) 540-4220

Mr. Peter Brandien, Vice President of System Operations, ISO-New England:

E-mail: pbrandien@iso-ne.com .

NOTE: Mr. Brandien writes the annual support letter that facilitates the daily commercial damage to the Connecticut wrought by the Northfield Mountain Pumped Storage Project. ISO has never acknowledged to the public that NMPS is NOT essential to the DAILY functioning of the power grid. Instead it encourages and shackles the public to those peak-priced, daily ravages as NMPS is handsomely paid to hold back several hours of reserve emergency-function megawatts for ISO’s 20th Century bulk power grid in case of a rare blackout (like the one in 2003), and also for occasional use–at scattered intervals, in controlling grid fluctuations.

ISO should have ago been curtailed as a functionary for private mega power interests. Today’s grid should already be based on distributed generation and micro-grid functions in this time of climate chaos and cyber crime. Energy and storage should be located nearest to where it is produced and used. Future linking of river-ravaging NMPS to 200-mile-distant wind turbines is wholly criminal when compressed air storage can be located close to metro/industrial coastal centers—including implementation at sites like Everett, Somerset, New Bedford, and elsewhere. That would render the system resilient, local and detachable–and rescue New England’s Connecticut River ecosystem to support generations to come across the next half century.

But, today and into the future, counter to Holyoke Co. v. Lyman, , ISO will happily sell off a US ecosystem’s daily life to foreign venture capital interests, keeping NMPS in lucrative daily play for decades into the future. The bottom line function of ISO-New England—forget ecosystems and climate, is apparently commercial first, and foremost. In their own words: to “protect the health of the region’s economy and the well-being of its people by ensuring the constant availability of competitively-priced wholesale electricity—today and for future generations.” They love to employ the term “clean”, but never elaborate on glaring incongruities, fallacies or impacts. Future generations apparently will have no need of living ecosystems, just an endless stream of “competitively-priced” energy. They NEVER mention energy CONSERVATION…

FEDERAL PUBLIC officials:

For endangered Connecticut River shortnose sturgeon, freshwater mussels, as well as American shad, blueback herring and American eel:
Donna Wieting, Director of Protected Resources, National Marine Fisheries Service, NOAA Fisheries:
Phone: 301-427-8400

Also, for endangered shortnose sturgeon, as well as American shad, blueback herring and American eels: Mr. Sean Mcdermott, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Sean.mcdermott@noaa.gov

Also at NMFS, protecting shortnose sturgeon and their habitat: Ms. Julie Crocker, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Julie.crocker@noaa.gov

For federal protection and enforcement of the Clean Water Act on the Connecticut River: Mr. Timothy L. Timmermann Office of Environmental Review, EPA New England Region 1, Boston MA 02109-3912:

E-mail: timmermann.timothy@epa.gov

For all migratory fish and safe passage on the Connecticut including American shad, herring, and endangered sturgeon: Wendi Weber, US Fish & Wildlife Service Region 5, Hadley MA 01035:

E-mail: wendi_weber@usfws.gov

MASSACHUSETTS state officials:

Kathleen Theoharides, Secretary of the MA Executive Office of Energy & Environmental Affairs 100 Cambridge St., Suite 900, Boston, MA 02114:
Main Phone at (617) 626-1000

For Massachusetts clean water and wetland habitat protections on the Connecticut: Mr. Brian Harrington, Bureau of Water Resources Deputy Regional Director, Massachusetts Department of Environmental Protection, 436 Dwight Street, Springfield MA 01103:

E-mail: Brian.d.harrington@state.ma.us

Also from MA DEP: Mr. David Cameron, PWS Section Chief, Massachusetts Department of Environmental Protection, 436 Dwight St., Springfield, MA 01103:

E-mail: David.cameron@state.ma.us

For state-endangered shortnose sturgeon and all Connecticut River migratory fish in MA: Mr. Jesse Leddick, Chief of Regulatory Review, Massachusetts Division of Fisheries and Wildlife, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: Jesse.Leddick@mass.gov

Also at MA Div. of Fish & Wildlife: Mr. Steven Mattocks, Massachusetts Division of Fisheries and Wildlife, Fisheries, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: steven.mattocks.@mass.gov

THE GREAT FAILURE TO PROTECT

Posted by on 22 May 2021 | Tagged as: Cabot Woods, Clean Water Act, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Conte National Fish & Wildlife Refuge, Endangered Species Act, Environmental Protection Agency, EPA, ESA, Federal Energy Regulatory Commission, Federal Energy Regulatory Commission Chairman, FERC Commissioner Richard Glick, FirstLight, FirstLight Power, Julie Crocker, Kathleen Theoharides, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Martin Suuberg: Commissioner MA Department of Environmental Protection, Monte Belmonte, National Marine Fisheries Service, National Marine Fisheries Service, Nipmuck, NMFS, Norwottuck, P-1889, P-2485, Pocumtuck, Rock Dam, Rock Dam Pool, Section 9–Prohibition of Take Section 9(a)(1), Shortnose Stout, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, State of Delaware, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Survey, Wendi Weber, wrsi.com

THE GREAT FAILURE TO PROTECT: Flaunting the Endangered Species Act and Other federal and state laws governing clean water and habitat on the Connecticut River at Rock Dam in Massachusetts


Photo credit: US Geological Service

FirstLight’s Turners Falls and Cabot Station under the Federal Energy Regulatory Commission License #: FERC P-1889.

The ROCK DAM spawning nursery on the Connecticut River: the ONLY documented NATURAL spawning site for the ONLY FEDERALLY-ENDANGERED MIGRATORY FISH on the Connecticut River: the CONNECTICUT RIVER SHORTNOSE STURGEON.


Desiccating and baking shortnose sturgeon nursery habitat in the Connecticut River at the Rock Dam pool on May 21, 2021.
Photo Copyright © 2021 by Karl Meyer

The FEDERAL ENDANGERED SPECIES ACT OF 1973, Section 9: the term “TAKE” MAKES IT ILLEGAL TO: “to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct.”

Other federal and state laws NOT being ENFORCED on the Connecticut River at this critical habitat: the CLEAN WATER ACT, THE WETLANDS PROTECTION ACT, and, the Supreme Court’s 1872 landmark environmental decision for the Connecticut River in Holyoke Company v. Lyman—mandating that private operators of dams and facilities on the Connecticut—and thence for all rivers, must provide safe upstream and downstream passage for migratory fish.

A red slurry enters the Connecticut at the Rock Dam

Copyright © 2021 by Karl Meyer

When there is no WATCHDOG, there is no ENFORCEMENT.

THE: federal and state agencies and leaders responsible for implementation, protection and enforcement of laws and conditions protecting spawning, habitat, life-cycle and survival of the Connecticut River’s sole federal and state endangered migratory fish: THE CONNECTICUT RIVER SHORTNOSE STURGEON

THEIR NAMES:

Phil Glick, Chairman, Federal Energy Regulatory Commission:
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA (
Kathleen Theoharides: Sec. of MA Energy & Environmental Affairs
Martin Suuberg: Commissioner MA Department of Environmental Protection
Ron Amidon: Commissioner MA Dept. of Fish & Game
Daniel McKiernan: Director MA Division of Marine Fisheries
Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service

Here is a link to further discussion of testing the connection between the TF Canal and grim sludge at Rock Dam–w/Monte Belmonte, WRSI.com
https://wrsi.com/monte/how-to-save-the-shortnose-sturgeon/

When there is no WATCHDOG, there is no ENFORCEMENT.

Connecticut River shortnose sturgeon: a spectacular failure to protect

Posted by on 26 Mar 2020 | Tagged as: Christopher Chaney, Christopher Cheney, Clean Water Act, Connecticut River, Connecticut River pollution, Connecticut River riverbank failure, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, Endangered Species Act, EnviroSho, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, FirstLight Power Resources, Kimberly D. Bose, MA Division of Fish and Wildlife, manganese pollution, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, NMFS, P-1889, Rock Dam, Secretary Kimberly Bose, Turners Falls, Turners Falls power canal, Uncategorized, US Fish & Wildlife Service, www.whmp.com

Connecticut River shortnose sturgeon: a spectacular failure to protect
Copyright © 2020, by Karl Meyer. All rights reserved.

Photo Copyright © 2020, by Karl Meyer (click X3 to enlarge)
Well over 4 months since I registered my October 9, 2019 Comments describing critical erosion and polluting impacts on the Connecticut River at fragile habitat at the Rock Dam in Turners Falls–the sole documented natural spawning site for the federally endangered shortnose sturgeon in this river FirstLight Power Resources received instructions from the Federal Energy Regulatory Commission’s Christopher Cheney at the Office of Hydro Compliance. On February 21, 2020, they included the following:

“Dear Mr. Traester:

On October 9, 2019, we received a complaint regarding erosion in the bypassed reach of the Turners Falls Project No. 1889. According to the complaint, releases from the dam caused erosion in the area known as the Rock Dam in the project’s bypassedreach. For us to complete our review of the of the complaint, please file the followinginformation within 30 days of the date of this letter:

1. Photographs and the location(s) and an estimate of the extent(s) (e.g., height, width, depth) of the erosion in the bypassed reach identified in the October 9, 2019complaint.”

Here are some key points, verbatim, from my October 9, 2019 letter, including impacts on this fragile endangered-species spawning site and habitat—and addressing as well, federal and state laws and license conditions:

“In recent weeks I have noted increasingly steady water leakage in the riverbanks above the Rock Dam site, leading to constant water flow intrusions along these banks. Less than 400 feet away sits the downstream, outer-right banking curve of the Turners Falls power canal, which is the apparent source of these increasing water intrusions.
Photo Copyright © 2020, by Karl Meyer.

In a visit to the Rock Dam site on October 8, 2019, I noted the dramatic collapses of a long section of riverbank adjacent to the Rock Dam. This collapse, of some 25 feet in width and dropping down between 5 – 10 feet toward the river, is apparent in my attached photo. Please note that the draped yellow jacket in the foreground is approximately 3-1/2 feet across. This new bank collapse is just south, by perhaps 30 feet, from an earlier recent collapse of a smaller scale of some 6 feet across, occurring at approximately the same bank level. At both of these sites there has been a serious leaching of manganese, the red colored flow toward the river and the sand and cobbles that constitute the shortnose sturgeon spawning site and egg/embryo nursery unique to this reach. Photo Copyright © 2020, by Karl Meyer. (click X3 to enlarge)

Please take action requiring immediate remedy to this situation, which appears to concern license and statute infractions that run afoul of the federal Endangered Species Act, the Clean Water Act, and Article 17 concerning erosion; Article 19, concerning construction and maintenance; Article 18 concerning fishing access; and Article 35 concerning State Historic Preservation under the current license for P-1889.”
Photo Copyright © 2020, by Karl Meyer (click x3 to enlarge)

FirstLight responded on March 20, 2020. They included an all-but-useless satellite shot for a federal agency that has exact information on this site, and pictures of boulder-rubble that connect directly to their dumped rubble that is currently tumbling from their ancient attempts to shore up the failing Connecticut River banks above and adjacent to the TF power canal.
This is evidence of the power company’s failure in decades past. They now attempt infer that the tumbled rocks here are the work of the public and fishermen, not the failed detritus of their ongoing neglect.

FirstLight also failed to address the requested measurements from FERC. And, as to my original complaint, they leave out any mention of manganese, the intrusions and water—and it’s leaching and crumbling connections to the Turners Falls power canal; as well as failure to protect and maintain critical shortnose sturgeon spawning habitat. Nor does FL address the ESA, Clean Water Act, and current FERC license conditions required at this site. Below are excerpts from FL’s response, and below that is a link that you may be able to use to access FirstLight’s full response to FERC:

“FirstLight cannot provide dimensions of the extent of the erosion because there is no evidence of any recent erosion in this natural river channel.”
Above photo taken March 25, 2020 w/sturgeon expert Dr. Boyd Kynard at right, on the failed banks adjacent to Rock Dam. (click X3 to enlarge) Photo Copyright © 2020, by Karl Meyer.

Further, FL states, “Photographs were taken on October 29, 2019, after the October 9, 2019 complaint letter. Note moss on the rocks located within the side channel in Photos Nos. 1 and 2, indicating the preexistenceof a wet environment. Note also a Photo No. 3 showing ~12” rocks placed across the side channel. This section of the bypass reach is frequented by the public in summer months. The rocks aligned across the side channel appear to have been placed by unknown members of the general public, possibly to form a barrier or walk path across the side channel, suggesting that the channel is frequently wetted.”

You may be able to access FirstLight’s full response to FERC by copying an pasting the link below:https://elibrary.ferc.gov/idmws/file_list.asp?accession_num=20200318-5043

You may also want to Comment directly to the Federal Energy Regulatory Commission.
Here’s how:
Go to www.ferc.gov ; then to file E-Comment; from there to Documents and Filings; then to Hydro; then to Washington DC; then paste-in P-1889 for the Project # (you must have this), then check the little X Box; then address your comments to “Secretary Kimberly D. Bose” and comment away! Make sure to include your own contact information.

AND, from FERC Hydro Compliance: Christopher.Chaney@ferc.gov

Also, you may want to contact your agency representatives negotiating on the public’s behalf in the current FERC relicensing. They will assuredly forward your message to their Department Chiefs who are responsible for the CURRENT license and river conditions and enforcement:

For the National Marine Fisheries Service: julie.crocker@noaa.gov
For US Fish & Wildlife Service: ken_sprankle@fws.gov ; melissa_grader@fws.gov
For MA Div. of Fish & Wildlife: caleb.slater@state.ma.us

There’s also your federal and state/local reps: Warren, McGovern, Comerford, etc., all represent you! And, you can write to the local media—this effects all at the ground level, and into the future.

Also, a few recent radio spots addressing this issue, below, with thanks to Bob, d.o., and Glen!

The Enviro Show

The Shortnose Sturgeon are Coming to Spawn –in THIS?

Intervening for the Connecticut River Ecosystem

Posted by on 13 Nov 2019 | Tagged as: Connecticut River ecosystem, Connecticut River shortnose sturgeon, Douglas Bennett, Dr. Boyd Kynard, Endangere Species Act, ESA, Federal Conte Anadromous Fish Research Center, Federal Energy Regulatory Commission, Federal Recovery Plan, federally-endangered Connecticut River shortnose sturgeion, FirstLight Power Resources, Kleinschmidt Associates, Micah Kieffer, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, Northfield Control Room, Northfield Mountain Pumped Storage Project, P-1889, P-2485, Recovery Plan for the Shortnose Sturgeon (Acipenser brevirostrum), Rock Dam, Secretary, Section 9–Prohibition of Take Section 9(a)(1), Steven Leach, Turners Falls dam, Uncategorized, US Fish & Wildlife Service, US Fish and Wildlife Coordination Act

NOTE: below, find photographic evidence and the text of my Request for Rehearing delivered to Federal Energy Regulatory Commission Secretary Kimberly D. Bose on August 11, 2019. My request was granted. I will update this posting when FERC delivers its decision on whether FirstLight can be approved for several Transfer of License applications while being out of compliance with current license requirements that have impacted the critical habitat and spawning of a federally-endangered migratory fish. Text begins below photos.

ALSO here: https://www.youtube.com/watch?v=WZVyFgoFYyA is a link to Episode 187 of Local Bias that I recorded with host Drew Hutchison at the studios of Greenfield Community Television. It is running throughout November on GCTV, and has been broadcast in Hadley, MA, HQ home of Region 5, US Fish & Wildlife Service.


PHOTO: dewatered shortnose sturgeon spawning pool at the Rock Dam in the early hours of May 17, 2019. (Click x3 to enlarge)
Photo Copyright © 2019 by Karl Meyer All rights reserved.


PHOTO: Closed bascule gates and cut-off flow to the main stem Connecticut River on the morning of May 17, 2019. (Click x3 to enlarge)
Photo Copyright © 2019 by Karl Meyer All rights reserved.

Karl Meyer, M.S. Environmental Science
91 Smith Street
Greenfield, MA, 01301
karlmeyer1809@verizon.net

August 11, 2019

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

Request for a Rehearing of Commission’s July 11, 2019 Order Approving Transfer of License and Substitution of Relicensing Applicant for P-2485-077, FirstLight Hydro Generating Company to Northfield Mountain LLC; and P-1889-088, FirstLight Hydro Generating Company to FirstLightMA Hydro LLC.

Specifically: the FirstLight Hydro Generating Company, Project No. 2485-077 Northfield Mountain LLC) APPLICATION FOR APPROVAL OF TRANSFER OF LICENSE, SUBSTITUTION OF APPLICANT, AND REQUEST FOR EXPEDITED CONSIDERATION; and FirstLight Hydro Generating Company, Project No. 1889-088, FirstLight MA Hydro LLC ) APPLICATION FOR APPROVAL OF TRANSFER OF LICENSE, SUBSTITUTION OF APPLICANT, AND REQUEST FOR EXPEDITED CONSIDERATION

Dear Secretary Bose,

I request that the Commission rehear and review its expedited decision regarding P-2485 and P-1889. This request is being made in part because I believe the Commission erred when it stated in its approvals of the transfers under the Section D headings that “The Transferer is in Compliance with the License.”

FERC’s decision that FirstLight, in its Section 12 Discussion statements, “demonstrated this transfer is in the public Interest,” was made in error—particularly with respect to its Section 16 statements that, “Our review of the compliance history of the project shows that the licensee has been in compliance.” And further, in FERC’s Section 17 Discussion statements that, “In conclusion, we find that Northfield’s transfer application demonstrates that it is qualified to be the licensee for the project. In this case, the transferee has provided documentation showing its fitness to comply with the terms and conditions of the license.”

My request for a rehearing and withdrawal of the Commission’s July 11, 2019 decision granting these license transfers is that FirstLight was not in compliance of the terms and conditions of its license on May 17, 2019 respecting the federal Endangered Species Act, Section 9.(ESA section 9 makes it unlawful to take (harass, harm, kill, etc.) any endangered species.), as well as Article 45: “The operating of Project No. 2485 shall be coordinated with the operation of Project No. 1889.”

Section 9–Prohibition of Take Section 9(a)(1) makes it illegal to take²² an endangered species of fish or wildlife. The take prohibition has been applied to most threatened species by regulation. ²² *: Take–to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or attempt to engage in any such conduct (section 3 of the ESA–definitions). Harm means an act that actually kills or injures wildlife, and may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding, or sheltering (50 CFR § 17.3, § 222.102).

On May 9, 2019, US Geological Services Micah Kieffer, Research Fishery Biologist at the LSC Conte Anadromous Fish Laboratory detected a signal from a radio-tagged shortnose sturgeon at the Rock Dam, a documented natural SNS spawning site on the Connecticut River. Kieffer, a sturgeon specialist, set two nets in the river overnight, and returned early on the morning of May 10, 2019, to find 48 federally endangered shortnose sturgeon in those nets.

In turn, on May 13, 2019, Kieffer emailed a report of this finding in his ongoing work to biologists and various interested parties and SNS stakeholders, noting: “This past Thursday evening we dropped two gill-nets in the Rock Dam pool. Expecting to capture only a few fish, on Friday morning we instead landed 48 individuals: four females (two pre-spawning, one running, one spent) and 44 males (all running sperm) (pers. comm.)” Duly apprised of the presence and apparent spawning activity of that federal endangered species were two biologists working for FirstLight Power Resources–Steven Leach, Senior Fishery Biologist, FirstLight Power Resources, Inc., and Chris Tomichek, Senior Manager, Kleinschmidt Associates, working as a FL consultant.

In an updating May 22, 2019 email that again included fishery and agency biologists and stakeholders, including myself and FL’s Steven Leach and Chris Tomichek, Kieffer noted:

“Greetings to all SNS stakeholders:
Here is an update on the monitoring of SNS spawning at Montague for 2019. Following the May 13 report, we set additional nets on three days (May 14, 16, and 17), mostly at Rock Dam, but a few at Cabot and the Deerfield River, all day-sets to avoid excessive captures like that we experienced on 5/10. These efforts resulted in the additional capture of 11 fish on 5/14 and another 11 on 5/16 (we got skunked on the 17th). Within these efforts, we captured an additional female running eggs that received an external tag, and we also internally tagged three males, two that we PIT-tagged 25 years ago!”

Having been apprised of SNS spawning activity having been observed at Rock Dam on May 10, 2019, I found the Rock Dam spawning and rearing site had had its flows cut and its banks dewatered just a week later, on the morning of Friday, May 17, 2019. That is the same morning when Kieffer later recorded getting “skunked” at Rock Dam. Upstream, FL had shut bascule gates 2, 3, and 4, while pinching down Bascule 1 to just a few hundred CFS. See photos attached. Flow at the Rock Dam had been ramped down to a shallow lick of whitewater, while robust flows have been documented as necessities for females to remain on that spawning ground. Further, the cobble banks had been dewatered, habitat where embryos shelter and develop. The practice is lethal.

In short, FL’s actions at the dam, controlled from upstream at the Northfield Mountain Pumped Storage Station, directly interfered and imperiled SNS spawning. They did this at a time when they were apprised of SNS presence and should have executed the utmost diligence—FL, of its own volition, was in the process of implementing its own test flows for the By Pass reach.

The presence and spawning activity requirements of shortnose sturgeon in the project areas–and within the influences of P-1889 and P-2485 has been known by the license holders for decades. Indeed, several studies were referenced in the PAD, before the beginning of the current relicensing:

From the Northfield Mountain/Turners Falls Pre-Application Document, October 2012, Section 6:

LITERATURE AND INFORMATION SOURCES CITED IN THE DESCRIPTIONS AND SUMMARIES OF EXISTING RESOURCE DATA (18 C.F.R. § 5.6 (c)(2)), pp. 297. – 301
Fish and Aquatic Resources, Sections 6-3, 6-4, 6-5.

Kieffer, Micah & Boyd Kynard. (2007). Effects of Water Manipulations by Turners Falls Dam Hydroelectric Complex Rearing Conditions for Connecticut River Shortnose Sturgeon Early Life Stages. S.O. Turners Falls. MA: Conte Anadromous Fish Research Center.

National Marine Fisheries Service (NMFS). (1998). Recovery Plan for the Shortnose Sturgeon (Acipenser brevirostrum). Prepared by the Shortnose Sturgeon Recovery Team for the National Marine Fisheries Service, Silver Spring, Maryland. 104 pages.

In an email to SNS stakeholders from FirstLight Manager Douglas Bennett, responding to an inquiry from US Fish & Wildlife Biologist Melissa Grader about see-sawing flows and bascule gate settings, Bennett noted that the FL settings impacting SNS spawning and habitat in the By Pass at Rock Dam in the P-1889 Project area had been implemented in the control room of NMPS, P-2485:

“On Friday morning at approximate 1000 the flows receded enough so that the 6500 cfs by-pass flows were initiated by discharging 4400 cfs over Bascules 1 and 4 and 2100 cfs at TF #1 Station.

The 6500 cfs by-pass flows were maintained until 2400 on Saturday evening when by-pass flows were dropped to 4400 cfs, discharging 2400over Bascule gate 1 and 2100 at TF #1 Station. This was an error on our part due to misinterpretation of conflicting schedules in the Northfield Control Room. Corrective actions have been taken to prevent this going forward.”

I witnessed the Rock Dam water-starved and bank-exposed at 5:30 a.m., and my photo of the listless spill with ONLY Bascule 1 open, was taken at 7:30 a.m. Mr. Bennett’s note states that flows had not come down enough to implement FL-initiated test flows until 1000 hrs. He did not mention the setting hours earlier that I documented. Thus, apparently, there had been a ramping down of the bascule from within the NMPS control room sometime in the early morning hours, with the result of further impacts on spawning SNS through a jumble of see-sawing gate settings.

The Commission notes in its granting of these Transfers that “Section 8 of the FPA requires “any successor or assign of the rights of such licensee . . . shall be subject to all the conditions of the license under which such rights are held by such licensee and also subject to all the provisions and conditions of [the FPA] to the same extent as though such successor as assign were the original licensee.”24. FirstLight, at a time when it was apprised of the presence of a federally endangered species did not meet its license requirements here—regarding the ESA Section 9, and the only federally-endangered migratory fish in the Connecticut River

The Commission further stated that, “Northfield is affiliated with companies in the operation and maintenance of hydroelectric projects and will have access to their expertise.” Their actions clearly demonstrate there was no expertise shown or relayed between P-2485 and P-1889 at this critical time.

The Commission noted, in their decision: “In conclusion, we find that Northfield’s transfer application demonstrates that it is qualified to be the licensee for the project. In this case, the transferee has provided documentation showing its fitness to comply with the terms and conditions of the license.”

Their actions clearly call the company’s fitness to operate these plants into question. Is FERC’s finding that these transfers are “in the public’s interest” valid? FL clearly did not coordinate operations between P-2485 and P-1889 at this critical time, which is clearly spelled out in Article 45 of their license. Those actions should have been updated with the Commission and investigated before a Transfer finding was granted. An investigation and exploration of impacts and penalties under Section 9 of the ESA should be undertaken by the Commission before these transfers are validated.

I therefore request that the Commission undertake a rehearing of these license transfers. The grantor and grantee need to demonstrate they can comply with federal regulations to operate these facilities. Please see attachments.

Thank you for your careful review of these matters.

Sincerely,
Karl Meyer