NOAA

Archived Posts from this Category

CONNECTICUT RIVER CASUAL TRAGIC HISTORY HIKE: Sat., May 14th

Posted by on 06 May 2022 | Tagged as: America's best landscaped sewer, Andrew Fisk, Connecticut River, Connecticut River Day of Mourning, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, Federal Conte Anadromous Fish Research Center, federally-endangered Connecticut River shortnose sturgeion, Great Falls, Jesse Leddick, Julie Crocker, Landmark Supreme Court Decision 1872, Mark Tisa, Martin Suuberg, migratory fish, Nation's best landscaped sewer, National Marine Fisheries Service, net-loss power, no license to kill, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, public trust, Rock Dam, shad, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, The Recorder, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, USFWS, Wendi Weber

THE CONNECTICUT RIVER CASUAL TRAGIC HISTORY HIKE:
Saturday, May 14, 2022, 9:30 – 11:00 a.m..

The April 2, 2022, Connecticut River Day of Mourning. Photo courtesy of John Bos.

Trip meets 9:30 in the courtyard of the Great Falls Discovery Center and continues onto the Rail Trail. Photo Copyright © 2022 by Karl Meyer

I hope some folks are able join this long and casual history walk. * * Please be aware that it will be close to 5 miles–with the return to Great Falls to be done on your own. As noted, a bike or even a 2nd car-pool, relay-car can be left near the walk’s end and return point. Bikes can be locked near Conte Lab–also, relay cars could be parked in the public lot at the end of G-Street, where “Migratory Way” continues along the canal heading the last 1/2 mile to Rock Dam. (I’ll be on my bike.)

The April 2nd Connecticut River Day of Mourning. Photo courtesy of John Bos.

The Connecticut River casual, tragic history hike
Saturday, May 14, 2022, 9:30 a.m. – 11:00 a.m.
Meet: Great Falls Discovery Center courtyard, Avenue A, Turners Falls
Free. No pre-registration required. * * Rain cancels.

Join journalist Karl Meyer for this 2-1/2 mile (one-way) unnatural history walk, starting at the Great Falls Discovery Center and Turners Falls dam’s failed salmon ladder. This casual hike partly follows the Rail Trail’s 200 year old transportation and power canal. We’ll cross it on a one-way bridge, pass a 1906 generating station; then head to G Street and down “Migratory Way” to unprotected sturgeon habitat at the river’s Rock Dam near the USGS Conte Fish Lab. We end above the failed fish ladder adjacent to Cabot hydro station. NOTE: * * Participants responsible for returning to Great Falls on their own (total: 5-mile round trip). It’s possible to pre-stash a locked bike near Conte Lab along Migratory Way, then cycle back via the Rail Trail.

DEAD American shad at the Rock Dam, May 2021: a public trust migratory fish guaranteed safe passage to VT and NH waters by the US Supreme Court back in 1872. Photo Copyright © 2021 by Karl Meyer

*** OH, and here are a few LINKS, the first two comprising defense of an undefended river by citizens; the last three are where foreign vultures are spending the ill-gotten spoils from our massively broken river–far from our Valley ecosystem:

https://www.recorder.com/my-turn-Meyer-Don-t-Take-FirstLight-for-Granted-46104531

https://www.recorder.com/ltr-Ogden-FirstLight-s-Lack-of-Urgency-Threatening-Shortnose-Sturgeon-46144862

https://energycentral.com/news/invenergy-and-energyre-secure-offshore-wind-lease-award-and-announce-formation-investor

https://www.bizjournals.com/pittsburgh/news/2022/05/02/hydro-electric-firstlight-allegheny-8-9.html

https://apnews.com/press-release/business-wire/business-new-york-pennsylvania-ca11a3273cfb45eeb0e7181075ebe2df

CONNECTICUT RIVER UPDATE: STAY THE COURSE; KEEP UP THE PRESSURE!

Posted by on 20 Jan 2022 | Tagged as: Anadromous Fish Conservation Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River blog, Connecticut River ecosystem, conservancy, Conte National Fish & Wildlife Refuge, critical habitat, E-Comments, ecosystem, EPA, ESA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Comments, FERC license, FirstLight, Holyoke Co. v Lyman, Landmark Supreme Court Decision 1872, MA Department of Energy and Environmental Affairs, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, public trust, right-to-know, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, US Fish & Wildlife Service

A Connecticut River deluge of citizens “no License to kill” defense pours into the Federal Energy Regulatory Commission.

READ THOSE DEFENDERS NAMES in the list below…

STAY THE COURSE; KEEP UP THE PRESSURE!

* * Also: On Sunday, January 23 at 10:00 AM, on Occupy the Airwaves, I join Paki Wieland, Bob Gardner and Emikan Sudan, to speak about these critical weeks for the future of the Connecticut River as FirstLight Power tries to nail down secret negotiations to relicense the devastation of the Northfield Mountain Pumped Storage Station for another half century: https://www.facebook.com/VFROccupytheAirwaves/ I hope you can listen and TAKE ACTION! * *

Occupy the Airwaves can be heard every Sunday morning at 10:00 AM on Valley Free Radio, WXOJ-LP, 103.3 FM, in Northampton, MA. Shows are re-broadcast every Friday at 3:00 PM, and can be streamed at www.valleyfreeradio.org.

HERE IS THE LIST OF THE LATEST CITIZEN HEROES of Connecticut River DEFENSE. NOTE: Update continues further below:

Joseph W Stubblefield, Sanjay Arwade, Jonathan S Shefftz, Jamie Rowen, Michael Giles, William H. Pete, Nicholas Reich, James Lowenthal, Katharine Sims, William Daniels, Paige Wilder, Karl Meyer, Shayla G Freeland, Mary J Metzger, Robert Arbib, C Grecsek, Malcolm G Everett, Mike Cournyn, Robert Catlin, Don Ogden, William N. Ryan, Elizabeth Whitcomb, Judith Nietsche, Celt Grant, Susan Olmsted, David B. Keith, Glen Ayers, Virginia Hastings, Annie Chappell, James Seretta, Ron Barto, Robert Dickerman, Pamela Scott, Tanya Dragan, Lin Respess, Rebecca Tippens, Sigurd Nilsen, Peggy Matthews-Nilsen, Amy Rose, Steven Wilkinson, Stephen Kerr, Nancy Obertz, Dorothy McIver, Robert Sweener, Seth Wilpan, Norma Roche, Fergus Marshall, Louise P. Doud, Vicki Citron, John Nelson Jr., Jon Burgess, Robert F Porzio, Garrett D Connelly, Dave Dersham, Betsy Corner, Graham Hayward, Sid Siff, Paul Richmond, Betsy Browning, Rebecca Robbins, James Smethurst, Laura Doughty, Mary Hall, Laura Kaye, Frank Ribeiro, Andrew Hutchison, Mark Russo, Judith Phillips, Priscilla Lynch, Molly Freeland, John Hoffman, Roberta Murphy, Dodi Melnicoff, Ethel S. White.

These folks have gone on the record with FERC in recent weeks and months, stating no new license should be issued for the Northfield Mountain Pumped Storage Station. They are from up and down the Connecticut Valley, from the Bay State’s border with Connecticut, up to Putney VT. I hope I haven’t skipped any of these people who understand ecosystems and have had the courage to defend ours for those who come along after. Many have also made their defense stronger by posting it in the public press. Thank you all, and stay the course!

These River’s defenders have staved off FirstLight’s secret license-to-kill negotiated plans with US Fish & Wildlife, National Marine Fisheries, MA DEP and MA Fisheries & Wildlife. THEY ARE SUCCEEDING: * NO SECRET AGREEMENT has yet been signed!! *

Don’t get sidetracked: STAY THE COURSE; KEEP UP THE PRESSURE!

OF CRITICAL NOTE:

I’ve been forwarded some posts recently. They appear to be some watershed rhetoric claiming to have discovered a last-minute, secret mechanism that can change the trajectory of this federal process at the state-level–AFTER a negotiated deal has been signed by the big-dog players and forwarded to FERC for approval.

That Cinderella idea seems to be just more window dressing from those who’ve failed to engage openly with the public in this 10 year fight. There have been decades–and numerous opportunities for any bona fide watchdog to file lawsuits on any number of flow, critical habitat and wetlands infractions and flagrant ecosystem damage across half a century.

New England’s River has been left on life-support here in Massachusetts—reversed, comatose and massively-deadly at Northfield for the last half century. There have been no lawsuits; there have been no challenges—under the Clean Water Act, Rivers and Harbors Act, Endangered Species Act, the 1872 Supreme Court ruling in Holyoke Company v. Lyman. None stood up as responsible public trust agencies for decade upon decade as the river was left in ruins as the Nation’s best landscaped deadly sewer in the Commonwealth.

We’ve just never had a real watchdog here. If there had been one it would have sued federal and state agencies and taken on a power company long ago. Defenseless for 50 years… YOU DON’T STAND BY WATCHING THE HORSE LEAVE THE BARN!

At this time, in this top-down federal process where big-time forever decisions are being made beyond the public eye, the key place to put the pressure on the agencies charged with protecting our public trust is straight to the top: GOING ON THE RECORD WITH THE FEDERAL ENERGY REGULATORY COMMISSION. Every FERC entry these defenders made has also been seen and registered in the licensing files by MA DEP, US Fish & Wildlife, MA Fisheries and Wildlife, and National Marine Fisheries. These folks are getting a constituent earful.

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife. Forward them your Letter; then maybe forward it to the MEDIA for broadening the public record!

It is pure fantasy that it will be possible to “save the river” and make key changes to a top-down negotiated federal deal AFTER these key agencies have signed some giant ecosystem compromise with venture capital FirstLight for the next 50 years. It’s pure fantasy, bravado, and soft-pedaling of the critical juncture we are at right NOW.

The only sensible, just and moral position to take with the future of an ecosystem that must be revived to support coming generations is simply: NO LICENSE TO KILL. That’s what’s at stake right now—telling our public agents there can be no deal sanctioning a half century of massive fish kills and river reversals here in Massachusetts, in the heart of the S.O. Conte Connecticut River National Fish & Wildlife Refuge. ONCE it’s signed, there will be little if anything left to re-bargain over. The time is NOW.

There is no sugarcoating what’s at stake RIGHT NOW in secret Connecticut River federal relicensing negotiations occurring behind closed doors between FirstLight and fed/state agencies. It’s no less than the future of a living Connecticut River ecosystem. Critically, what takes place and gets secretly-signed in that backroom closet between FirstLight’s venture capital lawyers, and federal and state environmental trust entities is likely to seal the life-or-death fate of a broken ecosystem here for what ‘s essentially its last chance at revival. There are many examples of terrific testimony and river defense in the other blog posts on this site.

AGAIN, if you haven’t yet submitted testimony–or know of others who want to defend our River’s right to survive as a living system, here’s the FERC formula to share:

Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

This is THE PUBLIC’S RIVER!

More Connecticut River citizens’ defense

Posted by on 13 Jan 2022 | Tagged as: America's best landscaped sewer, American shad, Clean Water Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River blog, Connecticut River Conservancy, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, Endangered Species Act, EPA, ESA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, fish kill, Holyoke Co. v Lyman, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, Nation's best landscaped sewer, National Marine Fisheries Service, NMFS, NOAA, Northeast Utilities, Northfield Mountain, Northfield Mountain Pumped Storage Station, NU/WMECO, P-2485, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, US Fish & Wildlife Service

THE CONNECTICUT RIVER’S CITIZEN DEFENSE continues:
While FirstLight’s secret January license “settlement” talks continue–centered around leaky net ideas and spit-and-glue window dressing at Northfield Mountain, the public is demanding that its 50 years of devastation cease.

https://www.youtube.com/watch?v=ybwy8MBiy9I
* * NOTE: ABOVE is a link to a Wilbraham Public Library ecology lecture series I was asked to take part in last November. The title of my presentation was: “LIVING RIVERS FLOW DOWNSTREAM.” IT IS A KEY HISTORIC PERSPECTIVE to understanding why we live in a broken ecosystem… * *

https://www.gazettenet.com/my-turn-meyer-LastLightCtRiver-44127152

FirstLight led closed-door bargaining with state and federal fish and environment agencies are continuing here in MA, while an ongoing flood of citizen testimony to end Northfield Mountain’s license to kill continues at the Federal Energy Regulatory Commission.

THOSE DEMANDS–from no less than 77 people since November 13th, are also sending a very clear signal to the MA Division of Fish & Wildlife, MA DEP, the US Fish & Wildlife, and National Marine Fisheries Service:

DON’T SELL OUT New England’s Great River for another half-century!

* Read the latest public testimony targeting Northfield lethal ecosystem destruction entered into the FERC record further below.*

BUT FOR THE LONG VIEW, HERE’S A LITTLE ILLUMINATING HISTORY:

Only living rivers flow downstream. But that’s not what you find on the Connecticut River in the Commonwealth of Massachusetts. Here, 150 years after the US Supreme Court guaranteed safe upstream and downstream passage of migratory fish to and from New Hampshire and Vermont—and a full half century after the enacting of the Clean Water Act and Endangered Species Act, the Northfield Mountain Pumped Storage Station continues to chew-through, reverse and obliterate the key living ecosystem functions of New England’s critical central artery here in northern Massachusetts.

The grim prospects of allowing Northfield to be built were widely known by federal and state agencies half a decade before it began its deadly, net-power loss, river-reversing ecosystem damage. Here, from the same agencies that are today’s MA Fish & Wildlife, US Fish & Wildlife Service, and the National Marine Fisheries Service (the entities still publicly responsible for environmental enforcement and river fish protection), are their words from a key, signed, 1967 document:

“Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River Basin”

“Based on the present fragmentary data available on the Northfield Pump Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae, and young fish of both anadromous and resident species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water. Studies, designed to minimize the potential adverse effects to fishery resources, should be undertaken in development of the design for the Northfield Pump Storage Project. In related studies, fish screens, barriers and deflectors, and flow regimen must be thoroughly investigated.”

Those agencies’ inaction, their failure to protect–while instead indulging in a massive frenzy to recreate an extirpated salmon hybrid in place of a fish not seen here since 1809, proved disastrous for the river’s still-living fish runs and species in this four-state ecosystem. Today, absurdly, a deadly Northfield Mountain soldiers on, while—50 years later those same agencies dicker with foreign owners over emplacing a new band-aid of a barrier net—one full of holes, upstream of that deadly, river-reversing suction.

In the “library” at the Connecticut River Watershed Council—today’s “Conservancy”, there is a boxed, mid-1960s promotional document from WMECO/Northeast Utilities. NU is today does business as Eversource, the perennial chief sponsor of the Conservancy’s Source to Sea Cleanup. That half-century old box contains a glossy booklet promoting the future construction of a Northfield Mountain Pumped Storage Station. The booklet includes several scenarios and options to premise how of its net-loss power pumping operations might be deployed.

One of them was a glaring red flag for the river, its fish, and an entire ecosystem…

The Watershed Council HQ has a private library within…

THAT SHUTDOWN OPTION, never implemented, was that Northfield’s impacts would be so detrimental to the river and life cycles of its migratory fish that it would have to be shut it down during fish migration season. But here again, no watchdog ever emerged to stand up and fight for a living Connecticut River in Massachusetts. Basically, the only protection ever offered was a net to protect their mythical, teeny, hatchery-bred baby salmon, leaving all the river’s other species to fend for themselves.

Thus Northfield’s gargantuan and lethal water and fish appetite still strangles New England’s four-state ecosystem today. And, half a century later, those same public agencies are allowing a power company to dangle the grim bait of temporary fish barrier net before them once more.

ABOVE IS AN EPA-ORDERED “silt barrier” mandated to be kept in place at FirstLight’s Northfield intake after they were caught flagrantly and clandestinely dumping a mountain of muck directly into the river for over 90 days straight in gross violation of the Clean Water Act. Looking closely, you can see it has FAILED, its anchors useless, and its floats flapping in the breeze along the shoreline downstream of Northfield’s sucking intake. Photo taken 10/2/2010.

Even two years after Northfield came on-line the Federal Power Commission–today’s FERC, still had not been given answers to information they’ requested of WMECO–today’s Eversource, including describing flows on a reversing river. This is a Xeroxed document from FERC:

20010120-0656 FERC PDF (Unofficial) 09/10/2014: January 22, 1974, from the Federal Power Commission to WMECO:

Robert E. Barrett, Jr.,President.
Western Massachusetts Electric Company
West Springfield, Massachusetts 01089

Dear Mr. Barrett:
The Commission staff is presently preparing the Draft Environmental Impact Statement for the Turners Falls Project (No. 1889) and requests the following information:
(1) In the revised Fxhibit W of the application (page 43, second paragraph), reference is made to the continuing resident fish study being conducted in Turners Falls Reservoir. Please provide a copy of the results obtained since the last Progress Report. If the study has not been completed, please indicate the date you expect a report to be available.

(2) In Exhibit W (pages 19, 20, and Figure 5), the conditions expected to produce flow reversals in the Turners Falls ‘Reservoir as a result of Northfield operation were set forth. Since the Northfield Mountain Project became operational, which of the conditions described have been observed to produce reverse flows? Based on operational experience, are there any observed or anticipated changes in the patterns, durations, or velocities of the flows described therein? Your early response in providing this information would be appreciated.
Very truly yours,
Secretary

On October 16, 1974, WMECO’s lawyers finally replied in the negative to the Federal Power Commission’s questions, stating they still had not implemented the required study which would offer answers to questions about the impacts of reversing the flow of the Connecticut:

“Staff also inquired whether the Company had a study on the effect of hydrology caused by the pumping of Northfield Mountain project this year. The Northfield Licensees have not made a formal study but are accumulating data with respect to Pond elevations, flows and other operating data.”

EVERYBODY KNEW 50 YEARS AGO: yet nobody came to the Connecticut’s rescue…

BUT TODAY CITIZENS are standing up for the living river owed future generations. SEE BELOW for the latest entries into the FERC public record…

BUT FIRST, here’s how it can be done:
Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

HERE ARE THE LATEST:

Document Accession #: 20220111-5033 Filed Date: 01/11/2022
Elizabeth J Erickson, Colrain, MA.

As a long time resident of Franklin County I have for a long time been very concerned about the environmental and ecosystem destruction at Northfield mountain because of the power generating plant there. I have been following the research about the decline in fish populations in the Connecticut River nearby because of the turbines and am strongly opposed to the reicensing of the First Light hydropower plant there. I’m actually shocked that the relicensing is even being considered given all that is now known about how destructive the plant is. Please deny any future license of power generation of Northfield Mountain.

thank you,
Elizabeth Erickson
Colrain, Massachusetts

Document Accession #: 20220111-5005 Filed Date: 01/11/2022
John Hoffman, Shelburne Falls, MA.

I am writing to ask that you deny a continuation of the license for FirstLight Hydro Generating Company. The project began as a way to make use of excess power from the Vernon Nuclear Power Plant. That plant is now closed. This license is now simply a vehicle for FirstLight to use its capitol to make a profit.

That profit comes at the expense of the Connecticut River, one of the glories of New England, and the source of outstanding agricultural soils in the Connecticut River valley. Now that we possess a vastly more sophisticated understanding of river ecology, the damage to the river is elaborately documented.

By sucking large volumes of water out of the river and then disgorging them back, the company erodes the river banks which in turn damages water quality. The turbines through which water is sucked destroy aquatic life, from adult fish, to their young and down to their eggs.

This is a primitive way to treat a river. No company in our present era should be allowed to inflict such damage. This river is a part of the commonwealth of Massachusetts. We the citizens ask you to protect the invaluable ecosystem of our preeminent river and deny FirstLight its license.
Future generations will thank you.

Document Accession #: 20220111-5004 Filed Date: 01/11/2022
Molly Freeland, Gill, MA.

To whom it may concern,
I am a resident of Gill Massachusetts and I request that you do not let Northfield Mountain Pump Station renew their license. The pump station is killing all life it sucks up from the river. Millions of fish are dyeing every year, including endangered short nose sturgeon. The pump station causes major erosion in the river banks which then spreads pollution. The pump station is escalating climate change when we need to be looking to renewable energy sources. Please say no to the pump station for our children, grandchildren, all life and the planet.
Sincerely,
Molly Freeland

Document Accession #: 20220111-5002 Filed Date: 01/11/2022
Irma Lorraine Pearson, Greenfield, MA.

If we, residing in the Democratic heart of our country, cannot save the only large river we have, and all the life in it, we are putting our imprimature on the destruction of our planet for the sake of building private fortunes.

The cautionary tale of Midas and his gold works very well here.
Let’s try another path, of freeing the rivers of dams and reversals, and saving 50% of our ecosystem as wilderness.

NO DEAL: amid public opposition FirstLight’s secret Northfield Mountain settlement plans stumble.

Posted by on 10 Jan 2022 | Tagged as: America's best landscaped sewer, American shad, Canada, Clean Water Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, Endangered Species Act, EPA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, Nation's best landscaped sewer, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Public Comment period, shad, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, State of Delaware, US Fish & Wildlife Service, USFWS


NO DEAL: amid public opposition FirstLight’s secret Northfield Mountain settlement plans stumble.

Failing in December to secure a secrecy-shrouded agreement, foreign-owned FL petitions FERC again for what’s now an open-ended “Delay of Action/Extension of Time” request. Thus the opportunity for critical public testimony in FL’s Federal Energy Regulatory relicense bid for Northfield remains WIDE OPEN. (**SEE simple FERC filing instructions at end of post)

As scores of public testimony to end Northfield Mountain’s devastation has poured into the Federal Energy Regulatory Commission of late, secret license deals with federal and state fish and agencies here in Massachusetts continue to elude FirstLight Power. The MA Division of Fish & Wildlife, US Fish & Wildlife, MA DEP and the National Marine Fisheries Service–responsible to the public for protecting the Connecticut’s migratory and resident fish, flows, and water quality under established law, are legally empowered with “conditioning authority” to end the half century of slaughter wrought by Northfield’s deadly suctioning. They currently hold the keys to determining if the Commonwealth hosts New England’s river-reversing, ecosystem grim reaper for more decades to come.

Democracy for coming generations means not leaving our river in the hands of a private corporation for ANOTHER half century.

FirstLight filed their latest FERC delay bid on January 4, 2022, the same day as Ethel White of Easthampton filed her FERC testimony stating, “I write concerning the Northfield, MA hydroelectric plant application for recertification. I strongly request that recertification be denied,” Meanwhile, FirstLight, that same day filed a “Continued Request to Defer Issuance of Notice of Acceptance / Ready for Environmental Analysis” with FERC for their Delaware tax-sheltered MA facilities here. Yet, with this latest delay request it appears they’ve discovered their venture capital plans for the Connecticut River are not being swallowed whole here in New England.

Parent-owned by Canadian venture capital giant PSP Investments, FirstLight has once again punted on deadlines in what has now become a decade long slog to continue the massive predation of the region’s key ecosystem artery, after a full half century. In its own January 4, 2022 filing FirstLight again begged FERC for relief of its own previously promised deadlines: “FirstLight requests that the Commission continue to defer issuance of the REA Notice until after January 31, 2022, to allow the parties to focus on the agreement in principle. If the parties are able to reach an agreement in principle by that time, they will then request that the Commission further defer issuance of the REA Notice to allow for negotiation of a fully developed, binding settlement agreement that the parties would submit to the Commission as an offer of settlement pursuant to 18 C.F.R. § 385.602.” An “REA” is FERC-speak for “ready for environmental analysis.”

In its Final License Application FirstLight’s big bid as a concession for the massive sucking fish kill annually at Northfield was a temporary 1,000 foot net, with ¾ inch mesh, to be deployed from upstream, and angled to near its suction tunnels to deflect some of the 24 species of adult fish from its giant, river-reversing vortex. That is literally a year round open door to the obliteration of 100s of millions of eggs and tiny young of developing migratory American shad and the two dozen resident and migrant species of the river—but in particular the key spawning, rearing and out-migrating months between late May and mid-October…

Importantly in that regard, the window for DEMOCRACY on our Connecticut River remains wide open for citizen to go on the public with FERC, and as well in the region’s media. Of late, literally scores of citizens have done just that, in FERC testimony that Northfield’s devastation must end and no new license be offered to FirstLight.

Below is Ethel White’s full January 4th on-the-record testimony, from the same day FL requested more FERC time for their venture capital plans for New England’s Great River, its life, and the future generations who are all entitled to a living ecosystem.

* * But first, here’s how you can stand up, on-the-record, in this critical time for the Connecticut River’s future:

GO TO: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

Document Accession #: 20220104-5000 Filed Date: 01/04/2022
Ethel S. White, Easthampton, MA.

I write concerning the Northfield, MA hydroelectric plant application for recertification. I strongly request that recertification be denied. Your commission’s decisions are key to how we deal with climate change. The vast majority of Americans believe that climate change is one of the top issues of today, if not THE top issue. We are on the brink of losing our planet’s ability to sustain human life, and large hydroelectric plants are not beneficial to rivers, aquatic life, or human existence. The Connecticut River is a vital artery in New England, and losing it to environmental degradation would be a tragedy. I hope the Commission will regulate this particular energy source in the proper way, by closing it down.
Sincerely, Ethel S. White

* * Agency heads and personnel representing the public trust:

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife.

A Connecticut River extinction rebellion

Posted by on 30 Dec 2021 | Tagged as: American shad, blueback herring, Clean Water Act, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, Death-Sewer, Delaware LLC, E-Comments, Environmental Protection Agency, EPA, Extinction Rebellion, Federal Energy Regulatory Commission, FERC, FERC Comments, FERC licensing process, FirstLight, FISH and Wildlife Refuge??, Holyoke Co. v Lyman, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Nation's best landscaped sewer, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, nuclear power, P-2485, pumped storage, right-to-know, shad larvae, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, State of Delaware, US Fish & Wildlife Service, USFWS

A VIRTUAL CONNECTICUT RIVER extinction rebellion has been taking place in the region over the last 10 days. Since December 20, 2021, over three dozen people have gone on the record with the Federal Energy Regulatory Commission stating, unequivocally–and in the clearest terms, that NO new license should be issued for the continued operation of the Northfield Mountain Pumped Storage Station by FirstLight. You can read testimony from the latest thirteen people in the text that follows.

Many have taken this action upon being apprised of some of the most basic information about the high stakes games for the Connecticut’s four-state ecosystem being played out behind closed doors right now. Many learned of this through my Opinion piece, “Last light for New England’s Great River” that appeared in the Daily Hampshire Gazette and The Recorder on December 2oth and 21sth, https://www.gazettenet.com/my-turn-meyer-LastLightCtRiver-44127152 .

It outlined the perilous place our ecosystem is teetering in as “confidential” final license settlement negotiations between Canada-owned FirstLight and MA Division of Fish & Wildlife, MA Div. of Environmental Protection, the US Fish & Wildlife Service and NOAA’s National Marine Fisheries have been taking place during this month.

This citizen action has galvanized amidst the great void of leadership and wholesale lack of enforcement of any and all state and federal environmental statutes on the Connecticut River in Massachusetts these last 49 years. It’s been a half century of predation on a Connecticut River wholly lacking in a watchdog–in a state where a devastated 23 mile-long ecosystem reach literally flows backwards for miles at times, and virtually millions of resident and migratory fish are been obliterated, annually by the massive, daily, energy-squandering suction of Northfield Mountain’s turbines in their venture capital electricity resale boondoggle.

juvenile Connecticut River shad, dead

* *and this killing is NOTHING compared to the millions of juvenile fish extinguished at Northfield annually. Shad a just one species out of two dozen inhaled and obliterated there–an annual extirpation of literally hundreds of millions of juvenile and adult fish, eggs, and aquatic creatures each year.

Today in Massachusetts the Connecticut River at Northfield remains the deadliest “Nation’s best landscaped sewer”–far more drop-dead-deadly for fish and aquatic life than in the decades prior to the Clean Water Act.

I’m certain, if this river had a voice it would be raising it now to say thank you to the folks below, and the many others, who are taking a stand to save the soul of this ancient ecosystem. To read their words, please follow down.

* * ALSO, as we are at the holiday break, there is STILL time to enter your own on-the-record testimony to FERC. This ecosystem does not belong to FirstLight, or the Commonwealth, or the “environmental” agencies that have so long failed to protect it. It belongs to the children of the future. HERE’S HOW TO ENTER YOUR TESTIMONY:Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

THIS is the giant mess in 2010 made when Northfield operators failed at flushing out the accumulated muck, detritus, and death that had been sucked up from the river into their 4 billion gallon reservoir for years. They clogged their mile-long suction tunnels with several feet of mud, and later got caught and ordered to CEASE AND DESIST by the EPA, after dumping truck-load after truck-load of polluting muck directly into the river for over 90 days straight. In direct violation of the CLEAN WATER ACT. This is the MASSIVE RIVER DREDGING OPERATION the EPA ordered. Northfield went down for over HALF a year, yet everyone’s lights stayed on…

* AND HERE ARE THOSE WORDS OF SOME OF THE OTHER FOLKS CURRENTLY TAKING A STAND:


Document Accession #: 20220103-5000 Filed Date: 01/03/2022
Laura Kaye, Northfield, MA.

Dear Commissioners,
I would like to add my voice to those of my neighbors and fellow citizens of Massachusetts, who have written many thousands of words to you in support of our great Connecticut River, which has been so adversely impacted by the pumping station in Northfield – from the waste of energy from fossil fuels burned to send water uphill just so it can flow down back into the river, to the destruction of fish, and more recently impacting our tax base. Please read the detailed comments that so many people have sent to you and DO NOT approve the re licensing of the Northfield Mountain Pumping Station. For the people and the environment upon which we depend for our continuing survival.

Document Accession #: 20211230-5080 Filed Date: 12/30/2021
Mary Hall, South Hadley, MA.

I am seeking to comment on FirstLight’s relicensing bid for the NorthfieldMountain Pumped Storage Station on the Connecticut River.

I consider it is past time for that Pumping Storage Station to cease operation. The ecological costs of operation, as detailed by Karl Meyer of Greenfield, Mary J. Metzger of Westfield, and others is far too great for continued use of this facility to be justifiable.

Mr. Meyer explains how, in order to continue operations, FirstLight has undertaken to avoid tax payments for its use. In the event the facility was economically viable, it would not be necessary to obtain a tax shelter for it to continue to operate.

The Northfield Mountain Pumped Storage Station is a giant counterbalance to all of our efforts to maintain and restore our Connecticut River ecosystem. There is nothing anyone can do in advocacy for fish and other aquatic life that can remedy the harm that the Storage Station produces. To say again: The fact that FirstLight thought they needed a tax shelter for the Storage Station testifies to the fact that, even as a business, it is not economically viable.

I ask FERC to deny FirstLight’s bid to relicense the Northfield Mountain Pumped Storage Station for the sake of all aquatic life in our beloved Connecticut River ecosystem.

Document Accession #: 20211230-5007 Filed Date: 12/30/2021
Laura Doughty, Wendell, MA.
RE: Hydroelectric License/Re-license Proceedings FERC Project Number P-2485

I urge FERC in the strongest possible terms: Please do NOT relicense First Light’s Northfield Mountain Pumped Storage facility. If we are to have anychance at keeping a livable planet, we must start *now* to use wiser and more efficient energy storage technologies. It is ridiculous to let this
corporation use far more energy than it can ever create so that it can perpetuate its business model of buying low and selling high. From an energy conservation point of view it makes no sense, but when one considers the vast ecological damage this facility has been allowed to inflict, it is shameful that it has not been shut down long ago. Please do what is right for our river, and for our planet.

Document Accession #: 20211230-5000 Filed Date: 12/30/2021
James Smethurst, Deerfield, MA.

I am writing to oppose the relicensing of the Northfield Mountain Pumped Storage. It has had a devastating impact on aquatic species in the Connecticut River, some of which, like the shortnose sturgeon, are endangered. It serves no useful purpose other than to provide profits for out of state investors. It is not a renewable energy source, but actually an energy drain, given the power required to pump water from the river uphill. The nuclear power plant whose excess energy Northfield Mountain was supposed to repurpose is no more. It is time to close it down.

James Smethurst
5 Pleasant Avenue
Deerfield, MA

Document Accession #: 20211229-5002 Filed Date: 12/29/2021
Rebecca Robbins, Williamsburg, MA.
Dear FERC,

I am concerned about the fish and other aquatic life that get ground to bits at the Northfield Mountain Pumped Storage Station. Please do not relicense this facility without ensuring the health of the river and the creatures that live in it.

Thank you,
Rebecca Robbins
Williamsburg, MA

Document Accession #: 20211229-5000 Filed Date: 12/29/2021
Betsy Browning, Colrain, MA.

I am writing to voice my opposition to the relicensing of the Northfield Mountain Pump Storage facility. I have learned so much by reading the other letters that I feel morally obligated to add my voice. I grew up within a mile of the French King Bridge and remember the Northfield Mountain project being built. Both Northfield and Erving had great enthusiasm for the bountiful tax money they grew to rely on.

For 49 years the pump storage process has been decimating fish and wildlife along the Connecticut River. Amidst our climate crisis and the threats to species, this living river deserves our protection. Ironically this area is part of the Silvio Conte Fish and Wildlife protected area.

That FirstLight is a subsidiary of Canada owned power company and that they have moved their corporate assets for Northfield Pump Storage and the Turners Falls Hydroelectric to Delaware to avoid Massachusetts taxes, clearly shows their primary goal is maximum profit.

I understand its original plan was to use the excess power from the nuclear plant at Vernon which is now defunct. So using power generated by other means to pump water uphill is now wasteful of resources, outdated, and
impractical.

Someone voiced the brilliant idea that the mountain could be converted to a vast solar site.

Renewing a 50-year license should be unthinkable knowing both the environmental crisis in our midst and the current environmental damage that is occurring daily from the pump storage process.

Document Accession #: 20211229-5084 Filed Date: 12/29/2021
Paul Richmond, WENDELL, MA.

I have a questions why is First Light Power going to sign a new contract
which allows them to continue to use an old technology, which is destroying
the CT River and all life in it. I am speaking of the pumping stations, which sucks up everything in the river and kills it to be pumped out when energy is needed. Storage has been an age old question since we started producing energy. When you have access how to store it. When there was access Nuclear electricity at night when it is consider cheap, they would pump up the water to then release it when they needed electricity at peek times for more money. A reasonable idea if you are an energy company trying to make a profit. Then there is the method you use to do that. Today there are much better batteries being spurred on by alternative energy to address when the sun is shining or the wind is blowing. So why isn’t First Light being asked to stop the old method which was and is destroying the river and store the access energy in batteries, or compressed air storage in the new contract they are about to sign with the state. Please do not sign a new agreement with this in it.

Document Accession #: 20211228-5069 Filed Date: 12/28/2021
Sid Siff, Amherst, MA.

I am writing to oppose the rel icensing of FirstLight’s Northfield Mountain Pumped Storage facility on the Connecticut River. At the time of its inception in 1972, it was considered a renewable energy resource, and in 1975 I visited the site on a field trip for a Natural Resource class I was taking at UMass. There was much banter about the benefits of taking ‘extra’ energy from the nearby Vermont Yankee Power Plant in Vernon, and using it to pump water out of the Connecticut River and up to the top of Northfield Mountain, where it was stored and released to spin giant turbines, thereby creating ‘clean’ energy at times of peak demand. Since that time, not only has the nuclear plant been decommissioned, requiring fossil fuel based energy to operate the pumps, but it is well documented that the effect on the ecosystem of the river has been devastating. Multiple species of aquatic life are sucked out of the river in large numbers and killed, on a daily basis. The river acts as a narrow tidal basin, causing extreme bank erosion. The flow of the river is disrupted, leading to inadequate water levels downstream, and a resulting inability of fish to reach critical spawning habitat. Add to this the fact that the facility uses more energy than it creates, it is clearly not, and never was, a source of renewable energy.

Furthermore, FirstLight has demonstrated a clear disregard for not only every living species in the river ecosytem, but also for the people of Massachusetts, by registering Northfield Mountain and Turner’s Falls hydroelectric facilities into Delaware tax shelters, depriving Massachusetts of any tax revenue.

Perhaps by creating a closed loop system, with a reservoir at the bottom of the mountain that is completely separated from the river, and using any excess offshore wind energy to operate the pumps, Northfield Mountain could be a viable energy source going forward. But in its current state, it’s an outdated, dangerous and extremely harmful and wasteful behemoth that should be put to rest.

Document Accession #: 20211228-5066 Filed Date: 12/28/2021
Graham Hayward, NORTHFIELD, MA.

I do not want First Light’s bid for re-licensing to be approved. All they’ve done behind benefit of closed doors must be moved out into the light of day and a public forum.

This is one of many matters that won’t “fly” anymore and all those involved will be dealt with, these days of theft are over.
Thank you,
Graham Hayward

Document Accession #: 20211228-5065 Filed Date: 12/28/2021
Betsy Corner, Shelburne Falls, MA.
Concerning P-2485 for Northfield Mountain

For the past 50 years I’ve witnessed and read about the damage that the Northfield Mountain Pump Storage facility has caused to the Connecticut River and its inhabitants. Certainly common sense tells us that the kind of system that uses more energy than it produces is antiquated and foolish. It’s clear that relicensing this facility would be done in the financial interests of the owner of the corporation that seems to have power over those who are involved in granting another 50 year long license. Residents of the Connecticut Valley must have a transparent licensing process, not the closed door one that has been on-going. It’s high time to protect the river’s ecology and to look at the big picture of money and politics as it affects all of us in this decision.

Document Accession #: 20211228-5058 Filed Date: 12/28/2021
Dave Dersham, Northampton, MA.

I write to you concerning project number P-2485:
The kinetic energy that FirstLight consumes to push the Connecticut river
backwards and up Northfield Mountain, exceeds the potential energy eventually gained.

Simultaneously, 10s of thousands of small fry become pulverized by being
sucked into the hydro electric turbines placed at the midpoint of this
convoluted design. The result is essentially an aquatic Rube Goldberg killing machine, despite the substandard netting placed in the river meant to divert the inexorable fate of the baby fish.

This procedure, which has been going on for decades, is the exact opposite of sustainability both energetically and ecologically ” and needs to
finally stop.

FirstLight does not deserve to be granted another 50 year license.
Thank you for your attention,
Dave Dersham

Document Accession #: 20211228-5048 Filed Date: 12/28/2021
Garrett D Connelly, Greenfield, MA.

Hello,
I am writing this request that you revoke First Light’s operation permit for the Northfield Mountain Pumped Storage Facility so that you know one more person stands against United States policies that disregard life on Earth and serve only short term profit. And in this case it is a false profit.

FERC employees know short-term profits are small relative to the economic
benefits of a clean and free flowing Connecticut river as well as I do,
probably much better. For this reason I won’t try to fit a list of economic
and environmental benefits from a clean and free flowing river and simply
describe what clear thinking people in the future might do instead.

Visualize a line of pollution sensors across a free flowing river that is so clean it has become a world renowned tourist destination. One of the sensors registers a trace of some cancer inducing chemical and enlightened employees of a future country that cares about life spring into action. Chemical sensors follow the pollution to its source and the activity causing it is stopped and cleaned up.

We all know the energy used by consumer societies is leading to extinction of human life on Earth. The wealth generated by free flowing clean rivers can only happen when energy regulators know how much energy is required by a modern and healthy nation. FERC knows far better than I that the real economy does not require a fake enterprise destroying river life for unreal paper profits so I stop here.

Please think about it from a pro-life perspective and then deny the permit to operate a fake business that destroys real life. Deny the permit that allows operation of the Northfield Mountain Pumped Storage Facility.
Sincerely,
Garrett Connelly

Document Accession #: 20211227-5224 Filed Date: 12/27/2021
Robert F Porzio, Putney, VT.
Bob Porzio, Putney VT

Dear Federal Energy Regulatory Commission,
Please do not grant a new federal license for the Northfield Mountain Pumped Storage Station, P-2485. This plant has done huge damage to the river for the last half century, reversing flows and killing fish while squandering massive
amount of energy. As a Vermont resident it is unacceptable to allow this machine to kill migrating fish that should be reaching our section of river, but are swallowed by this deadly plant on their upstream and downstream travels. We folks upstream are entitled to a thriving river and a share of its migratory fish.

Thank you,
Robert Porzio
Putney VT

Public rejecting new Connecticut River license bid for Northfield Mtn: 49 years of ecosystem predation and waste is enough.

Posted by on 24 Dec 2021 | Tagged as: Connecticut River, Connecticut River ecosystem, E-Comments, Federal Energy Regulatory Commission, FERC, FirstLight, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, public trust, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, US Fish & Wildlife Service, USFWS

Public rejecting new Connecticut River license bid for Northfield Mtn: 49 years of ecosystem predation and waste is enough.

Even at the holiday break a belatedly-informed citizenry is going on the record, while secret talks between FirstLight and US Fish & Wildlife, NOAA Fisheries, MA Fish & Wildlife and MA DEP loom in a shadowy background. Below are the latest citizen filing with the Federal Energy Regulatory Commission. All state that no license should be issued for Northfield Mountain. It is time the devastation ceased.

These were all accepted into the FERC public record on Christmas Eve, people taking a stand for the river that is the lifeblood and soul of this New England ecosystem. SEE BELOW:

(* * NOTE:if you would like to add your voice into the public record concerning the Connecticut River and relicensing, you’ll find simple instructions at the end of this post.)

Document Accession #: 20211227-5000 Filed Date: 12/27/2021
Stephen Kerr, Greenfield, MA.

To whom it ma concern, I am looking to voice my disapproval of thee FirstLight power plant’s usage of the Connecticut river. I believe the damage it causes the river ecosystem (and by extension, the local ocean ecosystem which uses the river as a breeding ground) is not worth the electrical power it’s converted into.

I hope that my concern is taken seriously, as it is also representative of many people I know. Please contact me if you’re able to put this concern into action, or if you know of any further action I can take to help make a change in this system.

Thanks and happy holidays,
Stephen

Nancy Obertz, Westhampton, MA.

Please refuse to relicense this company as they are using my river for their gain. Millions of species are dying from the intense pull of their turbines and they do not help the environment. They dodge tax responsibilities (sheltering in Delaware) and hand out pittance amounts to locals in the guise of “good community partners”. STOP this now. We are not going to sacrifice our beautiful Connecticut river for many more decades of their unchecked degradation.

I have grown up on this river (Ox-Bow in Easthampton) and am sickened by what First Light is doing. I have watched the shad and herring disappear. Yet, this company touts all the good they do for the local fish. This is your chance to have a very long-lasting impact. PLEASE refuse to re-license First Light! History will tell our children of your impact here. Please make that impact a positive one.

Thank you!
Nancy Obertz
Westhampton Mass.

Document Accession #: 20211227-5002 Filed Date: 12/27/2021
Dorothy McIver, Greenfield, MA, MA.

I am writing to voice my opposition to the re-licensing of the Northfield Mountain Pumped Storage Facility. It is not needed to generate electricity with all the new advances in technology and it has had a devastating effect on the fish and other aquatic life who are killed when it is in operation. The river needs to be allowed to heal, and continuing this harmful operation for another 50 years is an affront to all of us who want this shut down, and
a benefit only to those who profit from their own greed and lack of concern for this delicate ecosystem and are in denial of the harm they have done for the past 50 years. Please do the right thing and set our river free to flow where it it will with a revitalization of the life it is meant to sustain.
Dorothy McIver

* * HERE’S HOW TO MAKE YOU VOICE HEARD: Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and use Northfield’s FERC project number, P-2485, to enter your comments.

THIS CONNECTICUT RIVER DEFENSE IS SPOT-ON!

Posted by on 18 Nov 2021 | Tagged as: Connecticut River, Connecticut River Conservancy, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, E-Comments, Federal Energy Regulatory Commission, FERC, FirstLight, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-1889, P-2485, Relicensing, State of Delaware, The Nature Conservancy, US Fish & Wildlife Service, USFWS, wildlife refuge

THIS NOTEWORTHY and pointed river defense was sent into the Federal Energy Regulatory Commission on 11/17/2021 and entered into the public record–summarizing the 49 years of ecosystem devastation wrought by the Northfield Mountain Pumped Storage Station. PLEASE READ SHAYLA FREELAND’S FULL FERC FILING FURTHER BELOW.

FirstLight–running the licensing show, has scheduled confidential, endgame license “settlement” talks with the US Fish & Wildlife, National Marine Fisheries, and MA Division of Fish & Wildlife and the MA DEP for this December 2.

IF THERE WAS EVER A MORE IMPORTANT TIME for the public to make its case for a living future for this river ecosystem, THAT TIME IS NOW.

Comments can be written, then copied and pasted into the FERC record by going to www.ferc.gov; then find E-Comment in documents and filings–then be sure to know and INCLUDE in your filing the FERC “project number” for both Northfield Mountain Pumped Storage: P-2485, and Turners Falls dam and hydro operations: P-1889. Note that other people have taken simple further steps by publishing their comments on-line, on web pages, and, importantly, sending out to enter the record in the PUBLIC media.

Shayla’s strong, thoughtful and personal summary puts any filing or public statement made by either the Connecticut River Conservancy or The Nature Conservancy about Northfield’s massive river destruction in Massachusetts to shame. Further, it leaves our public trust agencies–including the US Fish & Wildlife Service, National Marine Fisheries Service, MA Division of Fisheries and Wildlife and MA DEP cowardly silent and liable for a river that’s now staring at a full CENTURY-LONG death sentence in Massachusetts.

By not stepping up, they collaborate on a broken ecosystem and the collapse of one of the Earth’s key cooling arteries. These entities have had 49 years to stand up, to speak out against this deadly machine, to end its killing–to intervene at any number of junctures. None did. Thus, the lethal, heart-stopping pumping at Northfield continues, chewing through the lives of hundreds of millions of eggs, larvae and juvenile migrant and resident fish alike every year.

In a just world this endless, massive fish kill would have been prosecuted decades ago. But not here–not in Massachusetts, where all these entities will meet in secret with FirstLight on December 2nd to decide a river’s fate. Silence and secrecy in a democratic society bear a very close resemblance to complicity and their 49 years of a failure to protect…

In stark contrast, here is a brave person is speaking for future generations–and their right to have a living planet. Thank you Shayla!

“My name is Shayla Freeland and I live in Gill. As some of you might know there is a power plant in Northfield called the Northfield Pump Station. There have been many people trying to prevent Firstlight, the owner of the pump station, from renewing their 50 year license to continue making electricity at the expense of our river. On the bridge over the Connecticut river, crossing into Turners Falls, there have been two protests against this license. Many people have invested their time and energy to try and convey how bad this process is for the environment. Personally I agree with everyone who is trying to prevent this. I live in Gill right next to the river and the dam (Firstlight also owns) so I can see first hand the destruction the station is causing. I am able to see and smell the problems.

The stench that comes from that part of the river can be absolutely horrendous. The turbines of the pump station suck in life and throw out death. When they put up the dam the other side gets very low in water and the sun fries up the bits of fish creating the horrible smell. Below the Turners Falls dam there is also an ancient Shortnose Sturgeon spawning ground and the same thing happens to them as the bits of fish. They fry. They rote. They go rancid. As you can probably tell this is not a naturally occurring problem, it’s a problem caused by Firstlight.

In the night they suck water from the Connecticut River up the Northfield Mountain when electricity is cheap. To get the water up the mountain they have to burn fossil fuels to power the pumps. Not only are they polluting the earth with this dwindling resource (because they made a choice between easy money and protecting our home) they are completely killing and destroying our rivers ecosystem. During the day when demand is high they let the water back down the mountain. As it does this it is going through turbines (which creates the electricity)chopping and killing animals. Twenty-four species have the wonderful chance to meet the
deadly blades of the turbines.Now Firstlight is about to renew their fifty year license.

So they pollute the earth, kill the animals and the river’s ecosystem, but hey they’re making easy money and we’re getting electricity so it’s okay right? No, it’s not. And the electricity they are making doesn’t even get used by the people in this area. It’s getting stored as backup for some city. Not only is the electricity not being used by the local population, but Firstlight is not paying any taxes to the town. They are an LLC based in Delaware so they are not obligated to pay us taxes.

This pump station has no benefit to the people living in this area. We are not getting electricity or taxes. It’s deadly turbines are killing fish and preventing them from helping our river prospure. Firstlight should not be allowed to get their license renewed because all they do is
pollute the planet, kill animals and destroy the Connecticut’s ecosystem, which in turn will affect us too.

HERE, is one citizen taking responsibility for a living river system, and for those who come after us…

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future

Posted by on 21 Jul 2021 | Tagged as: 5-year FERC licensing process, Brian Harrington, Catherine Carlson, climate change, Connecticut River Atlantic Salmon Commission, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, CRASC, Daniel McKiernan, David Cameron, Donna Wieting, E-Comments, Environmental Protection Agency, EPA, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Comments, FERC Commissioner Richard Glick, FERC Secretary Kimberly D. Bose, FirstLight, FirstLight Power, Gordon van Welie, Holyoke Co. v Lyman, ISO-NEW ENGLAND, Jesse Leddick, Julie Crocker, Kathleen Theoharides, Kimberly D. Bose, Landmark Supreme Court Decision 1872, Local Bias, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, Northfield Mountain Pumped Storage Project, P-1889, P-2485, Peter Brandien, Public Comment period, Public Sector Pension Investments, Rock Dam, Sam Lovejoy, Sean McDermott, shad, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Steven Mattocks, Timothy L. Timmermann, Turners Falls, US Fish & Wildlife Service, Vermont, Wendi Weber

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future Copyright © 2021 by Karl Meyer

Kathleen Theoharides, Massachuetts’ Secretary of the Executive Office of Energy & Environmental Affairs before launching on a PR kayak tour of the river at FirstLight’s dock next to the intake of the Northfield Mountain Pumped Storage Project, October 2020. Photo Copyright © 2020 by Karl Meyer

NOTE: as a journalist and citizen I’ve been a participating stakeholder for nearly a decade in the ongoing Federal Energy Regulatory Commission relicensing process for the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot hydro operations. In that light, I encourage people to first view the half-hour segment of Local Bias, linked below. Then, return to this post and its resource list below for ways to participate in the critical decisions now being made about the Connecticut River. They will impact its currently crippled ecosystem for generations to come.

LOCAL BIAS link: https://youtu.be/IX2Rv2NYq3s

Since 1872 the US Supreme Court has made it the law of the land that migratory fish on US Rivers are guaranteed safe upstream and downstream passage at dams and industrial river sites. That decision was centered on a Massachusetts case at the Holyoke Dam. One hundred forty-nine years later that law remains essentially unfulfilled at an endangered species’ critical spawning and nursery site on the Connecticut River at Montague, MA, as well as at the Turners Falls Dam in that town.

Further, that law remains glaringly unenforced and unimplemented at the Northfield Mountain Pumped Storage Project in Northfield MA, where the river is literally sucked into reverse, and millions of eggs and downstream running juvenile American shad are pulled to their “functional extirpation”(vacuumed to their deaths) yearly, on their way to the ocean from Vermont and New Hampshire spawning reaches. The Commonwealth of Massachusetts has now owed Vermont and New Hampshire—and really all of New England, a living river for almost exactly a century and a half.

Warning sign announcing the dangers of Northfield’s massive intake suction. Photo Copyright © 2021 by Karl Meyer

The current Canadian parent-owners of that net-loss power regeneration/resale site are proposing only an ineffective, seasonal “barrier net” at the vacuum mouth of this facility, the very ‘solution’ that leaves this monstrous sucking in place to kill all those Vermont and New Hampshire produced eggs and baby shad, crippling the prospects for returning adult shad to those states from the Atlantic four years in the future.

The donuts and coffee were on FirstLight for the state officials and representatives taking part in last October’s little PR kayak tour. Photo Copyright © 2020 by Karl Meyer

Northfield Mountain’s net-power-loss energy consumption literally swallows and squanders the entire annual energy equivalents of whole cities and counties as it ravages the Connecticut River, using it as a crushing and deadly energy relay switch.

FirstLight is applying to FERC—backed up by a power-hungry, ecosystem-and-climate-indifferent ISO-New England, for a license to kill for decades to come. Northfield Mountain wastes monstrous amounts of grid energy, while ravaging New England’s critical main ocean connection and planetary cooling artery…

Below are resources available to the public for interacting and participating with the Federal Energy Regulatory Commission in licensing decisions, and government agency officials charged with implementing the public trust on the Connecticut River.

www.karlmeyerwriting.com/blog

NOTE: the landmark US Supreme Court environmental decision centered on the Connecticut River came back in 1872 in Holyoke Company v. Lyman, requiring safe up- and down-stream protection for migratory fish.

Send public comments on relicensing of the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot Hydro Stations to the Federal Energy Regulatory Commission. The “project numbers” must be included, as well as your name and address, in order to become part of the public record. They should be concise, citing specifics in a paragraph or two, noting Northfield Mountain P-2485 and Turners Falls/Cabot P-1889.

Send via www.ferc.gov, usingE-comment, with the salutation going to: “Kimberly D. Bowles, Secretary.” Those comments can also include a cc to the current chair of the Federal Energy Regulatory Commission: Richard Glick.

Decisions concerning foreign interests and use of the Connecticut River are happening at this time, and the river in Massachusetts has sat largely emptied or dead here for half a century—a situation enabled by the Commonwealth and its officials’ enduring, ugly and pointed environmental neglect.

To gain effect, letters can be cc’d to federal-and-state officials who are the vested stakeholders representing the public in the protection of the river and resources. Those publicly recorded FERC entries can also be forwarded to local newspapers and media outlets.

LIST of executives–plus officials from federal and state agencies who represent the public in protecting the Connecticut, its migratory fish, aquatic animals and habitats through their “conditioning authority” powers:

ENERGY executives in the private/quasi-public sphere:

Mr. Gordon van Welie, President and CEO, ISO-New England, the “independent” system operator:
Phone (413) 540-4220

Mr. Peter Brandien, Vice President of System Operations, ISO-New England:

E-mail: pbrandien@iso-ne.com .

NOTE: Mr. Brandien writes the annual support letter that facilitates the daily commercial damage to the Connecticut wrought by the Northfield Mountain Pumped Storage Project. ISO has never acknowledged to the public that NMPS is NOT essential to the DAILY functioning of the power grid. Instead it encourages and shackles the public to those peak-priced, daily ravages as NMPS is handsomely paid to hold back several hours of reserve emergency-function megawatts for ISO’s 20th Century bulk power grid in case of a rare blackout (like the one in 2003), and also for occasional use–at scattered intervals, in controlling grid fluctuations.

ISO should have ago been curtailed as a functionary for private mega power interests. Today’s grid should already be based on distributed generation and micro-grid functions in this time of climate chaos and cyber crime. Energy and storage should be located nearest to where it is produced and used. Future linking of river-ravaging NMPS to 200-mile-distant wind turbines is wholly criminal when compressed air storage can be located close to metro/industrial coastal centers—including implementation at sites like Everett, Somerset, New Bedford, and elsewhere. That would render the system resilient, local and detachable–and rescue New England’s Connecticut River ecosystem to support generations to come across the next half century.

But, today and into the future, counter to Holyoke Co. v. Lyman, , ISO will happily sell off a US ecosystem’s daily life to foreign venture capital interests, keeping NMPS in lucrative daily play for decades into the future. The bottom line function of ISO-New England—forget ecosystems and climate, is apparently commercial first, and foremost. In their own words: to “protect the health of the region’s economy and the well-being of its people by ensuring the constant availability of competitively-priced wholesale electricity—today and for future generations.” They love to employ the term “clean”, but never elaborate on glaring incongruities, fallacies or impacts. Future generations apparently will have no need of living ecosystems, just an endless stream of “competitively-priced” energy. They NEVER mention energy CONSERVATION…

FEDERAL PUBLIC officials:

For endangered Connecticut River shortnose sturgeon, freshwater mussels, as well as American shad, blueback herring and American eel:
Donna Wieting, Director of Protected Resources, National Marine Fisheries Service, NOAA Fisheries:
Phone: 301-427-8400

Also, for endangered shortnose sturgeon, as well as American shad, blueback herring and American eels: Mr. Sean Mcdermott, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Sean.mcdermott@noaa.gov

Also at NMFS, protecting shortnose sturgeon and their habitat: Ms. Julie Crocker, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Julie.crocker@noaa.gov

For federal protection and enforcement of the Clean Water Act on the Connecticut River: Mr. Timothy L. Timmermann Office of Environmental Review, EPA New England Region 1, Boston MA 02109-3912:

E-mail: timmermann.timothy@epa.gov

For all migratory fish and safe passage on the Connecticut including American shad, herring, and endangered sturgeon: Wendi Weber, US Fish & Wildlife Service Region 5, Hadley MA 01035:

E-mail: wendi_weber@usfws.gov

MASSACHUSETTS state officials:

Kathleen Theoharides, Secretary of the MA Executive Office of Energy & Environmental Affairs 100 Cambridge St., Suite 900, Boston, MA 02114:
Main Phone at (617) 626-1000

For Massachusetts clean water and wetland habitat protections on the Connecticut: Mr. Brian Harrington, Bureau of Water Resources Deputy Regional Director, Massachusetts Department of Environmental Protection, 436 Dwight Street, Springfield MA 01103:

E-mail: Brian.d.harrington@state.ma.us

Also from MA DEP: Mr. David Cameron, PWS Section Chief, Massachusetts Department of Environmental Protection, 436 Dwight St., Springfield, MA 01103:

E-mail: David.cameron@state.ma.us

For state-endangered shortnose sturgeon and all Connecticut River migratory fish in MA: Mr. Jesse Leddick, Chief of Regulatory Review, Massachusetts Division of Fisheries and Wildlife, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: Jesse.Leddick@mass.gov

Also at MA Div. of Fish & Wildlife: Mr. Steven Mattocks, Massachusetts Division of Fisheries and Wildlife, Fisheries, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: steven.mattocks.@mass.gov

My Response to FERC respecting FirstLight’s response to the Federal Energy Regulatory Commission’s questions and this relicensing process

Posted by on 23 Jun 2021 | Tagged as: Connecticut River, Federal Energy Regulatory Commission, FERC licensing process, FirstLight, Fish and Aquatics Study Team, Kimberly D. Bose, MA Division of Fish and Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain Pumped Storage Project, PSP Investments, Rock Dam, US Fish & Wildlife Service, Vermont Fish & Game


PHOTO Copyright © 2021 by Karl Meyer


PHOTO Copyright © 2021 by Karl Meyer


PHOTO Copyright © 2021 by Karl Meyer


PHOTO Copyright © 2021 by Karl Meyer

NOTE: The four photos above were taken of the Connecticut River’s oozing banks and dewatered cobble shoals at the Rock Dam, the sole documented natural spawning site and nursery of the federally-endangered Connecticut River shortnose sturgeon on June 23, 2021.

The following was submitted to the Federal Energy Regulatory Commission on June 23, 2021.

Karl Meyer
91 Smith St., # 203
Greenfield MA 01301
413-773-0006
Karlmeyer1809@verizon.net June 23, 2021

Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
Hydro Licensing

RE: This day’s submission by FirstLight’s Operations Manager Nick Hollister respecting FirstLight MA Hydro LLC, Turners Falls Hydroelectric Project (FERC No. 1889)Northfield Mountain LLC, Northfield Mountain Pumped Storage Project (FERC No. 2485). Response #3 to FERC January 14, 2021 Letter Regarding Additional Information Requests

Dear Ms. Bose,

I write to you requesting a rejection of significant and substantial portions of the Additional Information Request filing made this day to FERC by FirstLight MA Hydro LLC and Northfield Mountain LLC. I have been a participating stakeholder, intervener and member of the Fish and Aquatic Studies Team for these projects, FERC P-1889 and P-2485, since 2012.

On January 14, 2021, FERC required updated information and an answer to the following inquiry:

“To enable staff’s evaluation of effects of the proposed project on fish entrainment at the Northfield Mountain Project, please provide estimated weekly and/or monthly pumping flow volumes for both current and proposed operations in a typical year.”

Simply stated, FirstLight has failed to address or provide any new or useful information in response to the requested NFM-AIR#4. What they have provided is decades-old data from the last century that does not reflect in any meaningful way how NMPS operates today, or how it might operate in any future scenarios.

Page 10 of their written response to FERC’s requirement sums up the uselessness of their outdated submission in bold parameters:

“Table NFM AIR#4-1 provides the average monthly volumetric flow rate of water pumped by Northfield Mountain over the 42-year period of record analyzed (i.e. 1962 – 2003).”

Put simply, Northfield Mountain did not exist in 1962, and did not come on-line until 1972. Therefore, a full 10 years of their purported data is null and void. Parent owner PSP Investments is new to this country and to Massachusetts, however that bit of historic information could have been culled in Wikipedia.

Further, their particular data-set ends in 2003, just three years into the timeframe when NMPS began operating under new and loosened pumping and generating parameters after Massachusetts deregulated their energy markets. It too is information representative of the past century.

Wholly absent is information on the first two decades of the 21st century, the one in which PSP purchased these facilities intending to profit from them for generations to come. What is absolutely needed, in order to make any projections on the scope and impact of pumping and generating operations far into the future, are the figures, charts and data from the year 2000 to the present, 2021.

And, as well, FERC surely understands that there have been policy changes at the Federal Energy Regulatory Commission in the current half-decade that now allow NMPS to operate more frequently and benefit from participation as a merchant supplier in the wholesale energy market. In order to begin to understand and project how these changes have impacted NMPS current operations and how they will impact future river conditions, a full comparison of recent operational changes due to these new FERC loosened parameters with the 5 preceding years should be the minimum of data and information required of FL by FERC.

In a relicensing now entering its 9th year, I find FL’s response to the FERC process to be yet another delay tactic at best, and wholly dismissive of all the state and federal agencies and stakeholders long engaged in this process at worst. It simply does not hold water. Please require an immediate and with-all-haste rewrite and resubmission of answers to these critical questions. Any new license offered should be shortened in relation to the accruing years beyond the expiration of their original license, April 30, 2018.

Sincerely,
Karl Meyer, MS Environmental Science

Cc: Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service
Kenneth Sprankle, U.S. Fish and Wildlife Service
Michael Pentony, NOAA Fisheries Service
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA
Daniel McKiernan: Director MA Division of Marine Fisheries
Louis Porter, Commissioner VT Dept. of Fish & Wildlife
Scott R. Decker, Inland Fisheries Division, NH Fish & Game Dept

GREAT CONNECTICUT RIVER SURVIVAL WALK DRAWS BIG MULTI-STATE CROWD

Posted by on 27 Apr 2021 | Tagged as: 1872, American shad, Bellows Falls VT, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Refuge, Conte National Fish & Wildlife Refuge, Daniel McKiernan, Delaware LLC, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, Haddam nuclear plant, Holyoke Dam, ISO New England, Julie Crocker, Kathleen Theoharides, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Martin Suuberg, Martin Suuberg:, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Millstone 1, National Marine Fisheries Service, National Marine Fisheries Service, net-loss power, NMFS, NOAA, Northeast Utilities, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, NU/WMECO, P-2485, PSP Investments, Public Sector Pension Investments, river cleanup, Riverkeeper, salmon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, State of Delaware, Treasury Board of Canada, Uncategorized, United States Supremed Court, US Fish & Wildlife Service, Vermont, Vermont Yankee

GREAT CONNECTICUT RIVER SURVIVAL WALK DRAWS BIG MULTI-STATE CROWD

Claire Chang of the Solar Store of Greenfield speaks to attendees. Note: see http://solarisworking.org/. Photo Copyright © 2021 by James Smethurst. All Right Reserved

Northfield MA. The biggest story on the 410-mile long Connecticut River this Earth Week did not center on yet another promo video or soft news story about people doing trash cleanups. It took place on Saturday, April 24th, when more than 70 people of all ages–from as far as Springfield, South Hadley and Northampton MA–all the way upstream to Putney VT, turned out for a 3-mile river walk to learn about the 50 years of devastation that the Northfield Mountain Pumped Storage Station has wrought on their four-state ecosystem.

THE DAY’S SPEAKERS BEARING WITNESS

Attendees heard from host, Traprock Center for Peace and Justice’s Anna Gyorgy, about the long, deep connection of this river killing to nearly 50 years of nuclear power excess and damages (www.traprock.org). They heard from Claire Chang of the Solar Store of Greenfield about alternative energy, solar installation and bulk storage alternatives to destroying whole ecosystems. And, I spoke at length about the long, grim and deadly history that has brought us to a crossroads for a living future for the Connecticut River vs. this massively violent machine.

WHERE THE RUBBER NEVER MET THE ROAD

What people heard about was that shutting up NMPS’s killer intake pipes is the only river cleanup that matters. Doing just that would have saved a now-crippled ecosystem–had there been an actual watchdog organization on the Connecticut in 1972–or again, when Vermont Yankee’s license expired in 2012. Those are the cleanups that would have spared an entire ecosystem, decade-upon-decade of this hide-in-plain-sight sucking wound.

THE LEGACY OF FAILURES

They learned the Commonwealth Massachusetts has endlessly failed this ecosystem, facilitating its exploitation to the detriment of 3 other New England states by not protecting it. And, that the federal and state fish agencies have failed it as well by first chasing, then never relinquishing, their long-failed salmon experiment, for a fish not seen here since 1809. And also that the NGO claiming guardianship here since 1952, massively failed New England’s River–never stepping up to challenge and prosecute the devastation of the power companies, nor calling out or suing government agencies charged to protect it under state and federal law.

LANDMARK SUPREME COURT DECISION 1872: HOLYOKE CO. v. LYMAN

Living rivers do not flow backwards. People walked a mile and a half to the intake pipes of a deadly machine that has laid waste to billions upon billions of fish across a half century—literally suctioning them to death while pulling miles of river current into reverse. Folks learned that building of this net-power-loss, river-gorging appliance and the deadly impacts it created on migrating fish, particularly American shad—actually flew in the face of the 1872 landmark Supreme Court decision in Holyoke Company v. Lyman, a full century before NMPS was built. Given that law, it had no right to exist here at all.</strong>

Photo Copyright © 2021 by Robert Flaherty All Rights Reserved.

What did that landmark decision require of dam system owners and private companies operating on the Connecticut–and on all rivers of the United States a century and a half ago? It said all must provide safe fish passage, upstream and down of their facilities, as “public rights.” Visitors also learned that the Canadian owners of this 365-day-a-year slicing machine want only to provide a flimsy net, part way across its killer mouth, for just over two months out of the year. That will largely leave the eggs, larvae and juveniles of most species—including migrants, in full peril. Names of agency leaders charged with saving the river for our grandkids were supplied.

NOTE:text below derives from a The GREAT RIVER WALK handout

NO NEW LICENSE TO KILL: THE NORTHFIELD MOUNTAIN PUMPED STORAGE STATION: A HALF CENTURY OF WASTE, DEATH AND ECOSYSTEM DESTRUCTION.</strong> Notes from Karl Meyer, FERC relicensing Stakeholder and Intervener since 2012

To COMMENT: Federal Energy Regulatory Commission Project License P-2485 (www.ferc.gov E-comments) Include your name, address, project # P-2485 and a brief. specific remedy for FERC to apply.

Owner:venture-capital firm PSP Investments, a Canadian Crown Corporation.
Operating in MA as: FirstLight Power Resources.
Current tax sheltering llc registration since 2018 out of MA & New England: in Dover, Delaware

NMPS is an energy consumer. It has never produced a single watt of virgin electricity. Every day this machine consumes huge pulses of electricity from the power grid to suck massive gulps from the Connecticut backward and uphill for hours on end at a rate of up to 15,000 cubic feet per second(cfs). That sucking pulls the Connecticut backward at times for over 3 miles downstream. SOURCE: FERC P-2485 relicensing Study 3.3.9 appendices.

This is not a hydropower plant; it is an energy wasting machine operating exactly like an electric toilet. It runs on imported electricity, profiting on the buy-low/re-sell high model.

RUNNING BACKWARD FOR DECADES

**VIEW Federal Power Commission document with link HERE FPC 1974 flow reversals

That 15,000 cfs is the equivalent of 60, seven-bedroom mansions being swallowed each minute, for hours on end—with everything from tiny fish eggs to full sized American eels obliterated by its turbines. Twenty-four species are subject to that suction. For shad alone it’s estimated that over 2 million juveniles and 10 million eggs and larvae die here annually. That’s just one species. How many billions of fish die annually, across all species—and now across 49 years? A fixed, monitored, year-round barrier screen, fully across its mouth was required.

NMPS then later sends that deadened water back down in peak-priced pulses for a few hours in the morning and afternoon at up to 20,000 cfs. A living river goes in, all that comes out is dead. The Northfield Mountain Pumped Storage Station does its killing in the heart of the Silvio O. Conte Connecticut River National FISH & Wildlife Refuge. This Canadian company is operating in the heart of a four-state ECOSYSTEM, crippling and pulling it apart daily. It should be relegated to rare emergency use.

The scheme to pair this eviscerating machine with future ocean wind is a nightmare—fully a Greek tragedy. Ocean wind sent to kill its river babies. Future generations require a living river.

Energy should be consumed close to where it is produced. That is where the load is. In New England that load is at the coast. Large-scale compressed air plants can be built at New Bedford, Everett, Boston, Somerset and Middltown RI for large-scale wind energy storage. If FERC allows massive LNG export farms to be built at the coast, it can require space for “local” energy storage—right near all those current “natural” gas tank farms of today.Storage needs to be adjacent to those metro cities where it is consumed. That battery storage can be constructed is a given.

In the age of Climate disruption the goal of an electricity network–one safe from mass outages due to cyber attacks and wind and flood events–disrupting the current corporate mega-grid built for huge area energy relays, should be micro-grids and distributed generation.

That decreases vulnerability and will encourage CONSERVATION—never mentioned by the Federal Energy Regulatory Commission or ISO-New England. That is the formula that begins to tackle climate disruption. It is time for Re-Regulation of the power grid. It is time for TRANSPARENCY in the Commonwealth’s energy policy–done behind closed doors with monopoly capital interests running the ISO-NE and NEPOOL table, while excluding even journalists from meetings. This plant squeezes the life out of approximately 1-1/2 billion gallons of Connecticut River water daily—its deadened re-sale power for export—for “load” consumers far from the small towns and cities of this 4 –state ecosystem.

NMPS was built by WMECO/Northeast Utilities(NU) to run off the bloated excess juice of their Vermont Yankee nuclear plant, 15 miles upriver. VY closed forever in 2014. NU today remains massively wired into and out of this facility’s energy resale loop. Today NMPS deadly consumption continues on 50% climate scorching natural gas, 25% nuclear from NH and CT, and 10% actual hydropower from Canada.


The massively fouled Connecticut River and NMPS’s intake tunnels on September 6, 2010. Photo Copyright © 2021 by Karl Meyer

In 2010 NMPS choked on its own effluent, and unexpectedly did not run for over half a year after fouling its massive tunnels with silt and muck. Shut down from May 1st thru early November– after being hit with a “cease and desist” order from the EPA for secretly and illegally dumping that grim effluent directly into the Connecticut for months, in gross violation of the Clean Water Act. Nobody lost power during NMPS’s surprise shutdown for over half a year. That’s despite arguments from grid operator ISO-New England about how necessary its killer, daily re-sale juice is to keeping the lights on. Even during record-breaking summer heat in 2010—when VT Yankee even shut down for refueling, the power grid held together just fine.

What did happen in the 4-state ecosystem—quieted without Northfield’s massive disruption, was that dismal fish passage for American shad just downstream at Turners Falls dam shot up 800% above yearly averages for the previous decade. That was the ugly decade when NMPS began operating differently—after Massachusetts decided to deregulate electricity markets.

NMPS is an ecosystem-crippling, anti-gravity machine, gobbling vast amounts of energy to send a river into reverse and uphill—a buy-low/re-sell-high, cash cow regenerating set-up.

This machine is a crime against nature.

At a time when the planet is dying, you revive ecosystems. This river belongs to our grandchildren and the future, not to greedy foreign investment firms. The corporate concern here is merely the weight of water—live fish and living rivers are nuisance expenses. What would suffice here would be a bunch of pulleys and a giant anvil, like a Roadrunner cartoon. Stop killing the future for our kids.

ORIGINAL OWNER/BUILDER: WMECO/Northeast Utilities—completed in 1972 to run off the excess electricity from its sister plant, Vermont Yankee nuclear station, completed in 1972. NU also had ownership in VT Yankee. Today NU/Northeast Utilities is “doing business as” Eversource. Eversource remains massively wired into and out of NMPS/FirstLight facilities.
Eversource/NU never left us. They just decided to dump their creaky and massively-fined nuclear plants at Millstone and Haddam, to become a bigger, more concealed monopoly. What they did was transfer emphasis to T & D–Transmission and Distribution. They would make their bucks by CONTROLLING THE ENERGY TOLL ROAD. Note the massive new wire structures and the some 18-line-long laundry list of charges on your energy bill for simply for T & D. They have as yet not figured out how to get a kick back for delivering STATIC ELECTRICITY.

Eversource is perennially green-washed through its major-money sponsorship of the Connecticut River Watershed Council/Conservancy’s “Source to Sea Cleanup.” NU/Eversource and the Council (founded 1952) have a long, close, deep-pocketed history. Thus, this green-washed, river-killing apparatus has been quietly-enabled for decades.

A 2021 Brown University study named Eversource as MA’s largest energy spender against clean energy and climate legislation: https://ibes.brown.edu/sites/g/files/dprerj831/files/MA-CSSN-Report-1.20.2021-Corrected-text.pdf

The following companies are now in business as “wholly owned subsidiariesof Eversource:
Connecticut Light & Power, Public Service Company of New Hampshire, PSNH Funding LLC 3, NSTAR Electric Company, Harbor Electric Energy Company, Yankee Energy System, Inc., Yankee Gas Service, NSTAR Gas Company of Mass.(EGMA), Hopkinton LNG Corp., Eversource Gas Transmission II LLC, Eversource Holdco Corporation, Eversource Investment LLC, Eversouce Investment Service Company LLC, Aquarion Company, Aquarion Water Company, Aquarion Water Company of Connecticut, Aquarion Water Company of Massachusetts, Inc., Aquarion Water Capital of Massachusetts, Inc., Aquarion Water Company of New Hampshire, Inc., NU Enterprises, Inc., IP Strategy LLC, Eversource Energy Service Company, The Rocky River Realty Company, Holyoke Water Power Company. Eversource has residual interest in nuclear plants they’ve sold: Seabrook NH and Millstone CT.

Part ownership in: Alps to Berkshires LLC, 50% in transmission line to NY State, 15% ownership in Algonquin Gas Transmission LLC, BSW Holdco LLC, BSW ProjectCo LLC, Bay State Holdco LLC, Bay State Wind LLC, Northeast Wind Energy LLC, North East Offshore, LLC, New England Hydro-Transmission Electric Company, New England Hydro-Transmission Corp. Eversource also has interest and ownership in companies that own and manage decommissioned nuclear plants they once owned, including: Connecticut Yankee Atomic Power Company, 65%, Maine Yankee Atomic Power Company, 24%, Yankee Atomic Electric Company, 52%. SOURCE: https://www.eversource.com/content/wma/about/about-us/doing-business-with-us/affiliates/list-of-affiliates

RESPONSIBLE FOR SECURING A LIVING RIVER FUTURE FOR OUR KIDS:

Kathleen Theoharides: Sec. of MA Energy & Environmental Affairs
Martin Suuberg: Commissioner MA Department of Environmental Protection
Ron Amidon: Commissioner MA Dept. of Fish & Game
Daniel McKiernan: Director MA Division of Marine Fisheries
Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA

It is time to break up the monopolies, re-regulate energy in Massachusetts for our children’s sake—and:RESTORE the CONNECTICUT RIVER ECOSYSTEM.