Great Falls

Archived Posts from this Category

EMPTIED RIVER NOTES: May 19, 2021

Posted by on 19 May 2021 | Tagged as: 1872, Connecticut River ecosystem, Connecticut River Refuge, Connecticut River shortnose sturgeon, Conte National Fish & Wildlife Refuge, Endangered Species Act, Federal Energy Regulatory Commission, FirstLight, fish passage, Great Falls, Landmark Supreme Court Decision 1872, Monte Belmonte, Northfield Mountain, Peskeomscut, Relicensing, Rock Dam, Turners Falls, Turners Falls dam, Turners Falls Massacre, United State Supreme Court, Vernon Dam Fishway

Copyright © 2021 by Karl Meyer

I took a bicycle ride 20 miles upstream to Vernon Dam this day in hopes of finding a few fish in the windows there. It proved a fruitless journey, though a pretty ride on a summer-like afternoon. There were plenty of lively bubbles in the windows, but not a single shad or early lamprey. Nothing.

The Vernon Fishladder and Dam Photo Copyright © 2021 by Karl Meyer

This was a river site smack in the midst of migration season that should have seen its first shad weeks ago. But here, on an 80 degree day, nothing.

The Connecticut’s DEAD REACH below Turners Falls Dam Photo Copyright © 2021 by Karl Meyer

That nothing is because the river downstream below Turners Falls Dam is all but empty. A thin stream of perhaps 1000 cubic feet per second is being dumped over the dam. What should be here, a full three years after the federal license for the hydro site expired, are flows on the order of 5X higher. That water, instead, continues to be dumped into FirstLight’s power canal in order to get an extra peak-priced power jump that puts more money in their coffers and leaves federal trust American shad and federally-endangered shortnose sturgeon starved of migration and spawning flows necessary for them to complete their life cycles in their natural habitats.

For the shad, that fully should now include the 50 miles of open spawning habitat above TF Dam that reaches to Bellows Falls VT and Charlestown NH. But, without water in the DEAD REACH for yet another year, their percentage-prospects for that are in the very low single digits.

The exposed and baking cobbles at Rock Dam, where shortnose sturgeon eggs and early life stage young are supposed to find watery shelter. Photo Copyright © 2021 by Karl Meyer

And, the endangered sturgeon, well, the message from the company is simply–tough luck. Flows at their only documented natural spawning site in the entire ecosystem have be dismal at their Rock Dam nursery and refuge. They were Monday, and Tuesday, and again today. This is a river run by foreigners with no mercy. And, in the midst of all this–in the midst of a a relicensing for facilities whose current license ENDED three spawning seasons back, no one has stepped up for the Connecticut River shortnose sturgeon in their time of greatest need. Another season, another sidestep for federal and state fish and environment agencies who fail to act again… and again. And, just one more year for a river without a single independent watchdog–on the four-state Silvio O. Conte Connecticut River National FISH & Wildlife Refuge.

This is a river that, 174 years after the US Supreme Court made the landmark(1872) environmental decision in HOLYOKE COMPANY v. LYMAN that dam and facility operators must ensure safe upstream and downstream passage for migratory fish, does not even have a single day-to-day attorney, as even the most bare bones watchdog organization would. And the one on this river has been around since Truman was president.

No water, no watchdog, no ESA enforcement. Corporate Canada–which today owns Northfield Mountain and Turners Falls/Cabot operations, has nothing to fear in this “refuge.” And, the other sad irony, not lost on me as I made my way upstream, is that today is the solemn anniversary of the Turners Falls Massacre, the grim genocidal event that wrested sovereignty from Native People in today’s southern New England on May 19, 1676. They were ambushed in the pre-dawn at Peskeomscut, the great falls, because they had come to the banks of a living river that would feed them, offer them water, shelter, and rest as it had for generations past. It was a respite that was not to endure…

Something there yet remains evident today in the starved riverbed. Recovery is still a dream denied to this place. There is yet little life. This a place that awaits healing water that might again make it whole once more.

Today it sits abandoned, reduced to computations and algorithms that see only money and megawatts as a river’s reason to be…

NOTE: Please click on the link below which includes an invitation to the WalK-the-Walk for Endangered Sturgeon to Rock Dam this Saturday. It is important that people show up for the River. Please join myself and others. And please be aware that there is some steep terrain on this walk.

https://wrsi.com/monte/how-to-save-the-shortnose-sturgeon/

A RIVER in HEATSTROKE: A Photo Portrait on July’s Hottest Day

Posted by on 21 Jul 2020 | Tagged as: Clean Water Act, climate-destroying, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Conte National Fish & Wildlife Refuge, endangerd shortnose sturgeon, Endangered Species Act, FirstLight, Great Falls, Peskeomscutt Island, Rock Dam, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Turners Falls dam, Turners Falls power canal, US Geological Survey's Conte Fish Lab, Vermont

A RIVER in HEATSTROKE: A Photo Portrait on July’s Hottest Day
Story and pictures Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

The above photo of the “Great Falls” at Turners Falls was taken at approximately 6:45 am, on July 19, 2020, the hottest day on a boiling-out planet this year. The riverbed below was simply left to bake in this reach until just after 4 pm. (CLICK x 3 to enlarge; BACK ARROW to return)
Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

I continued downstream on this, the most critical and imperiled reach in the entire Silvio O. Conte National Fish & Wildlife Refuge, through the two desperate miles of abused river channal, all the way to the Rock Dam, critical spawning site for the federally endangered Connecticut River shortnose sturgeon.

Locked-down river, starved in front of the “tainter gates” on the Gill side of the river. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


The stilled-water graveyard, just downstream of the TF Dam on the Gill side of the Connecticut. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Starving, de-oxygenated river on the Turner Falls side, looking downstream, with Peskeomscutt Island–now, no longer an island, de-watered and attached by tilted shales to the land. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


The entire flow of the Connecticut (save for a dribble of 125 cubic feet per second mandated to enter from a chute 100 feet downstream of the dam to keep shortnose sturgeon from stranding and dying in the baking pools) is shunted into the muck and sludge accumulating Turners Falls power canal. Pictured here, the canal downstream adjacent to Cabot Woods, back in 2009, the last time it was mucked out by the heavy machinery pictured. (Click x3)
Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


Here is the same area, pictured above, with the shunted Connecticut flow moving listlessly by the sludge-catching silt banks on the morning of July 19, 2020. This is the canal and just part of the grim habitats that ALL migratory fish must must face before emerging upstream of Turners Falls Dam. USGS Conte Fish Lab is visible in the background. Few fish ever manage to survive the puzzled and emerge to spawn in wide open upstream habitats stretching beyond Bellows Falls VT. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Another look from a similar vantage with the Fish Lab in the background and a grim canal substituted for a living river. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


View from the opposite side–from the rail trail, July 19, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


And, lastly, just some of the Campbell’s Tomato Soup-looking sludge bleeding down FirstLight’s failing riverbanks at Cabot Woods–adjacent to their sludge-choked canal, and into the endangered shortnose sturgeon’s Rock Dam spawning site and nursery for developing young on July 19, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


A closer look, 07/19/2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


And another, 07/19/2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED


And, just yards away, the slurry connection–where the grim soup enters the most critically endangered site in the entire river ecosystem: the Rock Dam, on July 19, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

That riverbank soup was already assaulting Rock Dam habitats back in September 2019. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED

Ten months has passed since this photo was taken. The banks continue to fail, the site continues to be assaulted through pollution, and outright neglect and flaunting a ESA protections.
Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED