no license to kill

Archived Posts from this Category

CONNECTICUT RIVER CASUAL TRAGIC HISTORY HIKE: Sat., May 14th

Posted by on 06 May 2022 | Tagged as: America's best landscaped sewer, Andrew Fisk, Connecticut River, Connecticut River Day of Mourning, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, Federal Conte Anadromous Fish Research Center, federally-endangered Connecticut River shortnose sturgeion, Great Falls, Jesse Leddick, Julie Crocker, Landmark Supreme Court Decision 1872, Mark Tisa, Martin Suuberg, migratory fish, Nation's best landscaped sewer, National Marine Fisheries Service, net-loss power, no license to kill, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, public trust, Rock Dam, shad, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, The Recorder, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, USFWS, Wendi Weber

THE CONNECTICUT RIVER CASUAL TRAGIC HISTORY HIKE:
Saturday, May 14, 2022, 9:30 – 11:00 a.m..

The April 2, 2022, Connecticut River Day of Mourning. Photo courtesy of John Bos.

Trip meets 9:30 in the courtyard of the Great Falls Discovery Center and continues onto the Rail Trail. Photo Copyright © 2022 by Karl Meyer

I hope some folks are able join this long and casual history walk. * * Please be aware that it will be close to 5 miles–with the return to Great Falls to be done on your own. As noted, a bike or even a 2nd car-pool, relay-car can be left near the walk’s end and return point. Bikes can be locked near Conte Lab–also, relay cars could be parked in the public lot at the end of G-Street, where “Migratory Way” continues along the canal heading the last 1/2 mile to Rock Dam. (I’ll be on my bike.)

The April 2nd Connecticut River Day of Mourning. Photo courtesy of John Bos.

The Connecticut River casual, tragic history hike
Saturday, May 14, 2022, 9:30 a.m. – 11:00 a.m.
Meet: Great Falls Discovery Center courtyard, Avenue A, Turners Falls
Free. No pre-registration required. * * Rain cancels.

Join journalist Karl Meyer for this 2-1/2 mile (one-way) unnatural history walk, starting at the Great Falls Discovery Center and Turners Falls dam’s failed salmon ladder. This casual hike partly follows the Rail Trail’s 200 year old transportation and power canal. We’ll cross it on a one-way bridge, pass a 1906 generating station; then head to G Street and down “Migratory Way” to unprotected sturgeon habitat at the river’s Rock Dam near the USGS Conte Fish Lab. We end above the failed fish ladder adjacent to Cabot hydro station. NOTE: * * Participants responsible for returning to Great Falls on their own (total: 5-mile round trip). It’s possible to pre-stash a locked bike near Conte Lab along Migratory Way, then cycle back via the Rail Trail.

DEAD American shad at the Rock Dam, May 2021: a public trust migratory fish guaranteed safe passage to VT and NH waters by the US Supreme Court back in 1872. Photo Copyright © 2021 by Karl Meyer

*** OH, and here are a few LINKS, the first two comprising defense of an undefended river by citizens; the last three are where foreign vultures are spending the ill-gotten spoils from our massively broken river–far from our Valley ecosystem:

https://www.recorder.com/my-turn-Meyer-Don-t-Take-FirstLight-for-Granted-46104531

https://www.recorder.com/ltr-Ogden-FirstLight-s-Lack-of-Urgency-Threatening-Shortnose-Sturgeon-46144862

https://energycentral.com/news/invenergy-and-energyre-secure-offshore-wind-lease-award-and-announce-formation-investor

https://www.bizjournals.com/pittsburgh/news/2022/05/02/hydro-electric-firstlight-allegheny-8-9.html

https://apnews.com/press-release/business-wire/business-new-york-pennsylvania-ca11a3273cfb45eeb0e7181075ebe2df

Connecticut River: citizens taking a stand to end Northfield Mountain’s half century of killing

Posted by on 02 Apr 2022 | Tagged as: America's best landscaped sewer, Clean Water Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River Day of Mourning, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, Environmental Protection Agency, EPA, Federal Energy Regulatory Commission, FERC, FirstLight Power, Greenfield Recorder, Julie Crocker, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Mark Tisa, Martin Suuberg, migratory fish, Mr. Mark S. Tisa, National Marine Fisheries Service, net-loss power, New Hampshire, no license to kill, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, PSP Investments, The Recorder, US Fish & Wildlife Service, US Fish and Wildlife Coordination Act, US Supreme Court, USFWS, Vermont, Vermont Digger, VT Digger, Waterkeeper Alliance, Wendi Weber, wrsi.com


The giant sucking intake mouth of FirstLight/PSP Investment’s Northfield Mountain Pumped Storage Station, where it preys on the aquatic life of the Connecticut in three New England states.Photo Copyright © 2022 by Karl Meyer

Things to understand about the current extended (expired April 30, 2018) and proposed FirstLight federal license for Northfield Mountain operations:

* Under commonly occurring conditions, its suction and pumping will continue to force more than 5 miles of the river to flow backwards.

* Northfield Mountain’s daily use will continue to obliterate 100s of millions of fish and aquatic animals annually.

* It’s suction and subsequent regurgitation of a deadened river at over 15,000 cubic feet per second, and 20,000 cubic feet per second respectively, for hours on end, is roughly the equivalent of swallowing all the aquatic life in the 4-story, 19,000 sq. ft. Hawkes and Reed building in Greenfield–one EVERY second, SIXTY every minute, THREE THOUSAND SIX HUNDRED per hour…

The turbines of the pump station suck in life and throw out death,” Shayla Freeland, Gill MA.

The gross megawatts it squanders yearly sucking the river backward could directly power the annual needs of cities and towns up and down this Valley. Instead it will suck out a river’s soul.”
Karl Meyer, Greenfield MA, from the Greenfield Recorder and vtdigger.org.

A There is NO WATCHDOG HERE: interview on THE RIVER ahead of the Connecticut River Day of Mourning.
https://wrsi.com/monte/mourning-the-connecticut-river/

Those seeking a true watchdog model with commitment, staff lawyers and enforcement intent might do well to investigate the Riverkeeper/Waterkeeper organization.

UNDERSTAND: there is no new signed license yet. Only the Federal Energy Regulatory Commission can issue one. FERC itself must ensure that any new license must comply with all existing US environmental laws. This machine does not; and cannot meet those requirements.

The US Supreme Courts decision in 1872 in Holyoke Co. v. Lyman confirmed there must be safe upstream and downstream passage of migratory fish on all US rivers. Canadian-parent owned FirstLight’s proposal fails this.

A river flowing backwards does not meet the standards of the Clean Water Act. You cannot license such impact on a US river.
Northfield Mountain, Northfield MA, where the Connecticut River ecosystem dies… Photo Copyright © 2022, by Karl Meyer

FirstLight’s proposed temporary and flimsy barrier “net” will not even be anchored in the riverbed, and will leave eggs, fish and young of three states exposed to Northfield’s massive suction in their most fragile months of development.

There is nothing in the plan to monitor it daily, below the surface, where the killing occurs. The see-sawing pressure from Northfield and natural river storm flows will very likely leaving it loose and flopping in the current–just as the old net for factory-produced baby salmon did for a quarter century, beginning back in the 1980s. It’s a red herring.

In short, if relicensed, the Northfield Mountain Pumped Storage Station, will continue to kill and erase a living Connecticut River ecosystem in Massachusetts daily. It’s uses has been illegal from the day it opened in 1972, a CENTURY after Holyoke Co. v Lyman.

* *GO ON THE RECORD WITH FERC: tell them “no new license to kill.” Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

Then go public, letters, op eds, papers… tell US Fish & Wildlife Service’s Wendi Weber, MA Fish & Wildlife’s Mark Tisa, National Marine Fisheries Julie Crocker, and MA DEP’s Martin Suuberg that
the Connecticut River will not be left to die here in the Commonwealth of Massachusetts… It’s THE PUBLIC’s RIVER.

NO RIVER SHOULD DIE IN THE DARK!

A Connecticut River Day of Mourning: STANDOUT this Sat. Apr. 2

Posted by on 30 Mar 2022 | Tagged as: 1872, Connecticut River, Connecticut River blog, Connecticut River Conservancy, Connecticut River ecosystem, Connecticut River Watershed Council, Conte National Fish & Wildlife Refuge, Death-Sewer, Eversource, FERC, FirstLight Power, Greenfield Recorder, Jesse Leddick, Julie Crocker, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Mark Tisa, Martin Suuberg, Massachusetts Division of Fish & Wildlife, Mr. Jesse Leddick, Mr. Mark S. Tisa, New Hampshire, NMFS, no license to kill, Northeast Utilities, Northfield Mountain Pumped Storage Station, NU/WMECO, PSP Investments, Public Sector Pension Investments, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, State of Delaware, Turners Falls, Turners Falls dam, USFWS, Vermont, Vernon Dam Fishway

A CONNECTICUT RIVER DAY OF MOURNING:

NO RIVER SHOULD EVER DIE IN THE DARK!

Standout on: Saturday April 2, 2022, 11 a.m. – 1 p.m.

WHERE:Turners Falls, on the TF Gill/Montague Bridge just off Rt. 2 East above the Connecticut River in Massachusetts.

A heartbreaking, river-betraying, FirstLight-filed Agreement in Principle has been signed by the US Fish & Wildlife Service, MA Division of Fisheries and Wildlife, National Marine Fisheries, and MA Natural Heritage, and sent to FERC.

It’s a CAPITULATION, a soulless document WITHOUT PRINCIPLE.
* READ IT at the END OF THIS POST.*

Come, WEAR BLACK, stand up for the SOUL of OUR RIVER:
Saturday, April 2, 2022, 11 am – 1 pm.

Please, everyone who has ever fought for the truth about this river, the life of this river—all of you who have marched, stood out, written and shouted publicly “NO LICENSE TO KILL” for our ancient Connecticut and its living waters, come to the Gill/Montague Bridge above the River on April 2nd.

https://vtdigger.org/2022/03/30/karl-meyer-a-connecticut-river-day-of-mourning-will-be-held-april-2/

We will stand in honor of the soul of this Valley–above FirstLight’s TF dam, controlled from inside Northfield Mountain, 5 miles away. We’ll be across from US Fish & Wildlife Service-funded and MA Division of Conservation and Recreation-run, Great Falls Discovery Center. Each one of these entities is culpable for allowing a four-state ecosystem to be turned into our river’s 23-mile MORTUARY by Northfield’s brutality in the Commonwealth of Massachusetts. Come, stand together and bear witness. NO RIVER SHOULD DIE IN THE DARK!

Please WEAR BLACK, and perhaps bring signs that name the names of those responsible. If you have an old shoe box or something small that can stand-in as symbolic coffin for the 20 miles of dead river here, cover it in black and place a single-page cut-out of a DEAD FISH inside–to illustrate the murderous continuation of Northfield’s license. Symbolically, we’ll feed a few into a shredder as witness to this failed ecosystem.

Northfield Mountain, Northfield MA, graveyard where Our Connecticut River Ecosystem Dies… Photo Copyright © 2022 by Karl Meyer

WHY?: Because the Northfield Mountain Pumped Storage Station, the most murderous, wasteful, river-reversing parasite ever licensed to kill on New England’s Great River was betrayed by the US Fish & Wildlife Service, Massachusetts Division of Fisheries & Wildlife, MA Natural Heritage & Endangered Species, and the National Marine Fisheries Service on St. Patrick’s Day, March 17, 2022. Behind closed doors they signed a heartbreakingly-grim Agreement in Principle (AIP) toward granting a new FERC license that will re-enshrine and continue the most brutal, murderous, river-reversing flows and ecosystem-dismemberment—occurring unabated here in Massachusetts since Northfield came on line in 1972.

This document, *LINKED AND INCLUDED AT THE END OF THIS POST*, is literally an agreement WITHOUT PRINCIPLE, as they are our guardians of the Public Trust—encumbered to protect our river, its fish and the coming generations who must depend on a living river ecosystem. In a cheap bit of grandstanding, the Connecticut River Watershed Council(CRC), in business since 1952—who should have stopped this killer from being built 50 years ago, made a show of walking away without signing this AIP. After signing another one..

Fifty years late they appear to have found the courage to mildly label Northfield as a killer–after staying mum and taking the power company’s cash for decades. Here is Director Andy Fisk’s new-found outrage about this River’s conveyor belt of death, a half century after the fact: “…Northfield Mountain has been operating for many years without any protection against fish being killed by the turbines.” Wow Andy, nice catch… It’s killed virtually EVERYTHING it’s sucked in–during all the 50 years the Connecticut River Watershed Council/Conservancy has been in business…


The deadly, suctioning, parasitic intake of FirstLight/PSP Investment’s Northfield Mountain Pumped Storage Project–the most efficient electric predator ever sanctioned to operate in this 4 state ecosystem. Photo Copyright © 2022 by Karl Meyer

In their watchdog claims of 70 years, they are perhaps the most complicit. They never did a protector’s job; never took the corporations or state and federal agencies to court for violations of some of the most basic environmental laws and river and fish protections dating back to 1872. This new “in it but not of it” posture should be wholly condemned. It’s a CRC version of alternative facts. They are a failed NGO, one that has let 50 years of the unconscionable annual slaughter of literally 100s of millions of fish eggs, juvenile and adult fish and developing larvae of some 24 different species from 3 states be suctioned to their deaths by Northfield, built by CRC’s great benefactor and BFF, NU/Eversource, in 1972. No staff lawyers, no bark, no TEETH!

In 2022, CRC finally makes a bland public statement recognizing that at Northfield there are “fish being killed by the turbines.” That half century of slaughter is on their watch.

Getting back to the public trust, the new Agreement WITHOUT Principle was signed under the directorship of US Fish & Wildlife Service Region 5 head Wendi Weber; Mark Tisa sanctioned it as MA Division of Fish & Wildlife Director, Jesse Leddick inked-in directly as leader of the MA Natural Heritage & Endangered Species Program, and Julie Crocker, NOAA/National Marine Fisheries Service ESA Fish, Ecosystems and Energy Branch Chief also agreed to let that promissory note of their legal intent to a new Northfield license be signed.

And who are they selling our ecosystem out to? Why it’s come-lately venture capital’s FirstLight Power, a subsidiary of Canada’s Public Sector Pension Investments. PSP/FirstLight arrived as big-budget bargain investment shoppers, buying up the Northfield Mountain Pumped Storage Station and Turners Falls Hydro Projects at basement rates in 2016. Then, in a marvelous vulture-capital-esque move, they quickly divided their MA assets in 2018, and reregistered them into Delaware tax shelters. Now–with the cowardly 50 years of no-show protection from federal and state agencies here, FirstLight will have the killer keys to 20-plus miles of the Connecticut—impacting three New England states, for decades.

As their constituents, they have failed US. At a time when the Earth is foundering, they’ve agreed to allow a river system to be strangled, reversed and culled of virtually all its aquatic life daily at Northfield. Meanwhile PSP/FirstLight will likely have execs walking off with hefty million dollar bonuses and golden parachutes, as our public trust agents stay in the shadows as abject failures.

After 50 years, this murderous slaughter is being renewed AGAIN, on their watch!

If these agencies were corporations, obligated to produce RESULTS for the benefit of all of us as public trust constituents—there would be massive outcries for resignations from the likes of Ms. Weber, Mr. Tisa, Mr. Leddick, and Ms. Crocker. Instead, they’ll likely have the option to retire years before their abject failure on behalf of the Connecticut River in three states becomes fully visible. Perhaps a few will do the right thing now, plus Mr. Fisk.

* * LASTLY: HERE is that Agreement in Principle–the document signalling the ABANDONMENT of a LIVING CONNECTICUT RIVER ECOSYSTEM
CLICK ON THIS LINK:

* * * RiverSALE-20220318-5004-1 * * *

“No license to kill”: citizens defend the Connecticut River at its ecosystem graveyard—Northfield Mountain Pumped Storage Station

Posted by on 06 Feb 2022 | Tagged as: Connecticut River, Connecticut River blog, Connecticut River ecosystem, Connecticut River Refuge, Conte National Fish & Wildlife Refuge, Delaware LLC, E-Comments, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, fish kill on the Connecticut, Great River Hydro, Greenfield Recorder, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Nation's best landscaped sewer, National Marine Fisheries Service, net-loss power, NMFS, no license to kill, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, PSP Investments, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, The Greenfield Recorder, The Recorder, US Fish & Wildlife Service, USFWS, Vermont

In an unrelenting drumbeat of filings to the Federal Energy Regulatory Commission, citizens throughout the Connecticut Valley are demanding that no new license be issued to Canada-owned FirstLight for their Delaware-tax-sheltered Northfield Mountain Pumped Storage Station here in Massachusetts.

https://www.recorder.com/my-turn-gyorgy-FirstLightLicensing-44862677

Please read the excellent opinion piece ABOVE from last week’s Greenfield Recorder by Anna Gyorgy, then continue further BELOW to read the latest group of on-the-record citizen filings to FERC insisting that a new license to kill be denied at Northfield Mountain for this venture capital outfit. KEY EXCERPTS from the most recent CORPORATE filings to FERC can be found at the end of this post.

IN THE LATEST INDICATION of the strength of opposition to a new Northfield license FirstLight just missed another self-targeted deadline to have its secret license negotiations with US Fish & Wildlife, MA Dept. of Environmental Protection, MA Division of Fish & Wildlife and the National Marine Fisheres Service all buttoned up and ready to send off for FERC approval.

IN THEIR LENGTHENING FAILURE to put the last nails in this four-state ecosystem’s river-reversing, fish-killing coffin, FL was forced to request “that the Commission continue to defer issuance of its Ready for Environmental Analysis (REA) Notice until after February 28, 2022. FirstLight anticipates requesting the Commission to further defer the REA Notice until after June 30, 2022, to allow the parties time to negotiate a comprehensive, binding settlement agreement that aims to fully resolve all relicensing issues.

THOUGH THIS MAY APPEAR to be merely yet another of FirstLight’s series of month-long delay requests–it’s actually admitting they’ll likely not have this thing safely in their Delaware-registered tax bag until July of 2022 or LATER. What it really says is that they foresee stumbling blocks to getting agreement on allowing the impacts of this river-killer with the public agencies charged with protecting the Connecticut River ecosystem. It’s being negotiated on their watch. They are responsible for defending our so-called, “S.O. Conte Connecticut River National Fish and Wildlife Refuge,” our ‘only’ “National Blueway”–and what remains today our drop-dead-deadly, ‘nation’s best landscaped sewer’ right here in Massachusetts.

It is the PEOPLES’ voices that are doing this by writing and filing with FERC:
Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

This is THE PUBLIC’S RIVER! It deserves to LIVE. And, it deserves a real WATCHDOG– YOU!! Thanks to all for raising your voices.

ALSO, this new podcast with OCCUPY THE AIRWAVES on Valley Free Radio:
https://archive.org/details/occupy-the-airwaves-1.17.2022-karl-meyer

BELOW are the latest citizen filings with the Federal Energy Regulatory Commission:

Document Accession #: 20220207-5017 Filed Date: 02/07/2022
Pat Graves, South Deerfield, MA.

Many things have changed in recent years. I urge that no relicensing of
FirstLight’s Northfield Mt. Pumped Storage Station take place without
careful consideration of the benefits and harms. At this time it appears
that the harms far outweigh the benefits.

Document Accession #: 20220207-5014 Filed Date: 02/07/2022
Anne Naughton, Shelburne Fls, MA.

Hello,
Please DO NOT renew Firstlight’s lease on the Northfield Mountain Pumped
Storage Project, P-2485.

The Connecticut River is not replaceable. We can get electricity from other,
less destructive sources.

Sincerely,
Anne Naughton
Shelburne Falls, Massachusetts

Document Accession #: 20220204-5174 Filed Date: 02/04/2022
Wayne Pleasant, Turners Falls, MA.
Feb 4, 2022
REF: P-2485 FirstLight vs River Wildlife

Dear FERC
Please deny the license for the Northfield pumped storage system. I have lived on the CT river all my life and have seen first hand the incredible damage that they do to our river.

The system is not “Green Energy.” It consumes more energy that it produces. It is only used for making more money for FirstLight and not to benefit consumers and the environment. It severely damages the shoreline by raising and lowering the water level and thus associated wildlife.

It causes unnatural waterflows that damages and compromises the river environment for endangered Short Nosed Sturgeon.

Sucks up and kills large and small fish through its turbines. No proposed net will stop small fish and associated eggs from being sucked up and killed.

NOTE: If I were to kill this many fish every day I would be arrested for violating protected species rules.

Please do not issue a license to this facility to kill more wildlife.

Thank you,
Wayne
(** NEW filings continue below **)

Document Accession #: 20220204-5027 Filed Date: 02/04/2022
James Terapane, South Deerfield, MA.

I am writing regarding P-2485 Northfield Pump Storage re-licensing process. First off, I am, with many other local citizens, opposed to re-licensing this facility as it currently operates. The disruption of the CT. River ecosystem that this and other First Light Hydro facilities create is
unacceptable.

I demand that FERC allow for public comment as required by Massachusetts DEP review of the re-licensing so that all information related to this process be presented to the public and the citizens of United States be heard. Let’s not forget that First Light is a foreign owned entity whose interests are not necessarily in line with ours, the American Citizens who’s river resources are being borrowed for profit.

We citizens of the Connecticut Valley have worked hard to protect and use our rivers in a sustainable manner and will continue to do so. The idea of the facility being used as a “battery” is a clever pitch but we don’t buy it, not at the cost of the continuing destruction the river ecology. Please don’t cloak this crude way of using the river as “Green”. What is being done to our river is anything but Green Thinking.

Now is the time for bold solutions that secure a reliable power source AND protect our environment. I urge First Light Company, if they must have their battery, to use what ever innovative brain power they have in their company to solve this problem of river and fish destruction otherwise you are not welcome to use our resources.

The people of this region have brought forth many innovative problem solving ideas and pioneered the American Hydro power industry so I urge the managers of First Light to step up to the plate and address how to solve this problem. If they don’t have any ideas we can help them out.

Document Accession #: 20220204-5025 Filed Date: 02/04/2022
Wendy Sibbison, Greenfield, MA.

I oppose the relicensing of the Northfield Mountain Pumped Hydro Storage Station because its immediate and long-lasting harm to the ecology of the river and to its living inhabitants outweigh “both in ethical and economic terms” any benefit to the public of FirstLight’s plan to transport and store energy, far from its source, for later generation at a net energy loss.

AND BELOW ARE DIRECT EXCERPTS FROM FirstLight’s most recent filing with FERC, and–further below that, from Great River Hydro’s filing noting that it is being held back in their relicensing of their non-lethal, Vermont river facilities due to the successive delays requested by PSP Investments-owned, FirstLight at Northfield.

Document Accession #: 20220131-5365 Filed Date: 01/31/2022
Alan Douglass Regulatory Compliance Manager

“FirstLight continues to discuss fish passage, minimum stream flows, and project operational issues with federal and state resource agencies, and certain non-governmental organizations. FirstLight and the agencies have reached conceptual agreement on minimum stream flows, upstream and downstream fish passage facilities, and certain operational measures. The parties are continuing to make progress on the remaining operational measures, at which time they intend to execute an AIP.”

“In light of the significant progress of FirstLight and the relicensing participants in achieving conceptual agreements, FirstLight requests that the Commission continue to defer issuance of its Ready for Environmental Analysis (REA) Notice until after February 28, 2022. FirstLight anticipates requesting the Commission to further defer the REA Notice until after June 30, 2022, to allow the parties time to negotiate a comprehensive, binding settlement agreement that aims to fully resolve all relicensing issues.”

Alan Douglass
Regulatory Compliance Manager

Great River Hydro’s VERNON DAM facilities and its non-lethal fish passage for migrating fish in New Hampshire and Vermont.

BELOW, is text excerpted from GRH’s FERC filing:

Document Accession #: 20220203-5098 Filed Date: 02/03/2022
John L. Ragonese
FERC License Manager
Great River Hydro, LLC

“In the most recent status report, FirstLight Licensees announced conceptual agreements with a number of relicensing participants on several key issues and that they were close to reaching agreement on other key issues. The filing asks the Commission to further defer issuance of the REA Notice until after February 28, 2022, to allow relicensing stakeholders to reach agreements in principle. It also suggests that they intend to request the Commission further delay issuance of the REA Notice until after June 30, 2022, to allow for the development of a binding settlement agreement that the parties. GRH anticipates the Commission would reasonably hold off issuing the REA Notice for at least six months, in order to consider an executed settlement agreement between FirstLight Licensees and stakeholders as a preferred alternative in an amended application.”

“At this point in the process, however, there is no reason for the Commission not to issue the REA Notice for the GRH Projects. Even if the Commission further defers the REA Notice for the FirstLight Projects for another six months, it can still prepare a multi-project environmental impact statement for all five projects.”

“GRH has consulted with federal and state fishery and water quality agencies, and we are authorized to state their support GRH’s request for the Commission to move forward.”

Sincerely,
John L. Ragonese
FERC License Manager