The Broken Connecticut

Posted by on 09 Oct 2018 | Tagged as: American shad, Clean Water Act, Connecticut River, Connecticut River ecosystem, EPA, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, pumped storage, Relicensing, shad, Uncategorized


Copyright © 2018 by Karl Meyer. All Rights Reserved

Eight years ago, almost to the day, this is how the Connecticut River in front of the Northfield Mountain Pumped Storage intake looked. (Click, then Click twice more)

The owners were under sanction from the EPA and had been scrambling for months to suction the mountain of reservoir silt they’d illegally dumped directly into the Connecticut after massively botching their reservoir de-watering and clean-out.Northfield remained inoperable from May 1st through early November. To minimize the reactivation of silt they’d already fouled the river with, they set up a ponderously long silt curtain–supposed to keep their gunk in place. Below, is how their silt-safety set-up looked on July 20, 2010 (Click, the Click twice more)

However, if you look at how effectively that sanctioned-solution was when employed-by–and deployed by the company, you would have to look at this photo below from October 2, 2010. (Click, then Click twice)

The sole solution FirstLight has proposed in these FERC proceedings to prevent the suctioning deaths of millions of juvenile shad–and that’s disregarding their round-the-year evisceration of adult and young fish of dozens of species, is to place a barrier net across the mouth of their giant suction and slice pumped storage contraption. This, for the next several decades, would be like putting a band-aid on a massively severed artery. If they couldn’t keep a net in place in the river when Northfield was sanctioned NOT pumping at all, what gives anyone the idea that this bit of window dressing will be of any service to a broken river system at all.

Since FirstLight is proposing to suck more water out of the river to suck into that reservoir, why not trade that money-making scheme for having NFMT shut down at key seasons to comply with the law and protect the Public Trust.

In delivering the 1872 Supreme Court’s decision in Holyoke Company vs. Lyman, Justice Nathan Clifford entered the following into his decision:

“Ownership of the banks and bed of the stream, as before remarked, gives to the proprietor the exclusive right of fishery, opposite his land, as well as the right to use the water to create power to operate mills, but neither the one nor the other right nor both combined confer any right to erect obstructions in the river to prevent the free passage of the fish up and down the river at their accustomed seasons.”

In deciding against the dam owners who had repeatedly refused to construct fish passage at their dam as settled law in the Commonwealth had long required, the Court made upstream and downstream passage of the public’s fish a precedent and legal right in rivers throughout the United States.

“Fish rights below a dam, constructed without passageways for the fish, are liable to be injured by such a structure as well as those owned above the dam, as the migratory fish, if they cannot ascend to the head waters of the stream at their accustomed seasons will soon cease to frequent the stream at all, or in greatly diminished numbers.”

“Clean, renewable” labels don’t apply

Posted by on 01 Oct 2018 | Tagged as: Ashuelot River, Bellows Falls, blueback herring, canal shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, crippled ecosystem, Dead Reach, ecosystem, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC Commissioner Neil Chatterjee, FERC license, FirstLight, Fish and Aquatics Study Team, fish counts, fish kill, fish kill on the Connecticut, fish passage, fishway windows, Holyoke Fish Lift, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, nuclear power, PSP Investments, Public Law 98-138, pumped storage, Relicensing, resident river fish, Saxtons River, Scott Pruitt, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2018 by Karl Meyer All Rights Reserved.

NOTE: the following piece appeared in VTDigger, www.vtdigger.org in September under the heading “Clean, renewable” labels don’t apply when crippling an ecosystem.”

TERMS OF ENTRAINMENT: a Connecticut River History


NOTE:in this photo are over 170 juvenile shad, among the many thousands killed in the recent de-watering of the Turners Falls Power Canal. The power canal is where the bulk of the Connecticut River is diverted into for most months of the year. So, when they drain it, they are killing the river. However, if you look at this photo and multiply that death toll by 10,000 you begin to get some idea of the mortality counts for young-of-the-year shad entrained annually–and un-tallied across nearly five decades, at the Northfield Mountain Pumped Storage Station. (CLICK, then CLICK twice more to enlarge photos.)

At 2:41 p.m. on May 20, 2018, a lone blueback herring appeared in the windows at Turners Falls Dam among a school of larger American shad. It was a small miracle. Barely a foot long, it was the first blueback here since 2005, and there would not be another this spring. Like those shad, its life had already spanned four springs, swimming thousands of ocean miles in shimmering schools. It re-crossed bays and estuaries of seven states and two provinces before reaching this Connecticut River juncture. In doing so it had survived sprawling drift nets and repeated attacks from sharks, bluefish, spiny dogfish, cormorants, seals and striped bass.

All these fish were seeking to spawn and give their young a head start as far upriver as currents, time and temperature would allow. Unfortunately, five miles upstream sat the Northfield Mountain Pumped Storage Station, a river vacuuming machine capable of out-killing all their natural predators. For the next 20 miles they’d be vulnerable to its impacts.

NMPS has inhaled river fish of all species and sizes daily for nearly half a century. Results from a river sampling study Juvenile Shad Assessment in the Connecticut River, were released in June by the US Fish & Wildlife Service and MA Division of Fisheries & Wildlife. They estimated NMPS’s 2017 operations resulted in losses of some 15 million shad eggs and larvae, plus the deaths of between 1 and 2-1/2 million juvenile shad. That’s for just one species.

On April 20, 1967, years before Northfield was built, federal agencies and four states signed the Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River, agreeing to restore runs of American shad, salmon and blueback herring upstream to Bellows Falls, Vermont and beyond. The migratory shortnose sturgeon had already been listed as endangered. Continuing today under Public Law 98-138, its mandate requires utilization of “the full potential of the fishery resources of the Connecticut River including both anadromous and resident species,” providing “high quality sport fishing,” and meeting “the long term needs of the population for seafood.”

American shad are still commercially fished today just 60 miles downriver. They’ve provided seafood to this valley for ages, yet most people in Vermont, New Hampshire and Massachusetts don’t know they were promised a “just share of the fishery harvest” back in 1967. All remain without, while shad continue to grace dinner and restaurant tables in Connecticut every spring.

Running on imported power via the buy-low/sell-high model, Northfield can suck the river into reverse for up to a mile downstream. It devours everything captured in that vortex at 15,000 cubic feet per second. Think 15,000 milk crates, for hours, to fill a 5 billion gallon mountain reservoir. The result is 100% mortality for all fish entrained. During peak-use and/or peak-price times—or both, it sends the deadened water back through its turbines as twice-produced electricity.

NOTE: more of the TF Canal kill here in another location–including mostly juvenile shad, but also a bluegill, several mud-puppies, and a young sea lamprey. Again, this is just a whisper of the year round fish kill occurring upstream at Northfield Mountain.

Northfield was built to run off Vermont Yankee’s excess nuclear megawatts. But even after VY closed in 2014, its carnage continued, unchallenged, rather than being relegated to emergency use. Having never produced a watt of its own power, its 46 years of accumulating carnage are yet to be tallied. That herring might have been heading for New Hampshire’s Ashuelot or Vermont’s Saxtons River, and those shad were perhaps steering for the Great Eddy at Bellows Falls. Regardless, any progeny would later face Northfield’s net-loss-power impacts heading downriver come fall.

Currently it pumps mostly at night when Canadian owners PSP Investments can purchase cheap electricity to suction the river uphill. Later it’s released as second-hand juice at peak-of-the-day profits. Promoters claim the benefits of dispersed solar and wind power can’t be realized without first relaying their renewable energy across the region to this lethal storage machine for later resale in markets far beyond the Connecticut Valley. “Clean, renewable” labels don’t apply when crippling an ecosystem.

NMPS boosters include (now-former) EPA Director Scott Pruitt, who made a sweetheart visit there last Valentine’s Day along with Federal Energy Regulatory Commissioner Neil Chatterjee. That occurred as PSP was requesting to suction yet more water from the Connecticut and applying for a new long-term FERC license. The next day FERC announced a major policy shift, potentially increasing both Northfield’s daytime use and its profits.

Since an 1872 landmark Supreme Court ruling indemnifying Holyoke Dam, all hydro facilities have been required to safely pass the public’s fish, upstream and down. But that 1967 agreement had this warning: “Based on the present fragmentary data available on the Northfield Mountain Pumped Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae and young fish of both resident and anadromous species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water.” Today the 20 mile reach hosting Northfield remains a migration minefield—while some 30 miles of open Vermont/New Hampshire spawning habitat above Vernon Dam sits essentially empty.

Holyoke Dam has annually lifted hundreds of thousands of shad and herring upstream since the 1970s. In 2017 it recorded its second highest shad numbers ever, 537,000 fish. Each spring, half or more of those shad attempt to pass Turners Falls. Less than 10-in-100 will succeed. Of those, some 50% drop from tallies and are never re-counted at Vernon Dam after entering the 20 miles impacted by Northfield. The blueback herring record at Turners Falls was 9,600 in 1986, out of the 517,000 counted 36 miles downstream at Holyoke that year. Of those 9,600 Turners herrings, just 94 reached Vernon Dam. Turners Falls saw another 7,500 blueback herring in 1991; just 383 reappeared upstream at Vernon.

Any new long-term FERC license must comply with federal and state law protecting endangered and public-trust fish. In seeking a new license, PSP’s main proposal for limiting Northfield’s massive carnage has been the test-anchoring of a few yards of Kevlar netting in the riverbed in front of the plant’s suction-and-surge tunnel. Those flag-sized yards of mesh, after a few months deployment, are supposed to effectively model how a 1,000 foot-long “exclusion net”–deployed seasonally in the river over the next decades, might halt the entrainment deaths of out-migrating adult–and millions of juvenile young-of-the year fish, heading back to the sea. Presumably, Northfield’s mouth would remain wide open to the ecosystem’s fish throughout the rest of the year.

In light of longstanding research the US Fish & Wildlife Service, Atlantic States Marine Fisheries Commission and Connecticut River Atlantic Salmon Commission have set shad passage goals requiring that a minimum of 397,000 pass Turners Falls; and a minimum of 226,000 pass Vernon Dam. It’s a certainty that a new fish lift will be required at Turners Falls under any new license, modeled on the long-term success of Holyoke’s lifts. But the ultimate question is this: can Northfield comply with federal and state law protecting the four-state ecosystem’s fish in order to be granted a new FERC license?

END

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

CAN NEW ENGLAND’S GREAT RIVER SURVIVE MORE DECADES OF PUMPED STORAGE GENERATION?

Posted by on 12 Mar 2017 | Tagged as: 5-year FERC licensing process, American shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Dr. Boyd Kynard, ecosystem, endangerd shortnose sturgeon, EPA, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC licensing process, FirstLight, Montague Reporter, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Vermont Digger, vtdigger.org, WBUR

NOTE: The following piece first appeared on the website of vtdigger.org in late February. It also appeared in print in the Montague Reporter, montaguereporter.org in early March.

Copyright © 2017 by Karl Meyer

Can New England’s Great River survive more decades of pumped storage generation? Long-term FERC licensing could lock out new river-sparing energy storage choices.

Dr. Boyd Kynard, retired federal expert on the Connecticut River’s migratory fish and endangered shortnose sturgeon, tells a story about bass fishing in Massachusetts around 1990. He was drifting near the French King Bridge, a mile downstream of the Northfield Mountain Pumped Storage Station’s subsurface tunnels when he glanced up and realized his boat had switched directions. It was being pulled upstream, “And at a pretty good clip.” Turbines at that Northfield MA plant had sucked New England’s river into reverse for at least a mile. This was nothing new, save that in this instance there was a daytime witness.

October 2, 2010, EPA ordered dredging at the site of Northfield Mountain Pumped Storage Station’s underground suction tunnels on the Connecticut.(CLICK TO ENLARGE, THEN CLICK AGAIN.)

In December a radio feature from Boson’s WBUR entitled “New England’s Largest Battery is Hidden Inside a Mass. Mountain” was rebroadcast widely in the Northeast. Referencing Ben Franklin, James Bond, even the Bat Cave, it painted a rosy future for the 1200 quick-start megawatts stored in a reservoir at the Northfield Mountain Pumped Storage Station. Roaring turbines were noted as company spokespeople staked claim to the plant’s “green” future as they bid to lock-in a new 50 year Federal Energy Regulatory Commission license. The occasional ring of an old phone connected directly to ISO New England–the grid’s “independent system operator,” was described as “the sound of money.”

Altogether missing in that story was NMPS’s violent mining of the Connecticut River. That ecosystem artery was never identified as the sole water source enabling it to regenerate electricity. Prior to Northfield construction the Connecticut had forever run seaward from the Canadian border to the tidal zone near today’s Hartford, CT. But 12,000 years of New England natural history changed in 1972, on the day NMPS came on line.

On January 22, 1974, two years after it began operation using overproduced nuclear megawatts then available on the grid at night to fill a 5 billion gallon reservoir, the Federal Power Commission (today’s FERC) notified Western Massachusetts Electric Company it required their “earliest response” on Northfield’s impacts for a Draft Environmental Impact Statement: “Since the Northfield Mountain Project became operational, which of the conditions described have been observed to produce reverse flows?” WMECO’s lawyers belatedly replied on October 16, 1974, they didn’t have the information. Questions about environmental impacts and reversing rivers went unanswered.

In 1967 a federal Connecticut River migratory fisheries program to restore American shad to historic upstream reaches in Vermont and New Hampshire got underway. That same year the embattled Connecticut River shortnose sturgeon was listed under the Endangered Species Act. Exactly fifty years later recovery goals for hundreds of thousands of spawning shad and thousands of shortnose sturgeon remain utterly unfulfilled. Spawning habitat access for both are impacted by Northfield’s suck and surge flows, which also create daily bank-eroding 4-foot “tides” along this reach, sometimes reaching to 10 feet.

Pictured in a less glowing light, NMPS is a 45 year-old dinosaur–a formerly nuclear-powered, net-loss energy transfer machine hacked out of the bowels of a mountain. With the region’s nukes now shuttered, it runs daily on imported electricity and has never produced a watt of virgin power. Today it’s a quick-start, high-profit operation relying on boatloads of fossil-fueled megawatts purchased in bulk on the wholesale market. Suctioning the river uphill, it later releases those waters down through its turbines in dense pulses—pumping out 25 percent less juice than the virgin power it consumes.

NMPS is not renewable energy, nor anything resembling the public’s idea of hydropower. It reproduces just a fraction of New England’s power at peak times, and peak prices, but can only generate for eight hours maximum. After that it is literally dead, its reserves spent. The Canadian-owned plant must then start consuming juice by reversing its turbines anew, yanking the river backward, sideways, and a mile uphill for hours into its reservoir.

That pumping occurs nightly at rates of up to 15,000 cubic feet per second. Picture 15,000 milk crates filled with a living river–every second for hours at a time. For more than two-thirds of the year the Connecticut’s “natural routed flow”—the water moving into and through this reach, is less than 15,000 cfs. Thus this plant is consuming more water than is entering the river. That’s how to turn an ecosystem on its head. The result is the evisceration of all manner of aquatic life, juiced twice through those turbines—tens of thousands of resident and migrating fish, millions of developing eggs, and their young. There’s nothing more violent you can do to a river.

Now the Canada Public Pension Investment Fund—latest in the decade’s revolving door of four different venture-capital owners of the FirstLight Power Resources-branded plant, is angling to lock those ecosystem assaults in place for another half century through the Federal Energy Regulatory Commission’s 5-year hydro relicensing process.

In its planning stages one model would’ve required Northfield to shut down during fish migration season due to impacts. That didn’t happen. Still, a chance experiment in 2010 gave a belated glimpse of those potential benefits. For half a year, from mid-spring through a hot summer into early November, NMPS sat broken, sanctioned and off-line. But seven miles downstream the migrating shad normally impacted by its violent suck-and-flush flows made great and unexpected gains in tandem with that spring break. Having languished for decades, the federal program to move American shad upstream into Vermont and New Hampshire saw a stunning boost at Turners Falls Dam. Shad passage jumped over 700 percent above the previous ten year average–16,440 shad swam past the dam in 2010, compared to the 2,260 annually over the previous ten years. Though meager, it was by far the best result since MA energy deregulation came to the NMPS reach of river in 1999.

The 5 billion gallon Northfield Mountain Pumped Storage Reservoir, as it sat emptied and idle from May 1st through early November 2010.
(CLICK TO ENLARGE, THEN CLICK AGAIN.)

On that May 1, 2010, NMPS had choked on the tons of silt and eroded riverbanks it constantly sucks into its reservoir. In attempting to clear that mucked-in lake a mile of mud-slumped tunnels resulted. Desperate, they began dumping it directly into the Connecticut at a rate equaling 30-40 dump truck loads a day. FirstLight’s sludge turned a mile of river brown for weeks. A contractor died when a suction hose broke loose.

One of thousands of dump truck loads of sludge the EPA ordered FirstLight to dredge back out of the Connecticut River. (CLICK TO ENLARGE, THEN CLICK AGAIN.)

Severe thunderstorms on May 27, 2010 resulted in tens of thousands of western New England power outages, many lasting for days. Yet as a back-up energy plant, Northfield’s sole output that week was more of the 45,000 cubic square yards of muck they’d eventually dump directly into the river. They succeeded for over 90 days, until they got caught. On August 10, 2010, the EPA issued a cease-and-desist order citing FirstLight for “polluting the navigable waters of the United States” under the Clean Water Act.

Major dredging operations continued for months at Northfield where FirstLight had dumped their sludge in the Connecticut for 90 straight days.(CLICK TO ENLARGE, THEN CLICK AGAIN.)

Throughout NMPS’s half-year off-line–and record-breaking summer heat in the Northeast, the purportedly ever-hungry, ever-fragile grid ISO New England claims makes Northfield’s dense, quick-start functions so indispensible, never faltered or failed—not even when the nearby( now closed) Vermont Yankee nuclear plant went down in June to refuel.

NMPS’s main claim to its indispensability came 14 years ago during the 2003 August Blackout. Its quick start power was employed by ISO New England to smooth out Massachusetts’ reconnection to the New York sector of the Northeast’s mega-grid—which had failed due to a computer glitch in Ohio. That sprawling network would have been reenergized regardless, but Northfield’s dense energy provided a convenient assist and made ISO’s job easier. But are rare-hour emergencies enough to justify more decades of NMPS daily destructive use? In truth–what would amount to virtual energy storage monopoly, need not be locked-in, de facto, by FERC as this region’s energy future for decades to come. There are other options.

“Pumped hydro is the most cost-effective way to store electricity,” that story stated flatly. But in September of 2016 the MA Department of Energy Resources and the MA Clean Energy Center released a study: “Massachusetts Energy Storage Initiative: State of Charge.” It noted the Bay State lags behind in innovation and deployed energy storage, ranking 23rd nationally. However, comparing new storage technologies now available to the costs of pumped storage, it noted three that will all readily out-compete pumped storage costs by 2018: Lithium Ion, Flow Battery and Compressed Air Storage.

These local/regional storage solutions are already coming into use in New England. They create distributed generation and safer, more reliable micro-grids—less vulnerable to mass outages and mega-grid cyber attack and failure. They also create jobs. Certainly they are more attractive to consumers than sending local solar and wind across New England to recharge a river-crippling machine—and repurchase that juice later at inflated consumer prices.

That story mentioned Northfield’s 18,000 panel solar array–enough for a few hundred homes. But that tax-deductable FirstLight solar field actually covers the huge scar leftover from acres of EPA-mandated settling ponds—sludge pools required in 2010 when they had to dredge their mountain of muck back out of the river. Also not mentioned were handsome payments NMPS collects when it chooses not to generate any power. They accrue through a FERC mechanism known as “capacity fees.” If “spot market” prices aren’t sweet enough, FirstLight can simply sit their plant idle, collecting ratepayer cash just for their “capacity” to potentially generate. With NMPS as its chief hydro asset, former owner GDF-Suez once told investors 40% of its annual profits had been realized through capacity fees.

FirstLight’s EPA-ordered sludge settling pools and drying pile at the Rt. 63 site covered by a solar panel installation today. (CLICK TO ENLARGE, THEN CLICK AGAIN.)

Gus Bakas, FirstLight’s Massachusetts operations director, stated his goal for the 45 year-old plant is to someday see it running wholly on “green” power–solar and wind relayed to it from legions of regional rooftop panels and turbines. That would align with Massachusetts’ new “Energy Storage Initiative,” a 10-year effort purportedly aimed at saving ratepayers “hundreds of millions of dollars” while making the grid more reliable and reducing greenhouse gasses. But wind runs strongest at night and is not plentiful in western New England, while all solar is generated by day. With NMPS’s peak-demand profit model based on sucking up bulk power and the river at night, something seems missing from the equation. Unless there are now plans to again run the river backward by day, when migrating fish are most vulnerable to entrainment.

The Federal Energy Regulatory Commission is charged with supplying reliable electricity at fair costs to the public, while fostering competition and protecting against energy monopolies. All licensing decisions from FERC must also comply with federal law including conditions set under the National Environmental Policy Act, the Fish and Wildlife Coordination Act, the Endangered Species Act, and the Clean Water Act. The operation of NMPS continues to prove a stumbling block to the successful execution of these federal acts and policies.

In the near-term, for rare big-grid emergencies, a summer heat-wave or winter cold snap, NMPS remains a credible back-up tool. But Northfield otherwise continues today as an expensive, profoundly-damaging energy relay device whose net-loss operations chew apart a critical four-state artery daily. Given its violent year-round ecosystem impacts, its drag on federal trust and endangered species restoration programs–and the market’s current and emerging alternative energy storage solutions, FERC should not sanction NMPS long-term, as its dominant, de facto, New England energy storage monopoly.

End

Writer and journalist Karl Meyer lives in Greenfield, MA. He has been participating as a stakeholder and member of the Fish and Aquatics Study Team in the five-year FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2013. He is a member of the Society of Environmental Journalists.

Karl Meyer: Connecticut River power storage plant is an ecological, economic and energy disaster

http://www.wbur.org/bostonomix/2016/12/02/northfield-mountain-hydroelectric-station

DEAD REACH REPORT: the BLACK HOLE continues…

Posted by on 09 May 2016 | Tagged as: American shad, blueback herring, Connecticut River, Dead Reach, federal trust fish, federally-endangered shortnose sturgeon, FirstLight, GDF-Suez FirstLight, Greenfield Community College, Holyoke Community College, Holyoke Fish Lift, MA Division of Fish and Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, Rock Dam, Rock Dam Pool, sea lamprey, shad, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vernon Dam Fishway

DEAD REACH REPORT: the BLACK HOLE continues…

Copyright © 2016 by Karl Meyer
P1000522

Forty-one days after the first fish were reported being lifted at Holyoke Dam, we still have not a shred of information on fish passage in the Connecticut River’s Dead Reach at Turners Falls. That’s the beleaguered, half-emptied, 2.7 miles of riverbed that all migrating American shad, sea lamprey, and blueback herring must pass in order to make progress toward Vermont and New Hampshire spawning grounds. Within that Dead Reach is the Rock Dam, the only documented natural spawning site for endangered shortnose sturgeon in this river system.

Thus, again, GDF-Suez FirstLight continues in sole control and possession of information on the public’s federal trust migratory fish—every one of which, in trying to reach upstream sites, gets diverted into their turbine-lined power canal. Once corralled and essentially privatized in that miles-long trench, very few ever emerge alive beyond Turners Falls Dam.

Holyoke Fish Lift numbers have been handed off daily to Ken Sprankle, USFWS’s Connecticut River Coordinator, for weeks now. Students from Holyoke Community College are staffing that site, overseen by the MA Division of Fisheries & Wildlife. MA Fish & Wildlife is responsible for those shad, lamprey and herring while they are traversing the Commonwealth’s reach on the Connecticut. They’re responsible for getting the public’s fish counted as well. That role up at Turners Falls is clearly not working or being taken seriously. We have no information from there whatsoever–with the video-counting apparatus controlled by FirstLight, and the review, tallies, and the hand-off of that public information left in the hands of Greenfield Community College students.

None of this speaks well for any safeguarding of the public trust.

Nevertheless, USFWS’s Ken Sprankle did provide these updates from Holyoke Dam this morning. Fish counts there as of Sunday, May 8, 2016 are: 32,937 American shad; 239 sea lamprey; and 14 federally-endangered shortnose sturgeon—all of which were brought to the top in the fish elevator, lifted out, and dropped back downstream. Virtually none of them will get an opportunity to spawn yet again this year.

To give you a sense of the miseries, one egg-laden female lifted up there had been tagged in the Dead Reach in Turners Falls 2004, as a female on a spawning site. This year, a dozen years after that tagging—she was apparently full of eggs and attempting to reach the Rock Dam for spawning once more. They plopped her back downstream on orders of the National Marine Fisheries Service. If that aging female dies over the winter, the genetic material in the hundreds of thousands of eggs she was carrying gets lost to eternity, and becomes yet another signpost on extinctions path.

Just what exactly is being accomplished by not letting these endangered fish spawn?

Meanwhile, here’s a tiny Dead Reach report of my own. I stopped by the TF Dam at mid-morning on Mother’s Day. It was drizzly, water was spilling from Bascule Gate 1(Turners Falls side), and no one was fishing at the site.

Downstream at 9:40 I met a lone angler exiting from the Rock Dam pool site at Cabot Woods. He said he’d had a few, earlier, but that it was slowing down. When I went out to the Rock Dam it was fairly quiet, with the water only moderately clear with the recent rain. Still, looking down from the rocks, schooling swirls of shad can sometimes be seen when the light is good. I saw nothing. Nor did I note any lamprey tails slapping the rock faces as they suctioned their way upstream through the notches.

According to this angler who fishes the mouth of the Deerfield as well, Rock Dam fishing on Saturday was pretty decent: “I had a dozen shad,” he noted. Thus, it’s become fairly obvious these last two springs that when flow is left in the riverbed, Rock Dam is one of the finest shad fishing sites on the Connecticut.

So, American shad have been reaching Turners Falls for 5 weeks now, we just don’t know how many are passing upstream—and we have yet to get count information from TransCanada about numbers passing Vernon Fishway. Thus parts of Massachusetts and all of Vermont and New Hampshire remain in the dark as to the whereabouts of their share of the ocean’s spring bounty.

Holyoke Fishway opened last week. You can visit, Weds. – Sunday from 9 – 5. Its on the CT, where Rt. 116 crosses into Holyoke from South Hadley. The public fish viewing facilities at Turners Falls have yet to open.

No “Springtime for Sturgeon in Holyoke…”

Posted by on 06 May 2016 | Tagged as: Connecticut River, Connecticut River ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, Holyoke Fish Lift, Holyoke Gas & Electric, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Rock Dam Pool, shortnose sturgeon, Turners Falls, US Fish & Wildlife Service, USFWS

SHadFalls2MtTom
HG&E’s Holyoke Dam with Mt. Tom in background(click to enlarge)

No “Springtime for Sturgeon in Holyoke…” Unenforced FERC License continues the woes for the Connecticut’s only federally endangered migratory fish

Copyright © 2016 by Karl Meyer

For endangered shortnose sturgeon on the Connecticut River this year has been the best thing and the worst thing to happen to them since 1849. In an infinitely promising development over a dozen sturgeon(13 thus far)have found their way into the retooled Holyoke Fish Lift this spring—and all were lifted 30 feet toward upstream spawning habitats at the facility. However, in a most ugly turn of events for a creature listed under the Endangered Species Act since 1967, every one of those sturgeon was subsequently dropped back downstream by humans working there. They literally gained ten yards… after 167 years. Sorry kids, wait ‘til next year–or maybe the one after that.

In 2002 Holyoke Gas and Electric was issued a FERC license under which they were required to complete construction of a fish lift providing up- and downstream access for endangered sturgeon by 2008. FERC, responsible for enforcing those license requirements as well as the tenets of the ESA, failed to enforce their requirements, leaving those improvements unconstructed, year after year. The National Marine Fisheries Service, US Fish & Wildlife Service, and MA Division of Fisheries & Wildlife sat on their hands respecting their responsibilities to act. Nor did any so-called “watchdog” group fulfill their role–to make the enforcers enforce.

This was just the latest failure in a foundering Connecticut River ecosystem steered by money and politics rather than legal obligations, science, and enforcement of the public trust. Just consider that one of the Connecticut River Watershed Council’s Board Members has worked for Holyoke Gas & Electric at their fish lift for a decade… Then consider the resounding silence on enforcement.

This year–a full 9 springs beyond their license obligations, HG&E finally completed that mandated construction at the Holyoke Fish Lift. That says a mouthful about FERC, their licensing process, private industry, and whether anyone is actually protecting the public’s fish and river.

Grimly this spring, when the most sturgeon embarking on upstream spawning runs since the building of the railroads made it to the top of those South Hadley Falls, all were captured and “released downstream” of Holyoke Dam. This bit of brilliance comes via the orders—or lack thereof, of NOAA’s National Marine Fisheries Service. Their failure to act again denies any new genetic input into the tiny upstream population keeping this species’ flickering spark alive across the centuries up at their sole natural spawning site, the Rock Dam in Turners Falls.

Below Holyoke, generation after generation of these long-lived fish have been relegated to simply growing to maturity, repeatedly attempting to return upstream, and ultimately expiring without ever having the chance to pass on their genes. That goes back to the time of President Zachery Taylor.

In one very cruel act of fate, any shortnose sturgeon finding themselves downstream of the newly constructed Holyoke Dam in 1849, were forever barred from reaching their sole natural spawning site in the river system—that ancient Rock Dam pool in Turners Falls. What that has meant is that hundreds upon hundreds of these fabulously evolved fish–across more than a century and a half, have been relegated to the status of “reproductive nulls,” unable to spawn in their natal river system.

Pick your favorite bad actor in this failed scenario–there are a half-dozen choices.

INFORMATION BLACK HOLE on the Connecticut

Posted by on 05 May 2016 | Tagged as: American shad, Connecticut River, federal trust fish, FirstLight, GDF-Suez FirstLight, Greenfield Community College, Holyoke Community College, Holyoke Fish Lift, Jack Buckley, MA Division of Fish and Wildlife, New Hampshire, Northfield Mountain, shad, shad fishing, Station 1, teachers, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Walpole, Wendi Weber

P1000385

INFORMATION BLACK HOLE

Copyright © 2016 by Karl Meyer

On this May 5th, 2016, they have no idea in Sunderland–or in Deerfield for that matter. Nor do they know anything in Greenfield, Turners Falls, Gill, Northfield or Millers Falls. Upstream, Vermont folks in Vernon, Guilford, Brattleboro and Putney don’t have a clue. Across the river, New Hampshire people in Hinsdale, Chesterfield, Walpole and Charlestown remain in the dark.

What these towns all have in common is that nobody can tell them anything of the whereabouts of their share of the spring American shad run. The fish have been in the river and upstream of Holyoke for a full five weeks now, and there hasn’t been a single fish count provided from the Greenfield Community College students hired by GDF-Suez FirstLight to monitor fish passage at Turners Falls. An accounting of the public’s fish remains in the hands of a private company—and, as I’ve said before, many or most are likely struggling to survive a trip through their private power canal.

For a migrating shad, the 36 mile swim from Holyoke to Turners Falls is a walk in the park. It’s a day—maybe a day-and-a-half trip, ostensibly on the way to spawning habitats in Vermont and New Hampshire. But thousands of the public’s fish have gone missing on the Connecticut River this spring. And it seems no one can say exactly where they are. If you had to make an educated guess, you could surmise many are somewhere between Greenfield and Turners Falls, with many not in the actual river at all.

A significant number are fighting currents in the debased habitats of the Turners Falls power canal, where murky flows delay most by over a week before they even approach the site that could route them past the dam. Others are in the river, trying to find a path to the base of a fish ladder whose construction back in 1980 was based on Pacific salmon. And still others are sidetracked and stalled in the riverbed like sardines, expending precious migratory and spawning energy in front of the ramping outflows at a mini overflow power site known as Station 1. Wherever those fish may be, we do know that, on average over time, just 4% of those shad ever make it beyond Turners Falls Dam toward Vermont and New Hampshire. In the very few “good” years, one fish in ten wriggles upstream.

We also know that the first two American shad were lifted past Holyoke Dam five weeks ago. As of May 4, 2016, some 25,000 had been passed upstream at the Holyoke Fish Lift. What happened to them next is anyone’s guess. Once they pass Holyoke, accounting for them is left in the hands of a private power company—currently GDF-Suez FirstLight Hydro, now going under the corporate aegis Engie. These are the folks responsible for passing the public’s fish at Turners Falls Dam, and giving public accounts of fish passage for anglers, teachers, the general public, and the state and federal fish agencies.

It’s been documented that at least half of all the shad passing Holyoke will attempt to pass Turners Falls. It’s wholly possible the actual number is significantly higher. It matters little though, as all fish get diverted into the Turners Falls Power Canal once they attain this easy upstream reach, and only that average of 4% make it past the TF Dam. The rest simply go unaccounted for once they arrive and are tempted into that turbine-lined pit.

Five full weeks since fish have been heading upstream, and that includes sea lamprey as well. Yet we still do not have a single fish passage update at Turners Falls. What’s wrong here? Who is responsible?? Well, obviously FirstLight GDF-Suez is responsible. But, nobody is holding them to it. These fish, while moving through Massachusetts, are the responsibility of the US Fish & Wildlife Service. But, while here, they in large part fall under the responsibility of the MA Division of & Wildlife. Why aren’t they ensuring the public gets daily fish updates—like those that have been available at Holyoke Dam for years? Again, go fish…

At Holyoke Dam there are actually humans on-site that can witness real-time conditions, fish passage, and provide the needed public info in a timely manner. These come via students from Holyoke Community College. Not so at Turners Falls, where the Commonwealth has largely left responsibility for the chicken coop up to the fox. All monitoring is done remotely by video, with equipment provided by FirstLight. Prior years show repeated equipment failures. And then you have to wait—often many WEEKS, before those videos are handed off and analyzed by GCC interns. Its only then that we are treated to weeks-out-of-date info about where our fish are.

This privatization needs to change. Wendi Weber, Region 5 Director at the USFWS might be able to help. Or MA Division of Fish & Wildlife Director Jack Buckley. Or, perhaps, MADFW’s Caleb Slater, Anadramous Fish Passage Project Director. The guy at FirstLight responsible if Bob Stira.

As a side note: many other states have actuarial tables that put specific monetary values on migratory and resident fish. Then, if they are killed in project operations, or fish do not reach their spawning grounds, the public is reimbursed for the ecological damages.

Updated HOLYOKE fish counts can be accessed at:
www.fws.gov/r5crc under Recreation.

New comments to the Federal Energy Regulatory Commission

Posted by on 16 Nov 2015 | Tagged as: 5-year FERC licensing process, American shad, canal shad, Connecticut River, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, Extinction, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC license, FERC licensing process, FirstLight, GDF-Suez FirstLight, migratory delay, power canal studies, Public Comment period, Relicensing, Revised Study Plan, Rock Dam, Rock Dam Pool, shad, shad fishing, shortnose sturgeon, Station 1, Turners Falls, Turners Falls dam, Turners Falls power canal, Vermont

The following comments were submitted to the Federal Energy Regulatory Commission on November 13, 2015, respecting relicensing studies occurring at the Northfield Mountain Pumped Storage Station and at the Turners Falls Dam and Canal. They are designated, respectively as: P-2485; and P-1889.

Karl Meyer, M.S. Environmental Science
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 November 13, 2014

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

ILP COMMENTS on Updated Study Reports—including Disagreements/Modifications to Study/Propose New Study on Turners Falls Hydroelectric Project P- 1889, and Northfield Mountain Pumped Storage Project P-2485.

Dear Secretary Bose,

The Turners Falls Hydroelectric Project, P-1889, and the Northfield Mountain Pumped Storage Project, P-2485, are currently undergoing studies through the 5-year FERC relicensing process. The majority of the fish and aquatics studies remain incomplete at this time. However, having attended the recent study update meetings with FirstLight’s consultants, and as a member of the Fish & Aquatics Studies Team for P-2485 and P-1889, please accept these brief comments on the USR and proposals for modifications and new studies needed in the FERC ILP for these projects. As studies are brought to completion and data and results are shared with Stakeholders I will submit further comments.

3.3.2 Evaluate Upstream and Downstream Passage of American Shad

Needed information from this study: from personal observations I noted many days when Station 1 was in operation. I visited the site, took some photos, and interviewed a fisherman who was busy catching shad at the Station 1 Outflow on 5/24/2015. In good light, and without the advantage of polarizing sunglasses, I observed dozens of shad stacked up like cordwood, treading water there. The gentlemen noted that whenever Station 1 is running “there are always fish here.” The report should include information about tagged fish delayed in this false attraction water. It is also critical to delineate the number of days during testing that Station 1 was in operation.

3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the Area of the Northfield Mountain and Turners Falls Projects.

In their update the applicant’s team stated that “because minimal shad spawning was observed in the Turners Falls Canal, no spawning areas in the canal were identified for further examination.”

Needed information from this study: at what hour, on what dates, and under what conditions were these “minimal” spawning observations made? Did they return to the site again under different, or more favorable conditions? What was the water temperature? Was it raining? Windy? Cloudy? Was Cabot Station running at the time-and how many units? Was Station 1 in operation on the nights they made their observations?

These are basic questions that require adequate answers as the TF Canal has been the bottleneck for the shad run up through Northern Massachusetts and into Vermont and New Hampshire these last 40 years. The canal appears to be culling off part of the run as a spawning trap. A thorough understanding of why fish are lingering there, and clear assessment of the numbers and delays of fish attempting to spawn in the canal is necessary for informed decision making.

3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms.

Needed information from this study: This study needs to be extended for another year. On October 5, 2015, I took a 20-minute walk through a small segment of the canal at 7:00 a.m. on the morning the canal had drained. On the flats far–from the thalweg where most of the 2014 assessment appears to have taken place, thousands of fish lay struggling, stranded, and dead in the drying pools. These included juvenile American shad, yellow perch, juvenile and “transformer” sea lamprey, one 8-inch chain pickerel, one crayfish, and thousands of tiny, unidentified YOY fish in drying pools and rills that led to nowhere.

These observations were made crossing just a few—out of the many acres, of silt and muck “shoulder habitat” that occurs away from the main channel on both the east and west sides of the TF Canal. A more thorough mortality assessment needs to be made across these habitats to have a full understanding of the impacts of the canal drawdown migrating and resident fish.

REQUEST for New Study: Tagging and Spawning Study of the Connecticut River Shortnose Sturgeon at the Rock Dam Pool in Turners Falls.

The USFWS’s fish passage and dam specialist John Warner reports that both downstream and upstream modifications for fish passage at Holyoke Dam will be completed this winter. New entrances and exits allowing CT River SNS to move upstream beyond that site will be working in spring 2016.

In light of the construction at Holyoke and the 2016 continuation of test flows evaluations on spring migrants in the By-Pass Reach at Turners Falls, testing of spawning success for SNS should be done at their documented natural spawning site–the Rock Dam in Turners Falls, in spring 2016. Regardless of any fine tuning needed at the Holyoke facility, some SNS will return to the Rock Dam pool by the last week of April, and the chance to study their spawning success in light of regulated test flows presents a unique opportunity for the only federally endangered migratory fish on the Connecticut River.

If this fish is ever to benefit from new genetic input, a full understanding of suitable flows at Rock Dam to accommodate spawning is necessary information going forward for a fish that has been decades on the cusp of extinction. It’s an opportunity to restore a part of the public trust.

For further information on longstanding research at this site without required test flows, see Kynard, B. and Kieffer, M.C., et al: Life History and Behaviour of Connecticut River shortnose and other sturgeons, published in 2102 by the World Sturgeon Conservation Society, ISBN 978-3-8448-2801-6.

Thank you for the opportunity to comment on the USR for these projects.

Sincerely,
Karl Meyer, M.S. Environmental Science
Greenfield, MA

Redeem the promise at Great Falls

Posted by on 16 Nov 2015 | Tagged as: 5-year FERC licensing process, American shad, bald eagle, canal shad, Captain William Turner, Connecticut River, Connecticut River ecosystem, Connecticut River Refuge, Connecticut River shortnose sturgeon, Conte, Conte National Fish & Wildlife Refuge, Daily Hampshire Gazette, endangerd shortnose sturgeon, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC license, FERC licensing process, Greenfield Recorder, Holyoke Fish Lift, New Hampshire, Northfield Mountain Pumped Storage Station, Relicensing, Rock Dam, Rock Dam Pool, shad, shad fishing, shortnose sturgeon, The Greenfield Recorder, The Recorder, Turners Falls, Turners Falls dam, Turners Falls power canal, USFWS, Vermont, Vermont Yankee, wildlife refuge

The following piece, with edits, appeared in the Daily Hampshire Gazette and The Recorder on November 12, 2015 as: “Federal wildlife service must preserve the promise at Great Falls,” and “River restoration retreat”

The US Fish & Wildlife Service’s recent abandonment of their flagship Conte National Fish & Wildlife Refuge Visitor Center at Turners Falls defies all logic. In August they abruptly withdrew their on-site interpreter and funding for The Great Falls Discover Center. That center was located above the falls two decades back precisely because of the site’s importance as an ecological refuge—perched at a river crossroads critical to the success of their new “watershed-based” refuge.

Back then bald eagles had just returned to Turners Falls; it was once again the place that hundreds of thousands of migrating American shad surged to each spring. And just downstream was the sole natural site where the only federally-endangered migratory fish in the watershed–the ancient Connecticut River shortnose sturgeon, attempted to spawn each May. Known as the Rock Dam, its an ancient geological formation that remains a premiere retreat for spring shad anglers. For its biological and historic importance alone, Rock Dam should have long ago been offered the Refuge’s first “in-river” sanctuary designation.

Yet today, USFWS seems ready to walk away from its core mission and long history on the river at Turners Falls. Doing so would be no less an historic retreat than that of Captain Turner and his battalion after their pre-dawn attack on hundreds of Native American women, children and old men seeking refuge at that very site nearly 340 years ago. On May 19, 1676–having accomplished their grizzly goal with the loss of just one man, they were sent in reeling retreat when the first counter-attacking Native warriors arrived from a downstream island encampment opposite today’s Rock Dam. They’d been stationed there to intercept the teeming May shad runs to help feed their people. Turner and 37 of his troops died in the ensuing rout.

Today, Turners Falls remains the site of the US Fish & Wildlife’s biggest regional blunder in a mission to protect a nation’s fish and wildlife resources on New England’s Great River. In the late 1970s they signed off on the plan resulting in a series of fish ladders being built there. It forced all migratory fish out of the river and into the Turners Falls Power Canal. That resulted in a half century of failed fisheries and habitat restoration—largely drawing the curtain down on a spring ocean-connection for riverine habitats in Vermont, New Hampshire, and northern Massachusetts. That 1967 USFWS/four-state migratory fisheries restoration compact for the Connecticut River still founders at Turners Falls today.

That is why the recent USFW’s retreat from their ecologically and historically unique flagship perch remains inexplicable. Currently federal hydro-relicensing studies of dam and canal operations at Turners Falls are taking place. Their outcomes will determine environmental conditions governing the Connecticut River in this reach for two generations to come. The USFWS is playing a key role in these studies as the lead agency empowered to define and require changes at Turners respecting the protection and restoration of the public’s federal-trust and federally-endangered fish species there. In short, they’re at a crossroads. They are the key player able to restore past mistakes and make the Conte Connecticut River Watershed National Fish and Wildlife Refuge a true refuge for annual migrants passing from Connecticut to Massachusetts; then Vermont and New Hampshire.

That long-awaited success would occur at the doorstep of the Great Falls Discovery Center–replete with its life-sized displays of watershed fish and wildlife, and its accessible public auditorium. It’s a huge opportunity at a site virtually on the river, easily reachable by visitors from a broad swath of southern New England travelling the I-91/Route 2 Corridor. Great Falls is the only brick and mortar place for the public to regularly interact with USFW staff and a diversity of displays of characterizing watershed habitats for 80 miles in any direction. What’s more it’s the only publicly-funded flagship Refuge site where admission is free.

Without a touchstone site in this populous reach of the watershed, most citizens will remain unaware of the restoration and conservation work of the USFWS. They’ll be left to surmise instead that Conte is more a theoretical Refuge—a concept and an amorphous jumble of disparate parts lacking any true core.

In practice and in theory, Turners Falls and the Discovery Center site represent the best of opportunities for the US Fish & Wildlife Service to succeed in their core missions of conservation, restoration, public access and education. A second retreat at Turners Falls would be an historic failure. This fabulously rich reach of the Connecticut is uniquely situated to showcase the Service’s long-awaited success in river restoration on the public’s behalf. Many mistakes could be redeemed with the right decisions at this time. Don’t abandon the Great River at the Great Falls.

Public comments are being accepted through November 13th on the USFWS’s plans for Conte Refuge priorities for the next 15 years at: www.fws.gov/refuge/silvio_o_conte/

Karl Meyer
Greenfield

Spawning shortnose sturgeon denied flow at Rock Dam Pool

Posted by on 08 May 2015 | Tagged as: 5-year FERC licensing process, American shad, Atlantic salmon, blueback herring, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, endangerd shortnose sturgeon, Endangered Species Act, ESA, Extinction, Federal Conte Anadromous Fish Research Center, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, Rock Dam, Rutland Herald, shortnose sturgeon, The Greenfield Recorder, University of Massachusetts, US Fish & Wildlife Service, Vermont Digger

PRockDamPoolDewatered (2)
(to view lager image, click on photo).

NOTE: the photo above documents conditions found at the Rock Dam Pool on the Connecticut River on May 3, 2015. Seventeen years of published studies conducted by federal and University of Massachusetts fisheries researchers at the adjacent Conte Anadromous Fish Research Center show that these river conditions cause spawning failure for federally-endangered Connecticut River shortnose sturgeon at the Rock Dam Pool, their only documented natural spawning site. The May 3rd river conditions found at Rock Dam mimicked mid-summer flows on the Connecticut–conditions that research shows drives spawning-ready females from the site, and de-waters the cobble-strewn pool where eggs and embryos attach and develop. April 25 to May 22 is the documented spawning window for the shortnose sturgeon on the Connecticut. It is a crime to kill, injure or interfere with endangered Connecticut River shortnose sturgeon under federal and state law. The Federal Energy Regulatory Commission, the National Marine Fisheries Service, the US Fish & Wildlife Service, and the MA Division of Fisheries & Wildlife are responsible for the protection of the Connecticut River’s only federally-endangered fish under the Endangered Species Act(ESA). GDF-Suez FirstLight controls river flows to this site via spill gate operations at the Turners Falls Dam, just upstream.

A RIVER PRESERVED IN PLASTIC Copyright © 2015 by Karl Meyer

(The following essay–with minor variation in each, appeared recently in The Recorder, The Rutland Herald, and at Vtdigger.org)

A lifeless, three-foot long Connecticut River shortnose sturgeon sits on display at the Great Falls Discovery Center in Turners Falls, MA. The shortnose has been this river’s only federally-endangered fish since 1967. That plastic sturgeon has sat amidst other replica fish for a dozen years now—a plastic American shad, a blueback herring, a trophy-size Atlantic salmon. They’re framed beneath a slightly-ruffled acrylic surface representing the Connecticut River at this flagship site of the Silvio Conte National Fish & Wildlife Refuge.

That display is the basic message offered to visitors here: ‘This is a river with congenial flows supporting populations of shad and herring, big native salmon, and federally-protected sturgeon.’

Nothing could be further from the truth.

Few upstream migrants reach Vermont and New Hampshire today. That’s part of the legacy of failure of federal and state fish agencies and watchdog groups claiming to safeguard an ecosystem and its native migratory fish. That legacy will remain intact until they confront ongoing conditions in Massachusetts that have been crippling the river here for decades.

That Discovery Center depiction falls apart if visitors simply walk outside onto the deck of the Turners Falls Bridge, adjacent to Turners Falls Dam. There, often for months on end, what they’ll see is the hollowed-out heart of New England’s Great River–a waterless chasm, or one teased by just a trickle from the power company’s dam. Conversely, when rain or snow send more river downstream than can be profitably sent through FirstLight’s power canal or stored upstream for their Northfield Mountain Pumped Storage Station, those spill gates open wide–producing violent, see-sawing flows few fish can fight or follow.

Meanwhile a 200 million year-old evolutionary gem, the Connecticut River shortnose sturgeon, remains all but abandoned just downstream–teetering on the verge of extinction for decades. Likewise, American shad can’t move upstream in the river here at all. They’re forced into that turbine-lined power canal where less than 1-in-10 will emerge alive beyond the dam. And those blueback herring–protected on paper as a “federal trust” species, have not been counted here in almost a decade. Just 20 years back they passed by the thousands.

That plastic salmon, showcased for decades as the darling of this river’s fisheries restoration, has been extinct here since 1809. It should not be presented as a living native fish. In science, extinct isn’t subject to interpretation.

That trophy-sized model derives from a massive hybrid hatchery program created by cross-breeding salmon imported from Canadian and northern New England rivers. For 43 years federal and state fish farms produced the millions of tiny fry dumped into the river each spring. Those fish factories repeatedly proved vectors for the potential spread of disease throughout the river system. Though those tiny fish proved great for public relations, no spawning population of engineered salmon ever took hold.

Hybrid salmon became the red herring that masked the massively broken ecosystem that exists on an eight-mile stretch of New England’s Great River from the Northfield Mountain Pumped Storage Station to the tailrace of the Turners Falls Power Canal. Those salmon were the stand-ins for agencies including the National Marine Fisheries Service, the USFWS, and MA Division of Fish & Wildlife that had failed to protect living migratory species here–and an ecosystem suffocating right in their backyard.

The plight of the only state- and federally endangered fish here represents the ultimate failure of responsibilities. Dr. Boyd Kynard spent decades studying the shortnose and documented it’s only natural spawning site–the Rock Dam Pool, less than two miles downstream of Turners Falls Dam. Dam operations there were annually creating conditions that crippled spawning success for the remaining 300 sturgeon still able to reach their ancient rendezvous site.

Kynard’s federal- and state-funded findings were given to fish agencies a decade back. Each bore legal responsibility for that sturgeon. Yet no agency or non-profit stepped-in to monitor and enforce Endangered Species Act protections. None intervened to halt the trickle-and-torrent flows preventing reproduction. That step alone would’ve put living waters back into the river here–aiding the shad and herring attempting to reach Vermont and New Hampshire. Likewise in 2012, when Kynard published a book on the shortnose–documenting its life history and the river conditions necessary for its recovery, again, no one went to court to protect this public legacy.

Had agencies and watchdog groups taken responsibility years back for protecting spawning sturgeon at that Rock Dam Pool below FirstLight’s dam, native migratory fish and the river ecosystem would be in a far better place today. Instead, that work was left to become part of the current studies in the Federal Energy Regulatory Commission’s 5-year relicensing process for the Turners Falls and Northfield hydro sites, where I’m on the Fisheries and Aquatic Studies Team.

Sturgeon spawning is not monitored today. It’s unconscionable to have waited for a 40 year relicensing process to come around before broaching concerns for an endangered fish and broken ecosystem. Hopefully it won’t prove the difference between a living river, and one merely depicted in a museum model.

Greenfield, MA journalist Karl Meyer is participating in the Federal Energy Regulatory Commission’s relicensing process for the Northfield Mountain and Turners Falls hydro sites.

FERC grants Northfield “temporary” Power Up-rate: the downside impacts of a studied pumped storage operation, re-posted.

Posted by on 04 Dec 2014 | Tagged as: American shad, Connecticut River, Connecticut River ecosystem, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, GDF-Suez FirstLight, ISO New England, Mt. Tom Coal Plant, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, USFWS

On November 26, 2014, FERC issued an “Order Granting a Temporary Amendment” for P-2485, the Northfield Mountain Pumped Storage Station to increase its storage capacity by 25%, and generate electricity during times of peak demand–or peak prices on the electricity “spot” market, without restriction.

In its power uprate application GDF-Suez FirstLight stated that this extra capacity was necessary due to power plant closures in Vermont and coastal Massachusetts and a predicted cold winter–a forecast for the Northeast that has now been re-evaluated, with a warmer winter now predicted.  GDF-Suez FirstLight did not mention in its application that it was shuttering its own 130 megawatt Mt. Tom plant in Holyoke in October. Another factor that may have played a part in the power uprate bid: GDF-Suez North America Hydro had had its bond rating downgraded in the prior fiscal year.

Given the unprecedented power hike granted Northfield, with ISO-New England formally jumping in the middle and cheering on the process with a formal letter to FERC, I thought I might republish testimony I sent to FERC last spring, when FirstLight submitted–then subsequently retracted as a “mistake,” testimony it posted on behalf of their plant’s storage flexibility cited the wind and solar benefits of a pumped storage plant in Ludington, Michigan.

If you read through the testimony you’ll see how devastating to the ecosystem and fisheries that Ludington Pumped Storage Plant has been.  That plant, though significantly larger, has a similar timeline–first started in the early 1970s, and currently undergoing relicensing. The big difference has been that local non-profits and agencies didn’t let them off the hook for the massive habitat destruction during their first licensing period–actually winning a $172 million dollar settlement from the owners some 20 years back.  Sadly, it was too late to shield their ecosystem or save their fisheries.

So, Northfield will pump more this winter.  It seemed a good time to re-post what the STUDIED damages were at another pumped storage plant over a similar time frame.  Sadly, we can’t know what we’ve lost across the decades here on the Connecticut River.

Read below:

New Stakeholder Comments filed with FERC re: Northfield Mountain

Posted by karlmeyer on 21 May 2014 | Tagged as: American shad, Bellows Falls, Connecticut River, Connecticut River ecosystem, ecosystem, Endangered Species Act, EPA, ESA, Federal Energy Regulatory Commission, federal trust fish, GDF-Suez FirstLight, Ludington Pumped Storage Plant, New Hampshire, Northfield Mountain Pumped Storage Station, shad larvae, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont Edit This

The following Stakeholder Comments were filed today, 5/21/2014, with the Federal Energy Regulatory Commission respecting Connecticut River fish mortality investigations at Northfield Mountain Pumped Storage station (NMPS)

Karl Meyer, M.S., Environmental Science

85 School Street, # 3

Greenfield, MA 01301

 

Kimberly D. Bose, Secretary

Federal Energy Regulatory Commission

88 First Street, N.E.

Washington, DC 20426

Stakeholder Comments, RE: FERC P-2485-063, and P-2680-108: relevance of FirstLight Hydro Generating Company’s document submission issued by FERC as “Conference/Meeting Transcript issued in FERC P-2485-063, et al” on May 9, 2014 for Northfield Mountain Pumped Storage project (NMPS). The inclusion of “Transcript of the April 17, 2014 FERC Scoping Meeting held in Pentwater, Michigan re Consumers Energy Company’s et al Ludington Pumped Storage Project under P-2680-108” offers an incomplete, unsubstantiated and confusing picture of its applicable connection to the relicensing of NMPS on the main stem of a four-state river system in Massachusetts.

Dear Secretary Bose,

Please consider the following comments respecting the relevance of FirstLight Hydro Generating Company’s recent document filing as it seeks a new license for the Northfield Mountain Pumped Storage station. I testified as a Stakeholder in the NMPS Study Dispute Panel Technical Conference along with officials from the USFWS and Trout UnLimited on Tuesday, April 8, 2014. The Dispute Panel was convened out of concerns that no study of the entrainment of eggs and larvae of migratory American shad was being required as part of a relicensing bid from GDF-Suez FirstLight Power for NMPS. I find no clear context provided by FirstLight for the inclusion of a transcript for the April 17, 2014 FERC Scoping Meeting for the Ludington Pumped Storage Plant–a lakeside Michigan-based facility, as part of the NMPS relicensing proceedings.

NMPS’s pumping/generating impacts are known to reach downstream to Holyoke Dam at river-mile 86 and affect spawning-run migratory fish that utilize Massachusetts, New Hampshire and Vermont habitats upstream to Bellows Falls Dam at river-mile 172. It is critical to the relicensing of any pumped storage generation on this four-state river to have robust studies with measurable outcomes to protect the public’s interest in a balanced and functioning Connecticut River ecosystem.

NMPS impacts migrating and spawning anadromous fish in a four-state ecosystem that has been the focus of a federal fisheries restoration program begun in 1967, “to provide the public with high quality sport fishing opportunities in a highly urbanized area, as well as provide for the long term needs of the population for seafood.” NMPS, completed in 1972, has been shown to have direct impacts on migratory fish entrainment and fish passage from northern Massachusetts to central Vermont and New Hampshire.

The US Fish & Wildlife Service, National Marine Fisheries Service, and fisheries directors in MA, NH, VT, and CT are all charged with protecting these resources for the public. Federal and state laws, licenses and statutes governing these mandated protections include the federal Clean Water Act, Endangered Species Act, and federal-trust fish protections beginning with the Anadromous Fish Conservation Act of 1965. FERC authority also mandates licensee compliance and protections for the public’s fisheries resources and restoration projects. FERC itself is mandated to comply with federal environmental law.

The Ludington Pumped Storage Plant is a FERC licensed facility sited and operating within a single state on a lakeshore well over 100 miles from it closest bordering state—and situated with 118 miles of open water at its back. Northfield Mountain Pumped Storage, situated adjacent to the Connecticut River, operates on the Navigable Waters of the United States in Massachusetts just 10 miles from where the Connecticut River passes out of Vermont and New Hampshire. NMPS pumps and generates from a narrow ribbon of river that is less than 1,000 feet wide—during warm seasons it sometimes draws more water than the river’s natural output.

In short, these are two very different animals, operating in very different habitats.

However, there are similarities in the long-term environmental impacts of these far-flung pumped storage facilities. They both kill large quantities of the public’s fish. Unfortunately, those impacts were not cited or included in FirstLight’s submission to FERC in either Dispute Resolution Panel documents or its license application documents. In 1995 the owners of the Ludinton Plant agreed to a $172 million dollar settlement for its killing o fish during the previous two decades. The public there at least had the minor benefit of one-time study that showed LPSP “in a single year, killed 440,000 salmon and trout, 85,000 perch and millions of forage fish that served as food for valuable game.”

Unfortunately, to date, we have no such data from a study of NMPS, nor any compensation for the long-term damage to a public resource and a long-term fisheries restoration project. In Michigan, a US-based entity was required to pay restitution and undertake remedial action. Here at NMPS the plant operator is a transnational corporation, based outside the United States, that is “taking” an unknown quantity of a public resource without compensation or required analysis. If a US Citizen were to do this they would be subject to legal action.

 

Please see below: Ludington Daily News, August 13, 1987: “Federal agency rules on fish kill, Ludington hydro plant must comply within 60-90 days.”

The Ludington plant had begun operations in 1973, and had been the subject of legal proceedings from that time forward. The State of Michigan had filed a suit in Ingham County Circuit Court seeking more than $147 million in damages, and the National Wildlife Federation had won a federal court order that Consumers needed a pollution discharge permit for the plant.

In summary here are several excerpts from that article defining the impacts at that time including references to a single study that found the plant killed millions of native fish in a single year, species that are today disappearing, or have essentially disappeared, in Lake Michigan waters:

“Environmentalists and state officials Wednesday hailed a federal ruling designed to end the fish kills at the Ludington Pumped Storage Facility operated by Consumers Power Co.” (Co-owned with Detroit Edison Co.)

“Finally, after 14 years of negotiations and litigation, and the destruction of millions of Lake Michigan sports fish, we’re going to see an end to this needless waste of an important resource,” said Thomas Washington, executive director of the Michigan United Conservation Clubs.

“The MUCC, National Wildlife Federation and Department of Natural Resources have negotiated fruitlessly for years with Consumers Power to stop the fish kills.”
“The plant, in operation since 1973, pumps Lake Michigan water uphill into a reservoir, and generates electricity during times of high demand by letting it flow back to Lake Michigan through generators. In the pumping process, it kills millions of fish.”

“The MUCC said that a study commissioned by Consumers Power showed the plant, in a single year, killed 440,000 salmon and trout, 85,000 perch and millions of forage fish that served as food for valuable game.”

However, it took another eight years of environmental damage and drawn-out court proceedings before a settlement—totaling $172 million, was finally reached in 1995. See: Ludington Daily News, March 7, 1995: “Local groups urged to begin working on projects for fish kill settlement plan.”

“While 12 to 18 months more may pass before the settlement, valued at $172 million, becomes final state officials urged local groups not to wait to prepare proposals for enhancing local fishing.”

“Many audience questions fielded by the five-person panel concerned the perception the settlement doesn’t do much for Ludington area fishing specifically—the fishing most affected by the fish kill at the plant.”

It was only after 1995 that some of the large-scale impacts of Ludington Pumped Storage Plant began to be addressed. Ultimately, a FERC-sanctioned 2-1/2 mile long (12,850 ft) barrier net was deployed across hundreds and hundreds of acres of riverbed and bank.

Sadly, it seems that net did not mitigate or resolve the loss of local fisheries in the Ludington region. Its deployment was either ineffective or far too late for a regionally- and culturally-important sustained harvest of local- sourced and eaten native yellow perch and lake trout. Those perch have now essentially disappeared in the Ludington-Manistee region—which is noted in Stakeholder Testimony supplied for the Ludington Scoping Meeting on April 17, 2014 where Mr. Richard Underwood testified that past Michigan DNR creel surveys had found: “close to a quarter million perch” in Ludington habitats. “In the last few years, four years, we have had a total of zero count of perch in Ludington, and that’s how it has affected.”

The giant Ludington barrier net appears to be one key player in the puzzle of the missing perch. It appears to act as a fish trap. According to Mr. Underwood that net, along with an artificial reef constructed nearby, attracts a giant collection of cormorants that feed on the fish trapped within the confines of the net, “There were so many birds on the reef and inside the barrier net you couldn’t count them. I estimated there were 3,500.”

Ironically too, in recent years, federal hatcheries in the Connecticut River basin have been producing lake trout to supplement the now-crippled and dwindling native population of lake trout on Lake Michigan.

Another similarity in these two relicensing proceedings is that FERC’s Scoping Site Visits at both the NMPS plant and LPSP were scheduled either before the PAD had been given to Stakeholders, as it was NMPS, or—as noted in state fisheries testimony at Ludington, the Site Visits are not scheduled to take place until well after Study Requests and Stakeholder Comments are due.

Both of these processes deprived the public and officials the ability to visit, witness, and develop an understanding of the complex impacts of these pumped storage plants before submitting testimony, comments, and informed study requests.

Similarly, both plants have deployed barrier nets as a means of diminishing their fish kills and entrainment/mortality impacts. And, at both sites the fishing is poor and with stocks deteriorating.

The difference on the Connecticut River is that migratory fish here are forced to encounter two entrainment opportunities through FirstLight facilities. The first occurs seven miles downstream, when they are deflected by attraction flows into the Turners Falls Power Canal, with Cabot Station turbines operating on the downstream end.   The small percentage of fish that manage to survive the 2-1/2-mile, 8-day (average) transit to the head of that canal—and the even smaller number that actually exit upstream(1-10%), then get the chance to be culled by NMPS turbines, just five miles further upstream.

In its filing of the Ludington Scoping Meeting documents, GDF-Suez FirstLight seems to be suggesting some link between the large-scale wind power facilities built by LPSP owners Consumers and DTE, and a key, future role for renewables here in sucking the Connecticut River backward and pulling it uphill into the Northfield Mountain Pumped Storage reservoir.

That connection is tenuous, at best. Consumers and its partner DTE now own and operate a large-scale wind farm consisting of some 56 turbines. Its deployment required the purchase or easement rights to 16,000 acres of Michigan property, most of it to trench-out underground power lines to reach back to their grid and pumped-storage plant. Their large-scale wind operations are due to the presence of 118 miles of open Lake Michigan at their back, as well as a flat, open, prairie landscape to site giant turbines on.

FirstLight seems to be implying that NMPS will be similarly employed at some future date—its ecosystem impacts ignored because of the huge amount of surplus, cheap, local, renewable energy available to pump a river uphill at night. But solar doesn’t generate at night; and available local hydro here is modest and run-of-river—it would not constitute a “renewable” source to be tapped to pump water uphill. And, wind power opportunities here are spotty, small scale, and generally available on isolated ridge tops.

Clearly the Connecticut River Valley has none of the necessary features that might facilitate the large-scale wind renewables/pumped storage relationship found at LPSP. Nor, has FirstLight proposed plans for any large-scale wind projects in the region. No other entity has either. Cape Wind, whose large scale deployment will be installed miles off the Atlantic shore, is not proposing a pumped storage plant be built above the Truro Cliffs in order for its renewable energy megawatts to be consumed. Here, there just aren’t flatland mega-farm acres available, and only a few ridge tops here have proven suitable for siting isolated turbines.

GDF-Suez Manager John Howard stated at the Dispute Resolution Panel: “We can manage fluctuations in energy schedules with wind, solar, and imports from Canada and New York, primarily. And then the ability to respond very quickly to energy and operating reserve needs of the power system, any time of the day or calendar year.” He states that “We can manage…” But there is nothing backing up the statement. Nothing that proves there is a surplus amount of renewable energy reaching NMPS to state clearly that “We do manage…” or “We will be managing…”   The implication is that NMPS is a necessity here in order to implement renewable energy in the region. Where is the science to back that up? Solar is not around at night. And the region is sub-marginal for large-scale wind, as well as lacking in opportunities for securing thousands of acres of right-of-way here. So, where is the implied connection between these two facilities—beyond fisheries destruction?

Michigan, with its open face to the winds—which do blow at night, apparently ignores the to damage to its Great Lake ecosystem and fish, and tallies the wind-energy driving Lake Michigan waters and uphill to its pumped-storage plant as “renewable.” We don’t have that wind here, and solar power generation is a whole different animal–not in any way the high-octane source needed to push a river uphill at NMPS. FirstLight has built a 2 MW solar installation atop the 11 acres of land it was mandated to construct for silt-settling ponds by the EPA in 2010 after being sanctioned for massive infractions of the federal Clean Water Act by dumping up to 45,000 tons of pumped storage reservoir silt and sludge into the Connecticut River , the company has not included any information on how that solar facility connects to, and interacts with, and powers its pumped storage operations. Unlike large-scale wind, solar does not deliver its energy at night–when NMPS asserts that it will do most of its pumping.

Pumped storage can only be deemed “renewable” energy in a generating environment where ecosystem impacts are not considered. Pumped-storage itself was a net-loss bargain that was ill-considered even back when there was actually surplus nuclear available in the region. Now this taking-of-a-river is mostly accomplished at NMPS by climate-warming, non-renewable fossil fuels. This is a lose-lose situation for renewable energy use–and for an ecosystem.

GDF-Suez FirstLight’s NMPS plant does feature “black-start” capabilities, and does offer FERC and ISO the ability to accomplish load-leveling at certain critical times. However, these attributes must be balanced against long-standing federal and state efforts to complete a forty-seven year old migratory fisheries restoration on the Connecticut, and the public’s long-term need to have a sustainable Connecticut River ecosystem. NMPS operations also need to adhere to federal and state environmental law.

In 1995, Consumers and DTE paid the public $172 million for their past fish kills of the previous decades. Thus far, the public has not been compensated for the on-going taking of fish at NMPS on the Navigable Waters of the United States, nor have citizens in MA, VT, NH and CT been able to reap the benefits of anything near the stated goals of a four-state fisheries restoration program targeting recreation fishing and harvestable seafood.

Studies with measurable results are required for a fair relicensing process. Stated steps in the FERC relicensing process should be followed to allow the public a contextual look at the operations before the need to suggest studies or prepare testimony. To facilitate a fair process, FERC should require context and full disclosure of all submitted documentation on the part of the applicant, as well as phone conference transcripts to allow an understanding of the ongoing dispute procedure.

Placing a net in front of LPSP and NMPS has not stopped the fish kills at either plant. A band-aid should not be applied to a gaping wound. Complete and proper studies of all life stages of fish mortality are needed for NMPS relicensing. Regulatory pumping and generating restrictions that protect the public resources of US citizens are overdue and necessary there. The studies needed to accomplish this should take place before any new license allows this ongoing “take” to continue through 2048.

End of Formal Comments

Thank you for this opportunity to participate in improving license requirements and protecting the Connecticut River ecosystem for future generations.

Sincerely,

Karl Meyer, M.S.