“Clean, renewable” labels don’t apply

Posted by on 01 Oct 2018 | Tagged as: Ashuelot River, Bellows Falls, blueback herring, canal shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, crippled ecosystem, Dead Reach, ecosystem, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC Commissioner Neil Chatterjee, FERC license, FirstLight, Fish and Aquatics Study Team, fish counts, fish kill, fish kill on the Connecticut, fish passage, fishway windows, Holyoke Fish Lift, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, nuclear power, PSP Investments, Public Law 98-138, pumped storage, Relicensing, resident river fish, Saxtons River, Scott Pruitt, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2018 by Karl Meyer All Rights Reserved.

NOTE: the following piece appeared in VTDigger, www.vtdigger.org in September under the heading “Clean, renewable” labels don’t apply when crippling an ecosystem.”

TERMS OF ENTRAINMENT: a Connecticut River History


NOTE:in this photo are over 170 juvenile shad, among the many thousands killed in the recent de-watering of the Turners Falls Power Canal. The power canal is where the bulk of the Connecticut River is diverted into for most months of the year. So, when they drain it, they are killing the river. However, if you look at this photo and multiply that death toll by 10,000 you begin to get some idea of the mortality counts for young-of-the-year shad entrained annually–and un-tallied across nearly five decades, at the Northfield Mountain Pumped Storage Station. (CLICK, then CLICK twice more to enlarge photos.)

At 2:41 p.m. on May 20, 2018, a lone blueback herring appeared in the windows at Turners Falls Dam among a school of larger American shad. It was a small miracle. Barely a foot long, it was the first blueback here since 2005, and there would not be another this spring. Like those shad, its life had already spanned four springs, swimming thousands of ocean miles in shimmering schools. It re-crossed bays and estuaries of seven states and two provinces before reaching this Connecticut River juncture. In doing so it had survived sprawling drift nets and repeated attacks from sharks, bluefish, spiny dogfish, cormorants, seals and striped bass.

All these fish were seeking to spawn and give their young a head start as far upriver as currents, time and temperature would allow. Unfortunately, five miles upstream sat the Northfield Mountain Pumped Storage Station, a river vacuuming machine capable of out-killing all their natural predators. For the next 20 miles they’d be vulnerable to its impacts.

NMPS has inhaled river fish of all species and sizes daily for nearly half a century. Results from a river sampling study Juvenile Shad Assessment in the Connecticut River, were released in June by the US Fish & Wildlife Service and MA Division of Fisheries & Wildlife. They estimated NMPS’s 2017 operations resulted in losses of some 15 million shad eggs and larvae, plus the deaths of between 1 and 2-1/2 million juvenile shad. That’s for just one species.

On April 20, 1967, years before Northfield was built, federal agencies and four states signed the Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River, agreeing to restore runs of American shad, salmon and blueback herring upstream to Bellows Falls, Vermont and beyond. The migratory shortnose sturgeon had already been listed as endangered. Continuing today under Public Law 98-138, its mandate requires utilization of “the full potential of the fishery resources of the Connecticut River including both anadromous and resident species,” providing “high quality sport fishing,” and meeting “the long term needs of the population for seafood.”

American shad are still commercially fished today just 60 miles downriver. They’ve provided seafood to this valley for ages, yet most people in Vermont, New Hampshire and Massachusetts don’t know they were promised a “just share of the fishery harvest” back in 1967. All remain without, while shad continue to grace dinner and restaurant tables in Connecticut every spring.

Running on imported power via the buy-low/sell-high model, Northfield can suck the river into reverse for up to a mile downstream. It devours everything captured in that vortex at 15,000 cubic feet per second. Think 15,000 milk crates, for hours, to fill a 5 billion gallon mountain reservoir. The result is 100% mortality for all fish entrained. During peak-use and/or peak-price times—or both, it sends the deadened water back through its turbines as twice-produced electricity.

NOTE: more of the TF Canal kill here in another location–including mostly juvenile shad, but also a bluegill, several mud-puppies, and a young sea lamprey. Again, this is just a whisper of the year round fish kill occurring upstream at Northfield Mountain.

Northfield was built to run off Vermont Yankee’s excess nuclear megawatts. But even after VY closed in 2014, its carnage continued, unchallenged, rather than being relegated to emergency use. Having never produced a watt of its own power, its 46 years of accumulating carnage are yet to be tallied. That herring might have been heading for New Hampshire’s Ashuelot or Vermont’s Saxtons River, and those shad were perhaps steering for the Great Eddy at Bellows Falls. Regardless, any progeny would later face Northfield’s net-loss-power impacts heading downriver come fall.

Currently it pumps mostly at night when Canadian owners PSP Investments can purchase cheap electricity to suction the river uphill. Later it’s released as second-hand juice at peak-of-the-day profits. Promoters claim the benefits of dispersed solar and wind power can’t be realized without first relaying their renewable energy across the region to this lethal storage machine for later resale in markets far beyond the Connecticut Valley. “Clean, renewable” labels don’t apply when crippling an ecosystem.

NMPS boosters include (now-former) EPA Director Scott Pruitt, who made a sweetheart visit there last Valentine’s Day along with Federal Energy Regulatory Commissioner Neil Chatterjee. That occurred as PSP was requesting to suction yet more water from the Connecticut and applying for a new long-term FERC license. The next day FERC announced a major policy shift, potentially increasing both Northfield’s daytime use and its profits.

Since an 1872 landmark Supreme Court ruling indemnifying Holyoke Dam, all hydro facilities have been required to safely pass the public’s fish, upstream and down. But that 1967 agreement had this warning: “Based on the present fragmentary data available on the Northfield Mountain Pumped Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae and young fish of both resident and anadromous species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water.” Today the 20 mile reach hosting Northfield remains a migration minefield—while some 30 miles of open Vermont/New Hampshire spawning habitat above Vernon Dam sits essentially empty.

Holyoke Dam has annually lifted hundreds of thousands of shad and herring upstream since the 1970s. In 2017 it recorded its second highest shad numbers ever, 537,000 fish. Each spring, half or more of those shad attempt to pass Turners Falls. Less than 10-in-100 will succeed. Of those, some 50% drop from tallies and are never re-counted at Vernon Dam after entering the 20 miles impacted by Northfield. The blueback herring record at Turners Falls was 9,600 in 1986, out of the 517,000 counted 36 miles downstream at Holyoke that year. Of those 9,600 Turners herrings, just 94 reached Vernon Dam. Turners Falls saw another 7,500 blueback herring in 1991; just 383 reappeared upstream at Vernon.

Any new long-term FERC license must comply with federal and state law protecting endangered and public-trust fish. In seeking a new license, PSP’s main proposal for limiting Northfield’s massive carnage has been the test-anchoring of a few yards of Kevlar netting in the riverbed in front of the plant’s suction-and-surge tunnel. Those flag-sized yards of mesh, after a few months deployment, are supposed to effectively model how a 1,000 foot-long “exclusion net”–deployed seasonally in the river over the next decades, might halt the entrainment deaths of out-migrating adult–and millions of juvenile young-of-the year fish, heading back to the sea. Presumably, Northfield’s mouth would remain wide open to the ecosystem’s fish throughout the rest of the year.

In light of longstanding research the US Fish & Wildlife Service, Atlantic States Marine Fisheries Commission and Connecticut River Atlantic Salmon Commission have set shad passage goals requiring that a minimum of 397,000 pass Turners Falls; and a minimum of 226,000 pass Vernon Dam. It’s a certainty that a new fish lift will be required at Turners Falls under any new license, modeled on the long-term success of Holyoke’s lifts. But the ultimate question is this: can Northfield comply with federal and state law protecting the four-state ecosystem’s fish in order to be granted a new FERC license?

END

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

VALID LICENSE REQUIRED

Posted by on 14 Jun 2018 | Tagged as: 5-year FERC licensing process, American shad, Connecticut River, Connecticut River migratory fisheries restoration, federally-endangered Connecticut River shortnose sturgeion, FERC, Fish and Aquatics Study Team, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, Northfield Mountain Pumped Storage Station, shortnose sturgeon, Society of Environmental Journalists, US Fish & Wildlife Service, USFWS, Vermont

Copyright © 2018 by Karl Meyer

(Note: the following piece appeared under “News Analysis” on the front page of The Montague Reporter‘s May 24, 2018 issue. www.montaguereporter.org)

VALID LICENSE REQUIRED

Is FirstLight Power Resources attempting an end run around the Federal Energy Regulatory Commission relicensing process for its Northfield Mountain Pumped Storage station on the Connecticut River? FirstLight’s parent owner, Canada’s Public Sector Pension Investments, is now offering up use of the giant power re-generation and transfer machine in a bidding process that won’t begin delivering electricity until 2023. The actual bidder is Deepwater Wind, in a partnership with British energy giant National Grid. One option included in their proposal is to relay clean, renewable wind power generated off Martha’s Vineyard, 125 miles across New England to be stored for peak-price regeneration back into the grid at Northfield. This offer is being floated despite the fact that NMPS won’t have a new FERC license requiring long-overdue river protections under federal and state environmental law until at least mid-2019.


Above: surface boom on the Connecticut at the intake of the Northfield Mountain Pumped Storage Station which inhales the river at 15,000 cubic feet per second for hours on end. Results are the “functional extirpation” of all aquatic life pulled in–ultimately shot twice through the turbines on a Northfield Mountain sleighride. It’s sucking vortex reaches over halfway across the Connecticut. (Click, click again, and AGAIN to enlarge).

For 46 years Northfield Mountain has lived off the Connecticut River, its operations subsidized at public expense by the host of deadened aquatic life it chokes from a four-state ecosystem. Just days from now Massachusetts officials are expected to choose among a handful of proposals for the future delivery of up to 1600 future megawatts of “clean, renewable” wind power. But would an agreement including NMPS be legal and binding without a full vetting and understanding of those future license requirements for coming decades? Wouldn’t it be subject litigation by the state and federal agencies now working on studies and agreements for that license? Is there any connection to this proposal with the all-but-secret Valentine’s Day visit by embattled EPA chief Scott Pruitt and FERC Commissioner Neil Chatterjee with NMPS officials?

There’s great irony in this proposed “clean energy” marriage-of-convenience, given that NMPS virtually kills all life it encounters by sucking the Connecticut backward, aside and uphill at the ponderous rate of 15,000 cubic feet per second. Think 15,000 milk crates each second for hours at a time. Everything from tiny fish eggs to adult resident and migratory fish get sent on a two mile-long Northfield Mountain sleigh ride, twice through the turbines. The accepted term for everything drawn into that suction cone is “functionally extirpated.” Dead.

In 2010, Northfield sat stilled and broken for over half a year–sanctioned by the EPA for gross violation of the Clean Water Act and its FERC operating license. The region’s electric grid held together just fine, while American shad passage success skyrocketed at Turners Falls dam toward Vermont and New Hampshire. That migration run, profoundly impacted by NMPS operations, soared to 700 percent above the decade’s yearly averages.

Northfield’s extreme environmental downsides should render it an ineligible option for long-term, wind power storage at this time. A half decade from now, new distributed electricity generation and state-of-the-art micro-grid storage options will be standard configurations for combating the security risks of bulk grid power storage and climate disruption in energy delivery. Unlike pumped storage, these options will feature the instantaneous, millisecond reaction and response times necessary to balance computer-age power glitches.

Northfield, a one-trick pony, is a bulk system designed long ago to profit from a buy-low/sell-high scheme by running off the cheap, overproduced megawatts cranked out by the now-closed Vermont Yankee nuclear plant. In 2016, in the midst of relicensing, Canada’s PSP Investments became NMPS’s third venture capital purchaser in just over a decade. Today it runs on fossil fuel-produced electricity as it sucks massive gulps of the Connecticut into its 5 billion gallon reservoir. A hike to that reservoir will illustrate what the stilled-water sound of a silent spring is.

Little was known about Northfield’s deadly future when its construction began in 1967, in tandem with Vermont’s only nuclear plant. Despite that black hole, this plant that can literally suck the Connecticut into reverse for a mile downstream under low flow conditions began operating just 10 miles from the Vermont/New Hampshire border in 1972. The Federal Power Commission granted it what became a license to kill at public expense—without a basic knowledge of its crippling impacts on shad and blueback herring under the 1965 Anadromous Fish Conservation Act, or its role in imperiling the spawning success of the federally-endangered Connecticut River shortnose sturgeon under the Endangered Species Act.

When demand and prices are high, NMPS sends its deadened river water back downhill through the turbines again, cranking out a few hours of peak-priced, secondhand electricity in a final juicing of all it’s inhaled. That net-energy-loss process is wholly subsidized by mining the life from critical reaches of a four-state ecosystem. Once its reservoir is emptied, NMPS itself is literally dead in the water, and must import new, virgin electricity to begin the process again. Northfield is an energy consumer and will never produce a single watt of its own power. The more often it runs the more river life it will kill into the future.

FirstLight/PSP Investments would do well to understand their giant electric appliance cannot be relicensed without stakeholders–from federal and state fisheries agencies to the Federal Energy Regulatory Commission, ensuring a new license adheres to all federal and state environmental laws of the United States. Without a signed license, Bay State officials should leave this proposal on the table. There are other fish in the sea.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

ONE WILDLY ILL-ADVISED RIDE

Posted by on 31 Jul 2016 | Tagged as: AMC, American Whitewater, Appalachian Mountain Club, Connecticut River Atlantic Salmon Commission, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, CRWC, Dead Reach, Dr. Boyd Kynard, EOEEA, Executive Office of Energy and Environmental Affairs, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, Fish and Aquatics Study Team, GDF-Suez FirstLight, Jack Buckley, John Bullard, MA Division of Fish and Wildlife, NMFS, NOAA, Regional Director of the National Marine Fisheries Service, Secretary Matthew Beaton, Society of Environmental Journalists, University of Massachusetts, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Wendi Weber

The following piece appeared in The Recorder, www.recorder.com on July 30, 2016, under the heading, “Rafting over prime sturgeon habitat unwise; State officials need to be smarter.”

Copyright © 2016 by Karl Meyer

ONE WILDLY ILL-ADVISED RIDE

A photo from May 25, 2016 posted on American Whitewater’s website shows Massachusetts’ Secretary of the Executive Office of Energy and Environmental Affairs Matthew Beaton and his staff lumbering across a small run of Connecticut River whitewater on a large raft. The short rapid they just surfed over is at a place called Rock Dam. It drops directly into a small, crescent-shaped pool–the sole natural spawning and nursery site for the federally-endangered Connecticut River shortnose sturgeon.

That Turners Falls site is the last place you’d want to see the Commonwealth’s highest environmental official rafting in May. Rock Dam is critical habitat for survival of the river’s most endangered migratory fish. There’s no other place like it in the ecosystem. It’s also where the state-endangered yellow lamp mussel was last recorded in this reach. Ecological protection is key to preserving the natural heritage there for future generations.

Why Secretary Beaton was at Rock Dam on the heels of the state’s failure to protect endangered timber rattlesnakes in their remaining habitat is a puzzlement. That site is literally where the Connecticut has long been left for dead. Each spring it is alternately starved and inundated—making spawning and survival of young for shortnose sturgeon nearly impossible. Rapid pumped storage hydro fluctuations also help make successful upstream passage for wild American shad, sea lamprey, and blueback herring a 1-in-10 proposition above Turners Falls.

The EOEEA was joyriding on “test” flows returned there specifically for environmental protection. They were meant to allow wild fish to reenter critical habitats where they might successfully gather; then spawn—in a natural pool that would subsequently nurture developing young in critical weeks lasting through mid-June. Those flows were delineated by John Bullard, Regional Director of the National Marine Fisheries Service, to not drop below minimum thresholds that would drive spawning sturgeon out. NMFS mandated the higher limits through June 3rd to ensure sturgeon had sufficient time there. That meant healing water for the most impoverished 2.7 miles of habitat on the entire 410 mile Connecticut.

The shortnose is a dinosaur-age fish—a yard-long creature with a shark-like tail and toughened leathery “scutes” instead of spindly scales. It’s the second species listed under the Massachusetts Endangered Species Act, and the most exhaustively studied endangered migratory fish in the river. It has long had a federal recovery plan, one now including the boatload of science documenting building blocks necessary for its survival. None call for boaters bashing over them during spawning gatherings, or beaching in shallows where developing embryos shelter. If this iconic fish is ever to begin the road back from the brink of extinction, mandated protections and uninterrupted flows are critical at Rock Dam.

Dr. Boyd Kynard, formerly of the US Fish & Wildlife Service, the USGS Conte Lab and UMass, led the 17 years of studies that documented Rock Dam as the species’ sole natural spawning site in the ecosystem. He recently stated, “As to protection of the pre-spawning, spawning, and rearing area at Rock Dam, exclusion dates for boating should be the same as the dates for water flow, 15 March to 15 June.”

A “watered” Rock Dam had long-offered sturgeons a wide choice of depths and flow levels they could selectively adjust, and readjust to, when natural surface flow or river temperatures fluctuated beyond optimal conditions for spawning. And that cobble and sand pool was ideal for dispersing tiny eggs and young. Only when flow is present does Rock Dam regain its function as an ancient species shelter, protecting early life stages in currents circulating through cobbled shoals.

In the current 5-year Federal Energy Regulatory Commission relicensing process that will govern hydro operations and ecological conditions here for decades, the Connecticut River Watershed Council and Appalachian Mountain Club are jointly advocating new access points into this delicate habitat for whitewater interests. Both have sat at FERC hearings where Rock Dam has been delineated as critical habitat. In joint AMC-CRWC testimony to FERC they’ve argued their interests in increased flows stem from aquatic habitat concerns, as well as recreation desires. Yet it was AMC that posted dates of those ecological study flows to their website, urging whitewater enthusiasts to exploit them: “Fish Study to Provide Paddling Opportunities: May – June 2016”

Secretary Beaton needs better advice.

Several expert appointees represent the Commonwealth on the Connecticut River Atlantic Salmon Commission. Jack Buckley, Director of MA Fisheries and Wildlife studied Connecticut River shortnose sturgeon at UMass. Mr. Buckley’s Anadromous Fish Project Leader Caleb Slater is also well versed on critical Rock Dam habitat. And the US Fish & Wildlife’s Region 5 Director Wendi Weber also sits at that CRASC table. Dr. Weber studied shortnose sturgeon in Georgia’s rivers. Ultimately, turning a failing Connecticut River migratory fisheries restoration in Massachusetts into a success story will require government leaders embracing solid government science.

Karl Meyer is on the Fish and Aquatics Study Team for FERC hydro-relicensing studies of the Turners Falls and Northfield Mountain Pumped Storage projects. He is a member of the Society of Environmental Journalists.

Stakeholder PROTEST of FERC Revised Study Plan finding endangering Connecticut River shortnose sturgeon

Posted by on 07 Mar 2016 | Tagged as: Connecticut River shortnose sturgeon, Dead Reach, Dr. Boyd Kynard, endangerd shortnose sturgeon, Endangered Species Act, ESA, Extinction, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Secretary Kimberly Bose, US Fish & Wildlife Service, USFWS

(The following Stakeholder testimony was submitted to FERC on March 4, 2016)

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 March 4, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.

Though my FERC Stakeholder comments of January 28, 2016 specifically addressed this ESA issue, FirstLight did not respond to the endangerment issue in its RSP revisions. Further, I had made this issue clear to FirstLight and its agents, FERC staff, and key stakeholder agencies in an email delivered on January 20, 2016. I again reiterated the endangered species impacts to those same parties in an email delivered on February 24, 2016. Madam Secretary, I again made my concerns about spawning interference and failure to you and for the FERC record in a letter delivered February 26, 2016. All are available for perusal in the FERC record for P-2485 and P-1889.

Shortnose sturgeon gather at this spawning and nursery site annually between April 22 and May 25 for pre-spawning and spawning. Further, the complex of key biological characteristics of flow, varying depths, and cobble/sand habitat provide SNS with protective options that nurture developing Young of the Year throughout June into July.

According to 17 years of published studies at that site documented by Dr. Boyd Kynard and research colleagues, a continuous minimum flow of 2500 cfs is required to protect sturgeon spawning and rearing at this site. Therefore, I PROTEST the findings of the FERC Revised Study Plan determination issued by FERC on February 25, 2016, and request that only continuous protective minimum flows of 2500 cfs be allowed in this study, and throughout the 2016 SNS spawning and rearing season, as well as all ensuing springs.

The following publication has been referenced in the FERC ILP for these projects by both federal and state stakeholder agencies, FERC, as well as FirstLight and their agents.

“LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4

“Effect of hydroelectric operations on spawning”

Page 101, bottom: “During the 11 yr spawning failed (excluding the failed migration in 2002), when discharge levels were too low for 5 yr and too high for 4 yr. During one yr (2007), discharge during April was both to low and too high. When spawning failed at RockD due to low discharge during 4 yr (1995, 1998, 1999, and 2006)m discharge decreased to <70 m3 s-1 for at least 4 d by 30 April (Fig. 14), the earlier period of low discharge likely marked a threshold making the RockD unattractive to spawning fish.”

Further published data, tables, and required flows necessary in this reach appear on pages 101-102 of LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEIONS.

I would welcome a FERC hearing on this critical ESA issue and would make myself available for testimony. Thank you for your attention to this pressing matter.

Sincerely,
Karl Meyer
Fish and Aquatics Study Team, P-2485 and P-1889

Cc’d via email to:
Brandon Cherry, FERC
James Donohue, FirstLight
Julie Crocker, NOAA
John Warner, USFWS
Caleb Slater, MA Division of Fisheries & Wildlife

FERC sanctions crippling flows for federally-endangered Connecticut River shortnose sturgeon

Posted by on 01 Mar 2016 | Tagged as: 5-year FERC licensing process, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NOAA, US Fish & Wildlife Service

The following Stakeholder Comments concerning proposed study flows that will wipe out this season’s spawning for federally-endangered Connecticut River shortnose sturgeon at their only documented natural spawning site in the river system were submitted to FERC Secretary Cheryl on Friday, February 26, 2016. They include comments submitted on Wednesday, February 24, 2016 to FERC staff, federal and state fisheries agents responsible for endangered species protection, and FirstLight–who proposed to include the crippling 1500 cfs(cubic feet per second) flows in FERC-ordered Study 3.3.19.

On Thursday, February 24, 2016, Vince E. Yearik, FERC Director of the Division of Hydropower directed FirstLight’s James Donohue that the ruinous 1500 cfs flows will be allowed at the Connecticut River shortnose sturgeon’s only documented natural spawning site in the spring of 2016.

My Stakeholder Comment letter, on the FERC official record for P-2485 and P-1889, is directly below.

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 February 26, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485

Dear Secretary Bose,

The comments below respecting federally-endangered Connecticut River shortnose sturgeon and Study 3.3.19 were delivered via email to GDF-Suez FirstLight�s James Donohue, FERC staff including Brandon Cherry, and Caleb Slater(MA), Julie Crocker(NOAA), and John Warner(USFWS) on 2/24/2016.

Thank you,
Karl Meyer

Dear Chris et al,
I commented to you and in the FERC record on your RSP for Study 3.3.19, the Ultrasound Study in P-2485 and P-1889, to repel fish from Cabot Tailrace. Since I was somehow left off the email list in the �call for comments� that went out on 2/11/2016, I will take the opportunity to comment at this time.
In your newly-revised RSP you failed to reply to this comment of mine in particular:

�The final week should be at a minimum of 2,500 CFS�which, as FL has indicated in their response to a new Stakeholder Study suggested at the Rock Dam for shortnose sturgeon spawning: 2,500 CFS is the absolute minimum, uninterrupted flow necessary through the Bypass from April 25 � May 22, in order to not interfere with the spawning of a federally endangered species at Rock Dam. In their response, FL cited �Kynard� et al. Minimum flows to keep SNS embryos and eggs motile, watered, and viable are required there throughout the month of June.�

FirstLight has now indicated it intends to use test flows including 1500 cfs in its Ultrasound Study. This is unacceptable, as data shows this will harm a federally endangered species, the Connecticut River shortnose sturgeon. FirstLight has cited Kynard, Kieffer et al; Life History and Behaviour of the Connecticut River shortnose and other sturgeons, in their official FERC comments. Both FERC and the agencies are in possession of the scientific study data contained therein. An examination of Chapter 3 and the �Effects of hydroelectric operations on spawning� makes it quite clear that 2500 cfs is the minimum continuous flow needed to allow females to sustain a presence at the site and complete successful spawning. Flows go below that level�and 1500 cfs is far below that required threshold, will cause sturgeon spawning to fail.

A continuous flow of 2500 cfs is the only protective flow that should be allowed in the Ultrasound Study�it is also necessary throughout the month of June to protect the Early Life Stages of shortnose sturgeon. Please make the required modifications, as I�m certain the agencies and FERC will not give you license to run afoul of the federal Endangered Species Act, as well as similar state statutes.
A review of the FERC record, as well as your proposed Revisions for 3.3.19 are included below. Thanks.
Best,
Karl Meyer,
Fish and Aquatics Study Team

In 2015, FERC agreed with FirstLight and rejected requested snorkeling studies to determine the fish assemblage in the By Pass Reach out of an abundance of caution for impacts they might have on federally-endangered shortnose sturgeon whose only documented natural spawning site is the Rock Dam Pool in that reach.
Though the record clearly misstates that that snorkeling survey request was for the By Pass Reach downstream of Turners Falls Dam�written as �downstream of Cabot Station�, the protected status and determination to �do no harm� was quite clear in FERC�s reply. Excerpts from FERC Staff directly below.
From 01/22/2015, FERC Study Modifications Determination Letter

Study 3.3.11 – Fish Assemblage Assessment
�Requested Study Modifications

The U.S. Fish and Wildlife Service (Interior) proposes modifying the study to require FirstLight to conduct snorkeling surveys in the reach downstream of Cabot Station, in order to avoid all effects on shortnose sturgeon during the spawning season. The Nature Conservancy and Karl Meyer support Interior�s proposed study modification.

Comments on Requested Study Modifications

To avoid all effects on shortnose sturgeon during the April-June period in the reach downstream of Cabot Station, FirstLight states that it will rely on sampling from the project impoundment, sampling of the reach downstream of Cabot Station during other times of the year (after June 30), and existing data from a 2009 electrofishing survey of the area downstream of Cabot Station.

Discussion and Staff Recommendation

The goal of this study is to provide general information on fish species that are present in the impoundment and in the river downstream of the dam and Cabot Station. Based on the description in the modified study plan, FirstLight�s proposed method will provide information on species occurrence, species distribution, relative abundance, and habitat associations that will adequately describe the existing fish community. Because FirstLight�s proposed methods would achieve the goals of the study while avoiding effects on spawning sturgeon, we conclude that snorkeling is not necessary and the study plan filed with the ISR should be approved without modification.�

And�FirstLight�s current revised flow plan for 3.3.19:

�This study would establish a high frequency sound (ultrasound) array across the entire Cabot Station tailrace and determine the effect of the ensonified field on upstream migrating shad moving by Cabot Station. Bypass reach test flows during the study will include flows of 1,500 cfs, 2,500 cfs and 4,400 cfs. These flows will be released depending on river flow conditions. When possible, flows will alternate with the array on for one day then off for one day at 1,500 cfs, followed by one day on and one day off at 2,500 cfs, then one day on and one day off at 4,400 cfs. This sequence will be repeated throughout the study depending on river flow. The field study will include two components: a) DIDSON count of shad entering the Cabot fish ladder and b) detection of telemetered adult shad to determine their movements after they encounter the sound field.�

FERC Stakeholder comments: Turner Falls Canal ultrasound study

Posted by on 06 Feb 2016 | Tagged as: American shad, Cabot Station, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, endangerd shortnose sturgeon, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, Fish and Aquatics Study Team, GDF-Suez FirstLight, Northfield Mountain Pumped Storage Station, Relicensing, Revised Study Plan, Rock Dam, Rock Dam Pool, Secretary Kimberly Bose, shad, Station 1, Turners Falls, Turners Falls dam, Turners Falls power canal

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
January 28, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, ILP for Turners Falls/Cabot Station and the Northfield Mountain Pumped Storage Project

Dear Secretary Bose,

The following comments pertain to an RSP and failures on the part of FirstLight Hydro Generating Company in following FERC’s SDL on Study 3.3.19 and Study 3.3.2. They were shared with FirstLight’s team and FERC’s Brandon Cherry on January 20, 2016:

As one of the requesters for an ultrasound study at Cabot Station, here are my comments, suggestions and observations for ways to gain the best applicable results from Study 3.3.19-Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace.

Unfortunately, FirstLight has not provided Stakeholders with any preliminary findings from the telemetry data gathered in Study 3.3.2, which would be a great help in addressing any changes or improvements needed for a successful 3.3.19 Ultrasound Study.

As stated in their Study Determination Letter under Discussion and Staff Recommendations, FERC was very clear that 3.3.2 information on: (1) “delay,” (2) “bypass flows,” and (3) “effects of Station 1 operations on upstream shad migrations,” be brought over and included in the design recommendations for 3.3.19:

“These evaluation data can be used to inform the methods and design of this study (e.g., ultrasound array design, layout, and placement; array testing at appropriate bypass flows) (section 5.9(b)(6)).”

FERC further stated in their SD Letter to FirstLight, “The amended study 3.3.19 should address stakeholder comments and recommendations. If FirstLight does not adopt a recommendation, FirstLight should provide its reasoning based on project-specific circumstances (e.g. Study 3.3.2 results).”

Revised Study Plan 3.3.19 ignores FERC’s guidance on the inclusion and application of “bypass flows” and “effects of Station 1 operations on upstream shad migrations” in its design. Neither key issue is addressed in their proposal. Bypass flows, which are key to any application of acoustic guidance to keep shad moving upstream in the Bypass, are not included at all. Stakeholders originally requested this Study be done for two years, with bypass flows tested throughout.

Further, the only mention of Station 1 is in a footnote, without any reference to testing its effects “on upstream shad migration operations.” FirstLight merely notes that hourly data on discharges at that site will be included—with no insight on how that data would be applicable if fish are not monitored for migratory delay, with and without flows, emanating from that site.

Since the thrust of the Study is aimed at getting fish up through the Bypass, I question why just three monitoring sites are suggested to be deployed upstream of Cabot Station itself.

• Sonic guidance at Cabot should be deployed in such a way that it encourages upstream movement as much as possible—and avoids biasing fish movements toward downstream retreat. It should also be deployed in a way that, when in ON mode, it also ensonnifies the entrance to Cabot Ladder, as the thrust of the study is to have fish avoid the power canal.

• Ensonification should NOT be engaged in two hour increments, as this would likely be a source of stress and disorientation for fish. Employ the tests in 24 hour cyles, one full day on, one full day off.

• Data should also be provided on the hourly operation and number of gates open at the Emergency Spill Gates off the Canal at Cabot.

• I’d suggest removing the monitor upstream of the mouth of the Deerfield and placing it at the Rock Dam pool, a site where shad–and anglers have a historic presence in the Bypass. The agencies, as well as the anglers, are concerned with finding out where fish gather and stall in this reach on their way northern MA, VT, and NH.

• Another monitor needs to be placed at Station 1, another known fishing site. I interviewed a fisherman there last year with Station 1 running. There were scores of fish visible, treading water in the outflow. He flatly said there are “always shad here” when Station 1 is generating.

• Station 1 should be monitored and switched On and Off in tandem with the Cabot ensonification to highlight impacts, false attraction, drop-backs to Rock Dam and elsewhere, and delays.

• Flow data, hours and number of units in operation, and any interruptions in flow at Station 1 should be included in the Study.

• Several more monitors need to be deployed at the Dam and the Spillway entrance to capture the early, freshet aggregation of fish there—as this is what’s at the core of this study.

• Given that this study will only have one sampling season, it is vitally important that it has enough reach to be applicable for informing a hydro-relicensing that may remain in place for two decades. One month testing and data collection is needed at minimum.

• Further, given the “drop out” rate for handled fish, the number of tagged fish included from FirstLight’s consultants should be doubled to 200, in order to have an acceptable sample entering the project reach.

• Test flows from May 15th through mid-June: two weeks at 5,000 CFS; third week at 4,000 CFS. The final week should be at a minimum of 2,500 CFS—which, as FL has indicated in their response to a new Stakeholder Study suggested at the Rock Dam for shortnose sturgeon spawning: 2,500 CFS is the absolute minimum, uninterrupted flow necessary through the Bypass from April 25 – May 22, in order to not interfere with the spawning of a federally endangered species and be subject to court action. In their response, FL cited “Kynard” et al. Minimum flows to keep SNS embryos and eggs motile, watered, and viable are required throughout the month of June.

Thank you,
Karl Meyer, Fish & Aquatics Study Team