Intervening for the Connecticut River Ecosystem

Posted by on 13 Nov 2019 | Tagged as: Connecticut River ecosystem, Connecticut River shortnose sturgeon, Douglas Bennett, Dr. Boyd Kynard, Endangere Species Act, ESA, Federal Conte Anadromous Fish Research Center, Federal Energy Regulatory Commission, Federal Recovery Plan, federally-endangered Connecticut River shortnose sturgeion, FirstLight Power Resources, Kleinschmidt Associates, Micah Kieffer, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, Northfield Control Room, Northfield Mountain Pumped Storage Project, P-1889, P-2485, Recovery Plan for the Shortnose Sturgeon (Acipenser brevirostrum), Rock Dam, Secretary, Section 9–Prohibition of Take Section 9(a)(1), Steven Leach, Turners Falls dam, Uncategorized, US Fish & Wildlife Service, US Fish and Wildlife Coordination Act

NOTE: below, find photographic evidence and the text of my Request for Rehearing delivered to Federal Energy Regulatory Commission Secretary Kimberly D. Bose on August 11, 2019. My request was granted. I will update this posting when FERC delivers its decision on whether FirstLight can be approved for several Transfer of License applications while being out of compliance with current license requirements that have impacted the critical habitat and spawning of a federally-endangered migratory fish. Text begins below photos.

ALSO here: https://www.youtube.com/watch?v=WZVyFgoFYyA is a link to Episode 187 of Local Bias that I recorded with host Drew Hutchison at the studios of Greenfield Community Television. It is running throughout November on GCTV, and has been broadcast in Hadley, MA, HQ home of Region 5, US Fish & Wildlife Service.


PHOTO: dewatered shortnose sturgeon spawning pool at the Rock Dam in the early hours of May 17, 2019. (Click x3 to enlarge)
Photo Copyright © 2019 by Karl Meyer All rights reserved.


PHOTO: Closed bascule gates and cut-off flow to the main stem Connecticut River on the morning of May 17, 2019. (Click x3 to enlarge)
Photo Copyright © 2019 by Karl Meyer All rights reserved.

Karl Meyer, M.S. Environmental Science
91 Smith Street
Greenfield, MA, 01301
karlmeyer1809@verizon.net

August 11, 2019

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

Request for a Rehearing of Commission’s July 11, 2019 Order Approving Transfer of License and Substitution of Relicensing Applicant for P-2485-077, FirstLight Hydro Generating Company to Northfield Mountain LLC; and P-1889-088, FirstLight Hydro Generating Company to FirstLightMA Hydro LLC.

Specifically: the FirstLight Hydro Generating Company, Project No. 2485-077 Northfield Mountain LLC) APPLICATION FOR APPROVAL OF TRANSFER OF LICENSE, SUBSTITUTION OF APPLICANT, AND REQUEST FOR EXPEDITED CONSIDERATION; and FirstLight Hydro Generating Company, Project No. 1889-088, FirstLight MA Hydro LLC ) APPLICATION FOR APPROVAL OF TRANSFER OF LICENSE, SUBSTITUTION OF APPLICANT, AND REQUEST FOR EXPEDITED CONSIDERATION

Dear Secretary Bose,

I request that the Commission rehear and review its expedited decision regarding P-2485 and P-1889. This request is being made in part because I believe the Commission erred when it stated in its approvals of the transfers under the Section D headings that “The Transferer is in Compliance with the License.”

FERC’s decision that FirstLight, in its Section 12 Discussion statements, “demonstrated this transfer is in the public Interest,” was made in error—particularly with respect to its Section 16 statements that, “Our review of the compliance history of the project shows that the licensee has been in compliance.” And further, in FERC’s Section 17 Discussion statements that, “In conclusion, we find that Northfield’s transfer application demonstrates that it is qualified to be the licensee for the project. In this case, the transferee has provided documentation showing its fitness to comply with the terms and conditions of the license.”

My request for a rehearing and withdrawal of the Commission’s July 11, 2019 decision granting these license transfers is that FirstLight was not in compliance of the terms and conditions of its license on May 17, 2019 respecting the federal Endangered Species Act, Section 9.(ESA section 9 makes it unlawful to take (harass, harm, kill, etc.) any endangered species.), as well as Article 45: “The operating of Project No. 2485 shall be coordinated with the operation of Project No. 1889.”

Section 9–Prohibition of Take Section 9(a)(1) makes it illegal to take²² an endangered species of fish or wildlife. The take prohibition has been applied to most threatened species by regulation. ²² *: Take–to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or attempt to engage in any such conduct (section 3 of the ESA–definitions). Harm means an act that actually kills or injures wildlife, and may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding, or sheltering (50 CFR § 17.3, § 222.102).

On May 9, 2019, US Geological Services Micah Kieffer, Research Fishery Biologist at the LSC Conte Anadromous Fish Laboratory detected a signal from a radio-tagged shortnose sturgeon at the Rock Dam, a documented natural SNS spawning site on the Connecticut River. Kieffer, a sturgeon specialist, set two nets in the river overnight, and returned early on the morning of May 10, 2019, to find 48 federally endangered shortnose sturgeon in those nets.

In turn, on May 13, 2019, Kieffer emailed a report of this finding in his ongoing work to biologists and various interested parties and SNS stakeholders, noting: “This past Thursday evening we dropped two gill-nets in the Rock Dam pool. Expecting to capture only a few fish, on Friday morning we instead landed 48 individuals: four females (two pre-spawning, one running, one spent) and 44 males (all running sperm) (pers. comm.)” Duly apprised of the presence and apparent spawning activity of that federal endangered species were two biologists working for FirstLight Power Resources–Steven Leach, Senior Fishery Biologist, FirstLight Power Resources, Inc., and Chris Tomichek, Senior Manager, Kleinschmidt Associates, working as a FL consultant.

In an updating May 22, 2019 email that again included fishery and agency biologists and stakeholders, including myself and FL’s Steven Leach and Chris Tomichek, Kieffer noted:

“Greetings to all SNS stakeholders:
Here is an update on the monitoring of SNS spawning at Montague for 2019. Following the May 13 report, we set additional nets on three days (May 14, 16, and 17), mostly at Rock Dam, but a few at Cabot and the Deerfield River, all day-sets to avoid excessive captures like that we experienced on 5/10. These efforts resulted in the additional capture of 11 fish on 5/14 and another 11 on 5/16 (we got skunked on the 17th). Within these efforts, we captured an additional female running eggs that received an external tag, and we also internally tagged three males, two that we PIT-tagged 25 years ago!”

Having been apprised of SNS spawning activity having been observed at Rock Dam on May 10, 2019, I found the Rock Dam spawning and rearing site had had its flows cut and its banks dewatered just a week later, on the morning of Friday, May 17, 2019. That is the same morning when Kieffer later recorded getting “skunked” at Rock Dam. Upstream, FL had shut bascule gates 2, 3, and 4, while pinching down Bascule 1 to just a few hundred CFS. See photos attached. Flow at the Rock Dam had been ramped down to a shallow lick of whitewater, while robust flows have been documented as necessities for females to remain on that spawning ground. Further, the cobble banks had been dewatered, habitat where embryos shelter and develop. The practice is lethal.

In short, FL’s actions at the dam, controlled from upstream at the Northfield Mountain Pumped Storage Station, directly interfered and imperiled SNS spawning. They did this at a time when they were apprised of SNS presence and should have executed the utmost diligence—FL, of its own volition, was in the process of implementing its own test flows for the By Pass reach.

The presence and spawning activity requirements of shortnose sturgeon in the project areas–and within the influences of P-1889 and P-2485 has been known by the license holders for decades. Indeed, several studies were referenced in the PAD, before the beginning of the current relicensing:

From the Northfield Mountain/Turners Falls Pre-Application Document, October 2012, Section 6:

LITERATURE AND INFORMATION SOURCES CITED IN THE DESCRIPTIONS AND SUMMARIES OF EXISTING RESOURCE DATA (18 C.F.R. § 5.6 (c)(2)), pp. 297. – 301
Fish and Aquatic Resources, Sections 6-3, 6-4, 6-5.

Kieffer, Micah & Boyd Kynard. (2007). Effects of Water Manipulations by Turners Falls Dam Hydroelectric Complex Rearing Conditions for Connecticut River Shortnose Sturgeon Early Life Stages. S.O. Turners Falls. MA: Conte Anadromous Fish Research Center.

National Marine Fisheries Service (NMFS). (1998). Recovery Plan for the Shortnose Sturgeon (Acipenser brevirostrum). Prepared by the Shortnose Sturgeon Recovery Team for the National Marine Fisheries Service, Silver Spring, Maryland. 104 pages.

In an email to SNS stakeholders from FirstLight Manager Douglas Bennett, responding to an inquiry from US Fish & Wildlife Biologist Melissa Grader about see-sawing flows and bascule gate settings, Bennett noted that the FL settings impacting SNS spawning and habitat in the By Pass at Rock Dam in the P-1889 Project area had been implemented in the control room of NMPS, P-2485:

“On Friday morning at approximate 1000 the flows receded enough so that the 6500 cfs by-pass flows were initiated by discharging 4400 cfs over Bascules 1 and 4 and 2100 cfs at TF #1 Station.

The 6500 cfs by-pass flows were maintained until 2400 on Saturday evening when by-pass flows were dropped to 4400 cfs, discharging 2400over Bascule gate 1 and 2100 at TF #1 Station. This was an error on our part due to misinterpretation of conflicting schedules in the Northfield Control Room. Corrective actions have been taken to prevent this going forward.”

I witnessed the Rock Dam water-starved and bank-exposed at 5:30 a.m., and my photo of the listless spill with ONLY Bascule 1 open, was taken at 7:30 a.m. Mr. Bennett’s note states that flows had not come down enough to implement FL-initiated test flows until 1000 hrs. He did not mention the setting hours earlier that I documented. Thus, apparently, there had been a ramping down of the bascule from within the NMPS control room sometime in the early morning hours, with the result of further impacts on spawning SNS through a jumble of see-sawing gate settings.

The Commission notes in its granting of these Transfers that “Section 8 of the FPA requires “any successor or assign of the rights of such licensee . . . shall be subject to all the conditions of the license under which such rights are held by such licensee and also subject to all the provisions and conditions of [the FPA] to the same extent as though such successor as assign were the original licensee.”24. FirstLight, at a time when it was apprised of the presence of a federally endangered species did not meet its license requirements here—regarding the ESA Section 9, and the only federally-endangered migratory fish in the Connecticut River

The Commission further stated that, “Northfield is affiliated with companies in the operation and maintenance of hydroelectric projects and will have access to their expertise.” Their actions clearly demonstrate there was no expertise shown or relayed between P-2485 and P-1889 at this critical time.

The Commission noted, in their decision: “In conclusion, we find that Northfield’s transfer application demonstrates that it is qualified to be the licensee for the project. In this case, the transferee has provided documentation showing its fitness to comply with the terms and conditions of the license.”

Their actions clearly call the company’s fitness to operate these plants into question. Is FERC’s finding that these transfers are “in the public’s interest” valid? FL clearly did not coordinate operations between P-2485 and P-1889 at this critical time, which is clearly spelled out in Article 45 of their license. Those actions should have been updated with the Commission and investigated before a Transfer finding was granted. An investigation and exploration of impacts and penalties under Section 9 of the ESA should be undertaken by the Commission before these transfers are validated.

I therefore request that the Commission undertake a rehearing of these license transfers. The grantor and grantee need to demonstrate they can comply with federal regulations to operate these facilities. Please see attachments.

Thank you for your careful review of these matters.

Sincerely,
Karl Meyer

INSIDE A FERC LICENSING PROCESS: the Federal Energy Regulatory Commission and the State of the Connecticut River in Massachusetts

Posted by on 31 Jul 2019 | Tagged as: climate-heating, Connecticut River, Connecticut River shortnose sturgeon, Dr. John Waldman, Endangered Species Act, Federal Energy Regulatory Commission, FERC Commissioner Neil Chatterjee, MA Division of Fish and Wildlife, National Freshwater Marine Sanctuary, National Marine Fisheries Service, Northfield Mountain Pumped Storage Project, Riverkeeper, Scott Pruitt, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Turners Falls dam, US Environmental Protection Agency, US Fish & Wildlife Service, USFWS

Inside a FERC Licensing Process: The Federal Energy Regulatory Commission and the State of the Connecticut River in Massachusetts

Copyright © 2019 by Karl Meyer All rights reserved.


The Connecticut River below Turners Falls Dam. Photo Copyright © 2019 by Karl Meyer All rights reserved. (NOTE: Click, then click twice more to enlarge.)

“River conditions miserable; relicensing progress, negligible. No end in sight.”

Note: the following is a long-form letter to Dr. John Waldman, CUNY Queens College professor of biology. John dropped a friendly note inquiring as to the state of affairs on the Connecticut River. I replied I would like get back to him in some detail, with a view toward publishing those extended thoughts. Besides his teaching, John is an award-winning author of several books. He has been a long-time advocate for the restoration of the Hudson River and its environs. We met some years back when I took him on a tour of the Connecticut River reaches I write about here. John was in the process of completing, RUNNING SILVER: Restoring Atlantic Rivers and Their Great Fish Migrations, published by Lyons Press (2013). He is an avid angler and a fierce defender of rivers.

Karl Meyer
Greenfield MA 01301 July 31, 2019

John Waldman, Professor of Biology
Queens College, CUNY
Queens, NY 11367

Hi John,

You asked me sometime back how things were going on the “mighty Connecticut?” Sorry it’s taken a while to get back to you.

As you know, the real news—as it were, is all bound up in the Federal Energy Regulatory Commission’s 5-year relicensing process for Northfield Mountain Pumped Storage Project, P-2485, and Turners Falls/Cabot Hydro Project, P-1889. That ponderous process for these tandemly-operated, peaking electric facilities, began way back in August of 2012. All the while some 10 miles of the Connecticut have been essentially strangled and broken here since 1972, when the Northfield Mountain Pumped Storage Station came on-line in concert with the now-shuttered Vermont Yankee Nuclear Plant, just upstream in Vermont. Overall, NMPS’s massive pump-and-purge water appetite impacts flows and habitat across 50 river miles in three New England states.

VY closed permanently in 2014. Instead of being pulled from daily service at that time and kept on as a reserve emergency power source for summer and winter grid-stress days, NMPS somehow has been allowed to soldier-on by importing giant surges of electricity from distant power sources, battering an ecosystem with deadly, pumped storage suction and creating artificial tides here daily, some 70 miles above the nearest reach of Long Island Sound tidal impacts at Hartford.

Of course NMPS has never produced, and will never produce, a single watt of its own virgin power. This is not renewable energy, and Northfield is not “hydro” power, as people think. It is recycled nuclear, natural gas, oil, coal, etc., power taken directly off the grid to do the unseemly work of suctioning a river backward. Pumped storage is the only category that shows up on regional power grids as turning in a negative percentage of power production. It’s a river-killing technology–a bulk power relay switch ferrying the climate-heating juice of a disastrously warming planet.

If I were to put into the fewest possible words how things are going on the mighty Connecticut it would read something like: “River conditions miserable; relicensing progress, negligible. No end in sight.”

It all seems to work in favor of the corporation—which, if you try and look beneath all the legal paperwork permutations still is ultimately parent-owned by Canada–the country, to the detriment of a four-state US river and ecosystem, and dozens of communities in Massachusetts, Vermont and New Hampshire. The biological losers, besides the citizenry, include—among others, the federally-endangered shortnose sturgeon, and federal trust species including American shad and blueback herring.

Further below you’ll find part of the asset transfer paperwork entered into this FERC relicensing record on Wednesday, July 17th, via the company’s Washington law firm, a limited legal partnership. They’ve essentially split these intimately-integrated components—Northfield Mountain Pumped Storage and Turners Falls power canal/Cabot Station, into a handful of separate limited liability companies, all now registered as corporations in the state of Delaware.

As you know, these peaking/re-peaking projects have proven major stumbling blocks to river connectivity and real anadromous/diadromous fish restoration above Holyoke Dam into wide open Vermont and New Hampshire habitats. There has long-existed fifty-miles of essentially empty and infinitely-restorable river spawning and rearing habitat for shad, lamprey, bluebacks, etc., in those New England states.

But the Connecticut is sucked into reverse for up to a mile downstream via NMPS’s monstrous water appetite. Chewing through 15,000 cubic feet per second of CT River flow for hours when pumping, it extirpates virtually all the river life it inhales—fish, eels, eggs, etc. And, in grim concert, the riverbed below Turners Falls Dam is left all but an empty bedrock relic many months out of the year—as the flow from Northfield is re-peaked into their three-mile long power canal below that dam.

Today as I write, there are three miles of exposed rocky riverbed baking in the sun in 93F degree heat. The company is actually required to only dribble 125 cubic feet per second of water into this Dead Reach from a point just below the dam. The rest is corralled for Northfield’s huge appetite and for shunting into that canal. Thus, the Connecticut River itself is essentially broken at this point. And, no nourishing, connecting flow to make it a viable river and waterway will be required again until NEXT April, at the earliest. It just sits—baking, starved of water.

During this spring’s migration season just over 7% of the 315,000 shad that passed Holyoke Dam were tallied passing Turners Falls. Those numbers do not even approach the passage numbers achieved here mid-1980s. That’s absurd.

Plus, during peak shortnose sturgeon spawning season operators inside Northfield Mountain pinched off spawning flows at the key site known as Rock Dam during a period when investigations by USGS fish biologists had demonstrated that 4 dozen of members of that federally-endangered species were present. The ancient pool at the Rock Dam site is their only documented natural spawning site in the entire river ecosystem.

This occurred during a time when the power company was conducting their own test flows to potentially move tagged American shad upstream through that water-starved Dead Reach which includes Rock Dam. I witnessed and documented the flow cuts one morning, and another federal fisheries biologist witnessed the same brutal draw-down two days later.

An email confirmed those grim impacts on those spawning sturgeon were caused by the operators 7 miles upstream inside the Northfield Mountain Mountain Pumped Storage Station, who control the Turners Falls Dam. The company has long been fully apprized during this federal relicensing process that shortnose sturgeon spawn here from mid-April past the third week of May, yet they pinched the flows shut and egg-sheltering banks were dewatered. That’s deadly. It’s what’s known as a taking under the Endangered Species Act.

Days later, a commercial rafting company was documented making repeat runs over that single, tiny rapid at the Rock Dam, while repeatedly entering onto sensitive wetland habitats on the island adjacent in rerunning those very brief joy rides.

As you know, a single instance of interference with a federally-endangered shortnose sturgeon is subject to a fine of $49,000 and possible jail time. If this was an individual citizen destroying spawning habitat and crippling reproduction–rather than a “corporate” citizen, I’m sure they would’ve ended up in court, fined, and answering to the law. I think if there was a worthy watchdog on the Connecticut, the company would have been sued, and a judgment sought. If the judgement of a taking of say 20 endangered shortnose sturgeon was rendered, at $49k per fish, we are talking serious river protection money! Here? Nada. Due diligence? Any diligence??

Alas, we really have no enforcing non-profit watchdog here on the Connecticut like you have with Riverkeeper and its battery of lawyers on the Hudson. There’s no enforcement or taking the corporations to court here on our 4-state Connecticut. That’s certainly why conditions are so miserable, despite the presence of long-settled law, the ESA and CWA statutes. No NGO teeth.

Our resident NGO did change its name a year or so back, but not its mission and mandate. And what’s always been needed here is that promise to prosecute corporations and take government agencies to court when they fail to enforce environmental mandates and do their jobs. The one we have submits lots of “comments.”

OK, they also hold a big river clean-up—offering high PR visibility for questionable corporate sponsors who have a legacy of nuclear waste left in their wake here, and they do some water quality testing. They also plant trees with grant money, and pull aquatic weeds. But, since producing several guides for boaters on the Connecticut, some of their key constituencies are the promoters of recreational and commercial paddle sports here—kayakers, rafters, canoeists.

They are pushing to get these interests portage and river access to the long-abused, critical habitats immediately below Turners Falls Dam. I have stated publicly any number of times that in a just world this tiny reach would be designated a National Freshwater Marine Sanctuary, so critical is it to this ecosystem—upstream and down.

Given the fragile biological, historical and cultural nature of those three river-miles—recreational and commercial watercraft pursuits are the absolute last pursuits that should be allowed there. But, guess what? That little NGO just entered their for-the-record “comments” into this FERC relicensing for their vision of new recreation access in that fragile reach—where over a dozen state- and federally- listed species are struggling for survival. It reads more like a marketing and development plan: new parking spaces, a trail cut onto an island for repeat runs over the tiny Rock Dam and habitat of endangered sturgeon and what may be the last place in the reach where state-endangered yellow lampmussels were documented.

I really have no idea whether they have ever looked up the definition of conservancy.

They want three or four new accesses designed for this tiny reach, as well as a road cut for emergency vehicles and a ramp-slide for watercraft. Makes you wonder who is donating to them. This is a mostly-forgotten, fragile biological gem, adjacent to a tiny backwater neighborhood of old factory double-decker homes—and you can just see it being turned into something commercialized and soulless…

It’s a damned good thing they have no actual conditioning authority in this relicensing. I think USFWS, National Marine Fisheries, MA Natural Heritage, MA Historical Commission, and several federal- and state recognized Native American tribes will be looking at this with some shock. At the very least, that NGO’s director should step down as vice chair and MA public-sector representative on the Connecticut River Atlantic Salmon Commission. It’s been two years now, but it’s more like a sycophant position for the NGO–since they get channeled grant monies through the fed and state agencies that they should be watch-dogging over. So, it’s like a cheerleading slot. Before that, the MA public sector slot on CRASC sat empty for seven years, but at least it was a do-no-harm arrangement.

They really need to look up the definition of conservancy.

Unfortunately John, that’s the state of affairs in this critical section of the Connecticut, tottering on the brink between resurrection and conservation protections, and their vision of the river as an attraction for tide of tourist-joyriders with little regard for place, or species, or the intrinsic right for a river to just live and heal; as a life giving entity in its own right. It’s merely a fun-time commodity. Sad, that we have no legal team or NGO operating under the watchdog/enforcement mode here. Lacking that bedrock necessity, a Connecticut River with monitored–and enforced, protections and life-giving flows in the future seems a highly unlikely prospect, no matter what gets written into a new license.

Unless, another organization steps into the breach–bringing consistent enforcement and a willingness to drag crimes against this ecosystem into the courtroom every time they occur. We need an every-day enforcement presence like you have on the Hudson.

Howsoever, I will say that the US Fish & Wildlife Service’s goal for Turners Falls Dam in these proceedings–after gathering research from long-range studies and examining decades of passage data, is: 75% of all the fish that pass Holyoke will be required to pass TF safely. After four decades of failed fish passage here, they appear solid on that goal being met through this relicensing. That passage, upstream and down, is required via the 1872 landmark Supreme Court decision in Holyoke Company vs. Lyman, as you know—decided exactly a century before NMPS began swallowing the Connecticut River and all manner of its migratory and resident fish. Its full impacts have never been calculated nor compensated–to even the smallest measure.

There’s one other ember of good news here: for the second year in a row a SINGLE blueback herring passed Turners Falls Dam. They hadn’t been seen here in most of a decade, though thousands used to pass back in the 1980s. It’s a federal trust species with its back against the wall. Good to see even the tiniest biological thread holding on.

The other test the power company is currently conducting–of its own volition vis-à-vis this relicensing: little swaths of mesh net have been placed in front of the massive sucking mouth of Northfield Mountain—purportedly to prevent that gaping maw from feasting on millions of tiny, young-of-year shad each spring, as well as adult American eels on their way downstream. Early YOY study results from fish agencies hinting that the reach at Northfield is the least productive of this river’s dammed sections. Wonder why??

The absolute brilliance of this “trial”, is they are going to project how effective a 1,000-plus foot net across the intake might be for decades into the future—by staking out several test panels that are about the size of high school flags in front of that giant pipe, during various sucking flows. I’m sure that’s gonna prove an effective snapshot of how a ponderous mega-net might perform for decades to come! Ludington Pumped Storage and lake trout should be the cautionary tale…

Of course, as the Federal Energy Regulatory Commission let’s this bloated process go on, ad infinitum, we may all be dead before Vermont and New Hampshire get their long-deserved shad runs, and those shortnose sturgeon–which you assisted as a reviewer in their Federal Recovery Plan, receive flows that guarantee they actually can spawn and are able to begin the slow slog toward viable species-status.

Ok, just to give you a flavor of what rights and privileges a ten dollar (yes $10.00) tax shelter sale in this key reach in a 4-state ecosystem that is part-and-parcel of the Silvio O. Conte Connecticut River National Fish & Wildlife Refuge can offer, please see the included clauses below. THEY ARE HEART-BREAKING in the midst of a 5-year FERC relicensing process that is now set to begin its 8th year, if my math is correct. We began meeting in August 2012.

And, John, the company and its consultants do not seem in any hurry to bring this process to a close. The last negotiation with conditioning federal and state fisheries agencies took place in mid-winter. Basically, the parties all stated their positions; then walked away with no further meetings scheduled. This was, of course, after they made their surprise December 20, 2018 filing to break the company up into little, Delaware-registered, llc tax silos… Some ten agencies and stakeholder interests have filed protests with FERC and been granted Intervener status, myself included.

Here is an excerpt from that conveyance document:

“In consideration of the covenants and agreements contained herein and the payment of $10.00 and other good and valuable consideration, the receipt of which is hereby acknowledged by the Grantor, the Grantor and the Grantee hereby agree as follows:

The Grantor hereby grants, bargains, sells, and conveys to the Grantee, and its
successors and assigns, with Quitclaim Covenants, a perpetual nonexclusive right and easement for the purposes set forth below in, on, over, under, across and through the Property identified on Exhibit “A” attached hereto.

The rights and easements conferred hereby shall include, but not be limited to, the right, at any time and from time to time and without payment of damages or further consideration to:

1. Alter the level of the Connecticut River and of its tributaries to any extent by
withdrawing water from said River and returning the same water in whole or in part by
the use of structures now or hereafter forming part of the Northfield Mountain Pumped
Storage Project, FERC No. 2485;

2. Retard, accelerate, reverse, or divert the flow of said river and of said tributaries,thereby causing an increase or decrease in the percolation, seepage, or flowage of waterupon, over, and under or from the Premises described and identified in Exhibit A notwithstanding that by such percolation, seepage, or flowage damage may be caused directly or indirectly to the said Premises or to any one of them or to structures, personal property or trees or vegetation thereon;

3. To erect and maintain upon the Premises so subject suitable gauges to measure and
record the flow and level of the said river and said tributaries;

4. To enter upon said Premises for the aforesaid purposes and for the purpose of removing any trees or other vegetation which may be injured or destroyed by the flowage
aforesaid; and

5. As an incident of the foregoing, cause an increase or decrease in the flowage of water orice upon, over, or from said Premises, notwithstanding that portions thereof subject tothe aforesaid rights and easements may be washed away or added to by the action ofwater or ice and that damage may be caused thereto and to structures or vegetation thereon or adjacent thereto by flowage, seepage, percolation, erosion, accretion,interference with drainage, or otherwise.”

Northfield Mountain Pumped Storage remains today the same ecosystem killer it was when it came on line in 1972. Absent in any of these proceedings has been its grim impacts on resident fish species across 4-1/2 decades. It is both an engine and enabler of climate change, as it sucks in 34% more natural gas- and nuclear-produced juice from the grid than it ever sends back as 2nd hand, peak-priced electricity.

FYI: the weakest partner with conditioning authority in all these years has been MA Division of Fish & Wildlife—the sole agency that has had authority to reopen the current license across all these decades concerning failed fish passage. They sat on their hands, mum, while anadromous fish passage nearly disappeared above Turners Falls Dam in the first decade of this century—dropping at times to 1% or less. It all adds up to what a massive taking has occurred here in Massachusetts across the decades via the operations of Northfield Mountain and Turners Falls. Vermont and New Hampshire have been hereby impoverished as well During these relicensing hearings MA Fish & Wildlife has shown little in the way of leadership. It’s an embarrassment for this Commonwealth.

I will, however, recognize that the MA Natural Heritage people and the Dept. of Environmental Protection have shown up and been active partners in environmental safeguarding during these proceedings.

Otherwise, the federal fish and environmental agencies—the people I sit with on the Fish and Aquatics Study Team, have ultimately shown great expertise and resolve in enforcing US statutory law and long-standing environmental mandates respecting a new license. I think the US Fish & Wildlife Service and the National Marine Fisheries Service recognize their responsibilities to get it right this time—and to protect this four-state New England River for the citizens of the United States as the heart of the US Silvio O. Conte Connecticut River Fish & Wildlife Refuge. They are proving forthright and honest brokers on behalf of the citizens they work for.

As you may know, I am the only recognized stakeholder/intervener in these proceedings who has not signed one of those grim non-disclosure agreements with the company. I have thus become a conduit for nearly all the relicensing information reaching the public on several platforms in this largely unseen process.

But as I write this I begin to wonder: since these intimately intertwined projects have now become a series of new LLC outfits–are all those agencies and towns still bound by non-disclosure agreements they signed years ago with a different company? The company’s behavior in that regard has been so snake-like that it hardly seems relevant or appropriate to hold back information from the public about their river at this time. It’s been like an in-your-face demonstration of the rootlessness and stark profit motives of the new “corporate citizenship.”

And, nowhere have I heard any hint that these newly-configured, on-paper companies are interested in coming to settlement terms any time soon.

With those actions driving the parties apart, why not just move it in front of FERC rather than watching and waiting for these venture capitalists’ next power move? Every year these proceedings drag on the Connecticut River ecosystem continues to fray and fracture along these miserable miles of broken river basin. And every year the company continues to profit from FERC’s extension of the current license. In the interim they’ve participated in helping change operational parameters for pumped storage payments and participation in ISO markets. The power companies sculpt the laws that FERC imposes.

And, of course, every year they do not have to put a shovel in the ground to construct mandatory fish passage is more money in the bank for them and their venture capital investors. The bulk power grid, FERC and ISO New England are some of the key engines of our climate crisis. Only distributed generation and micro-grid reorganization—stopping us from blithely consuming the glut of imported power that fuels our massive over-consumption, will offer us a way out of this emergency. Those new, localized power configurations would also guarantee routes around the looming threat of massive cyber attacks on this behemoth of a power grid.

Something called NEPOOL, a consortium of New England corporate power producers, really wags the dog that is ISO New England. And FERC generally rubber stamps their positions. And, FERC won’t even consider ruling on any given projects’ climate impacts or GHG emission contributions to an overheating planet. Not once. Seems they’ve never met a power project they didn’t embrace.

Hell, both NEPOOL and ISO ban the media outright from their meetings. They do not provide or disclose critical information needed for the public to understand and trust the decisions made about the grid, power production, energy sources, distribution and its import in the current climate crisis. It’s all backroom stuff. One of this company’s own executives testified in Washington hearings in support of continuing to ban the media from these critical, precedent-setting, energy meetings. As stakeholders we are denied data and information on what this power company pays for the glut of grid power it imports while it sells an ecosystem down the river, offering it back in deadened, second-hand, peak-priced juice.

There is speculation from folks I know who design and install solar projects and metering that this company may not actually be paying ANYTHING at times when the power grid is so bloated with excess juice at certain times and seasons. Bulk power producers pay to have it taken off their hands in what’s called “negative pricing”. How much money are they making? How much of a free ride is this boondoggle getting? Just a year and a half back the Federal Energy Regulatory Commission’s current chair Neil Chatterjee and now-disgraced former EPA chief Scott Pruitt made an all-but-secret visit to Northfield Mountain. No media; no witnesses. What does that tell you?

But then it’s always been pretty much at free ride at Northfield, having never paid for nearly a half century of unmeasured annual fisheries carnage. That’s been a taking on a massive scale: federal-trust migratory—and, resident fish, both.

The public really has no idea that this contraption can really only regenerate a few HOURS of dense, second hand juice, after which it is literally and completely dead in the water—and has to start hoovering-up endless juice from the grid once more, while sucking all manner of aquatic life through its deadly turbines. Its profits–and purchase price mechanisms are all shielded from the public in this FERC/ISO/NEPOOL process. It’s is an abomination of democracy.

Reregulating the energy market here presents the only open path to realigning our energy production, distribution and use with societal needs in the face of a climate crisis reaching a critical precipice. However, our governor here seems quite happy to farm-out our climate responsibilities and import-in massive amounts of what are termed green megawatts. Huge build-outs going on in Boston and elsewhere–casinos, luxury high-rise condos, giant, energy- sucking marijuana grow-houses. It’s all sleight of hand. Robbing Peter to pay Paul.

Rivers are the cooling arteries of this planet, and the Connecticut is the heart of an ecosystem stretching from the Quebec border to the estuary at Long Island Sound.

History will remember the inaction and misrepresentation of these corporate rogues and complicit bureaucrats in our time of climate crisis. Seems obvious that none of them have granddaughters or grandsons they worry for, in the draconian future they are helping engineer…

Well John, that’s plenty enough cheer from here.

BTW, how are things over on the mighty Hudson??

All best,
Karl

Precise, Repeatable Flow Measurements Required in FERC Licensing Studies

Posted by on 19 Apr 2019 | Tagged as: 5-year FERC licensing process, American shad, bascule gates, By Pass Reach, Connecticut River, Federal Energy Regulatory Commission, FERC, FERC licensing process, FirstLight, Northfield Mountain Pumped Storage Project, repeatable metric, Revised Study Plan, Secretary Kimberly Bose, staff gauges, Station 1, Turners Falls, Turners Falls dam


Turners Falls Dam with Spill on the Right Emanating from Two Bascule Gates. Photo Copyright © 2019 by Karl Meyer. All Rights Reserved. CLICK, then CLICK again.

(NOTE: the following Stakeholder Comments were accepted by the Federal Energy Regulatory Commission on April 18, 2019)

Karl Meyer, M.S. Environmental Science
Greenfield, MA, 01301 April 18,2019

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, Stakeholder Comments on Study 3.3.19, Evaluate Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding the Cabot Tailrace; and the Study Addendum Plan to extend the results of 3.3.19, presented by FirstLight at the March 29, 2019 meeting at Northfield.

Dear Secretary Bose,

I have been a participating Stakeholder in the FERC ILP relicensing proceedings for P-1889 and P-2485 since 2012. I serve on the Fish and Aquatics Studies Team for both projects and have been in attendance with fellow Stakeholders at all relevant FERC ILP meetings and consultations since that time.

On March 29, 2019, FirstLight held a meeting with federal and state agencies and stakeholders to present their Study Plan Addendum to continue investigations under Study 3.3.19. The new 2019 Study treatments will again involve manipulating flows from the Turners Falls Dam and Station 1 to understand the necessary conditions for bringing American shad through the By Pass and up to the TF Dam.

Need: the need for 3.3.19 has already been demonstrated; and the necessity of gaining further information has become obvious—results have shown that shad move through the By Pass directly to the dam when signaling flows are present. Thus, FL intends to do a new series of test flows through the By Pass Reach beginning in May, involving various flow treatments implemented at the TF Dam bascule gates, and through Station 1.

Need for Additional Information: any Study that informs decisions on License Conditions needs to be repeatable, with parameters that are verifiable. During the March 29, 2019 meeting FL Manager Doug Bennett stated that gauging flow releases at Turners Falls Dam was rather imprecise, involving guesswork and incremental, 1-foot adjustments to the Bascule Gates at TF Dam. This situation adds too much imprecision to a study meant to lead to repeatable flow conditions and an understanding of how shad respond to stepped flows.

Further Information Needed: Without precision or benchmarks to accurately gauge the flows entering the By Pass, it will be impossible to understand the precise settings impacting the movements of shad toward TF Dam as releases are made at the Bascules and through the Station 1 Canal Extension.

Recommendation: The need for an accurate and repeatable metric for testing and implementing flow conditions is obvious. It is a necessity for the future judicious sharing of water through these Projects.

This demonstrated necessity can be accomplished quickly, simply, elegantly, and with little expense for Study 3.3.19, with the installation of Staff Gauges at Turners Falls Dam and
Station 1.

At Turners Falls Dam, Staff Gauges can be braced and installed on the Support Stays between Bascule 1 and Bascule 2, extending upward from the base of the dam. A gauge will also be needed on the upstream side of the dam. There may yet be a gauge near the Old Red Bridge abutment just upstream of TF Dam, but this may need updating or replacement.

At Station 1, Staff Gauges can be installed at the outflow tunnels, and a gauge just inside the Station 1 Canal Extension at the defunct rail crossing would be sufficient.

(NOTE: if spring conditions do not allow for installation of hardware or permanent staff gauges for the upcoming study, painted benchmarks can easily suffice for this season in order to gain the required information.)

Thank you.

Sincerely,
Karl Meyer, M.S.

Justice for New England’s Embattled River

Posted by on 22 Mar 2019 | Tagged as: American shad, Anadromous Fish Conservation Act, Bellows Falls, Bellows Falls VT, Cabot Station, Canada, Connecticut River, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, Endangered Species Act, Federal Energy Regulatory Commission, FERC, First Light Hydro Generating Company, FirstLight, Greenfield Recorder, Holyoke Dam, MA Division of Fish and Wildlife, National Marine Fisheries Service, New Hampshire, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, PSP Investments, Public Sector Pension Investments, shad, shad fishing, Society of Environmental Journalists, Treasury Board of Canada, Turners Falls, Turners Falls dam, United State Supreme Court, US Fish & Wildlife Service, US Fish and Wildlife Coordination Act, Vermont


Above: FirstLight’s sign along Greenfield Road in Turners Falls MA highlighting their historically combined operations with the Northfield Mountain Pumped Storage Station. Photo Copyright © 2019 by Karl Meyer. All Rights Reserved. (CLICK, then click again to enlarge).

NOTE: an edited version of this piece appeared in The Greenfield Recorder on March 20, 2019, www.recorder.com .

Copyright © 2019 by Karl Meyer. All Rights Reserved.

Justice for New England’s Embattled River

In a shockingly-belated move on December 20, 2018, Canada’s FirstLight Hydro Generating Company petitioned the Federal Energy Regulatory Commission for “expedited consideration” of their last minute request to transfer the licenses of its Northfield Mountain and Turners Falls Projects on the Connecticut River into separate LLC holding companies. They further requested the just-minted corporations be substituted as the new license applicants in the ongoing federal hydro relicensing process, begun here in September 2012. FirstLight is wholly owned under the Treasury Board of Canada as Public Sector Pension Investments, a venture capital corporation.

For over half a decade stakeholders including the US Fish & Wildlife Service, the National Marine Fisheries Service, MA Division of Fish & Wildlife, and nearly a dozen assorted stakeholders and town governments have been meeting and negotiating with a single entity, FirstLight Hydro. All have been working toward a FL-requested single new license—one mandating river protections for the synchronized generating operations of Northfield Mountain and Turners Falls/Cabot Station along 10 miles of the Connecticut.

FL’s petition arrived just eight days after they’d quietly reregistered their conjoined operations in the State of Delaware as two separate, new, “limited liability” corporations—asking FERC to substitute their new LLCs as applicants for separate licenses.

FirstLight’s “expedited” request came just two days before stakeholders including the USFWS and National Marine Fisheries Service–agencies with “conditioning authority” in this relicensing, were sidelined by the government shutdown. FL wanted a decision no later than February 28th. Fortunately FERC extended the deadline. A decision is now expected by March 28th.

Turners Falls Dam crippled this ecosystem the day it was completed way back in 1798. Controlled for decades from a room inside the Northfield Mountain, it continues enabling crushing impacts on this four-state ecosystem artery, namesake of the Silvio O. Conte Connecticut River National Fish & Wildlife Refuge. New Englanders have long-awaited their rights to their River. Yet Massachusetts, Vermont and New Hampshire all remain essentially without upstream and downstream fish passage and protections at Northfield and Turners Falls—required of owners of all federally-licensed dams in the United States since the landmark Supreme Court decision in Holyoke Company vs. Lyman since 1872.

That landmark ruling should have dramatically changed conditions here beginning on April 30, 2018, when the current license for the NMPS—controller of Turners Falls dam, expired. But a new license has yet to be signed; and FERC has since extended the current license. Still, any corporation–foreign or domestic, must comply-with protections under the Anadromous Fish Conservation Act, the Endangered Species Act, the US Fish and Wildlife Coordination Act and Clean Water Act, among others.

Results from a Connecticut River study released last June by the US Fish & Wildlife Service and MA Fisheries & Wildlife estimated that NMPS’s 2017 operations resulted in losses of some 15 million shad eggs and larvae, plus the deaths of between 1 and 2-1/2 million juvenile shad. That’s for just one species.

NMPS sucks the river’s aquatic life into its turbines for hours at a time at 15,000 cubic feet per second–killing virtually everything it inhales. For two years running, NMPS consumed 33% more virgin power from the grid than it later returned in peak-priced, second-hand bursts. Though it can regenerate pulses of up to 1,100 megawatts for 6-8 hours—once emptied of its deadened reservoir waters, Northfield is virtually dead itself, and must begin sucking new virgin power from the grid, shredding more life.

Recent studies find that 80% percent of the shad tagged in the lower river and later recorded passing Holyoke Dam were again recorded reaching the Turners Falls project, some 35 miles upriver. They were still heading upstream. Holyoke has passed an average of 316,000 shad upstream annually since 1976. During that time, just 1-in-10 shad ever swam beyond the miseries created via Turners Falls Dam. Over 250,000 of this ecosystem’s shad are likely turned away annually on the doorstep to Greenfield, Montague, Gill, Millers Falls, Erving and Northfield—barred from the rest of New England all the way Bellows Falls VT as well.

In 2017, the 2nd biggest shad run ever passed Holyoke Dam: 537,000 edible, catchable fish. Fewer than 49,000 passed Turners Falls.

So perhaps it’s time to remind our Canadian-FirstLight guests—recently reregistered in Delaware, that when they purchased some hardware and hydro assets in Massachusetts nearly three years back, they didn’t purchase New England’s great river. They merely bought rights to lease some of our river’s water until the current federal license expired on April 30, 2018. After that time, how much, how often–and at what cost they might continue to operate via a new leased portion of some our river’s flow would be subject to all the laws and regulations of the United States and those of the Commonwealth of Massachusetts.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

NOTE: the piece below appeared at www.vtdigger.org in January.

Karl Meyer: Connecticut River dam owners pulling a fast one

CONNECTICUT RIVER ALERT: FERC deadline looms

Posted by on 24 Jan 2019 | Tagged as: Canada, Connecticut River ecosystem, Connecticut River Refuge, Connecticut River shortnose sturgeon, Conservation Law Foundation, Endangere Species Act, Federal Energy Regulatory Commission, Federal Recovery Plan, federal trust fish, FERC, FERC Commissioner Neil Chatterjee, FERC licensing process, First Light Hydro Generating Company, FirstLight, Greenfield Community Television, ISO New England, MA Division of Fish and Wildlife, Maura Healey, Natalie Blais, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Paul Mark, Public Comment period, public trust, Rock Dam, shad, Treasury Board of Canada, Turners Falls dam, USFWS, Vermont, Vermont Yankee, Yankee Rowe Nuclear Plant

While federal fisheries stakeholders from the US Fish & Wildlife Service and National Marine Fisheries Service are shut out of the FERC relicensing process by the government shutdown, Canada-owned FirstLight Hydro Generating Company has maneuvered to split its assets on the Connecticut River. This is a slick move, and a punch in the gut to all that have been working in good faith on the understanding throughout–since 2012,that these long-co-run plants were to be covered by a single new license: per the power company’s standing, 5 year-old request.

Copy and paste link directly below to see a half hour on this suspect 12th hour maneuver, filmed for later airing on Greenfield Community Television.

NOTE: FERC has extended the COMMENT, PROTEST, and INTERVENTION deadline for Stakeholder to file Motions with them until February 8, 2019. Go back to www.karlmeyerwriting.com/blog and see second blog post following this on this one on how to submit at FERC.gov on Ecomments.

The Broken Connecticut

Posted by on 09 Oct 2018 | Tagged as: American shad, Clean Water Act, Connecticut River, Connecticut River ecosystem, EPA, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, pumped storage, Relicensing, shad, Uncategorized


Copyright © 2018 by Karl Meyer. All Rights Reserved

Eight years ago, almost to the day, this is how the Connecticut River in front of the Northfield Mountain Pumped Storage intake looked. (Click, then Click twice more)

The owners were under sanction from the EPA and had been scrambling for months to suction the mountain of reservoir silt they’d illegally dumped directly into the Connecticut after massively botching their reservoir de-watering and clean-out.Northfield remained inoperable from May 1st through early November. To minimize the reactivation of silt they’d already fouled the river with, they set up a ponderously long silt curtain–supposed to keep their gunk in place. Below, is how their silt-safety set-up looked on July 20, 2010 (Click, the Click twice more)

However, if you look at how effectively that sanctioned-solution was when employed-by–and deployed by the company, you would have to look at this photo below from October 2, 2010. (Click, then Click twice)

The sole solution FirstLight has proposed in these FERC proceedings to prevent the suctioning deaths of millions of juvenile shad–and that’s disregarding their round-the-year evisceration of adult and young fish of dozens of species, is to place a barrier net across the mouth of their giant suction and slice pumped storage contraption. This, for the next several decades, would be like putting a band-aid on a massively severed artery. If they couldn’t keep a net in place in the river when Northfield was sanctioned NOT pumping at all, what gives anyone the idea that this bit of window dressing will be of any service to a broken river system at all.

Since FirstLight is proposing to suck more water out of the river to suck into that reservoir, why not trade that money-making scheme for having NFMT shut down at key seasons to comply with the law and protect the Public Trust.

In delivering the 1872 Supreme Court’s decision in Holyoke Company vs. Lyman, Justice Nathan Clifford entered the following into his decision:

“Ownership of the banks and bed of the stream, as before remarked, gives to the proprietor the exclusive right of fishery, opposite his land, as well as the right to use the water to create power to operate mills, but neither the one nor the other right nor both combined confer any right to erect obstructions in the river to prevent the free passage of the fish up and down the river at their accustomed seasons.”

In deciding against the dam owners who had repeatedly refused to construct fish passage at their dam as settled law in the Commonwealth had long required, the Court made upstream and downstream passage of the public’s fish a precedent and legal right in rivers throughout the United States.

“Fish rights below a dam, constructed without passageways for the fish, are liable to be injured by such a structure as well as those owned above the dam, as the migratory fish, if they cannot ascend to the head waters of the stream at their accustomed seasons will soon cease to frequent the stream at all, or in greatly diminished numbers.”

“Clean, renewable” labels don’t apply

Posted by on 01 Oct 2018 | Tagged as: Ashuelot River, Bellows Falls, blueback herring, canal shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, crippled ecosystem, Dead Reach, ecosystem, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC Commissioner Neil Chatterjee, FERC license, FirstLight, Fish and Aquatics Study Team, fish counts, fish kill, fish kill on the Connecticut, fish passage, fishway windows, Holyoke Fish Lift, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, nuclear power, PSP Investments, Public Law 98-138, pumped storage, Relicensing, resident river fish, Saxtons River, Scott Pruitt, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2018 by Karl Meyer All Rights Reserved.

NOTE: the following piece appeared in VTDigger, www.vtdigger.org in September under the heading “Clean, renewable” labels don’t apply when crippling an ecosystem.”

TERMS OF ENTRAINMENT: a Connecticut River History


NOTE:in this photo are over 170 juvenile shad, among the many thousands killed in the recent de-watering of the Turners Falls Power Canal. The power canal is where the bulk of the Connecticut River is diverted into for most months of the year. So, when they drain it, they are killing the river. However, if you look at this photo and multiply that death toll by 10,000 you begin to get some idea of the mortality counts for young-of-the-year shad entrained annually–and un-tallied across nearly five decades, at the Northfield Mountain Pumped Storage Station. (CLICK, then CLICK twice more to enlarge photos.)

At 2:41 p.m. on May 20, 2018, a lone blueback herring appeared in the windows at Turners Falls Dam among a school of larger American shad. It was a small miracle. Barely a foot long, it was the first blueback here since 2005, and there would not be another this spring. Like those shad, its life had already spanned four springs, swimming thousands of ocean miles in shimmering schools. It re-crossed bays and estuaries of seven states and two provinces before reaching this Connecticut River juncture. In doing so it had survived sprawling drift nets and repeated attacks from sharks, bluefish, spiny dogfish, cormorants, seals and striped bass.

All these fish were seeking to spawn and give their young a head start as far upriver as currents, time and temperature would allow. Unfortunately, five miles upstream sat the Northfield Mountain Pumped Storage Station, a river vacuuming machine capable of out-killing all their natural predators. For the next 20 miles they’d be vulnerable to its impacts.

NMPS has inhaled river fish of all species and sizes daily for nearly half a century. Results from a river sampling study Juvenile Shad Assessment in the Connecticut River, were released in June by the US Fish & Wildlife Service and MA Division of Fisheries & Wildlife. They estimated NMPS’s 2017 operations resulted in losses of some 15 million shad eggs and larvae, plus the deaths of between 1 and 2-1/2 million juvenile shad. That’s for just one species.

On April 20, 1967, years before Northfield was built, federal agencies and four states signed the Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River, agreeing to restore runs of American shad, salmon and blueback herring upstream to Bellows Falls, Vermont and beyond. The migratory shortnose sturgeon had already been listed as endangered. Continuing today under Public Law 98-138, its mandate requires utilization of “the full potential of the fishery resources of the Connecticut River including both anadromous and resident species,” providing “high quality sport fishing,” and meeting “the long term needs of the population for seafood.”

American shad are still commercially fished today just 60 miles downriver. They’ve provided seafood to this valley for ages, yet most people in Vermont, New Hampshire and Massachusetts don’t know they were promised a “just share of the fishery harvest” back in 1967. All remain without, while shad continue to grace dinner and restaurant tables in Connecticut every spring.

Running on imported power via the buy-low/sell-high model, Northfield can suck the river into reverse for up to a mile downstream. It devours everything captured in that vortex at 15,000 cubic feet per second. Think 15,000 milk crates, for hours, to fill a 5 billion gallon mountain reservoir. The result is 100% mortality for all fish entrained. During peak-use and/or peak-price times—or both, it sends the deadened water back through its turbines as twice-produced electricity.

NOTE: more of the TF Canal kill here in another location–including mostly juvenile shad, but also a bluegill, several mud-puppies, and a young sea lamprey. Again, this is just a whisper of the year round fish kill occurring upstream at Northfield Mountain.

Northfield was built to run off Vermont Yankee’s excess nuclear megawatts. But even after VY closed in 2014, its carnage continued, unchallenged, rather than being relegated to emergency use. Having never produced a watt of its own power, its 46 years of accumulating carnage are yet to be tallied. That herring might have been heading for New Hampshire’s Ashuelot or Vermont’s Saxtons River, and those shad were perhaps steering for the Great Eddy at Bellows Falls. Regardless, any progeny would later face Northfield’s net-loss-power impacts heading downriver come fall.

Currently it pumps mostly at night when Canadian owners PSP Investments can purchase cheap electricity to suction the river uphill. Later it’s released as second-hand juice at peak-of-the-day profits. Promoters claim the benefits of dispersed solar and wind power can’t be realized without first relaying their renewable energy across the region to this lethal storage machine for later resale in markets far beyond the Connecticut Valley. “Clean, renewable” labels don’t apply when crippling an ecosystem.

NMPS boosters include (now-former) EPA Director Scott Pruitt, who made a sweetheart visit there last Valentine’s Day along with Federal Energy Regulatory Commissioner Neil Chatterjee. That occurred as PSP was requesting to suction yet more water from the Connecticut and applying for a new long-term FERC license. The next day FERC announced a major policy shift, potentially increasing both Northfield’s daytime use and its profits.

Since an 1872 landmark Supreme Court ruling indemnifying Holyoke Dam, all hydro facilities have been required to safely pass the public’s fish, upstream and down. But that 1967 agreement had this warning: “Based on the present fragmentary data available on the Northfield Mountain Pumped Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae and young fish of both resident and anadromous species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water.” Today the 20 mile reach hosting Northfield remains a migration minefield—while some 30 miles of open Vermont/New Hampshire spawning habitat above Vernon Dam sits essentially empty.

Holyoke Dam has annually lifted hundreds of thousands of shad and herring upstream since the 1970s. In 2017 it recorded its second highest shad numbers ever, 537,000 fish. Each spring, half or more of those shad attempt to pass Turners Falls. Less than 10-in-100 will succeed. Of those, some 50% drop from tallies and are never re-counted at Vernon Dam after entering the 20 miles impacted by Northfield. The blueback herring record at Turners Falls was 9,600 in 1986, out of the 517,000 counted 36 miles downstream at Holyoke that year. Of those 9,600 Turners herrings, just 94 reached Vernon Dam. Turners Falls saw another 7,500 blueback herring in 1991; just 383 reappeared upstream at Vernon.

Any new long-term FERC license must comply with federal and state law protecting endangered and public-trust fish. In seeking a new license, PSP’s main proposal for limiting Northfield’s massive carnage has been the test-anchoring of a few yards of Kevlar netting in the riverbed in front of the plant’s suction-and-surge tunnel. Those flag-sized yards of mesh, after a few months deployment, are supposed to effectively model how a 1,000 foot-long “exclusion net”–deployed seasonally in the river over the next decades, might halt the entrainment deaths of out-migrating adult–and millions of juvenile young-of-the year fish, heading back to the sea. Presumably, Northfield’s mouth would remain wide open to the ecosystem’s fish throughout the rest of the year.

In light of longstanding research the US Fish & Wildlife Service, Atlantic States Marine Fisheries Commission and Connecticut River Atlantic Salmon Commission have set shad passage goals requiring that a minimum of 397,000 pass Turners Falls; and a minimum of 226,000 pass Vernon Dam. It’s a certainty that a new fish lift will be required at Turners Falls under any new license, modeled on the long-term success of Holyoke’s lifts. But the ultimate question is this: can Northfield comply with federal and state law protecting the four-state ecosystem’s fish in order to be granted a new FERC license?

END

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

ONE LAST CHANCE FOR THE CONNECTICUT RIVER

Posted by on 03 Sep 2018 | Tagged as: American shad, blueback herring, Clean Water Act, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Endangered Species Act, ESA, Federal Energy Regulatory Commission, FERC, FERC licensing process, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, PSP Investments, Rock Dam Pool, shad, Society of Environmental Journalists, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Yankee, Vernon Dam Fishway, Walpole

ONE LAST CHANCE FOR THE CONNECTICUT RIVER

Copyright © 2018, by Karl Meyer. All Rights Reserved.

Empty CT River bed below Turners Falls Dam on September 2, 2018 (CLICK, then CLICK AGAIN, to ENLARGE)

Northfield MA. On Wednesday, September 5, 2018, New England gets one final chance for a restored Connecticut River ecosystem, promised by federal and state fisheries agencies way back in 1967. That’s the day when the National Marine Fisheries Service, US Fish & Wildlife Service and MA Division of Fisheries & Wildlife meet at the Northfield Mountain Pumped Storage Project for precedent-setting, backroom settlement negotiations to decide the ultimate fate of this ecosystem–long-crippled by the impacts of Northfield’s river-suctioning, power re-generation. They will be representing the public on behalf of New England’s Great River against the interests of FirstLight/PSP Investments of Canada, latest venture capital owners of NMPS. Future generations deserve the living river system promised here long ago.

Closed river gates at Turners Falls Dam, September 2, 2018. (CLICK, the CLICK AGAIN to ENLARGE)

The last time similar negotiations took place was in the 1970s when the agencies misplaced their priorities and Northfield’s nuclear-powered (NMPS was built to run off the excess megawatts produced by the now-closed Vermont Yankee nuclear plant, 15 miles upstream) assault on the river was ignored, scuttling prospects for a river restoration in Vermont, New Hampshire, and northern Massachusetts. Those negotiations led to federal fish hatcheries and ladders for an extinct salmon strain, leaving miles of the Connecticut emptied of flow in Massachusetts, while all migratory shad, blueback herring and lamprey were forced into the industrial labyrinth of the Turners Falls power canal. That also succeeded in leaving the federally-endangered Connecticut River shortnose sturgeon with no protections at all on its critical spawning ground.

Worst of all back then, the agencies failed to protect migratory and resident fish from the year-round deadly assault of NMPS, which sucks the river backward and uphill at 15,000 cubic feet per second. Its vortex can actually yank the Connecticut’s flow into reverse for up to a mile downstream, pulling everything from tiny shad eggs to juvenile fish and adult eels into its turbines on a certain-death Northfield Mountain Sleigh Ride. A USFWS study found that Northfield killed up to 15 million American shad eggs and swallowed between 1 – 2-1/2 million juvenile shad in 2017.

Northfield’s Canadian owners are seeking a new, generations-long operating license from the Federal Energy Regulatory Commission. The relicensing process has now completed its 6th year, with the serious work of safeguarding New England’s largest ecosystem just now coming into focus. This plant is an energy consumer, and has never produced a single watt of its own energy. It’s a bulk-grid power storage and transfer station that can only run for about 6 hours full tilt before it is completely spent and dead in the water. Then, it must go out and suck new virgin power from the bulk grid to begin refilling its reservoir with deadened river water. Its regenerated power is marketed and resold to entities far beyond the borders of the Connecticut River Valley.

New Hampshire, Vermont and Massachusetts have a lot a stake here. Way back in 1967 they were promised a just share of a restored seafood harvest of American shad, all the way upstream to Bellows Falls VT and Walpole NH. Safe passage of fish, upstream and down, has been mandated on US rivers since a 1872 Supreme Court case. But no meaningful runs of shad and blueback herring ever materialized upstream of the brutal industrial impacts and flows created at Northfield Mountain and Turners Falls Dam. In 1967 when these agencies signed that Cooperative Fisheries Restoration agreement, 750,000 American shad was the target for passage above Vernon Dam to wide-open Vermont and New Hampshire habitats. The best year, 1991, saw just 37,000 fish.

Northfield’s giant Intake and Entrainment Tunnel (CLICK, then CLICK AGAIN to ENLARGE)

As for those shortnose sturgeon? Well, investigations continue to see if there is a remnant of this river’s population surviving upstream near Vernon. But, in Massachusetts their protection from interference and guaranteed spawning access and flows should have been enforced decades back in the 2-1/2 miles below PSP’s Turners Falls dam. But none of the federal and state agencies took action.

And here, the only non-profit river groups on the Connecticut have long been power-company-friendly and connected–and still accepting their corporate money. Other major river systems have watchdogs without ties to the corporations that cripple them–putting staff lawyers and their enforcement commitments and responsibilities front and center. These go to court repeatedly–the only method leading to lasting, meaningful results. Here, no one takes corporations to court for license violations or requirements under the Endangered Species Act or Clean Water Act. Others might have led a campaign to shut down an ecosystem killing plant the day the Vermont Yankee nuclear plant shut down forever in December 2014.

4-barrel floats above a few yards of experimental test netting that’s supposed to emulate how a 1000 foot-long net might be deployed seasonally over the coming decades to keep millions of baby fish from going on a Northfield Mountain Sleigh Ride. (CLICK, then CLICK AGAIN to ENLARGE)

Thus, it is really is now-or-never time on for a living Connecticut River ecosystem. So, the big question is: are the key agencies going to stand firm under federal and state environmental statute and law, and fulfill their mandate on behalf of future generations?

Here are some of the key questions to be decided at the table that will ultimately tell the four-state Connecticut River ecosystem’s future:

Can Northfield Mountain Pumped Storage Station—which literally kills millions of fish annually, be operated in such a way that it complies with long-standing federal and state environmental law in order to receive a new FERC license?

Will the US Fish & Wildlife Service and National Marine Fisheries require PSP’s operations to cease during critical times in the spawning cycles of the river’s fish—and only operate as an emergency power source at those times, rather than as a net-power loss, buy-low/sell high profit machine? (This happens on other river systems.)

Will National Marine Fisheries require the necessary 6,500 cubic feet per second flows now absent below Turners Falls Dam—from April through June, to protect the federally endangered shortnose sturgeon in its critical spawning ground?

Will the Massachusetts Division of Fisheries & Wildlife at last stand up for river protections in that same 2-1/2 miles of beleaguered river to safeguard over a dozen threatened and endangered plant, fish and aquatic species?

Will the National Marine Fisheries Service and the Commonwealth of Massachusetts protect the full spawning cycle of the shortnose sturgeon by barring all rafts and watercraft from landing on any of the islands in this stretch—and banning all disembarking in the critical Rock Dam Pool spawning area to safeguard young fish, rare plants and freshwater clams?

In deference to recognized New England Native American Peoples, will Massachusetts’s Natural Heritage Program leaders, the Massachusetts Historical Commission and the US Fish & Wildlife ban access to the Connecticut River islands in that embattled 2-1/2 mile reach, where several Tribes have a documented presence and ancient connection to these extremely sensitive sites?

Ultimately, the questions that will soon be answered are these:

Does the river belong to the corporation, or to the people?
Do endangered species matter?
Do ecosystems matter?
Do federal and state environmental laws matter?
And, finally: DO RIVERS MATTER?

Coming generations may soon have their answers on the Connecticut River.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists. Due to the non-disclosure agreements requested to take part in these private meetings with PSP Investments, he is not participating in these closed-door settlement discussions. The public is entitled to know.

CAN NEW ENGLAND’S GREAT RIVER SURVIVE MORE DECADES OF PUMPED STORAGE GENERATION?

Posted by on 12 Mar 2017 | Tagged as: 5-year FERC licensing process, American shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Dr. Boyd Kynard, ecosystem, endangerd shortnose sturgeon, EPA, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC licensing process, FirstLight, Montague Reporter, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Vermont Digger, vtdigger.org, WBUR

NOTE: The following piece first appeared on the website of vtdigger.org in late February. It also appeared in print in the Montague Reporter, montaguereporter.org in early March.

Copyright © 2017 by Karl Meyer

Can New England’s Great River survive more decades of pumped storage generation? Long-term FERC licensing could lock out new river-sparing energy storage choices.

Dr. Boyd Kynard, retired federal expert on the Connecticut River’s migratory fish and endangered shortnose sturgeon, tells a story about bass fishing in Massachusetts around 1990. He was drifting near the French King Bridge, a mile downstream of the Northfield Mountain Pumped Storage Station’s subsurface tunnels when he glanced up and realized his boat had switched directions. It was being pulled upstream, “And at a pretty good clip.” Turbines at that Northfield MA plant had sucked New England’s river into reverse for at least a mile. This was nothing new, save that in this instance there was a daytime witness.

October 2, 2010, EPA ordered dredging at the site of Northfield Mountain Pumped Storage Station’s underground suction tunnels on the Connecticut.(CLICK TO ENLARGE, THEN CLICK AGAIN.)

In December a radio feature from Boson’s WBUR entitled “New England’s Largest Battery is Hidden Inside a Mass. Mountain” was rebroadcast widely in the Northeast. Referencing Ben Franklin, James Bond, even the Bat Cave, it painted a rosy future for the 1200 quick-start megawatts stored in a reservoir at the Northfield Mountain Pumped Storage Station. Roaring turbines were noted as company spokespeople staked claim to the plant’s “green” future as they bid to lock-in a new 50 year Federal Energy Regulatory Commission license. The occasional ring of an old phone connected directly to ISO New England–the grid’s “independent system operator,” was described as “the sound of money.”

Altogether missing in that story was NMPS’s violent mining of the Connecticut River. That ecosystem artery was never identified as the sole water source enabling it to regenerate electricity. Prior to Northfield construction the Connecticut had forever run seaward from the Canadian border to the tidal zone near today’s Hartford, CT. But 12,000 years of New England natural history changed in 1972, on the day NMPS came on line.

On January 22, 1974, two years after it began operation using overproduced nuclear megawatts then available on the grid at night to fill a 5 billion gallon reservoir, the Federal Power Commission (today’s FERC) notified Western Massachusetts Electric Company it required their “earliest response” on Northfield’s impacts for a Draft Environmental Impact Statement: “Since the Northfield Mountain Project became operational, which of the conditions described have been observed to produce reverse flows?” WMECO’s lawyers belatedly replied on October 16, 1974, they didn’t have the information. Questions about environmental impacts and reversing rivers went unanswered.

In 1967 a federal Connecticut River migratory fisheries program to restore American shad to historic upstream reaches in Vermont and New Hampshire got underway. That same year the embattled Connecticut River shortnose sturgeon was listed under the Endangered Species Act. Exactly fifty years later recovery goals for hundreds of thousands of spawning shad and thousands of shortnose sturgeon remain utterly unfulfilled. Spawning habitat access for both are impacted by Northfield’s suck and surge flows, which also create daily bank-eroding 4-foot “tides” along this reach, sometimes reaching to 10 feet.

Pictured in a less glowing light, NMPS is a 45 year-old dinosaur–a formerly nuclear-powered, net-loss energy transfer machine hacked out of the bowels of a mountain. With the region’s nukes now shuttered, it runs daily on imported electricity and has never produced a watt of virgin power. Today it’s a quick-start, high-profit operation relying on boatloads of fossil-fueled megawatts purchased in bulk on the wholesale market. Suctioning the river uphill, it later releases those waters down through its turbines in dense pulses—pumping out 25 percent less juice than the virgin power it consumes.

NMPS is not renewable energy, nor anything resembling the public’s idea of hydropower. It reproduces just a fraction of New England’s power at peak times, and peak prices, but can only generate for eight hours maximum. After that it is literally dead, its reserves spent. The Canadian-owned plant must then start consuming juice by reversing its turbines anew, yanking the river backward, sideways, and a mile uphill for hours into its reservoir.

That pumping occurs nightly at rates of up to 15,000 cubic feet per second. Picture 15,000 milk crates filled with a living river–every second for hours at a time. For more than two-thirds of the year the Connecticut’s “natural routed flow”—the water moving into and through this reach, is less than 15,000 cfs. Thus this plant is consuming more water than is entering the river. That’s how to turn an ecosystem on its head. The result is the evisceration of all manner of aquatic life, juiced twice through those turbines—tens of thousands of resident and migrating fish, millions of developing eggs, and their young. There’s nothing more violent you can do to a river.

Now the Canada Public Pension Investment Fund—latest in the decade’s revolving door of four different venture-capital owners of the FirstLight Power Resources-branded plant, is angling to lock those ecosystem assaults in place for another half century through the Federal Energy Regulatory Commission’s 5-year hydro relicensing process.

In its planning stages one model would’ve required Northfield to shut down during fish migration season due to impacts. That didn’t happen. Still, a chance experiment in 2010 gave a belated glimpse of those potential benefits. For half a year, from mid-spring through a hot summer into early November, NMPS sat broken, sanctioned and off-line. But seven miles downstream the migrating shad normally impacted by its violent suck-and-flush flows made great and unexpected gains in tandem with that spring break. Having languished for decades, the federal program to move American shad upstream into Vermont and New Hampshire saw a stunning boost at Turners Falls Dam. Shad passage jumped over 700 percent above the previous ten year average–16,440 shad swam past the dam in 2010, compared to the 2,260 annually over the previous ten years. Though meager, it was by far the best result since MA energy deregulation came to the NMPS reach of river in 1999.

The 5 billion gallon Northfield Mountain Pumped Storage Reservoir, as it sat emptied and idle from May 1st through early November 2010.
(CLICK TO ENLARGE, THEN CLICK AGAIN.)

On that May 1, 2010, NMPS had choked on the tons of silt and eroded riverbanks it constantly sucks into its reservoir. In attempting to clear that mucked-in lake a mile of mud-slumped tunnels resulted. Desperate, they began dumping it directly into the Connecticut at a rate equaling 30-40 dump truck loads a day. FirstLight’s sludge turned a mile of river brown for weeks. A contractor died when a suction hose broke loose.

One of thousands of dump truck loads of sludge the EPA ordered FirstLight to dredge back out of the Connecticut River. (CLICK TO ENLARGE, THEN CLICK AGAIN.)

Severe thunderstorms on May 27, 2010 resulted in tens of thousands of western New England power outages, many lasting for days. Yet as a back-up energy plant, Northfield’s sole output that week was more of the 45,000 cubic square yards of muck they’d eventually dump directly into the river. They succeeded for over 90 days, until they got caught. On August 10, 2010, the EPA issued a cease-and-desist order citing FirstLight for “polluting the navigable waters of the United States” under the Clean Water Act.

Major dredging operations continued for months at Northfield where FirstLight had dumped their sludge in the Connecticut for 90 straight days.(CLICK TO ENLARGE, THEN CLICK AGAIN.)

Throughout NMPS’s half-year off-line–and record-breaking summer heat in the Northeast, the purportedly ever-hungry, ever-fragile grid ISO New England claims makes Northfield’s dense, quick-start functions so indispensible, never faltered or failed—not even when the nearby( now closed) Vermont Yankee nuclear plant went down in June to refuel.

NMPS’s main claim to its indispensability came 14 years ago during the 2003 August Blackout. Its quick start power was employed by ISO New England to smooth out Massachusetts’ reconnection to the New York sector of the Northeast’s mega-grid—which had failed due to a computer glitch in Ohio. That sprawling network would have been reenergized regardless, but Northfield’s dense energy provided a convenient assist and made ISO’s job easier. But are rare-hour emergencies enough to justify more decades of NMPS daily destructive use? In truth–what would amount to virtual energy storage monopoly, need not be locked-in, de facto, by FERC as this region’s energy future for decades to come. There are other options.

“Pumped hydro is the most cost-effective way to store electricity,” that story stated flatly. But in September of 2016 the MA Department of Energy Resources and the MA Clean Energy Center released a study: “Massachusetts Energy Storage Initiative: State of Charge.” It noted the Bay State lags behind in innovation and deployed energy storage, ranking 23rd nationally. However, comparing new storage technologies now available to the costs of pumped storage, it noted three that will all readily out-compete pumped storage costs by 2018: Lithium Ion, Flow Battery and Compressed Air Storage.

These local/regional storage solutions are already coming into use in New England. They create distributed generation and safer, more reliable micro-grids—less vulnerable to mass outages and mega-grid cyber attack and failure. They also create jobs. Certainly they are more attractive to consumers than sending local solar and wind across New England to recharge a river-crippling machine—and repurchase that juice later at inflated consumer prices.

That story mentioned Northfield’s 18,000 panel solar array–enough for a few hundred homes. But that tax-deductable FirstLight solar field actually covers the huge scar leftover from acres of EPA-mandated settling ponds—sludge pools required in 2010 when they had to dredge their mountain of muck back out of the river. Also not mentioned were handsome payments NMPS collects when it chooses not to generate any power. They accrue through a FERC mechanism known as “capacity fees.” If “spot market” prices aren’t sweet enough, FirstLight can simply sit their plant idle, collecting ratepayer cash just for their “capacity” to potentially generate. With NMPS as its chief hydro asset, former owner GDF-Suez once told investors 40% of its annual profits had been realized through capacity fees.

FirstLight’s EPA-ordered sludge settling pools and drying pile at the Rt. 63 site covered by a solar panel installation today. (CLICK TO ENLARGE, THEN CLICK AGAIN.)

Gus Bakas, FirstLight’s Massachusetts operations director, stated his goal for the 45 year-old plant is to someday see it running wholly on “green” power–solar and wind relayed to it from legions of regional rooftop panels and turbines. That would align with Massachusetts’ new “Energy Storage Initiative,” a 10-year effort purportedly aimed at saving ratepayers “hundreds of millions of dollars” while making the grid more reliable and reducing greenhouse gasses. But wind runs strongest at night and is not plentiful in western New England, while all solar is generated by day. With NMPS’s peak-demand profit model based on sucking up bulk power and the river at night, something seems missing from the equation. Unless there are now plans to again run the river backward by day, when migrating fish are most vulnerable to entrainment.

The Federal Energy Regulatory Commission is charged with supplying reliable electricity at fair costs to the public, while fostering competition and protecting against energy monopolies. All licensing decisions from FERC must also comply with federal law including conditions set under the National Environmental Policy Act, the Fish and Wildlife Coordination Act, the Endangered Species Act, and the Clean Water Act. The operation of NMPS continues to prove a stumbling block to the successful execution of these federal acts and policies.

In the near-term, for rare big-grid emergencies, a summer heat-wave or winter cold snap, NMPS remains a credible back-up tool. But Northfield otherwise continues today as an expensive, profoundly-damaging energy relay device whose net-loss operations chew apart a critical four-state artery daily. Given its violent year-round ecosystem impacts, its drag on federal trust and endangered species restoration programs–and the market’s current and emerging alternative energy storage solutions, FERC should not sanction NMPS long-term, as its dominant, de facto, New England energy storage monopoly.

End

Writer and journalist Karl Meyer lives in Greenfield, MA. He has been participating as a stakeholder and member of the Fish and Aquatics Study Team in the five-year FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2013. He is a member of the Society of Environmental Journalists.

Karl Meyer: Connecticut River power storage plant is an ecological, economic and energy disaster

http://www.wbur.org/bostonomix/2016/12/02/northfield-mountain-hydroelectric-station

Rolling over on a River: the real cost of pumped storage energy

Posted by on 26 Oct 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River ecosystem, Connecticut River Watershed Council, Daily Hampshire Gazette, ecosystem, Entrainment, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, federally-endangered shortnose sturgeon, FERC, fossil fuels, Greenfield Recorder, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, nuclear power, Public Comment period, public trust, pumped storage, Relicensing, shad, shortnose sturgeon, Society of Environmental Journalists, The Recorder, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2016 by Karl Meyer

(Note: this essay appeared in September and October in these MA and VT media and newspaper outlets: Vermont Digger, www.vtdigger.org ; The Daily Hampshire Gazette; and The Recorder.)

besttfemptybed

The de-watered CT below Turners Falls Dam that few people see. (Click, then click again to enlarge.)

Rolling over on a river

Since time began rivers have been the Earth’s arteries—the foundation of its ecosystems. Here in New England it’s “last chance” time for our Great River. On April 30, 2018 the fate of the long-foundered Connecticut River migratory fisheries restoration—and the survival of a four-state river ecosystem, will be decided for what’s essentially forever. New Federal Energy Regulatory Commission hydro licenses are expected to be signed then by government agencies and the Canada Pension Plan Investment Board–latest purchaser of the Turners Falls and Northfield Mountain projects. That company’s stated investor mandate is “to maximize investment returns without undue risk of loss.”

Over two generations ago public-trust mistakes were made favoring power companies, fish hatcheries, and high-end salmon-fishing interests that rendered eight miles of the Connecticut in Massachusetts a massively-suctioned, partially-dewatered flush sink. Sanctioned by fisheries agencies and non-profits, those decisions, severed an ecosystem in two. They forced all migrating fish into a deadly power canal, leaving three emptied miles of riverbed below Turners Falls Dam, while four turbines at the Northfield Mountain Pumped Storage Station five miles upstream consumed massive amounts of nuclear energy to suck a river backward and uphill to a mountaintop reservoir.

Those turbines were built to run on the promised endless supply of overproduced juice generated nightly at the local, now-closed, Vermont Yankee nuke, 15 miles away. Today, running on giant slugs of imported fossil fuel, they continue to spin, sucking the river up in endless gulps into a 4 billion gallon pool a mile up Northfield Mountain. That daily suctioning creates riverbank eroding “tides” higher than those at Hyannisport, MA—with some rivaling the ten-foot fluctuations of Fundy Bay.

Back then, predecessors of today’s National Marine Fisheries Service, the US Fish & Wildlife Service, Massachusetts’ Fish & Wildlife and the Connecticut River Watershed Council signed off on an agreement with the Federal Power Commission and Western Massachusetts Electric that strangled the river in northern Massachusetts. It resulted in the failure of migratory fish passage and a promised renewal of the river’s ancient seafood resources upstream to Vermont, New Hampshire, and northern Mass. Few American shad emerged alive after diversion into that canal. It also failed the shortnose sturgeon—this river’s only federally endangered migratory fish, leaving it without flow or monitoring at its only documented natural spawning site.

Upstream at Northfield the destruction was yet more complete. The suck and gush appetite of that nuclear-charged contraption virtually disassembled the river. It gulped flow at a rate of 15,000 cubic feet per second, often for hours at a time—drawing on the river pool above Turners Falls Dam where, 70% of the time, the Connecticut’s natural routed flow is less than 15,000 cfs. Boaters a mile downstream could find themselves drifting upriver via Northfield’s unearthly pull. All fish and organisms drawn up through the sphere of that suction were deemed “functionally extirpated”–dead to the ecosystem by virtue of being sieved twice through the turbines. It was evolution in reverse, a river ripped away from its eternal run to the sea.

Today, climate-blind FERC labels Northfield as a source of “renewable clean” energy—but there’s nothing clean, renewable or sustainable about its imported, twice-produced, peak-priced electricity crippling this river. ISO New England, FERC’s Northfield-cheering, ever-energy-hungry cousin, also ignores climate and its environmental dismemberment. “Pumped storage” is not hydropower—not even by the industry’s own technical terminology. Northfield-produced power in fact represents the heavy planetary burden of fossil fuel used to push a mountain of water uphill, merely as a weight to produce high-cost, second hand electricity. It cares nothing of rivers, fish or ecosystems.

If bureaucrats again fail the public trust and don’t demand critical habitat protections, flows, and the day-to-day monitoring needed to fulfill U.S. environmental statutes, Canadian pension speculators will be left as the de facto controlling interests on our river. The new owners have asked FERC to merge two separate licenses for Northfield and Turners Falls into a single new license dubbed the “Northfield Project.” What’s represented as mere bureaucratic streamlining would actually enshrine, by precedent–next time and forever, river-killing pumped storage.

Any responsible environmental agency should deny this single-license merger, and seek to have Northfield kept in use as emergency infrastructure only—with the ultimate remedy it’s dismantling in tandem with a move to a decentralized, far less vulnerable system than today’s expanding mega-grid. Massachusetts legislators are currently signing onto backroom energy deals for a glut of future hydropower from Quebec. Some 1,200 megawatts of those penciled-in imports could easily replace the few hours of daily juice Northfield puts out–while keeping it available for rare emergencies. Though the new Canadian power imports largely ignore conservation and innovation, they could be employed to end the river carnage here and begin restoring a future for a critical New England ecosystem.

(Note: timely public comment on licensing issues is carefully considered by FERC. Go to: http://ferc.gov/docs-filing/ecomment.asp and use “E-Comment.” Check “Hydro” and address to Secretary Kimberly D. Bose, using the required identifiers “P-2485” and “P-1889” for Northfield and Turners Falls.)

Karl Meyer lives in Greenfield MA. He is participating in the FERC relicensing process and is a member of the Society of Environmental Journalists.