MA Division of Fish and Wildlife

Archived Posts from this Category

Stakeholder PROTEST of FERC Revised Study Plan finding endangering Connecticut River shortnose sturgeon

Posted by on 07 Mar 2016 | Tagged as: Connecticut River shortnose sturgeon, Dead Reach, Dr. Boyd Kynard, endangerd shortnose sturgeon, Endangered Species Act, ESA, Extinction, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Secretary Kimberly Bose, US Fish & Wildlife Service, USFWS

(The following Stakeholder testimony was submitted to FERC on March 4, 2016)

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 March 4, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.

Though my FERC Stakeholder comments of January 28, 2016 specifically addressed this ESA issue, FirstLight did not respond to the endangerment issue in its RSP revisions. Further, I had made this issue clear to FirstLight and its agents, FERC staff, and key stakeholder agencies in an email delivered on January 20, 2016. I again reiterated the endangered species impacts to those same parties in an email delivered on February 24, 2016. Madam Secretary, I again made my concerns about spawning interference and failure to you and for the FERC record in a letter delivered February 26, 2016. All are available for perusal in the FERC record for P-2485 and P-1889.

Shortnose sturgeon gather at this spawning and nursery site annually between April 22 and May 25 for pre-spawning and spawning. Further, the complex of key biological characteristics of flow, varying depths, and cobble/sand habitat provide SNS with protective options that nurture developing Young of the Year throughout June into July.

According to 17 years of published studies at that site documented by Dr. Boyd Kynard and research colleagues, a continuous minimum flow of 2500 cfs is required to protect sturgeon spawning and rearing at this site. Therefore, I PROTEST the findings of the FERC Revised Study Plan determination issued by FERC on February 25, 2016, and request that only continuous protective minimum flows of 2500 cfs be allowed in this study, and throughout the 2016 SNS spawning and rearing season, as well as all ensuing springs.

The following publication has been referenced in the FERC ILP for these projects by both federal and state stakeholder agencies, FERC, as well as FirstLight and their agents.

“LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4

“Effect of hydroelectric operations on spawning”

Page 101, bottom: “During the 11 yr spawning failed (excluding the failed migration in 2002), when discharge levels were too low for 5 yr and too high for 4 yr. During one yr (2007), discharge during April was both to low and too high. When spawning failed at RockD due to low discharge during 4 yr (1995, 1998, 1999, and 2006)m discharge decreased to <70 m3 s-1 for at least 4 d by 30 April (Fig. 14), the earlier period of low discharge likely marked a threshold making the RockD unattractive to spawning fish.”

Further published data, tables, and required flows necessary in this reach appear on pages 101-102 of LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEIONS.

I would welcome a FERC hearing on this critical ESA issue and would make myself available for testimony. Thank you for your attention to this pressing matter.

Sincerely,
Karl Meyer
Fish and Aquatics Study Team, P-2485 and P-1889

Cc’d via email to:
Brandon Cherry, FERC
James Donohue, FirstLight
Julie Crocker, NOAA
John Warner, USFWS
Caleb Slater, MA Division of Fisheries & Wildlife

FERC sanctions crippling flows for federally-endangered Connecticut River shortnose sturgeon

Posted by on 01 Mar 2016 | Tagged as: 5-year FERC licensing process, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NOAA, US Fish & Wildlife Service

The following Stakeholder Comments concerning proposed study flows that will wipe out this season’s spawning for federally-endangered Connecticut River shortnose sturgeon at their only documented natural spawning site in the river system were submitted to FERC Secretary Cheryl on Friday, February 26, 2016. They include comments submitted on Wednesday, February 24, 2016 to FERC staff, federal and state fisheries agents responsible for endangered species protection, and FirstLight–who proposed to include the crippling 1500 cfs(cubic feet per second) flows in FERC-ordered Study 3.3.19.

On Thursday, February 24, 2016, Vince E. Yearik, FERC Director of the Division of Hydropower directed FirstLight’s James Donohue that the ruinous 1500 cfs flows will be allowed at the Connecticut River shortnose sturgeon’s only documented natural spawning site in the spring of 2016.

My Stakeholder Comment letter, on the FERC official record for P-2485 and P-1889, is directly below.

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 February 26, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485

Dear Secretary Bose,

The comments below respecting federally-endangered Connecticut River shortnose sturgeon and Study 3.3.19 were delivered via email to GDF-Suez FirstLight�s James Donohue, FERC staff including Brandon Cherry, and Caleb Slater(MA), Julie Crocker(NOAA), and John Warner(USFWS) on 2/24/2016.

Thank you,
Karl Meyer

Dear Chris et al,
I commented to you and in the FERC record on your RSP for Study 3.3.19, the Ultrasound Study in P-2485 and P-1889, to repel fish from Cabot Tailrace. Since I was somehow left off the email list in the �call for comments� that went out on 2/11/2016, I will take the opportunity to comment at this time.
In your newly-revised RSP you failed to reply to this comment of mine in particular:

�The final week should be at a minimum of 2,500 CFS�which, as FL has indicated in their response to a new Stakeholder Study suggested at the Rock Dam for shortnose sturgeon spawning: 2,500 CFS is the absolute minimum, uninterrupted flow necessary through the Bypass from April 25 � May 22, in order to not interfere with the spawning of a federally endangered species at Rock Dam. In their response, FL cited �Kynard� et al. Minimum flows to keep SNS embryos and eggs motile, watered, and viable are required there throughout the month of June.�

FirstLight has now indicated it intends to use test flows including 1500 cfs in its Ultrasound Study. This is unacceptable, as data shows this will harm a federally endangered species, the Connecticut River shortnose sturgeon. FirstLight has cited Kynard, Kieffer et al; Life History and Behaviour of the Connecticut River shortnose and other sturgeons, in their official FERC comments. Both FERC and the agencies are in possession of the scientific study data contained therein. An examination of Chapter 3 and the �Effects of hydroelectric operations on spawning� makes it quite clear that 2500 cfs is the minimum continuous flow needed to allow females to sustain a presence at the site and complete successful spawning. Flows go below that level�and 1500 cfs is far below that required threshold, will cause sturgeon spawning to fail.

A continuous flow of 2500 cfs is the only protective flow that should be allowed in the Ultrasound Study�it is also necessary throughout the month of June to protect the Early Life Stages of shortnose sturgeon. Please make the required modifications, as I�m certain the agencies and FERC will not give you license to run afoul of the federal Endangered Species Act, as well as similar state statutes.
A review of the FERC record, as well as your proposed Revisions for 3.3.19 are included below. Thanks.
Best,
Karl Meyer,
Fish and Aquatics Study Team

In 2015, FERC agreed with FirstLight and rejected requested snorkeling studies to determine the fish assemblage in the By Pass Reach out of an abundance of caution for impacts they might have on federally-endangered shortnose sturgeon whose only documented natural spawning site is the Rock Dam Pool in that reach.
Though the record clearly misstates that that snorkeling survey request was for the By Pass Reach downstream of Turners Falls Dam�written as �downstream of Cabot Station�, the protected status and determination to �do no harm� was quite clear in FERC�s reply. Excerpts from FERC Staff directly below.
From 01/22/2015, FERC Study Modifications Determination Letter

Study 3.3.11 – Fish Assemblage Assessment
�Requested Study Modifications

The U.S. Fish and Wildlife Service (Interior) proposes modifying the study to require FirstLight to conduct snorkeling surveys in the reach downstream of Cabot Station, in order to avoid all effects on shortnose sturgeon during the spawning season. The Nature Conservancy and Karl Meyer support Interior�s proposed study modification.

Comments on Requested Study Modifications

To avoid all effects on shortnose sturgeon during the April-June period in the reach downstream of Cabot Station, FirstLight states that it will rely on sampling from the project impoundment, sampling of the reach downstream of Cabot Station during other times of the year (after June 30), and existing data from a 2009 electrofishing survey of the area downstream of Cabot Station.

Discussion and Staff Recommendation

The goal of this study is to provide general information on fish species that are present in the impoundment and in the river downstream of the dam and Cabot Station. Based on the description in the modified study plan, FirstLight�s proposed method will provide information on species occurrence, species distribution, relative abundance, and habitat associations that will adequately describe the existing fish community. Because FirstLight�s proposed methods would achieve the goals of the study while avoiding effects on spawning sturgeon, we conclude that snorkeling is not necessary and the study plan filed with the ISR should be approved without modification.�

And�FirstLight�s current revised flow plan for 3.3.19:

�This study would establish a high frequency sound (ultrasound) array across the entire Cabot Station tailrace and determine the effect of the ensonified field on upstream migrating shad moving by Cabot Station. Bypass reach test flows during the study will include flows of 1,500 cfs, 2,500 cfs and 4,400 cfs. These flows will be released depending on river flow conditions. When possible, flows will alternate with the array on for one day then off for one day at 1,500 cfs, followed by one day on and one day off at 2,500 cfs, then one day on and one day off at 4,400 cfs. This sequence will be repeated throughout the study depending on river flow. The field study will include two components: a) DIDSON count of shad entering the Cabot fish ladder and b) detection of telemetered adult shad to determine their movements after they encounter the sound field.�

CASHING IN ON A CASH COW

Posted by on 15 Jan 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River shortnose sturgeon, Daily Hampshire Gazette, endangerd shortnose sturgeon, Endangered Species Act, Energy Capital Partners, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, fossil plant, GDF-Suez FirstLight, ISO, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, non-renewable, Northfield Mountain, Northfield Mountain Pumped Storage Station, Rock Dam, shortnose sturgeon, The Greenfield Recorder, The Pioneer, The Recorder, Turners Falls dam, Uncategorized, US Fish & Wildlife Service, USFWS, Vermont

The following piece appeared in the Daily Hampshire Gazette(www.gazettenet.com) and the Recorder(www.recorder.com) in the first week of January 2016.

CASHING IN ON A CASH COW

Copyright © 2015 by Karl Meyer

Ever dreamed of owning your own bank? I got a deal for you! Northfield Mountain Pumped Storage Project is for sale again, along with the Turners Falls canal and dam—and a string of little assets down in Connecticut. But Northfield’s the cash cow. Fourth time in a decade they’re unloading this golden calf–always at a tidy chunk of change. A quickie corporate win-win! It’s really like an A.T.M., run at the expense of the Connecticut River ecosystem.

Place works like a giant toilet–suck huge amounts of the river backward and uphill, then flush it all back and—viola, money spews out the other end. Could be ours! They’re holding bidder tours as we speak. I just need a few partners with ready credit. We go in on short-money and cash-in on the no-brainer electricity “spot market” for a few years. Then, with inflated power-price futures in play, we offload this puppy for a final cash-out of 30%–maybe 50%!

Here’s how it goes down. With the cheerleading of Northfield’s not-so-silent partner, ISO New England–the “independent” system operator (created by the Federal Energy Regulatory Commission), we simply slow dance this darlin’ past the banks, the FTC and FERC. Then, in 2016, its sweet business-as-usual—maybe with new shirts for employees.

Trust me, this works every time. Everyone walks away with full pockets—without the public knowing what hit them. Northfield got wholesaled in 2006 by Northeast Generations Services(formerly WMECO—formerly of Northeast Utilities, now Eversource—you follow?) They grabbed a quick $1.34 billion for the package, slipping it to a trio of Jersey venture capitalists, Energy Capital Partners. ECP renamed their little project FirstLight Energy. Those smartest-guys-in-the-room hung-in and grabbed Northfield’s peaking spot-market profits for two years, before off-loading it for a nifty $1.89 billion in that crazy year, 2008.

With that, GDF-Suez, third owner in four years, swept in–the world’s largest private energy corporation, based in France. They’ve been gobbling up contracts to run water systems across the US under the name Suez United Water. But GDF-Suez recently did a clever name-change to Engie, keeping the public totally confused. They got game! The true costs of these premium-priced plant sales get buried in the list of acronyms on electric bills. It’s like owning a 25-mile stretch the Connecticut River to dip into for cash any time you please.

This is a turn-key operation–with us, the new guys, pushing the buttons. The joke is that the public thinks Northfield is a hydropower operation, while this baby has never produced a single watt of its own energy. It’s imported!–huge swatches of bulk electricity now run-in from outside the region to suck a mountain’s worth of flow from the Connecticut up to a reservoir. Then, dump it out on the power lines when prices peak. It’s hugely inefficient, now largely carbon-based—and massively damaging to the river. But amazingly profitable!

That’s where we come in. Sure it was built as a sister to the region’s nukes to gobble up their monstrous stream of unused electricity–because nukes can’t shut down their feverish output at night. That’s how you get to put in a giant straw and suck the Connecticut uphill at a rate of 15,000 cubic feet per second–more than enough to pull the river backward for a mile downstream under low flow conditions. But who’s watching? When the region’s last nuke shut down, nobody said ‘boo!’ with Northfield going fossil. What climate change?

And when it became clear years back that Northfield operations were imperiling spawning success for the federally-endangered shortnose sturgeon at the Rock Dam in Turners Falls–their singular natural spawning site going back into pre-history, again, nobody came forward. Not the US Fish & Wildlife Service, the National Marine Fisheries Service or the MA Division of Fish & Wildlife—or any river protection group. No bureaucrats, no suits–nobody. At Turners Falls—instead of 70% of migratory fish heading upstream toward Vermont and New Hampshire, they squeeze out 4%. We have it made!

Still skeptical? ISO and FERC are addicted to Northfield—even though its power-flush characteristics might come into play maybe a handful of times a year, if at all. For this they let owners cash in on the river whenever y they want. In 2012, the owners of this “asset” collection of 1500 megawatts(of which over 1100 MW derived from Northfield alone) told investors a full 40% of their profits were realized from “Capacity Fees.” What that means is you get paid for holding back the Connecticut! They’re not required to use it at all if they don’t want to—just flush when prices are high. Paid for being you! Of course another 50% of profit comes from generating, though the public doesn’t know it only operates a few hours a day when prices are highest.

Here’s the kicker: in 2014, after a cry-wolf energy deficit winter that never materialized, FERC–with ISO as cheerleader, sanctioned the doubling of those “capacity fees”. Plants are now collecting 2X the amount they were two years back, for having the potential to dump some power on the lines—not for actually generating. Paid for being you! With 1100 potential megawatts at Northfield, how quick can you say “windfall at the public’s expense?” Lastly, Northfield petitioned FERC the last two winters to increase its reservoir storage by a full 25%, with ISO their biggest cheerleader. FERC agreed, twice. Double-dip with a cherry, anyone?

This thing’s a cinch! Even with all the nukes shut—when this should have been moth-balled to emergency use as more climate-warming, spent nuclear junk, it soldiers on as a virtual river monopoly with the blessings of FERC and ISO. Trust me, no one goes to court. Ecosystem damage, costs to the public? Fuggetaboutit!

Got credit? Give a call!

Spawning shortnose sturgeon denied flow at Rock Dam Pool

Posted by on 08 May 2015 | Tagged as: 5-year FERC licensing process, American shad, Atlantic salmon, blueback herring, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, endangerd shortnose sturgeon, Endangered Species Act, ESA, Extinction, Federal Conte Anadromous Fish Research Center, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, Rock Dam, Rutland Herald, shortnose sturgeon, The Greenfield Recorder, University of Massachusetts, US Fish & Wildlife Service, Vermont Digger

PRockDamPoolDewatered (2)
(to view lager image, click on photo).

NOTE: the photo above documents conditions found at the Rock Dam Pool on the Connecticut River on May 3, 2015. Seventeen years of published studies conducted by federal and University of Massachusetts fisheries researchers at the adjacent Conte Anadromous Fish Research Center show that these river conditions cause spawning failure for federally-endangered Connecticut River shortnose sturgeon at the Rock Dam Pool, their only documented natural spawning site. The May 3rd river conditions found at Rock Dam mimicked mid-summer flows on the Connecticut–conditions that research shows drives spawning-ready females from the site, and de-waters the cobble-strewn pool where eggs and embryos attach and develop. April 25 to May 22 is the documented spawning window for the shortnose sturgeon on the Connecticut. It is a crime to kill, injure or interfere with endangered Connecticut River shortnose sturgeon under federal and state law. The Federal Energy Regulatory Commission, the National Marine Fisheries Service, the US Fish & Wildlife Service, and the MA Division of Fisheries & Wildlife are responsible for the protection of the Connecticut River’s only federally-endangered fish under the Endangered Species Act(ESA). GDF-Suez FirstLight controls river flows to this site via spill gate operations at the Turners Falls Dam, just upstream.

A RIVER PRESERVED IN PLASTIC Copyright © 2015 by Karl Meyer

(The following essay–with minor variation in each, appeared recently in The Recorder, The Rutland Herald, and at Vtdigger.org)

A lifeless, three-foot long Connecticut River shortnose sturgeon sits on display at the Great Falls Discovery Center in Turners Falls, MA. The shortnose has been this river’s only federally-endangered fish since 1967. That plastic sturgeon has sat amidst other replica fish for a dozen years now—a plastic American shad, a blueback herring, a trophy-size Atlantic salmon. They’re framed beneath a slightly-ruffled acrylic surface representing the Connecticut River at this flagship site of the Silvio Conte National Fish & Wildlife Refuge.

That display is the basic message offered to visitors here: ‘This is a river with congenial flows supporting populations of shad and herring, big native salmon, and federally-protected sturgeon.’

Nothing could be further from the truth.

Few upstream migrants reach Vermont and New Hampshire today. That’s part of the legacy of failure of federal and state fish agencies and watchdog groups claiming to safeguard an ecosystem and its native migratory fish. That legacy will remain intact until they confront ongoing conditions in Massachusetts that have been crippling the river here for decades.

That Discovery Center depiction falls apart if visitors simply walk outside onto the deck of the Turners Falls Bridge, adjacent to Turners Falls Dam. There, often for months on end, what they’ll see is the hollowed-out heart of New England’s Great River–a waterless chasm, or one teased by just a trickle from the power company’s dam. Conversely, when rain or snow send more river downstream than can be profitably sent through FirstLight’s power canal or stored upstream for their Northfield Mountain Pumped Storage Station, those spill gates open wide–producing violent, see-sawing flows few fish can fight or follow.

Meanwhile a 200 million year-old evolutionary gem, the Connecticut River shortnose sturgeon, remains all but abandoned just downstream–teetering on the verge of extinction for decades. Likewise, American shad can’t move upstream in the river here at all. They’re forced into that turbine-lined power canal where less than 1-in-10 will emerge alive beyond the dam. And those blueback herring–protected on paper as a “federal trust” species, have not been counted here in almost a decade. Just 20 years back they passed by the thousands.

That plastic salmon, showcased for decades as the darling of this river’s fisheries restoration, has been extinct here since 1809. It should not be presented as a living native fish. In science, extinct isn’t subject to interpretation.

That trophy-sized model derives from a massive hybrid hatchery program created by cross-breeding salmon imported from Canadian and northern New England rivers. For 43 years federal and state fish farms produced the millions of tiny fry dumped into the river each spring. Those fish factories repeatedly proved vectors for the potential spread of disease throughout the river system. Though those tiny fish proved great for public relations, no spawning population of engineered salmon ever took hold.

Hybrid salmon became the red herring that masked the massively broken ecosystem that exists on an eight-mile stretch of New England’s Great River from the Northfield Mountain Pumped Storage Station to the tailrace of the Turners Falls Power Canal. Those salmon were the stand-ins for agencies including the National Marine Fisheries Service, the USFWS, and MA Division of Fish & Wildlife that had failed to protect living migratory species here–and an ecosystem suffocating right in their backyard.

The plight of the only state- and federally endangered fish here represents the ultimate failure of responsibilities. Dr. Boyd Kynard spent decades studying the shortnose and documented it’s only natural spawning site–the Rock Dam Pool, less than two miles downstream of Turners Falls Dam. Dam operations there were annually creating conditions that crippled spawning success for the remaining 300 sturgeon still able to reach their ancient rendezvous site.

Kynard’s federal- and state-funded findings were given to fish agencies a decade back. Each bore legal responsibility for that sturgeon. Yet no agency or non-profit stepped-in to monitor and enforce Endangered Species Act protections. None intervened to halt the trickle-and-torrent flows preventing reproduction. That step alone would’ve put living waters back into the river here–aiding the shad and herring attempting to reach Vermont and New Hampshire. Likewise in 2012, when Kynard published a book on the shortnose–documenting its life history and the river conditions necessary for its recovery, again, no one went to court to protect this public legacy.

Had agencies and watchdog groups taken responsibility years back for protecting spawning sturgeon at that Rock Dam Pool below FirstLight’s dam, native migratory fish and the river ecosystem would be in a far better place today. Instead, that work was left to become part of the current studies in the Federal Energy Regulatory Commission’s 5-year relicensing process for the Turners Falls and Northfield hydro sites, where I’m on the Fisheries and Aquatic Studies Team.

Sturgeon spawning is not monitored today. It’s unconscionable to have waited for a 40 year relicensing process to come around before broaching concerns for an endangered fish and broken ecosystem. Hopefully it won’t prove the difference between a living river, and one merely depicted in a museum model.

Greenfield, MA journalist Karl Meyer is participating in the Federal Energy Regulatory Commission’s relicensing process for the Northfield Mountain and Turners Falls hydro sites.

New Comments to FERC, RE: Turners Falls Fisheries Studies

Posted by on 08 Apr 2015 | Tagged as: 5-year FERC licensing process, American shad, Cabot Station, Connecticut River, Connecticut River shortnose sturgeon, Conte, Dr. Castro-Santos, Dr. Haro, endangerd shortnose sturgeon, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, MA Division of Fish and Wildlife, Mr. Colton Bridges, New Hampshire, Northfield Mountain Pumped Storage Project, Revised Study Plan, Secretary Kimberly Bose, shad, shortnose sturgeon, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, USFWS, Vermont

NOTE: the following comments were submitted to Federal Energy Regulatory Commission Secretary Kimberly Bose respecting FirstLight’s withdrawal from its stated position of using video-monitoring equipment at the Turners Falls Dam’s Spillway Ladder to compile study data and information on aggregations of migrating American shad.

This is information that has been the fisheries restoration’s Black Hole these last forty years. It can only be gathered at this site. However, with the withdrawal of these tools, fisheries agencies and the public will be relying on just a few hundred radio-tagged and tracked fish as substitutes for on-site, real time monitoring of aggregations of what are understood to be perhaps hundreds of thousands of migratory shad. (Comments to FERC were slightly abbreviated due space limits in E-filing.)

Karl Meyer, MS
Greenfield, MA 01301 April 8, 2015

Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426

Re: P-1889; P-2485

Dear Secretary Bose:

Please accept the following comments in the matter of the hydro-power licensing studies for P-1889, the Turners Falls Project; and P-2485, the Northfield Mountain Pumped Storage Project. These comments focus on changes FirstLight made to the Revised Study Plan. I first aired my objections to these RSP changes at a meeting on March 24, 2015–as a member of the Fisheries and Aquatics Study Team. They highlight a lack of Existing Information and a Need for Additional Information that FirstLight’s RSP revisions will not satisfy.

FirstLight has summarily excised all video monitoring in the vicinity of the Spillway Fishway at the base of Turners Falls Dam—a technique they’d agreed was needed in the initial RSP.

3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad

Existing Information and Need for Additional Information

Passage through the Turners Falls complex:

Study Goals and Objectives: (18CFR; 5.11(d)(1)

“Evaluate attraction, entrance efficiency and internal efficiency of the Spillway Ladder for shad reaching the dam spillway, under a range of conditions.”

FirstLight stated the following in their initial RSP response: (bolded italics below, mine

“Video monitoring will be used for specific study areas such as the Spillway Fishway. Use of video monitoring of the Spillway fishway will provide data on fishway efficiency; shad attempting to pass would be monitored versus only those shad that have been tagged.”

Task 2: Study Design and Methods:

FirstLight then wholly eliminated that key video information gathering technique that would help inform these studies with aggregate numbers of shad reaching the Spillway Entrance, versus only those few tagged fish approaching and passing the Spillway entrance.

From FirstLight’s March 14, 2015 RSP changes distributed to the Fisheries and Aquatics Study Team:

“The study will monitor shad migration within the study area using a combination of active and passive radio techniques and video surveillance.”

This needed information gathering was eliminated by FirstLight despite their description in the initial RSP that this was a proven and inexpensive technology:

“FirstLight proposes to conduct video monitoring using the Delta System commercial series of underwater video camera and lighting manufactured by Ocean Systems Inc. This system was recommended by A. Haro (Conte Lab) and has proven effective at other facilities. Video data will be recorded on a dedicated video recorder (DVR).”

“Video monitoring of the Spillway would add a modest cost to this study.”

As to why gathering information about aggregations of American shad at the Spillway adjacent to Turners Falls Dam is needed at this time–that need was stated in FirstLight’s initial RSP response as well:

“In general, the numbers of tagged fish passing through the Spillway Fishway were too low for vigorous evaluation (Haro and Castro-Santos 2005).”

Information about aggregations of migratory fish moving upstream to the base of Turners Falls Dam and the Spillway has been paltry to nonexistent these last 40 years. In the last 15 years, Dr. Haro and Dr. Castro-Santos of the USGS Conte Lab have focused nearly all their work in FirstLight’s power canal, while the Connecticut River passage route for these federal trust fish has been almost wholly ignored.

As to the huge gap in the information for American shad aggregations at this site, I herein cite expert testimony delivered before Commission members four decades back:

On August 21, 1975, in hearings before the United States Federal Power Commission in Boston, Mr. Colton Bridges, Deputy Director of the Massachusetts Division of Fisheries and Wildlife delivered the following expert testimony on the need for Spillway Fish Passage at the Turners Falls Dam:

To Mr. Bridges: Question: “Would either the Cabot power house fishway or the gatehouse fishway be effective in passing those early arriving shad?”

Answer from Mr. Bridges: “No, because with spill conditions at Turner Falls the major source of attraction water will be coming down river from the Turners Falls Dam and emanating from Cabot Station. Consequently, the conditions that existed at Holyoke with spillway flows limiting fishlift efficiency will prevail at Turners Falls Dam with only a Cabot Station fish passage facility in operation.”

Question: “What, in your opinion, would be the effect of the construction of the proposed fish passage facilities at Turners Falls Dam without the inclusion of the spillway fishway?”

Answer from Mr. Bridges: “Without a spillway fish passage facility, fish approaching Turners Falls during periods of spill will be attracted to the base of the dam and those isolated pools located immediately below it, and be subject to the same conditions that exist below Holyoke without the spillway fish collecting facility, i.e., migration delay and mortality due to lack of flow, increased water temperatures, and decreasing oxygen content.”

Given that, as of this date, FERC is refusing to allow the USFWS any in-situ access for snorkeling to get a general assessment of fish using this passage route to Turners Falls Dam during migration season–and that FERC is further disallowing any seining for fish or shad eggs in this reach due to concerns for endangered shortnose sturgeon, this is the only key place where any new information about Spillway aggregations of shad can be gained. This was stated as a result of FERC internal policy, though NMFS indicated a willingness to consult—and NMFS is the ultimate key-holder in decisions concerning Connecticut River shortnose sturgeon.

Hence, denying the gathering of this needed information at the Spillway effectively limits the public’s understanding of what is happening at this site. Though overall successful fish passage through the Spillway Ladder has proven ineffective these past 30 years, it should not limit the Entranceway as the key place to collect long-absent information on aggregating shad.

These are the early arriving fish that have long been known to be the key migrants–most likely to move upstream to Northern Massachusetts, Vermont and New Hampshire spawning sites on the Connecticut. As of this date, 40 years after Deputy Director Colton Bridges testimony, those fish are still not making it past Turners Falls Dam, and we don’t have the information about their numbers and when, where, and in what flow conditions they gather at the Spillway site.

For these reasons I respectfully request that Spillway video monitoring be returned to the Revised Study Plan for this season–to gather the data that cannot be gained simply by monitoring a few hundred radio-tagged fish.

Thank you.

Sincerely,
Karl Meyer, MS, Member, Fisheries and Aquatics Study Team for P-1889; P-2485

The Hidden Costs of Northfield Mountain Pumped Storage

Posted by on 01 Sep 2014 | Tagged as: Connecticut River, Connecticut River ecosystem, ecosystem, Entrainment, Federal Energy Regulatory Commission, FirstLight, GDF-Suez FirstLight, Haddam nuclear plant, Ludington Pumped Storage Plant, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, resident river fish, US Fish & Wildlife Service, USFWS, Vermont Yankee, Yankee Atomic, Yankee Rowe Nuclear Plant

Copyright © 2014 by Karl Meyer

The hidden costs of Northfield Mountain Pumped Storage: after Vermont Yankee closes, FirstLight wants to ramp up pumping and profits

(a version of this piece first appeared in the Greenfield Recorder, August 23, 2014)

Vermont Yankee, the last of the region’s nuclear plants, will close in December. In response, GDF-Suez FirstLight’s Northfield Mountain Pumped Storage plant is looking to change its stripes. On June 27th it applied to the Federal Energy Regulatory Commission for a “temporary” license amendment to allow it broad new freedoms to consume unprecedented amounts of the Connecticut River from December 1, 2014 through March 31, 2015. That plan would add an additional 22 feet of pumping capacity to its 5-billion gallon reservoir, sucked directly from the river. More pumping is certain to create more riverbank erosion and draw more silt into that reservoir. It will also kill untold thousands of the public’s resident river fish.

The unprecedented request defies logic. Northfield was built specifically to use energy from local nuclear plants to push water up to its reservoir. In its request FirstLight also cited the closing of the 330 megawatt Salem Harbor coal plant as rationale for why it should be allowed to pump more, and grow larger. FirstLight Hydro Compliance Director John Howard stated, “The requested increase in operational flexibility is needed to provide ISO-New England with additional resources to deal with a potential shortage of energy in the Northeast this winter.” However Andrea Donlon of the Connecticut River Watershed Council found that ISO-New England, the grid’s Independent System Operator, had made no requests concerning Northfield, stating it expected to have adequate energy supply this winter.

FirstLight’s application failed to mention is that it is shutting down its own 135 megawatt Mt. Tom Coal Plant this October. Rather than the “peaking energy” and “emergency resource” plant it’s been since coming on-line in 1972, Northfield seems to be implying it will somehow serve as a replacement for those 24/7 “baseload” energy plants. The other logic-defying reality is that it would be consuming more baseload energy to create more brief pulses of high-priced energy to re-sell to us at “spot” market prices.

Northfield was fashioned during the nuclear build-out in the late 1960s to use the excess power generated at night from nuclear plants in Rowe, Vernon, VT and Haddam, CT to gulp giant slugs of the Connecticut up to its reservoir. When demand “peaked” during mornings or late afternoons it would release that stored nuclear energy—our river, back to its bed through massive turbines. It could produce some 1,000 megawatts in just minutes, great for short-term needs and emergencies. But it could only store enough water to produce 6-8 hours of electricity, total. Depleted, it then waited to re-start the process.

In her book “Inventing Niagara” Ginger Strand described the inefficiencies and rationale behind selling pumped storage electricity to the public as a textbook case of corporate capitalism: buy low, sell high. Northfield has never been a renewable hydro source. It is inefficient and operates at a net-energy loss. While its impacts on the river ecosystem are profound, its brief, staggering pulses of violent, high-volume output are no more efficient than that of legacy electric producers, just more short-term profitable.

Northfield only makes sense while it operates as a designated nuclear adjunct, run on the excesses of the region’s short-lived and now-shuttered nuclear fleet. But now it wants to soldier on, utilizing imported power and climate-changing resources. Meanwhile the river pays an as-yet unstudied price–as the public is asked to accept yet more “peak” energy, repackaged and re-sold at “peak” prices culled from bidding boards on the “spot” market.

FirstLight’s FERC request sparked official replies from entities involved in the current 5-year relicensing of Northfield. The National Marine Fisheries Service’s William McDavitt noted to John Howard “the timing of this temporary amendment application is a bit unfortunate as the proposed change could bear some impact on proposed 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability. Were the proposed changes to go into effect, it seems as though the duration that NMPS pumps or generates could be changed.”

MA Fish and Wildlife made no objections to the up-rate, but the Watershed Council noted that fish kills there–known as “entrainment”, are worrisome, “Currently the entrainment impact of the NMPS facility during the winter is not well understood, which the pending appeal by USFWS regarding the sufficiency of FirstLight’s proposed entrainment study well illustrates,” further noting, “So until such time as we have a much better understanding of the entrainment impacts of NMPS, it seems inappropriate to request additional pumping capacity.”

In 1995 the owners of the Ludington(MI) Pumped Storage Plant agreed to a $172 million dollar settlement for its killing of the public’s fish across the previous two decades. There, according to the Ludington Daily News, they at least had the benefit of a one-time study showing LPSP “in a single year, killed 440,000 salmon and trout, 85,000 perch and millions of forage fish that served as food for valuable game.”

Since 1972 it’s been a free ride up at Northfield.

Karl Meyer is a member of the Society of Environmental Journalists.

Kynard,Part II: Fisheries restoration, or a new half-century of death in the TF Power Canal?

Posted by on 06 Aug 2014 | Tagged as: American shad, By Pass Reach, Cabot Station, Connecticut River, Connecticut River ecosystem, Dead Reach, Dr. Boyd Kynard, ecosystem, Federal Energy Regulatory Commission, federal trust fish, FERC license, FirstLight, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, New Hampshire, Northfield Mountain Pumped Storage Station, shad, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Service’s Silvio O. Conte Anadromous Fish Lab, USFWS, Vermont

Tune in to Local Bias on Greenfield Community Television, GCTV.org, for Part II of a wide ranging interview with fisheries biologist and US Fish & Wildlife Service Conte Anadromous Fish Research Center founder Dr. Boyd Kynard. He gives direct answers to questions about the fate of the millions of American shad that have been tricked out of the Connecticut River into the deadly and alien habitats of the private Turners Falls Power Canal for the last 35 years.

Dr. Boyd Kynard Part II; a Deadly Canal or a River Migration Solution?

http://mfi.re/watch/pdx5yqvqv7ygzdk/Local_Bias_147.mpg

The current Federal Energy Regulatory Commission Re-licensing process for FirstLight Power’s Turners Fall/Cabot Station and Northfield Mountain Pumped Storage Stations represents the last chance the Connecticut River gets to recover some of its biodiversity, fecundity and ecosystem functions for many decades to come. A second failure by the public agencies charged with protecting the public’s fisheries resources and endangered species will likely close off–forever, the last, best chance to restore New England’s Great River.

Will the federal and state agencies responsible for protecting and guiding the migratory fisheries restoration since 1967 (USFWS, National Marine Fisheries Service, VT, NH, and MA Division of Fish & Wildlife), again steer migratory fish headed upstream to northern MA, VT and NH spawning habitats into a private “roach motel” of deadly hydro blades and muck? Or, will they bring them directly upstream to a fish elevator at the Turners Falls and redeem decades of failure? Get the low-down, and hear about viable alternatives in this half-hour interview.

Tune in to Local Bias this Thursday, August 7 at 9 pm, or on Saturday, August 9th, at 9 pm. The shows repeat at those scheduled times the following week.

THE CONNECTICUT RIVER SHORTNOSE STURGEON: A PLANNED EXTINCTION?

Posted by on 08 Jul 2014 | Tagged as: Atlantic salmon, Connecticut River, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, ecosystem, Endangered Species Act, Extinction, federally-endangered shortnose sturgeon, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Turners Falls, US Fish & Wildlife Service, USFWS

Click on the link above for: Part one of Local Bias interview between Karl Meyer and Dr. Boyd Kynard, produced by Drew Hutchison of Greenfield Community Television.

Watch an interview with fisheries biologist Dr. Boyd Kynard who has made a career of researching migratory fish behavior and fish passage at dams in large rivers across four continents. Kynard is the long-standing research expert on the federally-endangered Connecticut River shortnose sturgeon.

For 45 years federal and state fisheries agencies plowed $100s-of-millions into a program targeting “restoration” of a strain of Connecticut River salmon extinct since 1809. Failing to understand the concept of extinction, that project failed.

For those same 45 years agencies including NOAA’s National Marine Fisheries Service, the US Fish & Wildlife Service, and Massachusetts and Connecticut fish and wildlife departments ignored, dismissed, and failed to provide the protections, outreach, and funding needed to rescue a native, four foot-long, living fossil: the federally-endangered Connecticut River shortnose sturgeon.

Listed among just 22 fish species in the original 1967 federal Endangered Species Act, these agencies–as well as regional non-profits, have failed to protect the 2-mile stretch of river decimated by industrial flows containing the only known natural spawning grounds of this pre- Dinosaur-Age fish: the pool below a natural rocky cleft in the river known as the Rock Dam, in Turners Falls, MA. Just 300 Connecticut River shortnose sturgeon can access the Rock Dam site today–where industrial flows cripple their spawning attempts, and endangered species protections are ignored.

Double Standard on the Connecticut

Posted by on 09 Jul 2013 | Tagged as: American shad, Connecticut River Atlantic Salmon Commission, Connecticut River ecosystem, ecosystem, EPA, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC license, FirstLight, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, New Hampshire, Northfield Mountain Pumped Storage Reservoir, Riverkeeper, Rutland Herald, shortnose sturgeon, Times Argus, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont

The following piece appeared in the Rutland Herald and the Barre-Montpelier Times-Argus during the first week of July.

Copyright © 2013, by Karl Meyer

This is the habitat all upstream migrants are diverted into at Turner Falls

This is the habitat all upstream migrants are diverted into at Turners Falls


                               A River Double Standard

On June 28, 2013, Federal Energy Regulatory Commission Director of Energy Projects Jeff C. Wright ruled against the US Fish & Wildlife Service as it sought two extra weeks to review hundreds of pages of just-released Proposed Study Plans for the relicensing of five Connecticut River hydro projects. “The request for a 15-day EOT to file comments on the licensee’s proposed study plans is denied.”  EOT is FERC-speak for “extension of time.”  Those studies will impact this four-state river for the next 20-40 years. Agencies joining that request included the National Marine Fisheries Service, MA Div. of Fish & Wildlife, The Connecticut River Watershed Council, The Nature Conservancy, Trout Unlimited, the Franklin Regional Council of Governments, NH Dept. of Environmental Service and The Vermont Agency of Natural Resources.

One big reason for that request was the difficulties in evaluating the impacts of FirstLight’s Northfield Mountain/Turners Falls hydro operations on the entire Connecticut River ecosystem.  Beginning last fall, FERC began deviating from its standardized relicensing model when it scheduled public site visits to FirstLight sites weeks before the company released a publicly-required 500-page Pre-Application Document describing its complex pumped storage operations and machinery.

This spring FERC also supported FirstLight’s expedited-request to conduct a series of complicated river flow studies this summer—an allowance falling well outside FERC’s strict licensing timelines.  In doing so they let the company schedule three days of river visits by fed/state agencies smack in the middle of their deadline to comment on FirstLight’s 434-page Updated Proposed Study Plan.  FirstLight released that document June 28th; comments to FERC are due July 15, 2013.  Even after nine meetings with the power company and FERC, many agency representatives continued to decry the lack of critical scientific detail provided in FirstLight documents.  Those were put together by its team of five consulting firms.  Ironically, those handpicked FirstLight firms will conduct the next two years of river studies—the ones meant to protect the river.  A fox and chicken coop analogy applies.

FERC is employing a legal double standard here on the Connecticut.  If you a public agency or citizen seeking protections for the ecosystem—well, even little rules are THE RULES.  At the same time it appears corporations can continuously and sometimes massively ignore federal license requirements with impunity.

In FERC’s own words, the Commission “enforces the conditions of each license for the duration of its term, and conducts project safety and environmental inspections.”  Yet today Holyoke Gas & Electric is half a decade–and counting, in violation of its 2002 agreement to construct facilities to end the evisceration of federally endangered shortnose sturgeon and other “federal trust” fish migrating downstream at their Holyoke Dam facility.  So, why have a license at all? 

Upstream in 2010 GDF-Suez FirstLight dumped some of 45,000 cubic square yards of reservoir sludge directly into the Connecticut at Northfield Mountain over a 90-day period—the equivalent of 40 dump truck loads of muck per day, smack in the middle of fish migration season. Yet in current documents FERC states their inspections have never found FirstLight in violation of its license.

The US EPA found FirstLight in violation of the Clean Water Act in August of 2010 and ordered a massive clean-up, though the ecosystem damage was already done.  In an August 4, 2010 letter EPA sanctioned FirstLight for violating “FERC License No. 2485” and polluting the “navigable waters of the United States.”  A subsequent letter dated August 10, 2013 from FERC’s Biological Resources Branch Chief Steve Hocking to FirstLight Manager John Howard specifically referenced the EPA’s sanctions, directing him to “article 20 of your license.”  Yet there is virtually no FERC mention of that egregious violation in current relicensing documents.

That’s the standard that for-profit companies are held to here.  It rivals the Pirate Code.  Currently there is no watchdog entity on this river willing to go to the mat to protect the ecosystem.  If, like on the Hudson, there was an organization like Riverkeeper—which cites “enforcement” as one of its main responsibilities, these egregious injuries to the Connecticut would not likely stand.  Holyoke Gas & Electric would have been in court long ago for killing endangered sturgeon; and the full range of FirstLight’s lethal impacts on the Connecticut’s migratory fish when all are diverted into their turbine-filled power canal would’ve been fully investigated.  FERC’s inaction is a disgrace.

FERC Director Wright requested that questions regarding that EOT denial go to Ken Hogan at: 202-502-8434, or Kenneth.Hogan@ferc.gov. Ken has presided over the CT River relicensing hearings.  Also, you can find FirstLight’s 434-page “Updated Proposed Study Plan” at: www.northfieldrelicensing.com under Documents.  The public has until July 15, 2013 to send comments on that plan to FERC.  You do that at: www.ferc.gov/docs-filing/efiling.asp .  You must cite FirstLight’s project numbers, P-2485 and P-1889, and be sure to note that you are commenting on the “Updated Proposed Study Plan.”

Karl Meyer is a member of the Society of Environmental Journalists. He lives in Greenfield, MA. Read more at: www.karlmeyerwriting.com

Dam Relicensing: Diving into the Dead Reach

Posted by on 28 May 2013 | Tagged as: American shad, blueback herring, Connecticut River, Connecticut River ecosystem, Dead Reach, federally-endangered shortnose sturgeon, FERC license, FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, Northfield Mountain Pumped Storage Reservoir, Rock Dam, US Fish & Wildlife Service, US Geological Service’s Silvio O. Conte Anadromous Fish Lab

Watch Diving into the Dead Reach on LOCAL-BIAS: Learn why information about fish mortality in the the deadly Turners Falls Power Canal has been kept from the public these last 14 years.

Tune-in Greenfield Community Television’s (GCTV) Local-Bias Host Drew Hutchison and guest Karl Meyer, and find out what happened when he went snorkeling in this critical segment of the Connecticut–which should be deemed a spawning sanctuary for shortnose sturgeon and migrating American shad.

The program airs Weds. May 29th at 5 pm, and again on Thursday, May 30, at 9 pm; then again on Saturday, June 1, at 9 pm.  The series repeats at those time the f0llowing week.

Go to:  http://www.gctv.org/node/5264

See also: http://www.gctv.org/schedule

« Previous PageNext Page »