DON’T SHORT-SELL NEW ENGLAND’S GREAT RIVER

Posted by on 17 Mar 2017 | Tagged as: Alex Haro, American Whitewater, Andrew Fisk, Bob Nasdor, Caleb Slater, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, CRWC, Dr. Boyd Kynard, ecosystem, Endangered Species Act, ESA, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeon, federally-endangered shortnose sturgeon, FERC, FERC licensing process, FirstLight, Holyoke Gas & Electric, John Warner, MA Division of Fish and Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain Pumped Storage Station, PSP Investments, public trust, Relicensing, Sean McDermott, Society of Environmental Journalists, The Nature Conservancy, Turners Falls, Turners Falls dam, US Fish & Wildlife Service, US Geological Survey

(Note: the following piece appeared in The Recorder, www.recorder.com, on March 11, 2017 under the heading: “Who will protect Connecticut River?”)

DON’T SHORT-SELL NEW ENGLAND’S GREAT RIVER

Copyright © 2017 by Karl Meyer

Canadian investors are looking to purchase the Connecticut River for a few decades, cheap and quick. Canada’s Public Sector Pension Investment Board bought up the Northfield Mountain Pumped Storage Station and Turners Falls hydro complex last year as part of PSP Investments. Their New England power play comes in the middle of the 5-year relicensing process for both facilities. That Federal Energy Regulatory Commission process will decide future conditions impacting this four-state ecosystem for decades.

The long-failed Cabot Station Fish Ladder on the Connecticut and competing flows flushing down the Turners Falls Power Canal’s Emergency Spillway. (Note:CLICK, THEN CLICK AGAIN TO ENLARGE.)

Thus, PSP may soon hold sway over what’s long been the most desolate 10-mile stretch of the entire Connecticut. It includes 2.1 miles of riverbed sitting empty for months at a time below Turners Falls Dam. It also includes the reach where, nearly 20 years back, federal fisheries expert Dr. Boyd Kynard found his boat being yanked backward—the Connecticut pulled into reverse by the suction of the Northfield Mountain Pumped Storage Station while he was drifting for bass a mile downstream near the French King Bridge. Looked at fully, it encompasses the entire reach where a 50 year federal migratory fisheries restoration program has long foundered.

On March 7th, after four years of meetings, thousands of pages of reports–and with volumes of study information incomplete and disputed, owners of these FirstLight-branded facilities are hoping select interests agree to take licensing talks underground. They’ll be fishing for backroom deals at a Boston area hotel well before this process has had a full public vetting. FL wants to take this little party private, fast. They’re asking invitees to agree to an embargo on public information about settlement talks, positions and decisions.

The key phrase in their invitation reads: “Because this meeting is intended to initiate confidential settlement discussions, it will not be open to the press or general public.” That’s FirstLight’s Director of Massachusetts Hydro Gus Bakas. His selected invitees include the National Oceanographic and Atmospheric Administration(Sean McDermott), US Fish & Wildlife Service(John Warner), US Geological Survey(Alex Haro), MA Fish & Wildlife(Caleb Slater), towns including Erving, Gill, Northfield, Montague, the Franklin Regional Council of Governments, The Nature Conservancy(Katie Kennedy), the Connecticut River Watershed Council(Andrew Fisk), and American Whitewater(Bob Nasdor).

That FirstLight stipulation is part of the quick-bait to get stakeholders thinking the time is right to cut deals. Sign-up, shut up; then we’ll talk. Cash out with what you can get for your agency, town, non-profit; or your fun-time rafting interests. Promises from this venture capitalist firm–in what’s become an ownership merry-go-round for these facilities, will surely all come true.

Ironically, many of these invitees descend directly from those who failed to step in and step up for the decimated river here decades back. They’re agencies and so-called watchdogs who failed to enforce laws and conditions negotiated when they were signatories to settlement talks for NMPS and Turners Falls nearly 40 years back–and for the 1999 FERC license negotiated for Holyoke Dam as well. At that site, Holyoke Gas & Electric just finally completed required improvements for endangered shortnose sturgeon last spring. Their license had mandated they be completed in 2008. Eight years, nine–no suits, no injunctions; no action.

Maybe that’s because the Watershed Council’s board chair works for HG & E, or because a significant number of board members are retirees from the region’s legacy power companies. Or, might it be because CRWC receives grant monies from National Marine Fisheries, US Fish & Wildlife, and MA Division of Fisheries, that these agencies were never taken to court for the withering spawning conditions and crippling flows experienced by federal trust American shad and federally endangered sturgeon in the reaches from Turners Falls to Northfield?

So who can our river look to for environmental protections under the National Environmental Policy Act, the Fish and Wildlife Coordination Act, the Endangered Species Act, and the Clean Water Act in the future?

Fourteen months remain in this relicensing. Key reports won’t be available until April, while other critical study information won’t be out until July. Some studies may need repeating. The best future for New England’s River will not be well served by quick-and-dirty agreements made in the shadows. Remember, Dear Stakeholders, it’s your names that will be forever associated with the conditions on a future Connecticut River—the river your grandchildren will be relying on. This is no time to sell the Connecticut short. What’s your price for a river’s soul?

Karl Meyer of Greenfield is on the Fish and Aquatics Study Team in the FERC relicensing for the Northfield Mountain and Turners Falls hydro facilities. He is a member of the Society of Environmental Journalists.

(Note: Bob Nasdor is former director of the Massachusetts Commission on Open Government.)

END

NOAA has once-in-a-lifetime Recovery Plan opportunity for sturgeon

Posted by on 17 Jan 2017 | Tagged as: Connecticut River shortnose sturgeon, Dr. Boyd Kynard, endangerd shortnose sturgeon, ESA, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeon, Jack Buckley, MA Natural Heritage and Endangered Species Program, Mr. John Bullard, National Marine Fisheries Service, NOAA, NOAA Fisheries Regional Administrator, Regional Director of the National Marine Fisheries Service, Rock Dam, US Fish & Wildlife Service, USFWS, Wendi Weber

KM-Rock Dam program 4-23-16
(Above:crowd attending shortnose sturgeon program at the Rock Dam spawning site, April 2016. Presenters were Dr. Boyd Kynard and me. CLICK and click again to ENLARGE.)

Below is a letter to Regional NOAA Fisheries Director John Bullard requesting immediate action to gather small funds to take advantage of a unique Recovery Plan Step that has literally been waiting in the wings for 167 years. Small Recovery Plan funds are needed to monitor newly-returning endangered shortnose sturgeon as they regain upstream access to their natural spawning reach in the Connecticut River for the FIRST TIME SINCE 1849! Recovery Plan opportunities and low-cost, critical federal science in the public interest come around but once in a Blue Moon.

Please feel free to copy the text of this letter, paste in your own information noting your concerns, and forward to Mr. Bullard and the two other fisheries directors cc’d here. Help these newly-arriving federally endangered Connecticut River shortnose sturgeon successfully SPAWN on their ancient home grounds for the first time in over a century and a half!

Karl Meyer
Greenfield, MA
413-773-0006

Mr. John K. Bullard, NOAA Fisheries Regional Administrator January 16, 2017
Greater Atlantic Regional Fisheries Office
55 Republic Drive
Gloucester, MA 01930
john.bullard@noaa.gov

Dear Mr. Bullard,

I’m one of many New Englanders anxious to see the Connecticut River shortnose sturgeon begin its long-belated recovery here by finally having a chance to regain its documented natural spawning habitat in Turners Falls–and experiencing conditions where it can successfully reproduce. Nine years late license agreements at Holyoke Dam have finally been met allowing SNS to pass upstream in significant numbers. This is literally the first progress made in this species’ name here since it was placed on the original federal Endangered Species List in 1967. And this is the first time since 1849 that these fish will have a real chance at increasing their genetic diversity, as well as their numbers. This is their chance at recovery.

It’s come to my attention that a unique opportunity exists to track SNS in the By Pass Reach of the Connecticut River in Turners Falls this spring. The USGS Conte Lab has proposed a straightforward, acceptable, and verifiable study plan. Apparently all that is needed for this simple study to go forward is $20,000. This is an extremely modest expenditure for your agency. This unique opportunity to collect information in the first season in 167 years that SNS have been able to return upstream to this site will never come around again. This study will document whether these fish are successfully arriving and accessing their chosen age-old spawning habitats. Critical, baseline information.

NOAA’s own banner states it provides science based conservation and management for sustainable fisheries and aquaculture, marine mammals, endangered species, and their habitats. There is no better belated-opportunity to fulfill that mandate vis-à-vis the Connecticut River shortnose sturgeon than to provide the small funding this study requires. Members of your endangered species team are aware of this, and have expressed enthusiasm for this study to go forward. Further, your fisheries colleagues from other federal and state agencies share a common mandate and concern for the SNS’s protection and recovery. This modest study will help to further that end, particularly given that in just 15 months a new federal license will be signed with the new Canadian owners of these hydro installation and facilities whose operation will directly impact the recovery and spawning success of SNS.

This time-sensitive request for small funding can demonstrate due diligence by NOAA in its migratory fisheries and habitat protections mandate here. Please make us proud of NOAA’s shortnose sturgeon Recovery Plan efforts and make these funds available immediately so that this key spring work can go forward. Your colleagues, state and regional directors at USFWS and MA Division of Fish & Wildlife may be able contribute as well as both Ms. Weber and Mr. Buckley have hands-on experience with endangered SNS research. They are being cc’d here. Thank you.

Sincerely,
Karl Meyer
Cc: Wendi_Weber@fws.gov; jack.buckley@state.ma.us

(BELOW: the Rock Dam and its adjacent pool to the left–the sole documented natural spawning site for shortnose sturgeon on the Connecticut River. USGS Conte Fish Lab is a few hundred yards southeast of this site. CLICK to enlarge; then click again.)
P1000433

Rolling over on a River: the real cost of pumped storage energy

Posted by on 26 Oct 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River ecosystem, Connecticut River Watershed Council, Daily Hampshire Gazette, ecosystem, Entrainment, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, federally-endangered shortnose sturgeon, FERC, fossil fuels, Greenfield Recorder, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, nuclear power, Public Comment period, public trust, pumped storage, Relicensing, shad, shortnose sturgeon, Society of Environmental Journalists, The Recorder, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2016 by Karl Meyer

(Note: this essay appeared in September and October in these MA and VT media and newspaper outlets: Vermont Digger, www.vtdigger.org ; The Daily Hampshire Gazette; and The Recorder.)

besttfemptybed

The de-watered CT below Turners Falls Dam that few people see. (Click, then click again to enlarge.)

Rolling over on a river

Since time began rivers have been the Earth’s arteries—the foundation of its ecosystems. Here in New England it’s “last chance” time for our Great River. On April 30, 2018 the fate of the long-foundered Connecticut River migratory fisheries restoration—and the survival of a four-state river ecosystem, will be decided for what’s essentially forever. New Federal Energy Regulatory Commission hydro licenses are expected to be signed then by government agencies and the Canada Pension Plan Investment Board–latest purchaser of the Turners Falls and Northfield Mountain projects. That company’s stated investor mandate is “to maximize investment returns without undue risk of loss.”

Over two generations ago public-trust mistakes were made favoring power companies, fish hatcheries, and high-end salmon-fishing interests that rendered eight miles of the Connecticut in Massachusetts a massively-suctioned, partially-dewatered flush sink. Sanctioned by fisheries agencies and non-profits, those decisions, severed an ecosystem in two. They forced all migrating fish into a deadly power canal, leaving three emptied miles of riverbed below Turners Falls Dam, while four turbines at the Northfield Mountain Pumped Storage Station five miles upstream consumed massive amounts of nuclear energy to suck a river backward and uphill to a mountaintop reservoir.

Those turbines were built to run on the promised endless supply of overproduced juice generated nightly at the local, now-closed, Vermont Yankee nuke, 15 miles away. Today, running on giant slugs of imported fossil fuel, they continue to spin, sucking the river up in endless gulps into a 4 billion gallon pool a mile up Northfield Mountain. That daily suctioning creates riverbank eroding “tides” higher than those at Hyannisport, MA—with some rivaling the ten-foot fluctuations of Fundy Bay.

Back then, predecessors of today’s National Marine Fisheries Service, the US Fish & Wildlife Service, Massachusetts’ Fish & Wildlife and the Connecticut River Watershed Council signed off on an agreement with the Federal Power Commission and Western Massachusetts Electric that strangled the river in northern Massachusetts. It resulted in the failure of migratory fish passage and a promised renewal of the river’s ancient seafood resources upstream to Vermont, New Hampshire, and northern Mass. Few American shad emerged alive after diversion into that canal. It also failed the shortnose sturgeon—this river’s only federally endangered migratory fish, leaving it without flow or monitoring at its only documented natural spawning site.

Upstream at Northfield the destruction was yet more complete. The suck and gush appetite of that nuclear-charged contraption virtually disassembled the river. It gulped flow at a rate of 15,000 cubic feet per second, often for hours at a time—drawing on the river pool above Turners Falls Dam where, 70% of the time, the Connecticut’s natural routed flow is less than 15,000 cfs. Boaters a mile downstream could find themselves drifting upriver via Northfield’s unearthly pull. All fish and organisms drawn up through the sphere of that suction were deemed “functionally extirpated”–dead to the ecosystem by virtue of being sieved twice through the turbines. It was evolution in reverse, a river ripped away from its eternal run to the sea.

Today, climate-blind FERC labels Northfield as a source of “renewable clean” energy—but there’s nothing clean, renewable or sustainable about its imported, twice-produced, peak-priced electricity crippling this river. ISO New England, FERC’s Northfield-cheering, ever-energy-hungry cousin, also ignores climate and its environmental dismemberment. “Pumped storage” is not hydropower—not even by the industry’s own technical terminology. Northfield-produced power in fact represents the heavy planetary burden of fossil fuel used to push a mountain of water uphill, merely as a weight to produce high-cost, second hand electricity. It cares nothing of rivers, fish or ecosystems.

If bureaucrats again fail the public trust and don’t demand critical habitat protections, flows, and the day-to-day monitoring needed to fulfill U.S. environmental statutes, Canadian pension speculators will be left as the de facto controlling interests on our river. The new owners have asked FERC to merge two separate licenses for Northfield and Turners Falls into a single new license dubbed the “Northfield Project.” What’s represented as mere bureaucratic streamlining would actually enshrine, by precedent–next time and forever, river-killing pumped storage.

Any responsible environmental agency should deny this single-license merger, and seek to have Northfield kept in use as emergency infrastructure only—with the ultimate remedy it’s dismantling in tandem with a move to a decentralized, far less vulnerable system than today’s expanding mega-grid. Massachusetts legislators are currently signing onto backroom energy deals for a glut of future hydropower from Quebec. Some 1,200 megawatts of those penciled-in imports could easily replace the few hours of daily juice Northfield puts out–while keeping it available for rare emergencies. Though the new Canadian power imports largely ignore conservation and innovation, they could be employed to end the river carnage here and begin restoring a future for a critical New England ecosystem.

(Note: timely public comment on licensing issues is carefully considered by FERC. Go to: http://ferc.gov/docs-filing/ecomment.asp and use “E-Comment.” Check “Hydro” and address to Secretary Kimberly D. Bose, using the required identifiers “P-2485” and “P-1889” for Northfield and Turners Falls.)

Karl Meyer lives in Greenfield MA. He is participating in the FERC relicensing process and is a member of the Society of Environmental Journalists.

ONE WILDLY ILL-ADVISED RIDE

Posted by on 31 Jul 2016 | Tagged as: AMC, American Whitewater, Appalachian Mountain Club, Connecticut River Atlantic Salmon Commission, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, CRWC, Dead Reach, Dr. Boyd Kynard, EOEEA, Executive Office of Energy and Environmental Affairs, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, Fish and Aquatics Study Team, GDF-Suez FirstLight, Jack Buckley, John Bullard, MA Division of Fish and Wildlife, NMFS, NOAA, Regional Director of the National Marine Fisheries Service, Secretary Matthew Beaton, Society of Environmental Journalists, University of Massachusetts, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Wendi Weber

The following piece appeared in The Recorder, www.recorder.com on July 30, 2016, under the heading, “Rafting over prime sturgeon habitat unwise; State officials need to be smarter.”

Copyright © 2016 by Karl Meyer

ONE WILDLY ILL-ADVISED RIDE

A photo from May 25, 2016 posted on American Whitewater’s website shows Massachusetts’ Secretary of the Executive Office of Energy and Environmental Affairs Matthew Beaton and his staff lumbering across a small run of Connecticut River whitewater on a large raft. The short rapid they just surfed over is at a place called Rock Dam. It drops directly into a small, crescent-shaped pool–the sole natural spawning and nursery site for the federally-endangered Connecticut River shortnose sturgeon.

That Turners Falls site is the last place you’d want to see the Commonwealth’s highest environmental official rafting in May. Rock Dam is critical habitat for survival of the river’s most endangered migratory fish. There’s no other place like it in the ecosystem. It’s also where the state-endangered yellow lamp mussel was last recorded in this reach. Ecological protection is key to preserving the natural heritage there for future generations.

Why Secretary Beaton was at Rock Dam on the heels of the state’s failure to protect endangered timber rattlesnakes in their remaining habitat is a puzzlement. That site is literally where the Connecticut has long been left for dead. Each spring it is alternately starved and inundated—making spawning and survival of young for shortnose sturgeon nearly impossible. Rapid pumped storage hydro fluctuations also help make successful upstream passage for wild American shad, sea lamprey, and blueback herring a 1-in-10 proposition above Turners Falls.

The EOEEA was joyriding on “test” flows returned there specifically for environmental protection. They were meant to allow wild fish to reenter critical habitats where they might successfully gather; then spawn—in a natural pool that would subsequently nurture developing young in critical weeks lasting through mid-June. Those flows were delineated by John Bullard, Regional Director of the National Marine Fisheries Service, to not drop below minimum thresholds that would drive spawning sturgeon out. NMFS mandated the higher limits through June 3rd to ensure sturgeon had sufficient time there. That meant healing water for the most impoverished 2.7 miles of habitat on the entire 410 mile Connecticut.

The shortnose is a dinosaur-age fish—a yard-long creature with a shark-like tail and toughened leathery “scutes” instead of spindly scales. It’s the second species listed under the Massachusetts Endangered Species Act, and the most exhaustively studied endangered migratory fish in the river. It has long had a federal recovery plan, one now including the boatload of science documenting building blocks necessary for its survival. None call for boaters bashing over them during spawning gatherings, or beaching in shallows where developing embryos shelter. If this iconic fish is ever to begin the road back from the brink of extinction, mandated protections and uninterrupted flows are critical at Rock Dam.

Dr. Boyd Kynard, formerly of the US Fish & Wildlife Service, the USGS Conte Lab and UMass, led the 17 years of studies that documented Rock Dam as the species’ sole natural spawning site in the ecosystem. He recently stated, “As to protection of the pre-spawning, spawning, and rearing area at Rock Dam, exclusion dates for boating should be the same as the dates for water flow, 15 March to 15 June.”

A “watered” Rock Dam had long-offered sturgeons a wide choice of depths and flow levels they could selectively adjust, and readjust to, when natural surface flow or river temperatures fluctuated beyond optimal conditions for spawning. And that cobble and sand pool was ideal for dispersing tiny eggs and young. Only when flow is present does Rock Dam regain its function as an ancient species shelter, protecting early life stages in currents circulating through cobbled shoals.

In the current 5-year Federal Energy Regulatory Commission relicensing process that will govern hydro operations and ecological conditions here for decades, the Connecticut River Watershed Council and Appalachian Mountain Club are jointly advocating new access points into this delicate habitat for whitewater interests. Both have sat at FERC hearings where Rock Dam has been delineated as critical habitat. In joint AMC-CRWC testimony to FERC they’ve argued their interests in increased flows stem from aquatic habitat concerns, as well as recreation desires. Yet it was AMC that posted dates of those ecological study flows to their website, urging whitewater enthusiasts to exploit them: “Fish Study to Provide Paddling Opportunities: May – June 2016”

Secretary Beaton needs better advice.

Several expert appointees represent the Commonwealth on the Connecticut River Atlantic Salmon Commission. Jack Buckley, Director of MA Fisheries and Wildlife studied Connecticut River shortnose sturgeon at UMass. Mr. Buckley’s Anadromous Fish Project Leader Caleb Slater is also well versed on critical Rock Dam habitat. And the US Fish & Wildlife’s Region 5 Director Wendi Weber also sits at that CRASC table. Dr. Weber studied shortnose sturgeon in Georgia’s rivers. Ultimately, turning a failing Connecticut River migratory fisheries restoration in Massachusetts into a success story will require government leaders embracing solid government science.

Karl Meyer is on the Fish and Aquatics Study Team for FERC hydro-relicensing studies of the Turners Falls and Northfield Mountain Pumped Storage projects. He is a member of the Society of Environmental Journalists.

HOLYOKE HOISTS RECORD SHAD NOS; TURNERS FALLS FOUNDERING ON ALL FRONTS

Posted by on 13 May 2016 | Tagged as: American shad, Connecticut River, federally-endangered shortnose sturgeon, GDF-Suez FirstLight, Greenfield Community College, Holyoke Fish Lift, National Marine Fisheries Service, New Hampshire, NOAA, Rock Dam, salmon, shad, shad fishing, shortnose sturgeon, Test flows, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont

P1000397

Copyright © 2016 by Karl Meyer

According to USFWS Connecticut River Coordinator Ken Sprankle on Thursday, May 12, 2016, the Holyoke Fishway lifted more fish—specifically 54,006 American shad, than on any single day in the fish lift’s 61 years of operation. In 1955, something simple and sensible came into being on the Connecticut. It was a fish passage set-up that brought shad directly upstream in the riverbed via upstream attraction flows, and drew them into an elevator that gave them a lift directly above South Hadley Falls. Once there they could head upstream toward open spawning habitat in Vermont and New Hampshire. For three generations, Holyoke has been the single largest fish passage success site and story for American shad on the entire East Coast.

Sadly, just 36 miles upstream, those shad met with the fish passage restoration boondoggle-disaster of all-time—a three-ladder fish passage puzzle that forced all fish into a 2.7 mile long power canal at Turners Falls. Steered out of the river, and forced to negotiate a turbine lined canal in order to make it upstream beyond the Turners Falls Dam, the average annual success rate was 4 fish out of 100. To focus in a bit more on the present, what Holyoke passed yesterday was nearly the equivalent of all the shad that made it past Turners Falls Dam last year: 58,000.

The Turners Falls Power Canal remains the dead end, adjacent to the Connecticut River’s Dead Reach, where the federal/state Connecticut River migratory fisheries program has lingered in a comatose—nearly frozen state, since those ladders were built in 1980.

Given the brief nature of spring spawning conditions, it’s likely—at minimum, 25,000 of yesterday’s shad from Holyoke will be attempting that torturous labyrinth in Turners Falls by midday today (Friday). Most won’t make it past, and most will expend over a week of their precious spawning energies in the attempt. A high, though poorly studied or documented percentage, will ultimately be cut up in the turbines of the Turners Falls Power Canal.

Such is the legacy of non-intervention on behalf of the public’s fish, and the 45 year focus on creating a hatchery strain of salmon on a river system where the species had been extinct since 1809. So, again, Vermont, New Hampshire, and northern Massachusetts—sorry, but your fish are stuck down here in the miseries of a power canal and the Connecticut’s Dead Reach lacking suitable flows and fish passage.

On that note: it’s now six weeks since we had the first fish passage numbers reported from Holyoke Dam. Here at Turners Falls, we have nothing from GDF-Suez FirstLight and the Greenfield Community College students hired to tally them. The public’s fish, and the information as to their whereabouts, remains in private hands—most of it in the murky environs of a private power canal.

I’ll give you an on-the-ground update from my visits. At Rock Dam, just after midday on Tuesday, three anglers were working the site for shad. Curiously, there was a very clear “tide” line in the sand at the site—which is also the natural spawning ground for endangered shortnose sturgeon. The very recent high water mark was between 10 and 25 feet wide leading down to the water’s edge. It indicated a recent and significant change in flow there. One of the gentlemen said the drop came quickly, and had only happened “fifteen minutes ago.” Such “ramping” up and down of flows by the power company has huge implications for migrating and spawning fish. In fact, ramping at this site is one of the key reasons for spawning failure for endangered sturgeon. But, who’s watching?

Anyway, the three anglers reported that the shad were running here before the flow drop—there were several in two buckets, but they had disappeared once flow conditions changed.

I returned to Rock Dam on Wednesday, and there was just a lone guy and his dog present. His name was Shawn, and he’s lived nearby for the past year, but this was his first outing for shad. He looked to be in his early 20s.

There must’ve been plenty of shad trying to pass upstream at Rock Dam—with extra “test” flow water being released at the dam for federal relicensing studies. It wasn’t a minute after I clambered up the rocks to speak with him that he hooked his first fish. I obliged and took his photo with it. While there, I also took a minute to explain that shad don’t survive handling well, and they do best if handled very gently and while right in the water at the shore line.

I only tarried only for five more minutes–in which time Shawn landed two more fish, and four new anglers had scrambled down to join the shad run at the Rock Dam.

The latest Connecticut River shortnose sturgeon count at Holyoke Dam: 15 fish—ostensibly on spawning runs to that self-same Rock Dam spawning haven, have been lifted in the fish ladder this spring–and stopped abruptly once reaching the top floor. Every one of them has been slapped on the nose with a newspaper, told “NO!” and been dropped back in the drink below the dam. “Wait till next year..!” Hey, National Marine Fisheries Service: that is award-worthy endangered species protection through genetic deprivation! Kind of makes you miss David Letterman and his Stupid Pet Tricks…

No “Springtime for Sturgeon in Holyoke…”

Posted by on 06 May 2016 | Tagged as: Connecticut River, Connecticut River ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, Holyoke Fish Lift, Holyoke Gas & Electric, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Rock Dam Pool, shortnose sturgeon, Turners Falls, US Fish & Wildlife Service, USFWS

SHadFalls2MtTom
HG&E’s Holyoke Dam with Mt. Tom in background(click to enlarge)

No “Springtime for Sturgeon in Holyoke…” Unenforced FERC License continues the woes for the Connecticut’s only federally endangered migratory fish

Copyright © 2016 by Karl Meyer

For endangered shortnose sturgeon on the Connecticut River this year has been the best thing and the worst thing to happen to them since 1849. In an infinitely promising development over a dozen sturgeon(13 thus far)have found their way into the retooled Holyoke Fish Lift this spring—and all were lifted 30 feet toward upstream spawning habitats at the facility. However, in a most ugly turn of events for a creature listed under the Endangered Species Act since 1967, every one of those sturgeon was subsequently dropped back downstream by humans working there. They literally gained ten yards… after 167 years. Sorry kids, wait ‘til next year–or maybe the one after that.

In 2002 Holyoke Gas and Electric was issued a FERC license under which they were required to complete construction of a fish lift providing up- and downstream access for endangered sturgeon by 2008. FERC, responsible for enforcing those license requirements as well as the tenets of the ESA, failed to enforce their requirements, leaving those improvements unconstructed, year after year. The National Marine Fisheries Service, US Fish & Wildlife Service, and MA Division of Fisheries & Wildlife sat on their hands respecting their responsibilities to act. Nor did any so-called “watchdog” group fulfill their role–to make the enforcers enforce.

This was just the latest failure in a foundering Connecticut River ecosystem steered by money and politics rather than legal obligations, science, and enforcement of the public trust. Just consider that one of the Connecticut River Watershed Council’s Board Members has worked for Holyoke Gas & Electric at their fish lift for a decade… Then consider the resounding silence on enforcement.

This year–a full 9 springs beyond their license obligations, HG&E finally completed that mandated construction at the Holyoke Fish Lift. That says a mouthful about FERC, their licensing process, private industry, and whether anyone is actually protecting the public’s fish and river.

Grimly this spring, when the most sturgeon embarking on upstream spawning runs since the building of the railroads made it to the top of those South Hadley Falls, all were captured and “released downstream” of Holyoke Dam. This bit of brilliance comes via the orders—or lack thereof, of NOAA’s National Marine Fisheries Service. Their failure to act again denies any new genetic input into the tiny upstream population keeping this species’ flickering spark alive across the centuries up at their sole natural spawning site, the Rock Dam in Turners Falls.

Below Holyoke, generation after generation of these long-lived fish have been relegated to simply growing to maturity, repeatedly attempting to return upstream, and ultimately expiring without ever having the chance to pass on their genes. That goes back to the time of President Zachery Taylor.

In one very cruel act of fate, any shortnose sturgeon finding themselves downstream of the newly constructed Holyoke Dam in 1849, were forever barred from reaching their sole natural spawning site in the river system—that ancient Rock Dam pool in Turners Falls. What that has meant is that hundreds upon hundreds of these fabulously evolved fish–across more than a century and a half, have been relegated to the status of “reproductive nulls,” unable to spawn in their natal river system.

Pick your favorite bad actor in this failed scenario–there are a half-dozen choices.

Shortnose sturgeon: ignoring published research

Posted by on 04 Apr 2016 | Tagged as: Connecticut River shortnose sturgeon, Dr. Boyd Kynard, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, FERC Comments, Jack Buckley, John Bullard, Julie Crocker, Kimberly D. Bose, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Rock Dam Pool, Secretary Kimberly Bose, shortnose sturgeon, US Fish & Wildlife Service, USFWS, Vince E. Yearick, Wendi Weber

KM-Rock Dam program 4-23-16P1000433

TOP: Rock Dam program, 4-23-16 (click to enlarge)

Bottom: The ROCK DAM: shortnose sturgeon spawning site (click to enlarge)

The following testimony was submitted on March 18, 2016, to the Federal Energy Regulatory Commission on behalf of the biological needs of the federally-endangered Connecticut River shortnose sturgeon at its sole documented natural spawning site in the Connecticut River ecosystem.

Karl Meyer, M.S.

85 School Street # 3

Greenfield, MA  01301                                       March 18, 2016

 

The Honorable Kimberly D. Bose, Secretary

Federal Energy Regulatory Commission

88 First Street, NE

Washington, DC  20426

 

SUPPLEMENTAL INFORMATION: RE: P-1889-081 and P-2485-063, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

Attach to: PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

This additional information is being submitted subsequent to my receipt of a March 15, 2016 letter from Mr. Vince Yearick, Director, Division of Hydropower Licensing, restating FERC’s intention to sanction spring 2016 test flows that are documented to result in spawning failure and displacement of federally-endangered Connecticut River shortnose sturgeon(SNS), at their sole natural spawning site in this river system. Those findings come from 20 years of research conducted by government scientists from both the US Fish & Wildlife Service and the US Geological Survey.

I am submitting an index and key chapters from this exhaustive body of shortnose sturgeon research published in LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4. Chapter 3 directly addresses SNS spawning failure and displacement at the Rock Dam in the Connecticut’s By Passed Reach, and clearly indicates that test flows of 1500 cfs will not be protective of a species listed since 1967 under the federal Endangered Species Act.

From P. 107 (PDF-page numbers and numbers in the actual text are the same), “Spawning failure in unregulated rivers likely occurs, but it should be rare because females have adapted to natural fluctuations in the river discharge. Spawning failure (when fish were present) occurred at MontSR due to river regulation, but spawning did not fail due to peaking operations. Regulation created bottom velocities that were too low or exceeded the preference of females or created a low discharge that either prevented female access to the RockD or failed to attract them.”

Findings and data from pages 101 and 102 should provide further guidance to FERC in reexamining this decision. In his response Mr. Yearick argues that the low test flow of 1500 cfs put forth for Study 3.3.19 is somehow key in making correlations to last year’s American shad passage tests from Study 3.3.2. However, that is by no means clear (note–the 3.3.2 results have yet to be made available to Stakeholders) as that study also included tests flows of 1000 cfs and 6300 cfs—flows also not being included in order to make any useful correlation with Study 3.3.19.

Further, in regard to the failure or oversight in the protective responsibilities of the National Marine Fisheries Service to submit objections in this instance (as well as the USFWS and MA Division of Fisheries and Wildlife, who also have federal and state ESA mandates), those failures in no way release the FERC from its own responsibilities under the federal Endangered Species Act. In FERC’s own words, from: Hydropower Relicensing-Get Involved, A GUIDE FOR THE PUBLIC: “Is the Commission subject to other federal laws? Yes. The Commission must comply with a variety of federal laws, such as the Clean Water Act (to protect water quality), the Endangered Species Act (to protect threatened and endangered plant and animal species) and the National Historic Preservation Act (to protect culturally significant places and historic properties).”

Regarding Mr. Yearick’s citing of Article 34 as permitting the harming of protected species in the current license, he fails to note the following tenets included in that self-same Article regarding continuous minimum flows and modifications thereof: “These flows may be modified temporarily: (1) during and to the extent required by operating emergencies beyond the control of the Licensee; and (2) in the interest of recreation and protection of the fisheries resources, upon mutual agreement of the Licensees for Projects 1889 and 2485 and the Massachusetts Division of Fisheries and Wildlife.”

Please also note that, with the marked improvements shown in American shad passage at Turners Falls in 2015 which appear to correlate well with the significant increases in flow through the By Passed Reach, it is highly unlikely that any of the Stakeholder Agencies would consider requesting a Licensed flow of 1500 cfs when the biological needs and passage of both federal-trust and federally-endangered migratory fish require significantly more volume to fulfill their spawning requirements.

Lastly, 8 years in arrears of its license agreement signed in 2002 for FERC P-2004–to have completed upstream access for federally endangered Connecticut River shortnose sturgeon by 2008, Holyoke Gas & Electric has completed modifications to its fishway. That should allow SNS their first access and reintroduction to their natural spawning grounds in 168 years. In my mind, it would be patently criminal to greet these endangered fish on their first spawning trip upstream since 1849 with sanctioned flows guaranteed to displace them and cause spawning failure.

Thank you for your careful attention to this critical matter.

Sincerely,

Karl Meyer, Fish and Aquatics Study Team, P-2485 and P-1889

Please see attached chapters in PDF format, as well as included index and book cover.

Cc’d via email to:

Brandon Cherry, FERC

William Connelly, FERC

James Donohue, FirstLight

Julie Crocker, NOAA

Bjorn Lake, NOAA

John Warner, USFWS

Caleb Slater, MA Division of Fisheries & Wildlife

John Bullard, Regional Administrator, NOAA Fisheries Greater Atlantic Region

Wendi Weber, Director, USFWS Region 7

Jack Buckley, Director, Massachusetts Division of Fisheries & Wildlife

Dr. Boyd Kynard

Stakeholder PROTEST of FERC Revised Study Plan finding endangering Connecticut River shortnose sturgeon

Posted by on 07 Mar 2016 | Tagged as: Connecticut River shortnose sturgeon, Dead Reach, Dr. Boyd Kynard, endangerd shortnose sturgeon, Endangered Species Act, ESA, Extinction, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Secretary Kimberly Bose, US Fish & Wildlife Service, USFWS

(The following Stakeholder testimony was submitted to FERC on March 4, 2016)

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 March 4, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.

Though my FERC Stakeholder comments of January 28, 2016 specifically addressed this ESA issue, FirstLight did not respond to the endangerment issue in its RSP revisions. Further, I had made this issue clear to FirstLight and its agents, FERC staff, and key stakeholder agencies in an email delivered on January 20, 2016. I again reiterated the endangered species impacts to those same parties in an email delivered on February 24, 2016. Madam Secretary, I again made my concerns about spawning interference and failure to you and for the FERC record in a letter delivered February 26, 2016. All are available for perusal in the FERC record for P-2485 and P-1889.

Shortnose sturgeon gather at this spawning and nursery site annually between April 22 and May 25 for pre-spawning and spawning. Further, the complex of key biological characteristics of flow, varying depths, and cobble/sand habitat provide SNS with protective options that nurture developing Young of the Year throughout June into July.

According to 17 years of published studies at that site documented by Dr. Boyd Kynard and research colleagues, a continuous minimum flow of 2500 cfs is required to protect sturgeon spawning and rearing at this site. Therefore, I PROTEST the findings of the FERC Revised Study Plan determination issued by FERC on February 25, 2016, and request that only continuous protective minimum flows of 2500 cfs be allowed in this study, and throughout the 2016 SNS spawning and rearing season, as well as all ensuing springs.

The following publication has been referenced in the FERC ILP for these projects by both federal and state stakeholder agencies, FERC, as well as FirstLight and their agents.

“LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4

“Effect of hydroelectric operations on spawning”

Page 101, bottom: “During the 11 yr spawning failed (excluding the failed migration in 2002), when discharge levels were too low for 5 yr and too high for 4 yr. During one yr (2007), discharge during April was both to low and too high. When spawning failed at RockD due to low discharge during 4 yr (1995, 1998, 1999, and 2006)m discharge decreased to <70 m3 s-1 for at least 4 d by 30 April (Fig. 14), the earlier period of low discharge likely marked a threshold making the RockD unattractive to spawning fish.”

Further published data, tables, and required flows necessary in this reach appear on pages 101-102 of LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEIONS.

I would welcome a FERC hearing on this critical ESA issue and would make myself available for testimony. Thank you for your attention to this pressing matter.

Sincerely,
Karl Meyer
Fish and Aquatics Study Team, P-2485 and P-1889

Cc’d via email to:
Brandon Cherry, FERC
James Donohue, FirstLight
Julie Crocker, NOAA
John Warner, USFWS
Caleb Slater, MA Division of Fisheries & Wildlife

FERC sanctions crippling flows for federally-endangered Connecticut River shortnose sturgeon

Posted by on 01 Mar 2016 | Tagged as: 5-year FERC licensing process, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NOAA, US Fish & Wildlife Service

The following Stakeholder Comments concerning proposed study flows that will wipe out this season’s spawning for federally-endangered Connecticut River shortnose sturgeon at their only documented natural spawning site in the river system were submitted to FERC Secretary Cheryl on Friday, February 26, 2016. They include comments submitted on Wednesday, February 24, 2016 to FERC staff, federal and state fisheries agents responsible for endangered species protection, and FirstLight–who proposed to include the crippling 1500 cfs(cubic feet per second) flows in FERC-ordered Study 3.3.19.

On Thursday, February 24, 2016, Vince E. Yearik, FERC Director of the Division of Hydropower directed FirstLight’s James Donohue that the ruinous 1500 cfs flows will be allowed at the Connecticut River shortnose sturgeon’s only documented natural spawning site in the spring of 2016.

My Stakeholder Comment letter, on the FERC official record for P-2485 and P-1889, is directly below.

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 February 26, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485

Dear Secretary Bose,

The comments below respecting federally-endangered Connecticut River shortnose sturgeon and Study 3.3.19 were delivered via email to GDF-Suez FirstLight�s James Donohue, FERC staff including Brandon Cherry, and Caleb Slater(MA), Julie Crocker(NOAA), and John Warner(USFWS) on 2/24/2016.

Thank you,
Karl Meyer

Dear Chris et al,
I commented to you and in the FERC record on your RSP for Study 3.3.19, the Ultrasound Study in P-2485 and P-1889, to repel fish from Cabot Tailrace. Since I was somehow left off the email list in the �call for comments� that went out on 2/11/2016, I will take the opportunity to comment at this time.
In your newly-revised RSP you failed to reply to this comment of mine in particular:

�The final week should be at a minimum of 2,500 CFS�which, as FL has indicated in their response to a new Stakeholder Study suggested at the Rock Dam for shortnose sturgeon spawning: 2,500 CFS is the absolute minimum, uninterrupted flow necessary through the Bypass from April 25 � May 22, in order to not interfere with the spawning of a federally endangered species at Rock Dam. In their response, FL cited �Kynard� et al. Minimum flows to keep SNS embryos and eggs motile, watered, and viable are required there throughout the month of June.�

FirstLight has now indicated it intends to use test flows including 1500 cfs in its Ultrasound Study. This is unacceptable, as data shows this will harm a federally endangered species, the Connecticut River shortnose sturgeon. FirstLight has cited Kynard, Kieffer et al; Life History and Behaviour of the Connecticut River shortnose and other sturgeons, in their official FERC comments. Both FERC and the agencies are in possession of the scientific study data contained therein. An examination of Chapter 3 and the �Effects of hydroelectric operations on spawning� makes it quite clear that 2500 cfs is the minimum continuous flow needed to allow females to sustain a presence at the site and complete successful spawning. Flows go below that level�and 1500 cfs is far below that required threshold, will cause sturgeon spawning to fail.

A continuous flow of 2500 cfs is the only protective flow that should be allowed in the Ultrasound Study�it is also necessary throughout the month of June to protect the Early Life Stages of shortnose sturgeon. Please make the required modifications, as I�m certain the agencies and FERC will not give you license to run afoul of the federal Endangered Species Act, as well as similar state statutes.
A review of the FERC record, as well as your proposed Revisions for 3.3.19 are included below. Thanks.
Best,
Karl Meyer,
Fish and Aquatics Study Team

In 2015, FERC agreed with FirstLight and rejected requested snorkeling studies to determine the fish assemblage in the By Pass Reach out of an abundance of caution for impacts they might have on federally-endangered shortnose sturgeon whose only documented natural spawning site is the Rock Dam Pool in that reach.
Though the record clearly misstates that that snorkeling survey request was for the By Pass Reach downstream of Turners Falls Dam�written as �downstream of Cabot Station�, the protected status and determination to �do no harm� was quite clear in FERC�s reply. Excerpts from FERC Staff directly below.
From 01/22/2015, FERC Study Modifications Determination Letter

Study 3.3.11 – Fish Assemblage Assessment
�Requested Study Modifications

The U.S. Fish and Wildlife Service (Interior) proposes modifying the study to require FirstLight to conduct snorkeling surveys in the reach downstream of Cabot Station, in order to avoid all effects on shortnose sturgeon during the spawning season. The Nature Conservancy and Karl Meyer support Interior�s proposed study modification.

Comments on Requested Study Modifications

To avoid all effects on shortnose sturgeon during the April-June period in the reach downstream of Cabot Station, FirstLight states that it will rely on sampling from the project impoundment, sampling of the reach downstream of Cabot Station during other times of the year (after June 30), and existing data from a 2009 electrofishing survey of the area downstream of Cabot Station.

Discussion and Staff Recommendation

The goal of this study is to provide general information on fish species that are present in the impoundment and in the river downstream of the dam and Cabot Station. Based on the description in the modified study plan, FirstLight�s proposed method will provide information on species occurrence, species distribution, relative abundance, and habitat associations that will adequately describe the existing fish community. Because FirstLight�s proposed methods would achieve the goals of the study while avoiding effects on spawning sturgeon, we conclude that snorkeling is not necessary and the study plan filed with the ISR should be approved without modification.�

And�FirstLight�s current revised flow plan for 3.3.19:

�This study would establish a high frequency sound (ultrasound) array across the entire Cabot Station tailrace and determine the effect of the ensonified field on upstream migrating shad moving by Cabot Station. Bypass reach test flows during the study will include flows of 1,500 cfs, 2,500 cfs and 4,400 cfs. These flows will be released depending on river flow conditions. When possible, flows will alternate with the array on for one day then off for one day at 1,500 cfs, followed by one day on and one day off at 2,500 cfs, then one day on and one day off at 4,400 cfs. This sequence will be repeated throughout the study depending on river flow. The field study will include two components: a) DIDSON count of shad entering the Cabot fish ladder and b) detection of telemetered adult shad to determine their movements after they encounter the sound field.�

CASHING IN ON A CASH COW

Posted by on 15 Jan 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River shortnose sturgeon, Daily Hampshire Gazette, endangerd shortnose sturgeon, Endangered Species Act, Energy Capital Partners, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, fossil plant, GDF-Suez FirstLight, ISO, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, non-renewable, Northfield Mountain, Northfield Mountain Pumped Storage Station, Rock Dam, shortnose sturgeon, The Greenfield Recorder, The Pioneer, The Recorder, Turners Falls dam, Uncategorized, US Fish & Wildlife Service, USFWS, Vermont

The following piece appeared in the Daily Hampshire Gazette(www.gazettenet.com) and the Recorder(www.recorder.com) in the first week of January 2016.

CASHING IN ON A CASH COW

Copyright © 2015 by Karl Meyer

Ever dreamed of owning your own bank? I got a deal for you! Northfield Mountain Pumped Storage Project is for sale again, along with the Turners Falls canal and dam—and a string of little assets down in Connecticut. But Northfield’s the cash cow. Fourth time in a decade they’re unloading this golden calf–always at a tidy chunk of change. A quickie corporate win-win! It’s really like an A.T.M., run at the expense of the Connecticut River ecosystem.

Place works like a giant toilet–suck huge amounts of the river backward and uphill, then flush it all back and—viola, money spews out the other end. Could be ours! They’re holding bidder tours as we speak. I just need a few partners with ready credit. We go in on short-money and cash-in on the no-brainer electricity “spot market” for a few years. Then, with inflated power-price futures in play, we offload this puppy for a final cash-out of 30%–maybe 50%!

Here’s how it goes down. With the cheerleading of Northfield’s not-so-silent partner, ISO New England–the “independent” system operator (created by the Federal Energy Regulatory Commission), we simply slow dance this darlin’ past the banks, the FTC and FERC. Then, in 2016, its sweet business-as-usual—maybe with new shirts for employees.

Trust me, this works every time. Everyone walks away with full pockets—without the public knowing what hit them. Northfield got wholesaled in 2006 by Northeast Generations Services(formerly WMECO—formerly of Northeast Utilities, now Eversource—you follow?) They grabbed a quick $1.34 billion for the package, slipping it to a trio of Jersey venture capitalists, Energy Capital Partners. ECP renamed their little project FirstLight Energy. Those smartest-guys-in-the-room hung-in and grabbed Northfield’s peaking spot-market profits for two years, before off-loading it for a nifty $1.89 billion in that crazy year, 2008.

With that, GDF-Suez, third owner in four years, swept in–the world’s largest private energy corporation, based in France. They’ve been gobbling up contracts to run water systems across the US under the name Suez United Water. But GDF-Suez recently did a clever name-change to Engie, keeping the public totally confused. They got game! The true costs of these premium-priced plant sales get buried in the list of acronyms on electric bills. It’s like owning a 25-mile stretch the Connecticut River to dip into for cash any time you please.

This is a turn-key operation–with us, the new guys, pushing the buttons. The joke is that the public thinks Northfield is a hydropower operation, while this baby has never produced a single watt of its own energy. It’s imported!–huge swatches of bulk electricity now run-in from outside the region to suck a mountain’s worth of flow from the Connecticut up to a reservoir. Then, dump it out on the power lines when prices peak. It’s hugely inefficient, now largely carbon-based—and massively damaging to the river. But amazingly profitable!

That’s where we come in. Sure it was built as a sister to the region’s nukes to gobble up their monstrous stream of unused electricity–because nukes can’t shut down their feverish output at night. That’s how you get to put in a giant straw and suck the Connecticut uphill at a rate of 15,000 cubic feet per second–more than enough to pull the river backward for a mile downstream under low flow conditions. But who’s watching? When the region’s last nuke shut down, nobody said ‘boo!’ with Northfield going fossil. What climate change?

And when it became clear years back that Northfield operations were imperiling spawning success for the federally-endangered shortnose sturgeon at the Rock Dam in Turners Falls–their singular natural spawning site going back into pre-history, again, nobody came forward. Not the US Fish & Wildlife Service, the National Marine Fisheries Service or the MA Division of Fish & Wildlife—or any river protection group. No bureaucrats, no suits–nobody. At Turners Falls—instead of 70% of migratory fish heading upstream toward Vermont and New Hampshire, they squeeze out 4%. We have it made!

Still skeptical? ISO and FERC are addicted to Northfield—even though its power-flush characteristics might come into play maybe a handful of times a year, if at all. For this they let owners cash in on the river whenever y they want. In 2012, the owners of this “asset” collection of 1500 megawatts(of which over 1100 MW derived from Northfield alone) told investors a full 40% of their profits were realized from “Capacity Fees.” What that means is you get paid for holding back the Connecticut! They’re not required to use it at all if they don’t want to—just flush when prices are high. Paid for being you! Of course another 50% of profit comes from generating, though the public doesn’t know it only operates a few hours a day when prices are highest.

Here’s the kicker: in 2014, after a cry-wolf energy deficit winter that never materialized, FERC–with ISO as cheerleader, sanctioned the doubling of those “capacity fees”. Plants are now collecting 2X the amount they were two years back, for having the potential to dump some power on the lines—not for actually generating. Paid for being you! With 1100 potential megawatts at Northfield, how quick can you say “windfall at the public’s expense?” Lastly, Northfield petitioned FERC the last two winters to increase its reservoir storage by a full 25%, with ISO their biggest cheerleader. FERC agreed, twice. Double-dip with a cherry, anyone?

This thing’s a cinch! Even with all the nukes shut—when this should have been moth-balled to emergency use as more climate-warming, spent nuclear junk, it soldiers on as a virtual river monopoly with the blessings of FERC and ISO. Trust me, no one goes to court. Ecosystem damage, costs to the public? Fuggetaboutit!

Got credit? Give a call!