federal trust fish

Archived Posts from this Category

STARVED: Our river has rights!

Posted by on 31 May 2022 | Tagged as: Connecticut River, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, Death-Sewer, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, Holyoke Co. v Lyman, migratory fish, Nation's best landscaped sewer, Northfield Mountain, Northfield Mountain Pumped Storage Station, Peskeomscut, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, US Supreme Court, Vermont Digger

Our River has Rights


Controlled from 5 miles upstream by operators inside Northfield Mountain, FirstLight’s impoverished river spill at Turners Falls Dam: its now five, full, grim spawning seasons since FL’s Federal Energy Regulatory Commission license expired, April 30, 2018. Photo Copyright © 2022 by Karl Meyer

NOTE: text below published in www.vtdigger.org on May 18, 2022.
https://vtdigger.org/letters_to_editor/our-connecticut-river-has-rights/>

In Turners Falls Massachusetts on Saturday May 14th just a small wash of current folded through two bedrock notches in the Connecticut River at a basin known as the Rock Dam pool. It was peak spawning time at critical spawning habitat for the federally endangered shortnose sturgeon. Upriver just a thin spill entered the riverbed via a single open gate at Turners Falls dam, controlled by FirstLight operators at the Northfield Mountain Pumped Storage Station, 5-miles away. The Connecticut’s giant chasm at the place known to Algonquian Peoples as Peskeomscutt was mostly dry bedrock, with just thin braids of dam flow washing downstream.


The listless, calf-deep shallows at the ancient chasm known as Peskeomscutt below Turners Falls Dam. For a living river the trickling flow from the dam into this basin should be 20x times what you see in this baking riverbed landscape. Photo Copyright © 2022 by Karl Meyer

That lack of flow had assuredly chased the ancient sturgeon from their age old spawning site again. Five years and 5 seasons after FirstLight’s license on the river expired on April 30, 2018, there is still no water for the river or its fish. Why? After a decade of endless Federal Energy Regulatory Commission relicensing procedures, why are hundreds of thousands of American shad lacking river flows needed to reach and pass the dam blocking them from spawning habitat in three New England states since 1798?


The grim “bakers” field of exposed cobbles and starved shoreline at the Rock Dam on the Connecticut–critical spawning and sheltering habitat for federally endangered shortnose sturgeon, and an impoverished upstream roadblock to shad attempting to reach Vermont and New Hampshire habitats. Photo Copyright © 2022 by Karl Meyer

The river and its fish are a public trust. Shad should be feeding us. FirstLight’s little dam spillage is some 20 times less than a basic flow needed to support a living river ecosystem here–one allowing sturgeon to spawn and shad to reach Vermont and New Hampshire.


Reconstruction work being done at the giant sucking intake of FirstLight’s Northfield Mountain Pumped Storage Project–essentially a deadly, energy-wasting, river-sucking, gas-powered machine that extinguishes the life of everything its consumed for over a half century. Since 1972 there has never been a more direct-deadly contraption operating on New England’s Great River. Here at Northfield Massachusetts is where an ecosystem is literally pulled apart by suctioning the four-state Connecticut River backward and uphill for hours at a massive 15,000 cubic feet per second. It’s really exploited as the Connecticut River’s Death-Sewer. Photo Copyright © 2022 by Karl Meyer

In 1872 the US Supreme Court made safe fish passage on the Connecticut the law of the land. Canadian-owned FirstLight is exploiting our river for millions, while laws and requirements go listlessly unenforced by agencies and so-called watchdogs. The Connecticut in Massachusetts has been an environmental disaster since Northfield Mountain began its massive suck and surge operations in 1972. By whose right?

“No license to kill”: citizens defend the Connecticut River at its ecosystem graveyard—Northfield Mountain Pumped Storage Station

Posted by on 06 Feb 2022 | Tagged as: Connecticut River, Connecticut River blog, Connecticut River ecosystem, Connecticut River Refuge, Conte National Fish & Wildlife Refuge, Delaware LLC, E-Comments, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, fish kill on the Connecticut, Great River Hydro, Greenfield Recorder, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Nation's best landscaped sewer, National Marine Fisheries Service, net-loss power, NMFS, no license to kill, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, PSP Investments, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, The Greenfield Recorder, The Recorder, US Fish & Wildlife Service, USFWS, Vermont

In an unrelenting drumbeat of filings to the Federal Energy Regulatory Commission, citizens throughout the Connecticut Valley are demanding that no new license be issued to Canada-owned FirstLight for their Delaware-tax-sheltered Northfield Mountain Pumped Storage Station here in Massachusetts.

https://www.recorder.com/my-turn-gyorgy-FirstLightLicensing-44862677

Please read the excellent opinion piece ABOVE from last week’s Greenfield Recorder by Anna Gyorgy, then continue further BELOW to read the latest group of on-the-record citizen filings to FERC insisting that a new license to kill be denied at Northfield Mountain for this venture capital outfit. KEY EXCERPTS from the most recent CORPORATE filings to FERC can be found at the end of this post.

IN THE LATEST INDICATION of the strength of opposition to a new Northfield license FirstLight just missed another self-targeted deadline to have its secret license negotiations with US Fish & Wildlife, MA Dept. of Environmental Protection, MA Division of Fish & Wildlife and the National Marine Fisheres Service all buttoned up and ready to send off for FERC approval.

IN THEIR LENGTHENING FAILURE to put the last nails in this four-state ecosystem’s river-reversing, fish-killing coffin, FL was forced to request “that the Commission continue to defer issuance of its Ready for Environmental Analysis (REA) Notice until after February 28, 2022. FirstLight anticipates requesting the Commission to further defer the REA Notice until after June 30, 2022, to allow the parties time to negotiate a comprehensive, binding settlement agreement that aims to fully resolve all relicensing issues.

THOUGH THIS MAY APPEAR to be merely yet another of FirstLight’s series of month-long delay requests–it’s actually admitting they’ll likely not have this thing safely in their Delaware-registered tax bag until July of 2022 or LATER. What it really says is that they foresee stumbling blocks to getting agreement on allowing the impacts of this river-killer with the public agencies charged with protecting the Connecticut River ecosystem. It’s being negotiated on their watch. They are responsible for defending our so-called, “S.O. Conte Connecticut River National Fish and Wildlife Refuge,” our ‘only’ “National Blueway”–and what remains today our drop-dead-deadly, ‘nation’s best landscaped sewer’ right here in Massachusetts.

It is the PEOPLES’ voices that are doing this by writing and filing with FERC:
Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

This is THE PUBLIC’S RIVER! It deserves to LIVE. And, it deserves a real WATCHDOG– YOU!! Thanks to all for raising your voices.

ALSO, this new podcast with OCCUPY THE AIRWAVES on Valley Free Radio:
https://archive.org/details/occupy-the-airwaves-1.17.2022-karl-meyer

BELOW are the latest citizen filings with the Federal Energy Regulatory Commission:

Document Accession #: 20220207-5017 Filed Date: 02/07/2022
Pat Graves, South Deerfield, MA.

Many things have changed in recent years. I urge that no relicensing of
FirstLight’s Northfield Mt. Pumped Storage Station take place without
careful consideration of the benefits and harms. At this time it appears
that the harms far outweigh the benefits.

Document Accession #: 20220207-5014 Filed Date: 02/07/2022
Anne Naughton, Shelburne Fls, MA.

Hello,
Please DO NOT renew Firstlight’s lease on the Northfield Mountain Pumped
Storage Project, P-2485.

The Connecticut River is not replaceable. We can get electricity from other,
less destructive sources.

Sincerely,
Anne Naughton
Shelburne Falls, Massachusetts

Document Accession #: 20220204-5174 Filed Date: 02/04/2022
Wayne Pleasant, Turners Falls, MA.
Feb 4, 2022
REF: P-2485 FirstLight vs River Wildlife

Dear FERC
Please deny the license for the Northfield pumped storage system. I have lived on the CT river all my life and have seen first hand the incredible damage that they do to our river.

The system is not “Green Energy.” It consumes more energy that it produces. It is only used for making more money for FirstLight and not to benefit consumers and the environment. It severely damages the shoreline by raising and lowering the water level and thus associated wildlife.

It causes unnatural waterflows that damages and compromises the river environment for endangered Short Nosed Sturgeon.

Sucks up and kills large and small fish through its turbines. No proposed net will stop small fish and associated eggs from being sucked up and killed.

NOTE: If I were to kill this many fish every day I would be arrested for violating protected species rules.

Please do not issue a license to this facility to kill more wildlife.

Thank you,
Wayne
(** NEW filings continue below **)

Document Accession #: 20220204-5027 Filed Date: 02/04/2022
James Terapane, South Deerfield, MA.

I am writing regarding P-2485 Northfield Pump Storage re-licensing process. First off, I am, with many other local citizens, opposed to re-licensing this facility as it currently operates. The disruption of the CT. River ecosystem that this and other First Light Hydro facilities create is
unacceptable.

I demand that FERC allow for public comment as required by Massachusetts DEP review of the re-licensing so that all information related to this process be presented to the public and the citizens of United States be heard. Let’s not forget that First Light is a foreign owned entity whose interests are not necessarily in line with ours, the American Citizens who’s river resources are being borrowed for profit.

We citizens of the Connecticut Valley have worked hard to protect and use our rivers in a sustainable manner and will continue to do so. The idea of the facility being used as a “battery” is a clever pitch but we don’t buy it, not at the cost of the continuing destruction the river ecology. Please don’t cloak this crude way of using the river as “Green”. What is being done to our river is anything but Green Thinking.

Now is the time for bold solutions that secure a reliable power source AND protect our environment. I urge First Light Company, if they must have their battery, to use what ever innovative brain power they have in their company to solve this problem of river and fish destruction otherwise you are not welcome to use our resources.

The people of this region have brought forth many innovative problem solving ideas and pioneered the American Hydro power industry so I urge the managers of First Light to step up to the plate and address how to solve this problem. If they don’t have any ideas we can help them out.

Document Accession #: 20220204-5025 Filed Date: 02/04/2022
Wendy Sibbison, Greenfield, MA.

I oppose the relicensing of the Northfield Mountain Pumped Hydro Storage Station because its immediate and long-lasting harm to the ecology of the river and to its living inhabitants outweigh “both in ethical and economic terms” any benefit to the public of FirstLight’s plan to transport and store energy, far from its source, for later generation at a net energy loss.

AND BELOW ARE DIRECT EXCERPTS FROM FirstLight’s most recent filing with FERC, and–further below that, from Great River Hydro’s filing noting that it is being held back in their relicensing of their non-lethal, Vermont river facilities due to the successive delays requested by PSP Investments-owned, FirstLight at Northfield.

Document Accession #: 20220131-5365 Filed Date: 01/31/2022
Alan Douglass Regulatory Compliance Manager

“FirstLight continues to discuss fish passage, minimum stream flows, and project operational issues with federal and state resource agencies, and certain non-governmental organizations. FirstLight and the agencies have reached conceptual agreement on minimum stream flows, upstream and downstream fish passage facilities, and certain operational measures. The parties are continuing to make progress on the remaining operational measures, at which time they intend to execute an AIP.”

“In light of the significant progress of FirstLight and the relicensing participants in achieving conceptual agreements, FirstLight requests that the Commission continue to defer issuance of its Ready for Environmental Analysis (REA) Notice until after February 28, 2022. FirstLight anticipates requesting the Commission to further defer the REA Notice until after June 30, 2022, to allow the parties time to negotiate a comprehensive, binding settlement agreement that aims to fully resolve all relicensing issues.”

Alan Douglass
Regulatory Compliance Manager

Great River Hydro’s VERNON DAM facilities and its non-lethal fish passage for migrating fish in New Hampshire and Vermont.

BELOW, is text excerpted from GRH’s FERC filing:

Document Accession #: 20220203-5098 Filed Date: 02/03/2022
John L. Ragonese
FERC License Manager
Great River Hydro, LLC

“In the most recent status report, FirstLight Licensees announced conceptual agreements with a number of relicensing participants on several key issues and that they were close to reaching agreement on other key issues. The filing asks the Commission to further defer issuance of the REA Notice until after February 28, 2022, to allow relicensing stakeholders to reach agreements in principle. It also suggests that they intend to request the Commission further delay issuance of the REA Notice until after June 30, 2022, to allow for the development of a binding settlement agreement that the parties. GRH anticipates the Commission would reasonably hold off issuing the REA Notice for at least six months, in order to consider an executed settlement agreement between FirstLight Licensees and stakeholders as a preferred alternative in an amended application.”

“At this point in the process, however, there is no reason for the Commission not to issue the REA Notice for the GRH Projects. Even if the Commission further defers the REA Notice for the FirstLight Projects for another six months, it can still prepare a multi-project environmental impact statement for all five projects.”

“GRH has consulted with federal and state fishery and water quality agencies, and we are authorized to state their support GRH’s request for the Commission to move forward.”

Sincerely,
John L. Ragonese
FERC License Manager

CONNECTICUT RIVER UPDATE: STAY THE COURSE; KEEP UP THE PRESSURE!

Posted by on 20 Jan 2022 | Tagged as: Anadromous Fish Conservation Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River blog, Connecticut River ecosystem, conservancy, Conte National Fish & Wildlife Refuge, critical habitat, E-Comments, ecosystem, EPA, ESA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Comments, FERC license, FirstLight, Holyoke Co. v Lyman, Landmark Supreme Court Decision 1872, MA Department of Energy and Environmental Affairs, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, public trust, right-to-know, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, US Fish & Wildlife Service

A Connecticut River deluge of citizens “no License to kill” defense pours into the Federal Energy Regulatory Commission.

READ THOSE DEFENDERS NAMES in the list below…

STAY THE COURSE; KEEP UP THE PRESSURE!

* * Also: On Sunday, January 23 at 10:00 AM, on Occupy the Airwaves, I join Paki Wieland, Bob Gardner and Emikan Sudan, to speak about these critical weeks for the future of the Connecticut River as FirstLight Power tries to nail down secret negotiations to relicense the devastation of the Northfield Mountain Pumped Storage Station for another half century: https://www.facebook.com/VFROccupytheAirwaves/ I hope you can listen and TAKE ACTION! * *

Occupy the Airwaves can be heard every Sunday morning at 10:00 AM on Valley Free Radio, WXOJ-LP, 103.3 FM, in Northampton, MA. Shows are re-broadcast every Friday at 3:00 PM, and can be streamed at www.valleyfreeradio.org.

HERE IS THE LIST OF THE LATEST CITIZEN HEROES of Connecticut River DEFENSE. NOTE: Update continues further below:

Joseph W Stubblefield, Sanjay Arwade, Jonathan S Shefftz, Jamie Rowen, Michael Giles, William H. Pete, Nicholas Reich, James Lowenthal, Katharine Sims, William Daniels, Paige Wilder, Karl Meyer, Shayla G Freeland, Mary J Metzger, Robert Arbib, C Grecsek, Malcolm G Everett, Mike Cournyn, Robert Catlin, Don Ogden, William N. Ryan, Elizabeth Whitcomb, Judith Nietsche, Celt Grant, Susan Olmsted, David B. Keith, Glen Ayers, Virginia Hastings, Annie Chappell, James Seretta, Ron Barto, Robert Dickerman, Pamela Scott, Tanya Dragan, Lin Respess, Rebecca Tippens, Sigurd Nilsen, Peggy Matthews-Nilsen, Amy Rose, Steven Wilkinson, Stephen Kerr, Nancy Obertz, Dorothy McIver, Robert Sweener, Seth Wilpan, Norma Roche, Fergus Marshall, Louise P. Doud, Vicki Citron, John Nelson Jr., Jon Burgess, Robert F Porzio, Garrett D Connelly, Dave Dersham, Betsy Corner, Graham Hayward, Sid Siff, Paul Richmond, Betsy Browning, Rebecca Robbins, James Smethurst, Laura Doughty, Mary Hall, Laura Kaye, Frank Ribeiro, Andrew Hutchison, Mark Russo, Judith Phillips, Priscilla Lynch, Molly Freeland, John Hoffman, Roberta Murphy, Dodi Melnicoff, Ethel S. White.

These folks have gone on the record with FERC in recent weeks and months, stating no new license should be issued for the Northfield Mountain Pumped Storage Station. They are from up and down the Connecticut Valley, from the Bay State’s border with Connecticut, up to Putney VT. I hope I haven’t skipped any of these people who understand ecosystems and have had the courage to defend ours for those who come along after. Many have also made their defense stronger by posting it in the public press. Thank you all, and stay the course!

These River’s defenders have staved off FirstLight’s secret license-to-kill negotiated plans with US Fish & Wildlife, National Marine Fisheries, MA DEP and MA Fisheries & Wildlife. THEY ARE SUCCEEDING: * NO SECRET AGREEMENT has yet been signed!! *

Don’t get sidetracked: STAY THE COURSE; KEEP UP THE PRESSURE!

OF CRITICAL NOTE:

I’ve been forwarded some posts recently. They appear to be some watershed rhetoric claiming to have discovered a last-minute, secret mechanism that can change the trajectory of this federal process at the state-level–AFTER a negotiated deal has been signed by the big-dog players and forwarded to FERC for approval.

That Cinderella idea seems to be just more window dressing from those who’ve failed to engage openly with the public in this 10 year fight. There have been decades–and numerous opportunities for any bona fide watchdog to file lawsuits on any number of flow, critical habitat and wetlands infractions and flagrant ecosystem damage across half a century.

New England’s River has been left on life-support here in Massachusetts—reversed, comatose and massively-deadly at Northfield for the last half century. There have been no lawsuits; there have been no challenges—under the Clean Water Act, Rivers and Harbors Act, Endangered Species Act, the 1872 Supreme Court ruling in Holyoke Company v. Lyman. None stood up as responsible public trust agencies for decade upon decade as the river was left in ruins as the Nation’s best landscaped deadly sewer in the Commonwealth.

We’ve just never had a real watchdog here. If there had been one it would have sued federal and state agencies and taken on a power company long ago. Defenseless for 50 years… YOU DON’T STAND BY WATCHING THE HORSE LEAVE THE BARN!

At this time, in this top-down federal process where big-time forever decisions are being made beyond the public eye, the key place to put the pressure on the agencies charged with protecting our public trust is straight to the top: GOING ON THE RECORD WITH THE FEDERAL ENERGY REGULATORY COMMISSION. Every FERC entry these defenders made has also been seen and registered in the licensing files by MA DEP, US Fish & Wildlife, MA Fisheries and Wildlife, and National Marine Fisheries. These folks are getting a constituent earful.

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife. Forward them your Letter; then maybe forward it to the MEDIA for broadening the public record!

It is pure fantasy that it will be possible to “save the river” and make key changes to a top-down negotiated federal deal AFTER these key agencies have signed some giant ecosystem compromise with venture capital FirstLight for the next 50 years. It’s pure fantasy, bravado, and soft-pedaling of the critical juncture we are at right NOW.

The only sensible, just and moral position to take with the future of an ecosystem that must be revived to support coming generations is simply: NO LICENSE TO KILL. That’s what’s at stake right now—telling our public agents there can be no deal sanctioning a half century of massive fish kills and river reversals here in Massachusetts, in the heart of the S.O. Conte Connecticut River National Fish & Wildlife Refuge. ONCE it’s signed, there will be little if anything left to re-bargain over. The time is NOW.

There is no sugarcoating what’s at stake RIGHT NOW in secret Connecticut River federal relicensing negotiations occurring behind closed doors between FirstLight and fed/state agencies. It’s no less than the future of a living Connecticut River ecosystem. Critically, what takes place and gets secretly-signed in that backroom closet between FirstLight’s venture capital lawyers, and federal and state environmental trust entities is likely to seal the life-or-death fate of a broken ecosystem here for what ‘s essentially its last chance at revival. There are many examples of terrific testimony and river defense in the other blog posts on this site.

AGAIN, if you haven’t yet submitted testimony–or know of others who want to defend our River’s right to survive as a living system, here’s the FERC formula to share:

Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

This is THE PUBLIC’S RIVER!

More Connecticut River citizens’ defense

Posted by on 13 Jan 2022 | Tagged as: America's best landscaped sewer, American shad, Clean Water Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River blog, Connecticut River Conservancy, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, Endangered Species Act, EPA, ESA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, fish kill, Holyoke Co. v Lyman, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, Nation's best landscaped sewer, National Marine Fisheries Service, NMFS, NOAA, Northeast Utilities, Northfield Mountain, Northfield Mountain Pumped Storage Station, NU/WMECO, P-2485, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, US Fish & Wildlife Service

THE CONNECTICUT RIVER’S CITIZEN DEFENSE continues:
While FirstLight’s secret January license “settlement” talks continue–centered around leaky net ideas and spit-and-glue window dressing at Northfield Mountain, the public is demanding that its 50 years of devastation cease.

https://www.youtube.com/watch?v=ybwy8MBiy9I
* * NOTE: ABOVE is a link to a Wilbraham Public Library ecology lecture series I was asked to take part in last November. The title of my presentation was: “LIVING RIVERS FLOW DOWNSTREAM.” IT IS A KEY HISTORIC PERSPECTIVE to understanding why we live in a broken ecosystem… * *

https://www.gazettenet.com/my-turn-meyer-LastLightCtRiver-44127152

FirstLight led closed-door bargaining with state and federal fish and environment agencies are continuing here in MA, while an ongoing flood of citizen testimony to end Northfield Mountain’s license to kill continues at the Federal Energy Regulatory Commission.

THOSE DEMANDS–from no less than 77 people since November 13th, are also sending a very clear signal to the MA Division of Fish & Wildlife, MA DEP, the US Fish & Wildlife, and National Marine Fisheries Service:

DON’T SELL OUT New England’s Great River for another half-century!

* Read the latest public testimony targeting Northfield lethal ecosystem destruction entered into the FERC record further below.*

BUT FOR THE LONG VIEW, HERE’S A LITTLE ILLUMINATING HISTORY:

Only living rivers flow downstream. But that’s not what you find on the Connecticut River in the Commonwealth of Massachusetts. Here, 150 years after the US Supreme Court guaranteed safe upstream and downstream passage of migratory fish to and from New Hampshire and Vermont—and a full half century after the enacting of the Clean Water Act and Endangered Species Act, the Northfield Mountain Pumped Storage Station continues to chew-through, reverse and obliterate the key living ecosystem functions of New England’s critical central artery here in northern Massachusetts.

The grim prospects of allowing Northfield to be built were widely known by federal and state agencies half a decade before it began its deadly, net-power loss, river-reversing ecosystem damage. Here, from the same agencies that are today’s MA Fish & Wildlife, US Fish & Wildlife Service, and the National Marine Fisheries Service (the entities still publicly responsible for environmental enforcement and river fish protection), are their words from a key, signed, 1967 document:

“Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River Basin”

“Based on the present fragmentary data available on the Northfield Pump Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae, and young fish of both anadromous and resident species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water. Studies, designed to minimize the potential adverse effects to fishery resources, should be undertaken in development of the design for the Northfield Pump Storage Project. In related studies, fish screens, barriers and deflectors, and flow regimen must be thoroughly investigated.”

Those agencies’ inaction, their failure to protect–while instead indulging in a massive frenzy to recreate an extirpated salmon hybrid in place of a fish not seen here since 1809, proved disastrous for the river’s still-living fish runs and species in this four-state ecosystem. Today, absurdly, a deadly Northfield Mountain soldiers on, while—50 years later those same agencies dicker with foreign owners over emplacing a new band-aid of a barrier net—one full of holes, upstream of that deadly, river-reversing suction.

In the “library” at the Connecticut River Watershed Council—today’s “Conservancy”, there is a boxed, mid-1960s promotional document from WMECO/Northeast Utilities. NU is today does business as Eversource, the perennial chief sponsor of the Conservancy’s Source to Sea Cleanup. That half-century old box contains a glossy booklet promoting the future construction of a Northfield Mountain Pumped Storage Station. The booklet includes several scenarios and options to premise how of its net-loss power pumping operations might be deployed.

One of them was a glaring red flag for the river, its fish, and an entire ecosystem…

The Watershed Council HQ has a private library within…

THAT SHUTDOWN OPTION, never implemented, was that Northfield’s impacts would be so detrimental to the river and life cycles of its migratory fish that it would have to be shut it down during fish migration season. But here again, no watchdog ever emerged to stand up and fight for a living Connecticut River in Massachusetts. Basically, the only protection ever offered was a net to protect their mythical, teeny, hatchery-bred baby salmon, leaving all the river’s other species to fend for themselves.

Thus Northfield’s gargantuan and lethal water and fish appetite still strangles New England’s four-state ecosystem today. And, half a century later, those same public agencies are allowing a power company to dangle the grim bait of temporary fish barrier net before them once more.

ABOVE IS AN EPA-ORDERED “silt barrier” mandated to be kept in place at FirstLight’s Northfield intake after they were caught flagrantly and clandestinely dumping a mountain of muck directly into the river for over 90 days straight in gross violation of the Clean Water Act. Looking closely, you can see it has FAILED, its anchors useless, and its floats flapping in the breeze along the shoreline downstream of Northfield’s sucking intake. Photo taken 10/2/2010.

Even two years after Northfield came on-line the Federal Power Commission–today’s FERC, still had not been given answers to information they’ requested of WMECO–today’s Eversource, including describing flows on a reversing river. This is a Xeroxed document from FERC:

20010120-0656 FERC PDF (Unofficial) 09/10/2014: January 22, 1974, from the Federal Power Commission to WMECO:

Robert E. Barrett, Jr.,President.
Western Massachusetts Electric Company
West Springfield, Massachusetts 01089

Dear Mr. Barrett:
The Commission staff is presently preparing the Draft Environmental Impact Statement for the Turners Falls Project (No. 1889) and requests the following information:
(1) In the revised Fxhibit W of the application (page 43, second paragraph), reference is made to the continuing resident fish study being conducted in Turners Falls Reservoir. Please provide a copy of the results obtained since the last Progress Report. If the study has not been completed, please indicate the date you expect a report to be available.

(2) In Exhibit W (pages 19, 20, and Figure 5), the conditions expected to produce flow reversals in the Turners Falls ‘Reservoir as a result of Northfield operation were set forth. Since the Northfield Mountain Project became operational, which of the conditions described have been observed to produce reverse flows? Based on operational experience, are there any observed or anticipated changes in the patterns, durations, or velocities of the flows described therein? Your early response in providing this information would be appreciated.
Very truly yours,
Secretary

On October 16, 1974, WMECO’s lawyers finally replied in the negative to the Federal Power Commission’s questions, stating they still had not implemented the required study which would offer answers to questions about the impacts of reversing the flow of the Connecticut:

“Staff also inquired whether the Company had a study on the effect of hydrology caused by the pumping of Northfield Mountain project this year. The Northfield Licensees have not made a formal study but are accumulating data with respect to Pond elevations, flows and other operating data.”

EVERYBODY KNEW 50 YEARS AGO: yet nobody came to the Connecticut’s rescue…

BUT TODAY CITIZENS are standing up for the living river owed future generations. SEE BELOW for the latest entries into the FERC public record…

BUT FIRST, here’s how it can be done:
Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

HERE ARE THE LATEST:

Document Accession #: 20220111-5033 Filed Date: 01/11/2022
Elizabeth J Erickson, Colrain, MA.

As a long time resident of Franklin County I have for a long time been very concerned about the environmental and ecosystem destruction at Northfield mountain because of the power generating plant there. I have been following the research about the decline in fish populations in the Connecticut River nearby because of the turbines and am strongly opposed to the reicensing of the First Light hydropower plant there. I’m actually shocked that the relicensing is even being considered given all that is now known about how destructive the plant is. Please deny any future license of power generation of Northfield Mountain.

thank you,
Elizabeth Erickson
Colrain, Massachusetts

Document Accession #: 20220111-5005 Filed Date: 01/11/2022
John Hoffman, Shelburne Falls, MA.

I am writing to ask that you deny a continuation of the license for FirstLight Hydro Generating Company. The project began as a way to make use of excess power from the Vernon Nuclear Power Plant. That plant is now closed. This license is now simply a vehicle for FirstLight to use its capitol to make a profit.

That profit comes at the expense of the Connecticut River, one of the glories of New England, and the source of outstanding agricultural soils in the Connecticut River valley. Now that we possess a vastly more sophisticated understanding of river ecology, the damage to the river is elaborately documented.

By sucking large volumes of water out of the river and then disgorging them back, the company erodes the river banks which in turn damages water quality. The turbines through which water is sucked destroy aquatic life, from adult fish, to their young and down to their eggs.

This is a primitive way to treat a river. No company in our present era should be allowed to inflict such damage. This river is a part of the commonwealth of Massachusetts. We the citizens ask you to protect the invaluable ecosystem of our preeminent river and deny FirstLight its license.
Future generations will thank you.

Document Accession #: 20220111-5004 Filed Date: 01/11/2022
Molly Freeland, Gill, MA.

To whom it may concern,
I am a resident of Gill Massachusetts and I request that you do not let Northfield Mountain Pump Station renew their license. The pump station is killing all life it sucks up from the river. Millions of fish are dyeing every year, including endangered short nose sturgeon. The pump station causes major erosion in the river banks which then spreads pollution. The pump station is escalating climate change when we need to be looking to renewable energy sources. Please say no to the pump station for our children, grandchildren, all life and the planet.
Sincerely,
Molly Freeland

Document Accession #: 20220111-5002 Filed Date: 01/11/2022
Irma Lorraine Pearson, Greenfield, MA.

If we, residing in the Democratic heart of our country, cannot save the only large river we have, and all the life in it, we are putting our imprimature on the destruction of our planet for the sake of building private fortunes.

The cautionary tale of Midas and his gold works very well here.
Let’s try another path, of freeing the rivers of dams and reversals, and saving 50% of our ecosystem as wilderness.

NO DEAL: amid public opposition FirstLight’s secret Northfield Mountain settlement plans stumble.

Posted by on 10 Jan 2022 | Tagged as: America's best landscaped sewer, American shad, Canada, Clean Water Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, Endangered Species Act, EPA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, Nation's best landscaped sewer, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Public Comment period, shad, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, State of Delaware, US Fish & Wildlife Service, USFWS


NO DEAL: amid public opposition FirstLight’s secret Northfield Mountain settlement plans stumble.

Failing in December to secure a secrecy-shrouded agreement, foreign-owned FL petitions FERC again for what’s now an open-ended “Delay of Action/Extension of Time” request. Thus the opportunity for critical public testimony in FL’s Federal Energy Regulatory relicense bid for Northfield remains WIDE OPEN. (**SEE simple FERC filing instructions at end of post)

As scores of public testimony to end Northfield Mountain’s devastation has poured into the Federal Energy Regulatory Commission of late, secret license deals with federal and state fish and agencies here in Massachusetts continue to elude FirstLight Power. The MA Division of Fish & Wildlife, US Fish & Wildlife, MA DEP and the National Marine Fisheries Service–responsible to the public for protecting the Connecticut’s migratory and resident fish, flows, and water quality under established law, are legally empowered with “conditioning authority” to end the half century of slaughter wrought by Northfield’s deadly suctioning. They currently hold the keys to determining if the Commonwealth hosts New England’s river-reversing, ecosystem grim reaper for more decades to come.

Democracy for coming generations means not leaving our river in the hands of a private corporation for ANOTHER half century.

FirstLight filed their latest FERC delay bid on January 4, 2022, the same day as Ethel White of Easthampton filed her FERC testimony stating, “I write concerning the Northfield, MA hydroelectric plant application for recertification. I strongly request that recertification be denied,” Meanwhile, FirstLight, that same day filed a “Continued Request to Defer Issuance of Notice of Acceptance / Ready for Environmental Analysis” with FERC for their Delaware tax-sheltered MA facilities here. Yet, with this latest delay request it appears they’ve discovered their venture capital plans for the Connecticut River are not being swallowed whole here in New England.

Parent-owned by Canadian venture capital giant PSP Investments, FirstLight has once again punted on deadlines in what has now become a decade long slog to continue the massive predation of the region’s key ecosystem artery, after a full half century. In its own January 4, 2022 filing FirstLight again begged FERC for relief of its own previously promised deadlines: “FirstLight requests that the Commission continue to defer issuance of the REA Notice until after January 31, 2022, to allow the parties to focus on the agreement in principle. If the parties are able to reach an agreement in principle by that time, they will then request that the Commission further defer issuance of the REA Notice to allow for negotiation of a fully developed, binding settlement agreement that the parties would submit to the Commission as an offer of settlement pursuant to 18 C.F.R. § 385.602.” An “REA” is FERC-speak for “ready for environmental analysis.”

In its Final License Application FirstLight’s big bid as a concession for the massive sucking fish kill annually at Northfield was a temporary 1,000 foot net, with ¾ inch mesh, to be deployed from upstream, and angled to near its suction tunnels to deflect some of the 24 species of adult fish from its giant, river-reversing vortex. That is literally a year round open door to the obliteration of 100s of millions of eggs and tiny young of developing migratory American shad and the two dozen resident and migrant species of the river—but in particular the key spawning, rearing and out-migrating months between late May and mid-October…

Importantly in that regard, the window for DEMOCRACY on our Connecticut River remains wide open for citizen to go on the public with FERC, and as well in the region’s media. Of late, literally scores of citizens have done just that, in FERC testimony that Northfield’s devastation must end and no new license be offered to FirstLight.

Below is Ethel White’s full January 4th on-the-record testimony, from the same day FL requested more FERC time for their venture capital plans for New England’s Great River, its life, and the future generations who are all entitled to a living ecosystem.

* * But first, here’s how you can stand up, on-the-record, in this critical time for the Connecticut River’s future:

GO TO: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

Document Accession #: 20220104-5000 Filed Date: 01/04/2022
Ethel S. White, Easthampton, MA.

I write concerning the Northfield, MA hydroelectric plant application for recertification. I strongly request that recertification be denied. Your commission’s decisions are key to how we deal with climate change. The vast majority of Americans believe that climate change is one of the top issues of today, if not THE top issue. We are on the brink of losing our planet’s ability to sustain human life, and large hydroelectric plants are not beneficial to rivers, aquatic life, or human existence. The Connecticut River is a vital artery in New England, and losing it to environmental degradation would be a tragedy. I hope the Commission will regulate this particular energy source in the proper way, by closing it down.
Sincerely, Ethel S. White

* * Agency heads and personnel representing the public trust:

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife.

CONSENSUS BUILDS AGAINST RELICENSING NORTHFIELD MTN: YOU CAN STILL BE HEARD!!!

Posted by on 06 Dec 2021 | Tagged as: Andrew Tittler, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, E-Comments, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Secretary Kimberly D. Bose, FirstLight Power, Greenfield Recorder, Julie Crocker, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Mr. Jesse Leddick, Mr. Mark S. Tisa, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, PSP Investments, public trust, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, The Daily Hampshire Gazette, US Fish & Wildlife Service, Wendi Weber


GREENFIELD MA. November 30, 5:58 am: River protector Dave Dersham of Northampton MA sets out on a 20 mile hike from Greenfield to deliver a “No License to Kill” message to the US Fish & Wildlife Service at their Hadley HQ. Photo Copyright © 2021 by Karl Meyer

YOU CAN STILL BE HEARD!!!!!

*BE PART OF THE “SAVE OUR RIVER” HOLIDAY CAMPAIGN: READ BELOW!*

Public demonstrations, public comments to the Federal Energy Regulatory Commission, and opinion pieces in the media all point to a gelling opposition to any FERC relicensing of FirstLight’s Northfield Mountain Pumped Storage Station. The coalescing opinions cite Northfield’s lethal impact on fish, it’s massive river-reversing ecosystem destruction–plus the profit motives of its Canadian venture capital owners. (* *See the 3 new public comment letters posted by FERC today, 12/06/2021, at the end of this message.)

Last Thursday, December 2, FirstLight gathered behind closed doors with the US Fish and Wildlife Service, National Marine Fisheries, MA Division of Fish and Wildlife, MA Department of Environmental Protection and American Whitewater in what the Canadian-owned company termed “final” settlement negotiations. There was no daylight for the public to bear witness, and no way to know how far they reached toward a final signing agreement on relicensing this disaster or ending heart-stopping ecosystem flow reversals and inhalation of 100s of millions of fish.


RECEPTION at USFWS HQ, Hadley MA, November 30, 4 pm. Photo Copyright © 2021 by Karl Meyer

What’s certain is the big horse-trading was on the table–with our public trust agencies holding our cards in the form of standing up for long-established environmental law and the ecosystem defense that future generations are counting on. Our River, our Refuge, OUR FISH!

Well it ain’t over till it’s over folks! Certainly there are issues not yet fully vetted, emails being exchanged, and last minute changes in the works from the agencies and FirstLight/PSP Investments’ big lawyers.

IN SHORT, nothing has been signed yet!

There remains time to get your comments in to the media, your public trust federal/state agency representatives (emails below), to FERC (address below), and cc’ed to your representatives—all of which are impactful.

HERE IS WHY: in FirstLight’s own words & schedule, filed with FERC November 12, 2021.

“FirstLight MA Hydro LLC submits request for FERC to delay issuance of Ready for Environmental Assessment Notice under P-1889, et al.”

AND, word-for-word, FirstLight’s Timeline to FERC:

“December 2021/January 2022 – parties schedule meeting or meetings of combined groups (fish/flows and recreation/cultural) to discuss overlapping issues. Parties provide status update to the Commission no later than December 31, 2021.

January 2022 – parties work toward achieving a conceptual agreement that can be filed with the Commission on or about January 31, 2022.”


At US Fish & Wildlife HQ, Hadley MA. Photo Copyright © 2021 by Karl Meyer

WHICH is to note FirstLight’s sending the settlement outline “to the Commission no later than DECEMBER 31, 2021.”

THUS, if you make your public statement NOW–ahead of when everyone heads home for the holiday break, you can impact this secret, looming train wreck and help make a difference for future generations. Northfield Mountain has been a half century long disaster. You have the information. Short, concise comments—-to the media, cc’ed to your public trust agency officials, and sent as comments to FERC is what matters NOW. There are 3 new public comments shared below.

Directly below are the federal and state department heads and the public trust officials with long-term seats at the negotiating table:

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife.

SEND them your Letter; forward it to the MEDIA for the public record—and…

THEN, file it with FERC for the OFFICIAL LICENSE RECORD.
Here’s the final step: TO FERC:

Go to www.ferc.gov . Go to Documents and Filings, or simply find the “file E-Comment” link if you see it. Once there, make sure you have this official number for Northfield Mountain Pumped Storage Station, and USE IT. “P-2485.” In E-Comment you are filing comments under Hydro, in the Washington DC office, c/o FERC Secretary Kimberly D. Boles–and that FERC Project number, again is P-2485. Write in your comments and then hit send. DONE!

THIS ONE IS NEW TODAY! Followed by the 3 filed over the weekend:

Document Accession #: 20211207-5027 Filed Date: 12/07/2021

Mike Cournyn, Sudbury, MA.
Please reject the application for this license. It is hard to express how wrong this system is on so many levels. It is even harder to try and justify usefulness. More power is USED than is CREATED. The death and disruption of the ecosystem for a few dollars profit. I am amazed it was even allowed inthe first place. Please do the right thing.

Document Accession #: 20211206-5059 Filed Date: 12/06/2021

Malcolm G Everett, NORTHAMPTON, MA.
I am writing to express my deep concern about the impact of the Northfield Mountain Pumped Storage Facility on the ecosystem of the Connecticut River. I believe the damage this system causes to species native to the river justifies the non-renewal of its license to operate. I understand it is viewed as a way to meet peak electricity demand, but I think there are better
ways being developed to solve this problem without causing damage to the life forms in the river. The owner of this facility has no right to cause such damage to the delicate systems of life that have evolved long before the facility existed. Thank you for considering my concern.

Document Accession #: 20211206-5009 Filed Date: 12/06/2021

C Grecsek, SUNDERLAND, MA.
I am writing to express my opposition to the re-licensing of the Northfield Mountain Pumped Storage facility. The system costs in energy, and especially in ecological damage, are too high.

The Connecticut River flows backward when the pumps are engaged, an unnatural and harmful process. In addition, the turbines kill countless fish and other river dwellers. The generation of electricity should not need to use so much energy to operate nor should it result in such senseless destruction of an ecosystem.

We have made great strides in the improvement of the Connecticut River from when it was essentially an open sewer, but there is more work to do to repair the harm we have caused, including the cessation of this damaging system.

Thank you

Document Accession #: 20211206-5008 Filed Date: 12/06/2021

robert arbib, cummington, MA.
Please reject the application of Firstlight to operate Northfield Mt.for another 50 years.This pumping station causes terrible disruption of the natural flow of the Connecticut River.I know as I canoe on this section of the river. Natural flows necessary for the life cycles of various vertebrates and invertebrates are disrupted, fish and other animals are shredded going up
through the pumps,the flow of the river is reversed during pumping and shallow areas are washed out and eroded as water is released.Firstlight will say they are addressing these concerns but they will promise anything to get a renewal. Please don’t believe their B.S,

Their model is to use massive amounts of power to pump water up. only to profit through ‘generation’ when rates are higher, It is not worth the damage to the river to generate not really new power but only profits for this Canadian company.

Photo Copyright © 2021 by Karl Meyer

WITH PUBLIC KEPT IN DARK, FirstLight schedules secret endgame license negotiations for December 2

Posted by on 14 Nov 2021 | Tagged as: Conte National Fish & Wildlife Refuge, CRASC, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, MA Department of Energy and Environmental Affairs, MA Division of Fish and Wildlife, Massachusetts DEP, National Marine Fisheries Service, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, P-2485, public trust, right-to-know, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, US Fish & Wildlife Service, US Geological Survey, USFWS

WITH PUBLIC KEPT IN DARK, FirstLight schedules secret endgame negotiations on Northfield’s deadly river vacuuming with federal and state fisheries agencies this December 2nd.

Many people have asked when the critical secret talks are happening—finally I can offer news…

PLEASE READ TO THE BOTTOM and find out how you can meet the PLAYERS–the agencies and agents CHARGED WITH representing the interests OF THE RIVER and US!

Here is a section of FirstLight’s latest license “extension request” filing, sent electronically to the Federal Energy Regulatory Commission on Friday, November 12.

In the last three months, FirstLight and the other parties have made substantial progress in negotiating relicensing solutions. The settlement parties have exchanged proposals on fish passage, flows, and recreation. FirstLight is currently holding discussions on fish passage and flows with federal and state resource agencies. FirstLight and the agencies held fish passage and flow meetings on September 24, October 14, and November 10, 2021 and have established an additional meeting on December 2.

The critical next backroom session, scheduled for December 2, 2021, includes the following named agencies responsible for the fate of a living Connecticut River ecosystem for the decades into the future. This from FirstLight’s FERC extension filing at its conclusion:

“The following settlement parties have affirmatively indicated that they support this timeline: the United States Fish and Wildlife Service, the National Marine Fisheries Service, and American Whitewater Association. Therefore, FirstLight requests that the Commission continue to defer the issuance of the Notice of Acceptance and Ready for Environmental Analysis until after January 31, 2022.”

The US Fish & Wildlife Service and National Marine Fisheries are the public agencies charged with “conditioning authority” to protect the Connecticut and its migratory fish at the grim and deadly ecosystem bottleneck, Northfield Mountain. Also, charged and responsible here in the Bay State as well—are the MA Division of Fish & Wildlife and Division of Environmental Protection. These are the guardians and enforcers of US and state environmental laws and protections. They are the public trustees of our river and fish. This is the public’s river.

juvenile Connecticut River shad, dead

Northfield Mountain’s miserable suction literally kills hundreds of millions of eggs, larvae and juvenile migratory and resident fish annually. Will these agencies fail the river once again—and for all, by letting Northfield reverse-suck the life out of our legally mandated fish runs? Or will they put their money where their responsibility lies, and shut its mouth to killing juvenile fish?

That is what’s at stake here. FirstLight is playing for keeps with the future of our children’s ecosystem, for a net-power-loss, deadly energy wasting contraption with profits heading first to Delaware and thence to Canada and its parent owner, PSP Investments.

There is nothing responsible or democratic about a private company and federal and state officials deciding an ecosystem’s fate in the dark… People want to know who the leaders are that are responsible–and how they can engage with them.

Given the late date, and with time being so critical I can offer this suggestion. On Wednesday, November 17, at 9:30 – 11:30 a.m. there will be a Technical Committee meeting of something called the Connecticut River Atlantic Salmon Commission, or CRASC. AND, on December 1, 1:00 – 3:00 p.m., there will be a meeting of the full (CRASC) Commission. CRASC is comprised of the federal/state fisheries leaders from the US Fish & Wildlife Service, National Marine Fisheries, and the state fisheries leaders from VT, MA, NH, and CT. These are top fisheries agency leaders, and CRASC is the Congressionally-authorized agency that has been responsible for managing the Connecticut River and it migratory fish runs since 1967. IT IS A PUBLIC AGENCY, though their meetings are not widely publicized, and the CRASC stopped posting the minutes to their meetings in 2017. In other words, it operates quietly outside the public eye—regardless of its critical public mandate.

The key thing to know here is that the fisheries agencies on the CRASC are literally the same ones who will be sitting down at the secret table with FirstLight on December 2, right after that meeting of CRASC leaders the day before.

So, SINCE LIVING RIVERS FLOW DOWNSTREAM, and NO RIVER SHOULD DIE IN THE DARK, as a journalist and stakeholder I’d like you to know that YOU CAN ATTEND THESE MEETINGS. It is your right. They will be held on-line, but you must pre-register to get the “teams” registration application #, and/or a phone call-in number from Ken Sprankle, the USFWS Connecticut River Coordinator and CRASC Secretary. Ken is very helpful, and this is easy to do.

Simply email Ken at: ken_sprankle@fws.gov and tell him you want to be added to the CRASC public meeting list, and that you want to attend the CRASC meeting on November 17, and also December 1. Ken will get you signed up, and send you an on-line or telephone link, and an agenda. With all the secrecy, at least here you get to see some of the agencies and players who are responsible for our public trust. REST assured, FirstLight’s representatives are always in attendance, keeping an eye on things. That’s why you should think about putting in the time. There will be considerable tech-talk at this November meeting, but here you can get to know the agents and players. AND, there is a time at set aside for the public to ask questions. If you care about a living river, get signed up to attend these on-line public meetings.

BTW, each CT River state on the CRASC has what’s called a “public sector” representative. Here, representing our fisheries protections at Northfield that representative is Dr. Andrew Fisk, who is also director of the Connecticut River Conservancy. So, if you have questions or concerns about fish kills, fish futures and Northfield operations, your CRASC public sector rep can be reached at:afisk@ctriver.org He represents you!

The Connecticut River’s MASS. Killer is Northfield Mountain Pumped Storage

Posted by on 23 Oct 2021 | Tagged as: Andrew Fisk, Atlantic salmon, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River clean up, Connecticut River Conservancy, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, Death-Sewer, E-Comments, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Gordon van Welie, ISO-NEW ENGLAND, Kathleen Theoharides, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts Division of Fish & Wildlife, Mr. Caleb Slater, Mr. Charles Baker, Mr. Gordon van Welie, Mr. Jesse Leddick, Mr. Mark S. Tisa, Ms. Donna Wieting, National Marine Fisheries Service, net-loss power, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, source to sea, Uncategorized, US Fish & Wildlife Service, US Supreme Court, Vermont Fish & Game, Wendi Weber

The Connecticut River’s MASS. Killer is Northfield Mountain Pumped Storage, a law-breaking ecosystem disaster

READ Bill Stubblefield’s great river defense to the Federal Energy Regulatory Commission and to those responsible for protecting the public’s Connecticut River for future generations here: BillStubblefield20211022-5051-1

WATCH, HEAR my Friends of the Greenfield Public Library presentation: “LIVING RIVERS FLOW DOWNSTREAM,” a 50 year history of Northfield Mountain’s killing and the officials responsible for stopping its license to kill here:
https://www.youtube.com/watch?v=qs4LHjrjtsc

Below is a list of those responsible for ending this illegal license to kill.

Do share it with your local leaders and representatives. Will they step up and end this ecosystem slaughter for coming generations? Where do they stand? What will they do to stop this killing NOW?

The FOLLOWING OFFICIALS have NO RIGHT to bargain away the life of OUR CHILDREN’s ECOSYSTEM. This is THEIR WATCH. They have a PUBLIC TRUST to defend against Connecticut River Extinction and a 40 year Connecticut River death sentence in Massachusetts:

Ms.Kathleen Theoharides, Secretary, MA Executive Office of Energy & Environmental Affairs
Mr. Charles Baker, Governor of the Commonwealth of Massachusetts
Mr. Andy Fisk, MA Public Representative, Connecticut River Atlantic Salmon Commission, Dir. Connecticut River Conservancy
Mr. Gordon van Welie, President and CEO, ISO-New England
Ms. Wendi Weber, US Fish & Wildlife Service Northeast Regional Director
Ms. Donna Wieting Director of Protected Resources, National Marine Fisheries Service
Mr. Mark S. Tisa, Director of the MA Division of Fisheries and Wildlife
Mr. Caleb Slater, MA Div. of Fish & Wildlife, Anadromous Fish Project Leader CRASC
Mr. Jesse Leddick, Chief of Regulatory Review
MA Division of Fisheries & Wildlife

Connecticut River blog: Is it a river at all? Sucked to Death–upstream and down…

Posted by on 17 Aug 2021 | Tagged as: Buz Eisenberg, Clean Water Act, Connecticut River, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, Environmental Protection Agency, EPA, Federal Energy Regulatory Commission, federal trust fish, ISO-NEW ENGLAND, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Massachusetts DEP, net-loss power, Northfield Mountain Pumped Storage Project, Peskeomscutt Island, Relicensing, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Turners Falls dam, US Supreme Court, Vermont, WHMP

IS IT A RIVER AT ALL? * * MY TALK WITH ATTORNEY BUZ EISENBERG ON WHMP’S “AFTERNOON BUZZ” Copyright © 2021 by Karl Meyer
* Full links and topics below
*


STARVED! THE CONNECTICUT FROM THE TURNERS FALLS BRIDGE ON THE MORNING OF THE POCUMTUCK HOMELANDS FESTIVAL–TAKING PLACE JUST 200 YARDS UPSTREAM. THE LITTLE BUMP IN THE MIDDLE IS PESKEOMSCUTT ISLAND–WITHOUT WATER, NO ISLAND AT ALL…Photo Copyright © 2021 by Karl Meyer

NOTE: (please read through the questions, illustration link, and topics below, then click for the podcast link, here, or one at the bottom of the page) https://whmp.com/podcasts/the-afternoon-buzz-8-10-21/

* The Connecticut River is wrenched to a dead stop in Massachusetts daily. It’s literally a heart attack to the ecosystem. But wait, there’s MORE..!

* For up to 4 months out of the year the river’s median natural routed flow is far less than the 15,000 cubic-feet-per-second massive suction of the Northfield Mountain Pumped Storage Project’s four giant turbines pulling at its current. What does this mean?

* Well, it means that there is no living river—because NMPS actually pulls the current into reverse and UPSTREAM for over 3 miles. This is a heart attack, followed by a stroke…

(* CLICK ON THE LINK BELOW FOR A GRAPHIC FROM THE FERC PUBLIC RECORDS SHOWING THE CONNECTICUT PULLED BACKWARD–ARROWS HEADING UPSTREAM TOWARD THE INVISIBLE THROAT OF THE NORTHFIELD MOUNTAIN PUMPED STORAGE STATION, OVER 3 MILES AWAY. NOTE FRENCH KING BRIDGE IN 1ST PHOTO; AND FRANKLIN COUNTY TECH/TF INDUSTRIAL PARK IN THE 2ND*)

*20160301-2015Pages from 3.3.9_appendix_B_Velocity-2*

* Is THIS a RIVER??? *

* Learn how Northfield, a massive energy CONSUMER, squanders enough energy to power all of the housing units in metro-Boston annually—plus those of Franklin County, and nearly all those in Hampshire County, while killing a 4 state ecosystem…

* Hear how Northfield has never met the legal basic safe passage requirements for migratory fish—upstream and down, as it kills millions of juvenile shad in direct violation of the 1872 landmark US Supreme Court decision in Holyoke Company v. Lyman.

* Is the Connecticut even a river in Massachusetts? It meets NONE of the basic definitions of a river from any source or legal dictionary. It is denied it’s NATURAL FLOW; it does not run DOWNSTREAM; it does not flow to the SEA; and it is literally untethered from the pull of GRAVITY…

* Does it meet even basic EPA or Clean Water Act standards—in the Commonwealth or on the Navigable Waters of the United States?

* Why was Northfield not stopped before it got started?

* Why wasn’t it put to bed the moment Vermont Yankee shut down?

* The Connecticut is a river without a watchdog. This is the ecosystem’s critical artery, yet one without a single lawyer dedicated to its defense these last 69 years, while some falsely lay claim to being its protector…

Thanks to Buz and WHMP radio https://whmp.com/podcasts/the-afternoon-buzz-8-10-21/

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future

Posted by on 21 Jul 2021 | Tagged as: 5-year FERC licensing process, Brian Harrington, Catherine Carlson, climate change, Connecticut River Atlantic Salmon Commission, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, CRASC, Daniel McKiernan, David Cameron, Donna Wieting, E-Comments, Environmental Protection Agency, EPA, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Comments, FERC Commissioner Richard Glick, FERC Secretary Kimberly D. Bose, FirstLight, FirstLight Power, Gordon van Welie, Holyoke Co. v Lyman, ISO-NEW ENGLAND, Jesse Leddick, Julie Crocker, Kathleen Theoharides, Kimberly D. Bose, Landmark Supreme Court Decision 1872, Local Bias, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, Northfield Mountain Pumped Storage Project, P-1889, P-2485, Peter Brandien, Public Comment period, Public Sector Pension Investments, Rock Dam, Sam Lovejoy, Sean McDermott, shad, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Steven Mattocks, Timothy L. Timmermann, Turners Falls, US Fish & Wildlife Service, Vermont, Wendi Weber

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future Copyright © 2021 by Karl Meyer

Kathleen Theoharides, Massachuetts’ Secretary of the Executive Office of Energy & Environmental Affairs before launching on a PR kayak tour of the river at FirstLight’s dock next to the intake of the Northfield Mountain Pumped Storage Project, October 2020. Photo Copyright © 2020 by Karl Meyer

NOTE: as a journalist and citizen I’ve been a participating stakeholder for nearly a decade in the ongoing Federal Energy Regulatory Commission relicensing process for the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot hydro operations. In that light, I encourage people to first view the half-hour segment of Local Bias, linked below. Then, return to this post and its resource list below for ways to participate in the critical decisions now being made about the Connecticut River. They will impact its currently crippled ecosystem for generations to come.

LOCAL BIAS link: https://youtu.be/IX2Rv2NYq3s

Since 1872 the US Supreme Court has made it the law of the land that migratory fish on US Rivers are guaranteed safe upstream and downstream passage at dams and industrial river sites. That decision was centered on a Massachusetts case at the Holyoke Dam. One hundred forty-nine years later that law remains essentially unfulfilled at an endangered species’ critical spawning and nursery site on the Connecticut River at Montague, MA, as well as at the Turners Falls Dam in that town.

Further, that law remains glaringly unenforced and unimplemented at the Northfield Mountain Pumped Storage Project in Northfield MA, where the river is literally sucked into reverse, and millions of eggs and downstream running juvenile American shad are pulled to their “functional extirpation”(vacuumed to their deaths) yearly, on their way to the ocean from Vermont and New Hampshire spawning reaches. The Commonwealth of Massachusetts has now owed Vermont and New Hampshire—and really all of New England, a living river for almost exactly a century and a half.

Warning sign announcing the dangers of Northfield’s massive intake suction. Photo Copyright © 2021 by Karl Meyer

The current Canadian parent-owners of that net-loss power regeneration/resale site are proposing only an ineffective, seasonal “barrier net” at the vacuum mouth of this facility, the very ‘solution’ that leaves this monstrous sucking in place to kill all those Vermont and New Hampshire produced eggs and baby shad, crippling the prospects for returning adult shad to those states from the Atlantic four years in the future.

The donuts and coffee were on FirstLight for the state officials and representatives taking part in last October’s little PR kayak tour. Photo Copyright © 2020 by Karl Meyer

Northfield Mountain’s net-power-loss energy consumption literally swallows and squanders the entire annual energy equivalents of whole cities and counties as it ravages the Connecticut River, using it as a crushing and deadly energy relay switch.

FirstLight is applying to FERC—backed up by a power-hungry, ecosystem-and-climate-indifferent ISO-New England, for a license to kill for decades to come. Northfield Mountain wastes monstrous amounts of grid energy, while ravaging New England’s critical main ocean connection and planetary cooling artery…

Below are resources available to the public for interacting and participating with the Federal Energy Regulatory Commission in licensing decisions, and government agency officials charged with implementing the public trust on the Connecticut River.

www.karlmeyerwriting.com/blog

NOTE: the landmark US Supreme Court environmental decision centered on the Connecticut River came back in 1872 in Holyoke Company v. Lyman, requiring safe up- and down-stream protection for migratory fish.

Send public comments on relicensing of the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot Hydro Stations to the Federal Energy Regulatory Commission. The “project numbers” must be included, as well as your name and address, in order to become part of the public record. They should be concise, citing specifics in a paragraph or two, noting Northfield Mountain P-2485 and Turners Falls/Cabot P-1889.

Send via www.ferc.gov, usingE-comment, with the salutation going to: “Kimberly D. Bowles, Secretary.” Those comments can also include a cc to the current chair of the Federal Energy Regulatory Commission: Richard Glick.

Decisions concerning foreign interests and use of the Connecticut River are happening at this time, and the river in Massachusetts has sat largely emptied or dead here for half a century—a situation enabled by the Commonwealth and its officials’ enduring, ugly and pointed environmental neglect.

To gain effect, letters can be cc’d to federal-and-state officials who are the vested stakeholders representing the public in the protection of the river and resources. Those publicly recorded FERC entries can also be forwarded to local newspapers and media outlets.

LIST of executives–plus officials from federal and state agencies who represent the public in protecting the Connecticut, its migratory fish, aquatic animals and habitats through their “conditioning authority” powers:

ENERGY executives in the private/quasi-public sphere:

Mr. Gordon van Welie, President and CEO, ISO-New England, the “independent” system operator:
Phone (413) 540-4220

Mr. Peter Brandien, Vice President of System Operations, ISO-New England:

E-mail: pbrandien@iso-ne.com .

NOTE: Mr. Brandien writes the annual support letter that facilitates the daily commercial damage to the Connecticut wrought by the Northfield Mountain Pumped Storage Project. ISO has never acknowledged to the public that NMPS is NOT essential to the DAILY functioning of the power grid. Instead it encourages and shackles the public to those peak-priced, daily ravages as NMPS is handsomely paid to hold back several hours of reserve emergency-function megawatts for ISO’s 20th Century bulk power grid in case of a rare blackout (like the one in 2003), and also for occasional use–at scattered intervals, in controlling grid fluctuations.

ISO should have ago been curtailed as a functionary for private mega power interests. Today’s grid should already be based on distributed generation and micro-grid functions in this time of climate chaos and cyber crime. Energy and storage should be located nearest to where it is produced and used. Future linking of river-ravaging NMPS to 200-mile-distant wind turbines is wholly criminal when compressed air storage can be located close to metro/industrial coastal centers—including implementation at sites like Everett, Somerset, New Bedford, and elsewhere. That would render the system resilient, local and detachable–and rescue New England’s Connecticut River ecosystem to support generations to come across the next half century.

But, today and into the future, counter to Holyoke Co. v. Lyman, , ISO will happily sell off a US ecosystem’s daily life to foreign venture capital interests, keeping NMPS in lucrative daily play for decades into the future. The bottom line function of ISO-New England—forget ecosystems and climate, is apparently commercial first, and foremost. In their own words: to “protect the health of the region’s economy and the well-being of its people by ensuring the constant availability of competitively-priced wholesale electricity—today and for future generations.” They love to employ the term “clean”, but never elaborate on glaring incongruities, fallacies or impacts. Future generations apparently will have no need of living ecosystems, just an endless stream of “competitively-priced” energy. They NEVER mention energy CONSERVATION…

FEDERAL PUBLIC officials:

For endangered Connecticut River shortnose sturgeon, freshwater mussels, as well as American shad, blueback herring and American eel:
Donna Wieting, Director of Protected Resources, National Marine Fisheries Service, NOAA Fisheries:
Phone: 301-427-8400

Also, for endangered shortnose sturgeon, as well as American shad, blueback herring and American eels: Mr. Sean Mcdermott, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Sean.mcdermott@noaa.gov

Also at NMFS, protecting shortnose sturgeon and their habitat: Ms. Julie Crocker, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Julie.crocker@noaa.gov

For federal protection and enforcement of the Clean Water Act on the Connecticut River: Mr. Timothy L. Timmermann Office of Environmental Review, EPA New England Region 1, Boston MA 02109-3912:

E-mail: timmermann.timothy@epa.gov

For all migratory fish and safe passage on the Connecticut including American shad, herring, and endangered sturgeon: Wendi Weber, US Fish & Wildlife Service Region 5, Hadley MA 01035:

E-mail: wendi_weber@usfws.gov

MASSACHUSETTS state officials:

Kathleen Theoharides, Secretary of the MA Executive Office of Energy & Environmental Affairs 100 Cambridge St., Suite 900, Boston, MA 02114:
Main Phone at (617) 626-1000

For Massachusetts clean water and wetland habitat protections on the Connecticut: Mr. Brian Harrington, Bureau of Water Resources Deputy Regional Director, Massachusetts Department of Environmental Protection, 436 Dwight Street, Springfield MA 01103:

E-mail: Brian.d.harrington@state.ma.us

Also from MA DEP: Mr. David Cameron, PWS Section Chief, Massachusetts Department of Environmental Protection, 436 Dwight St., Springfield, MA 01103:

E-mail: David.cameron@state.ma.us

For state-endangered shortnose sturgeon and all Connecticut River migratory fish in MA: Mr. Jesse Leddick, Chief of Regulatory Review, Massachusetts Division of Fisheries and Wildlife, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: Jesse.Leddick@mass.gov

Also at MA Div. of Fish & Wildlife: Mr. Steven Mattocks, Massachusetts Division of Fisheries and Wildlife, Fisheries, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: steven.mattocks.@mass.gov

Next Page »