federal trust fish

Archived Posts from this Category

More Connecticut River citizens’ defense

Posted by on 13 Jan 2022 | Tagged as: America's best landscaped sewer, American shad, Clean Water Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River blog, Connecticut River Conservancy, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, Endangered Species Act, EPA, ESA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, fish kill, Holyoke Co. v Lyman, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, Nation's best landscaped sewer, National Marine Fisheries Service, NMFS, NOAA, Northeast Utilities, Northfield Mountain, Northfield Mountain Pumped Storage Station, NU/WMECO, P-2485, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, US Fish & Wildlife Service

THE CONNECTICUT RIVER’S CITIZEN DEFENSE continues:
While FirstLight’s secret January license “settlement” talks continue–centered around leaky net ideas and spit-and-glue window dressing at Northfield Mountain, the public is demanding that its 50 years of devastation cease.

https://www.youtube.com/watch?v=ybwy8MBiy9I
* * NOTE: ABOVE is a link to a Wilbraham Public Library ecology lecture series I was asked to take part in last November. The title of my presentation was: “LIVING RIVERS FLOW DOWNSTREAM.” IT IS A KEY HISTORIC PERSPECTIVE to understanding why we live in a broken ecosystem… * *

https://www.gazettenet.com/my-turn-meyer-LastLightCtRiver-44127152

FirstLight led closed-door bargaining with state and federal fish and environment agencies are continuing here in MA, while an ongoing flood of citizen testimony to end Northfield Mountain’s license to kill continues at the Federal Energy Regulatory Commission.

THOSE DEMANDS–from no less than 77 people since November 13th, are also sending a very clear signal to the MA Division of Fish & Wildlife, MA DEP, the US Fish & Wildlife, and National Marine Fisheries Service:

DON’T SELL OUT New England’s Great River for another half-century!

* Read the latest public testimony targeting Northfield lethal ecosystem destruction entered into the FERC record further below.*

BUT FOR THE LONG VIEW, HERE’S A LITTLE ILLUMINATING HISTORY:

Only living rivers flow downstream. But that’s not what you find on the Connecticut River in the Commonwealth of Massachusetts. Here, 150 years after the US Supreme Court guaranteed safe upstream and downstream passage of migratory fish to and from New Hampshire and Vermont—and a full half century after the enacting of the Clean Water Act and Endangered Species Act, the Northfield Mountain Pumped Storage Station continues to chew-through, reverse and obliterate the key living ecosystem functions of New England’s critical central artery here in northern Massachusetts.

The grim prospects of allowing Northfield to be built were widely known by federal and state agencies half a decade before it began its deadly, net-power loss, river-reversing ecosystem damage. Here, from the same agencies that are today’s MA Fish & Wildlife, US Fish & Wildlife Service, and the National Marine Fisheries Service (the entities still publicly responsible for environmental enforcement and river fish protection), are their words from a key, signed, 1967 document:

“Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River Basin”

“Based on the present fragmentary data available on the Northfield Pump Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae, and young fish of both anadromous and resident species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water. Studies, designed to minimize the potential adverse effects to fishery resources, should be undertaken in development of the design for the Northfield Pump Storage Project. In related studies, fish screens, barriers and deflectors, and flow regimen must be thoroughly investigated.”

Those agencies’ inaction, their failure to protect–while instead indulging in a massive frenzy to recreate an extirpated salmon hybrid in place of a fish not seen here since 1809, proved disastrous for the river’s still-living fish runs and species in this four-state ecosystem. Today, absurdly, a deadly Northfield Mountain soldiers on, while—50 years later those same agencies dicker with foreign owners over emplacing a new band-aid of a barrier net—one full of holes, upstream of that deadly, river-reversing suction.

In the “library” at the Connecticut River Watershed Council—today’s “Conservancy”, there is a boxed, mid-1960s promotional document from WMECO/Northeast Utilities. NU is today does business as Eversource, the perennial chief sponsor of the Conservancy’s Source to Sea Cleanup. That half-century old box contains a glossy booklet promoting the future construction of a Northfield Mountain Pumped Storage Station. The booklet includes several scenarios and options to premise how of its net-loss power pumping operations might be deployed.

One of them was a glaring red flag for the river, its fish, and an entire ecosystem…

The Watershed Council HQ has a private library within…

THAT SHUTDOWN OPTION, never implemented, was that Northfield’s impacts would be so detrimental to the river and life cycles of its migratory fish that it would have to be shut it down during fish migration season. But here again, no watchdog ever emerged to stand up and fight for a living Connecticut River in Massachusetts. Basically, the only protection ever offered was a net to protect their mythical, teeny, hatchery-bred baby salmon, leaving all the river’s other species to fend for themselves.

Thus Northfield’s gargantuan and lethal water and fish appetite still strangles New England’s four-state ecosystem today. And, half a century later, those same public agencies are allowing a power company to dangle the grim bait of temporary fish barrier net before them once more.

ABOVE IS AN EPA-ORDERED “silt barrier” mandated to be kept in place at FirstLight’s Northfield intake after they were caught flagrantly and clandestinely dumping a mountain of muck directly into the river for over 90 days straight in gross violation of the Clean Water Act. Looking closely, you can see it has FAILED, its anchors useless, and its floats flapping in the breeze along the shoreline downstream of Northfield’s sucking intake. Photo taken 10/2/2010.

Even two years after Northfield came on-line the Federal Power Commission–today’s FERC, still had not been given answers to information they’ requested of WMECO–today’s Eversource, including describing flows on a reversing river. This is a Xeroxed document from FERC:

20010120-0656 FERC PDF (Unofficial) 09/10/2014: January 22, 1974, from the Federal Power Commission to WMECO:

Robert E. Barrett, Jr.,President.
Western Massachusetts Electric Company
West Springfield, Massachusetts 01089

Dear Mr. Barrett:
The Commission staff is presently preparing the Draft Environmental Impact Statement for the Turners Falls Project (No. 1889) and requests the following information:
(1) In the revised Fxhibit W of the application (page 43, second paragraph), reference is made to the continuing resident fish study being conducted in Turners Falls Reservoir. Please provide a copy of the results obtained since the last Progress Report. If the study has not been completed, please indicate the date you expect a report to be available.

(2) In Exhibit W (pages 19, 20, and Figure 5), the conditions expected to produce flow reversals in the Turners Falls ‘Reservoir as a result of Northfield operation were set forth. Since the Northfield Mountain Project became operational, which of the conditions described have been observed to produce reverse flows? Based on operational experience, are there any observed or anticipated changes in the patterns, durations, or velocities of the flows described therein? Your early response in providing this information would be appreciated.
Very truly yours,
Secretary

On October 16, 1974, WMECO’s lawyers finally replied in the negative to the Federal Power Commission’s questions, stating they still had not implemented the required study which would offer answers to questions about the impacts of reversing the flow of the Connecticut:

“Staff also inquired whether the Company had a study on the effect of hydrology caused by the pumping of Northfield Mountain project this year. The Northfield Licensees have not made a formal study but are accumulating data with respect to Pond elevations, flows and other operating data.”

EVERYBODY KNEW 50 YEARS AGO: yet nobody came to the Connecticut’s rescue…

BUT TODAY CITIZENS are standing up for the living river owed future generations. SEE BELOW for the latest entries into the FERC public record…

BUT FIRST, here’s how it can be done:
Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

HERE ARE THE LATEST:

Document Accession #: 20220111-5033 Filed Date: 01/11/2022
Elizabeth J Erickson, Colrain, MA.

As a long time resident of Franklin County I have for a long time been very concerned about the environmental and ecosystem destruction at Northfield mountain because of the power generating plant there. I have been following the research about the decline in fish populations in the Connecticut River nearby because of the turbines and am strongly opposed to the reicensing of the First Light hydropower plant there. I’m actually shocked that the relicensing is even being considered given all that is now known about how destructive the plant is. Please deny any future license of power generation of Northfield Mountain.

thank you,
Elizabeth Erickson
Colrain, Massachusetts

Document Accession #: 20220111-5005 Filed Date: 01/11/2022
John Hoffman, Shelburne Falls, MA.

I am writing to ask that you deny a continuation of the license for FirstLight Hydro Generating Company. The project began as a way to make use of excess power from the Vernon Nuclear Power Plant. That plant is now closed. This license is now simply a vehicle for FirstLight to use its capitol to make a profit.

That profit comes at the expense of the Connecticut River, one of the glories of New England, and the source of outstanding agricultural soils in the Connecticut River valley. Now that we possess a vastly more sophisticated understanding of river ecology, the damage to the river is elaborately documented.

By sucking large volumes of water out of the river and then disgorging them back, the company erodes the river banks which in turn damages water quality. The turbines through which water is sucked destroy aquatic life, from adult fish, to their young and down to their eggs.

This is a primitive way to treat a river. No company in our present era should be allowed to inflict such damage. This river is a part of the commonwealth of Massachusetts. We the citizens ask you to protect the invaluable ecosystem of our preeminent river and deny FirstLight its license.
Future generations will thank you.

Document Accession #: 20220111-5004 Filed Date: 01/11/2022
Molly Freeland, Gill, MA.

To whom it may concern,
I am a resident of Gill Massachusetts and I request that you do not let Northfield Mountain Pump Station renew their license. The pump station is killing all life it sucks up from the river. Millions of fish are dyeing every year, including endangered short nose sturgeon. The pump station causes major erosion in the river banks which then spreads pollution. The pump station is escalating climate change when we need to be looking to renewable energy sources. Please say no to the pump station for our children, grandchildren, all life and the planet.
Sincerely,
Molly Freeland

Document Accession #: 20220111-5002 Filed Date: 01/11/2022
Irma Lorraine Pearson, Greenfield, MA.

If we, residing in the Democratic heart of our country, cannot save the only large river we have, and all the life in it, we are putting our imprimature on the destruction of our planet for the sake of building private fortunes.

The cautionary tale of Midas and his gold works very well here.
Let’s try another path, of freeing the rivers of dams and reversals, and saving 50% of our ecosystem as wilderness.

NO DEAL: amid public opposition FirstLight’s secret Northfield Mountain settlement plans stumble.

Posted by on 10 Jan 2022 | Tagged as: America's best landscaped sewer, American shad, Canada, Clean Water Act, Commonwealth of Massachusetts, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, Endangered Species Act, EPA, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, migratory fish, Nation's best landscaped sewer, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Public Comment period, shad, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, State of Delaware, US Fish & Wildlife Service, USFWS


NO DEAL: amid public opposition FirstLight’s secret Northfield Mountain settlement plans stumble.

Failing in December to secure a secrecy-shrouded agreement, foreign-owned FL petitions FERC again for what’s now an open-ended “Delay of Action/Extension of Time” request. Thus the opportunity for critical public testimony in FL’s Federal Energy Regulatory relicense bid for Northfield remains WIDE OPEN. (**SEE simple FERC filing instructions at end of post)

As scores of public testimony to end Northfield Mountain’s devastation has poured into the Federal Energy Regulatory Commission of late, secret license deals with federal and state fish and agencies here in Massachusetts continue to elude FirstLight Power. The MA Division of Fish & Wildlife, US Fish & Wildlife, MA DEP and the National Marine Fisheries Service–responsible to the public for protecting the Connecticut’s migratory and resident fish, flows, and water quality under established law, are legally empowered with “conditioning authority” to end the half century of slaughter wrought by Northfield’s deadly suctioning. They currently hold the keys to determining if the Commonwealth hosts New England’s river-reversing, ecosystem grim reaper for more decades to come.

Democracy for coming generations means not leaving our river in the hands of a private corporation for ANOTHER half century.

FirstLight filed their latest FERC delay bid on January 4, 2022, the same day as Ethel White of Easthampton filed her FERC testimony stating, “I write concerning the Northfield, MA hydroelectric plant application for recertification. I strongly request that recertification be denied,” Meanwhile, FirstLight, that same day filed a “Continued Request to Defer Issuance of Notice of Acceptance / Ready for Environmental Analysis” with FERC for their Delaware tax-sheltered MA facilities here. Yet, with this latest delay request it appears they’ve discovered their venture capital plans for the Connecticut River are not being swallowed whole here in New England.

Parent-owned by Canadian venture capital giant PSP Investments, FirstLight has once again punted on deadlines in what has now become a decade long slog to continue the massive predation of the region’s key ecosystem artery, after a full half century. In its own January 4, 2022 filing FirstLight again begged FERC for relief of its own previously promised deadlines: “FirstLight requests that the Commission continue to defer issuance of the REA Notice until after January 31, 2022, to allow the parties to focus on the agreement in principle. If the parties are able to reach an agreement in principle by that time, they will then request that the Commission further defer issuance of the REA Notice to allow for negotiation of a fully developed, binding settlement agreement that the parties would submit to the Commission as an offer of settlement pursuant to 18 C.F.R. § 385.602.” An “REA” is FERC-speak for “ready for environmental analysis.”

In its Final License Application FirstLight’s big bid as a concession for the massive sucking fish kill annually at Northfield was a temporary 1,000 foot net, with ¾ inch mesh, to be deployed from upstream, and angled to near its suction tunnels to deflect some of the 24 species of adult fish from its giant, river-reversing vortex. That is literally a year round open door to the obliteration of 100s of millions of eggs and tiny young of developing migratory American shad and the two dozen resident and migrant species of the river—but in particular the key spawning, rearing and out-migrating months between late May and mid-October…

Importantly in that regard, the window for DEMOCRACY on our Connecticut River remains wide open for citizen to go on the public with FERC, and as well in the region’s media. Of late, literally scores of citizens have done just that, in FERC testimony that Northfield’s devastation must end and no new license be offered to FirstLight.

Below is Ethel White’s full January 4th on-the-record testimony, from the same day FL requested more FERC time for their venture capital plans for New England’s Great River, its life, and the future generations who are all entitled to a living ecosystem.

* * But first, here’s how you can stand up, on-the-record, in this critical time for the Connecticut River’s future:

GO TO: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

Document Accession #: 20220104-5000 Filed Date: 01/04/2022
Ethel S. White, Easthampton, MA.

I write concerning the Northfield, MA hydroelectric plant application for recertification. I strongly request that recertification be denied. Your commission’s decisions are key to how we deal with climate change. The vast majority of Americans believe that climate change is one of the top issues of today, if not THE top issue. We are on the brink of losing our planet’s ability to sustain human life, and large hydroelectric plants are not beneficial to rivers, aquatic life, or human existence. The Connecticut River is a vital artery in New England, and losing it to environmental degradation would be a tragedy. I hope the Commission will regulate this particular energy source in the proper way, by closing it down.
Sincerely, Ethel S. White

* * Agency heads and personnel representing the public trust:

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife.

CONSENSUS BUILDS AGAINST RELICENSING NORTHFIELD MTN: YOU CAN STILL BE HEARD!!!

Posted by on 06 Dec 2021 | Tagged as: Andrew Tittler, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, E-Comments, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Secretary Kimberly D. Bose, FirstLight Power, Greenfield Recorder, Julie Crocker, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Mr. Jesse Leddick, Mr. Mark S. Tisa, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, PSP Investments, public trust, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, The Daily Hampshire Gazette, US Fish & Wildlife Service, Wendi Weber


GREENFIELD MA. November 30, 5:58 am: River protector Dave Dersham of Northampton MA sets out on a 20 mile hike from Greenfield to deliver a “No License to Kill” message to the US Fish & Wildlife Service at their Hadley HQ. Photo Copyright © 2021 by Karl Meyer

YOU CAN STILL BE HEARD!!!!!

*BE PART OF THE “SAVE OUR RIVER” HOLIDAY CAMPAIGN: READ BELOW!*

Public demonstrations, public comments to the Federal Energy Regulatory Commission, and opinion pieces in the media all point to a gelling opposition to any FERC relicensing of FirstLight’s Northfield Mountain Pumped Storage Station. The coalescing opinions cite Northfield’s lethal impact on fish, it’s massive river-reversing ecosystem destruction–plus the profit motives of its Canadian venture capital owners. (* *See the 3 new public comment letters posted by FERC today, 12/06/2021, at the end of this message.)

Last Thursday, December 2, FirstLight gathered behind closed doors with the US Fish and Wildlife Service, National Marine Fisheries, MA Division of Fish and Wildlife, MA Department of Environmental Protection and American Whitewater in what the Canadian-owned company termed “final” settlement negotiations. There was no daylight for the public to bear witness, and no way to know how far they reached toward a final signing agreement on relicensing this disaster or ending heart-stopping ecosystem flow reversals and inhalation of 100s of millions of fish.


RECEPTION at USFWS HQ, Hadley MA, November 30, 4 pm. Photo Copyright © 2021 by Karl Meyer

What’s certain is the big horse-trading was on the table–with our public trust agencies holding our cards in the form of standing up for long-established environmental law and the ecosystem defense that future generations are counting on. Our River, our Refuge, OUR FISH!

Well it ain’t over till it’s over folks! Certainly there are issues not yet fully vetted, emails being exchanged, and last minute changes in the works from the agencies and FirstLight/PSP Investments’ big lawyers.

IN SHORT, nothing has been signed yet!

There remains time to get your comments in to the media, your public trust federal/state agency representatives (emails below), to FERC (address below), and cc’ed to your representatives—all of which are impactful.

HERE IS WHY: in FirstLight’s own words & schedule, filed with FERC November 12, 2021.

“FirstLight MA Hydro LLC submits request for FERC to delay issuance of Ready for Environmental Assessment Notice under P-1889, et al.”

AND, word-for-word, FirstLight’s Timeline to FERC:

“December 2021/January 2022 – parties schedule meeting or meetings of combined groups (fish/flows and recreation/cultural) to discuss overlapping issues. Parties provide status update to the Commission no later than December 31, 2021.

January 2022 – parties work toward achieving a conceptual agreement that can be filed with the Commission on or about January 31, 2022.”


At US Fish & Wildlife HQ, Hadley MA. Photo Copyright © 2021 by Karl Meyer

WHICH is to note FirstLight’s sending the settlement outline “to the Commission no later than DECEMBER 31, 2021.”

THUS, if you make your public statement NOW–ahead of when everyone heads home for the holiday break, you can impact this secret, looming train wreck and help make a difference for future generations. Northfield Mountain has been a half century long disaster. You have the information. Short, concise comments—-to the media, cc’ed to your public trust agency officials, and sent as comments to FERC is what matters NOW. There are 3 new public comments shared below.

Directly below are the federal and state department heads and the public trust officials with long-term seats at the negotiating table:

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife.

SEND them your Letter; forward it to the MEDIA for the public record—and…

THEN, file it with FERC for the OFFICIAL LICENSE RECORD.
Here’s the final step: TO FERC:

Go to www.ferc.gov . Go to Documents and Filings, or simply find the “file E-Comment” link if you see it. Once there, make sure you have this official number for Northfield Mountain Pumped Storage Station, and USE IT. “P-2485.” In E-Comment you are filing comments under Hydro, in the Washington DC office, c/o FERC Secretary Kimberly D. Boles–and that FERC Project number, again is P-2485. Write in your comments and then hit send. DONE!

THIS ONE IS NEW TODAY! Followed by the 3 filed over the weekend:

Document Accession #: 20211207-5027 Filed Date: 12/07/2021

Mike Cournyn, Sudbury, MA.
Please reject the application for this license. It is hard to express how wrong this system is on so many levels. It is even harder to try and justify usefulness. More power is USED than is CREATED. The death and disruption of the ecosystem for a few dollars profit. I am amazed it was even allowed inthe first place. Please do the right thing.

Document Accession #: 20211206-5059 Filed Date: 12/06/2021

Malcolm G Everett, NORTHAMPTON, MA.
I am writing to express my deep concern about the impact of the Northfield Mountain Pumped Storage Facility on the ecosystem of the Connecticut River. I believe the damage this system causes to species native to the river justifies the non-renewal of its license to operate. I understand it is viewed as a way to meet peak electricity demand, but I think there are better
ways being developed to solve this problem without causing damage to the life forms in the river. The owner of this facility has no right to cause such damage to the delicate systems of life that have evolved long before the facility existed. Thank you for considering my concern.

Document Accession #: 20211206-5009 Filed Date: 12/06/2021

C Grecsek, SUNDERLAND, MA.
I am writing to express my opposition to the re-licensing of the Northfield Mountain Pumped Storage facility. The system costs in energy, and especially in ecological damage, are too high.

The Connecticut River flows backward when the pumps are engaged, an unnatural and harmful process. In addition, the turbines kill countless fish and other river dwellers. The generation of electricity should not need to use so much energy to operate nor should it result in such senseless destruction of an ecosystem.

We have made great strides in the improvement of the Connecticut River from when it was essentially an open sewer, but there is more work to do to repair the harm we have caused, including the cessation of this damaging system.

Thank you

Document Accession #: 20211206-5008 Filed Date: 12/06/2021

robert arbib, cummington, MA.
Please reject the application of Firstlight to operate Northfield Mt.for another 50 years.This pumping station causes terrible disruption of the natural flow of the Connecticut River.I know as I canoe on this section of the river. Natural flows necessary for the life cycles of various vertebrates and invertebrates are disrupted, fish and other animals are shredded going up
through the pumps,the flow of the river is reversed during pumping and shallow areas are washed out and eroded as water is released.Firstlight will say they are addressing these concerns but they will promise anything to get a renewal. Please don’t believe their B.S,

Their model is to use massive amounts of power to pump water up. only to profit through ‘generation’ when rates are higher, It is not worth the damage to the river to generate not really new power but only profits for this Canadian company.

Photo Copyright © 2021 by Karl Meyer

WITH PUBLIC KEPT IN DARK, FirstLight schedules secret endgame license negotiations for December 2

Posted by on 14 Nov 2021 | Tagged as: Conte National Fish & Wildlife Refuge, CRASC, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, MA Department of Energy and Environmental Affairs, MA Division of Fish and Wildlife, Massachusetts DEP, National Marine Fisheries Service, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, P-2485, public trust, right-to-know, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, US Fish & Wildlife Service, US Geological Survey, USFWS

WITH PUBLIC KEPT IN DARK, FirstLight schedules secret endgame negotiations on Northfield’s deadly river vacuuming with federal and state fisheries agencies this December 2nd.

Many people have asked when the critical secret talks are happening—finally I can offer news…

PLEASE READ TO THE BOTTOM and find out how you can meet the PLAYERS–the agencies and agents CHARGED WITH representing the interests OF THE RIVER and US!

Here is a section of FirstLight’s latest license “extension request” filing, sent electronically to the Federal Energy Regulatory Commission on Friday, November 12.

In the last three months, FirstLight and the other parties have made substantial progress in negotiating relicensing solutions. The settlement parties have exchanged proposals on fish passage, flows, and recreation. FirstLight is currently holding discussions on fish passage and flows with federal and state resource agencies. FirstLight and the agencies held fish passage and flow meetings on September 24, October 14, and November 10, 2021 and have established an additional meeting on December 2.

The critical next backroom session, scheduled for December 2, 2021, includes the following named agencies responsible for the fate of a living Connecticut River ecosystem for the decades into the future. This from FirstLight’s FERC extension filing at its conclusion:

“The following settlement parties have affirmatively indicated that they support this timeline: the United States Fish and Wildlife Service, the National Marine Fisheries Service, and American Whitewater Association. Therefore, FirstLight requests that the Commission continue to defer the issuance of the Notice of Acceptance and Ready for Environmental Analysis until after January 31, 2022.”

The US Fish & Wildlife Service and National Marine Fisheries are the public agencies charged with “conditioning authority” to protect the Connecticut and its migratory fish at the grim and deadly ecosystem bottleneck, Northfield Mountain. Also, charged and responsible here in the Bay State as well—are the MA Division of Fish & Wildlife and Division of Environmental Protection. These are the guardians and enforcers of US and state environmental laws and protections. They are the public trustees of our river and fish. This is the public’s river.

juvenile Connecticut River shad, dead

Northfield Mountain’s miserable suction literally kills hundreds of millions of eggs, larvae and juvenile migratory and resident fish annually. Will these agencies fail the river once again—and for all, by letting Northfield reverse-suck the life out of our legally mandated fish runs? Or will they put their money where their responsibility lies, and shut its mouth to killing juvenile fish?

That is what’s at stake here. FirstLight is playing for keeps with the future of our children’s ecosystem, for a net-power-loss, deadly energy wasting contraption with profits heading first to Delaware and thence to Canada and its parent owner, PSP Investments.

There is nothing responsible or democratic about a private company and federal and state officials deciding an ecosystem’s fate in the dark… People want to know who the leaders are that are responsible–and how they can engage with them.

Given the late date, and with time being so critical I can offer this suggestion. On Wednesday, November 17, at 9:30 – 11:30 a.m. there will be a Technical Committee meeting of something called the Connecticut River Atlantic Salmon Commission, or CRASC. AND, on December 1, 1:00 – 3:00 p.m., there will be a meeting of the full (CRASC) Commission. CRASC is comprised of the federal/state fisheries leaders from the US Fish & Wildlife Service, National Marine Fisheries, and the state fisheries leaders from VT, MA, NH, and CT. These are top fisheries agency leaders, and CRASC is the Congressionally-authorized agency that has been responsible for managing the Connecticut River and it migratory fish runs since 1967. IT IS A PUBLIC AGENCY, though their meetings are not widely publicized, and the CRASC stopped posting the minutes to their meetings in 2017. In other words, it operates quietly outside the public eye—regardless of its critical public mandate.

The key thing to know here is that the fisheries agencies on the CRASC are literally the same ones who will be sitting down at the secret table with FirstLight on December 2, right after that meeting of CRASC leaders the day before.

So, SINCE LIVING RIVERS FLOW DOWNSTREAM, and NO RIVER SHOULD DIE IN THE DARK, as a journalist and stakeholder I’d like you to know that YOU CAN ATTEND THESE MEETINGS. It is your right. They will be held on-line, but you must pre-register to get the “teams” registration application #, and/or a phone call-in number from Ken Sprankle, the USFWS Connecticut River Coordinator and CRASC Secretary. Ken is very helpful, and this is easy to do.

Simply email Ken at: ken_sprankle@fws.gov and tell him you want to be added to the CRASC public meeting list, and that you want to attend the CRASC meeting on November 17, and also December 1. Ken will get you signed up, and send you an on-line or telephone link, and an agenda. With all the secrecy, at least here you get to see some of the agencies and players who are responsible for our public trust. REST assured, FirstLight’s representatives are always in attendance, keeping an eye on things. That’s why you should think about putting in the time. There will be considerable tech-talk at this November meeting, but here you can get to know the agents and players. AND, there is a time at set aside for the public to ask questions. If you care about a living river, get signed up to attend these on-line public meetings.

BTW, each CT River state on the CRASC has what’s called a “public sector” representative. Here, representing our fisheries protections at Northfield that representative is Dr. Andrew Fisk, who is also director of the Connecticut River Conservancy. So, if you have questions or concerns about fish kills, fish futures and Northfield operations, your CRASC public sector rep can be reached at:afisk@ctriver.org He represents you!

The Connecticut River’s MASS. Killer is Northfield Mountain Pumped Storage

Posted by on 23 Oct 2021 | Tagged as: Andrew Fisk, Atlantic salmon, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River clean up, Connecticut River Conservancy, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, Death-Sewer, E-Comments, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Gordon van Welie, ISO-NEW ENGLAND, Kathleen Theoharides, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Massachusetts Division of Fish & Wildlife, Mr. Caleb Slater, Mr. Charles Baker, Mr. Gordon van Welie, Mr. Jesse Leddick, Mr. Mark S. Tisa, Ms. Donna Wieting, National Marine Fisheries Service, net-loss power, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, source to sea, Uncategorized, US Fish & Wildlife Service, US Supreme Court, Vermont Fish & Game, Wendi Weber

The Connecticut River’s MASS. Killer is Northfield Mountain Pumped Storage, a law-breaking ecosystem disaster

READ Bill Stubblefield’s great river defense to the Federal Energy Regulatory Commission and to those responsible for protecting the public’s Connecticut River for future generations here: BillStubblefield20211022-5051-1

WATCH, HEAR my Friends of the Greenfield Public Library presentation: “LIVING RIVERS FLOW DOWNSTREAM,” a 50 year history of Northfield Mountain’s killing and the officials responsible for stopping its license to kill here:
https://www.youtube.com/watch?v=qs4LHjrjtsc

Below is a list of those responsible for ending this illegal license to kill.

Do share it with your local leaders and representatives. Will they step up and end this ecosystem slaughter for coming generations? Where do they stand? What will they do to stop this killing NOW?

The FOLLOWING OFFICIALS have NO RIGHT to bargain away the life of OUR CHILDREN’s ECOSYSTEM. This is THEIR WATCH. They have a PUBLIC TRUST to defend against Connecticut River Extinction and a 40 year Connecticut River death sentence in Massachusetts:

Ms.Kathleen Theoharides, Secretary, MA Executive Office of Energy & Environmental Affairs
Mr. Charles Baker, Governor of the Commonwealth of Massachusetts
Mr. Andy Fisk, MA Public Representative, Connecticut River Atlantic Salmon Commission, Dir. Connecticut River Conservancy
Mr. Gordon van Welie, President and CEO, ISO-New England
Ms. Wendi Weber, US Fish & Wildlife Service Northeast Regional Director
Ms. Donna Wieting Director of Protected Resources, National Marine Fisheries Service
Mr. Mark S. Tisa, Director of the MA Division of Fisheries and Wildlife
Mr. Caleb Slater, MA Div. of Fish & Wildlife, Anadromous Fish Project Leader CRASC
Mr. Jesse Leddick, Chief of Regulatory Review
MA Division of Fisheries & Wildlife

Connecticut River blog: Is it a river at all? Sucked to Death–upstream and down…

Posted by on 17 Aug 2021 | Tagged as: Buz Eisenberg, Clean Water Act, Connecticut River, Connecticut River ecosystem, Conte National Fish & Wildlife Refuge, Environmental Protection Agency, EPA, Federal Energy Regulatory Commission, federal trust fish, ISO-NEW ENGLAND, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Massachusetts DEP, net-loss power, Northfield Mountain Pumped Storage Project, Peskeomscutt Island, Relicensing, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Turners Falls dam, US Supreme Court, Vermont, WHMP

IS IT A RIVER AT ALL? * * MY TALK WITH ATTORNEY BUZ EISENBERG ON WHMP’S “AFTERNOON BUZZ” Copyright © 2021 by Karl Meyer
* Full links and topics below
*


STARVED! THE CONNECTICUT FROM THE TURNERS FALLS BRIDGE ON THE MORNING OF THE POCUMTUCK HOMELANDS FESTIVAL–TAKING PLACE JUST 200 YARDS UPSTREAM. THE LITTLE BUMP IN THE MIDDLE IS PESKEOMSCUTT ISLAND–WITHOUT WATER, NO ISLAND AT ALL…Photo Copyright © 2021 by Karl Meyer

NOTE: (please read through the questions, illustration link, and topics below, then click for the podcast link, here, or one at the bottom of the page) https://whmp.com/podcasts/the-afternoon-buzz-8-10-21/

* The Connecticut River is wrenched to a dead stop in Massachusetts daily. It’s literally a heart attack to the ecosystem. But wait, there’s MORE..!

* For up to 4 months out of the year the river’s median natural routed flow is far less than the 15,000 cubic-feet-per-second massive suction of the Northfield Mountain Pumped Storage Project’s four giant turbines pulling at its current. What does this mean?

* Well, it means that there is no living river—because NMPS actually pulls the current into reverse and UPSTREAM for over 3 miles. This is a heart attack, followed by a stroke…

(* CLICK ON THE LINK BELOW FOR A GRAPHIC FROM THE FERC PUBLIC RECORDS SHOWING THE CONNECTICUT PULLED BACKWARD–ARROWS HEADING UPSTREAM TOWARD THE INVISIBLE THROAT OF THE NORTHFIELD MOUNTAIN PUMPED STORAGE STATION, OVER 3 MILES AWAY. NOTE FRENCH KING BRIDGE IN 1ST PHOTO; AND FRANKLIN COUNTY TECH/TF INDUSTRIAL PARK IN THE 2ND*)

*20160301-2015Pages from 3.3.9_appendix_B_Velocity-2*

* Is THIS a RIVER??? *

* Learn how Northfield, a massive energy CONSUMER, squanders enough energy to power all of the housing units in metro-Boston annually—plus those of Franklin County, and nearly all those in Hampshire County, while killing a 4 state ecosystem…

* Hear how Northfield has never met the legal basic safe passage requirements for migratory fish—upstream and down, as it kills millions of juvenile shad in direct violation of the 1872 landmark US Supreme Court decision in Holyoke Company v. Lyman.

* Is the Connecticut even a river in Massachusetts? It meets NONE of the basic definitions of a river from any source or legal dictionary. It is denied it’s NATURAL FLOW; it does not run DOWNSTREAM; it does not flow to the SEA; and it is literally untethered from the pull of GRAVITY…

* Does it meet even basic EPA or Clean Water Act standards—in the Commonwealth or on the Navigable Waters of the United States?

* Why was Northfield not stopped before it got started?

* Why wasn’t it put to bed the moment Vermont Yankee shut down?

* The Connecticut is a river without a watchdog. This is the ecosystem’s critical artery, yet one without a single lawyer dedicated to its defense these last 69 years, while some falsely lay claim to being its protector…

Thanks to Buz and WHMP radio https://whmp.com/podcasts/the-afternoon-buzz-8-10-21/

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future

Posted by on 21 Jul 2021 | Tagged as: 5-year FERC licensing process, Brian Harrington, Catherine Carlson, climate change, Connecticut River Atlantic Salmon Commission, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, CRASC, Daniel McKiernan, David Cameron, Donna Wieting, E-Comments, Environmental Protection Agency, EPA, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Comments, FERC Commissioner Richard Glick, FERC Secretary Kimberly D. Bose, FirstLight, FirstLight Power, Gordon van Welie, Holyoke Co. v Lyman, ISO-NEW ENGLAND, Jesse Leddick, Julie Crocker, Kathleen Theoharides, Kimberly D. Bose, Landmark Supreme Court Decision 1872, Local Bias, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, Northfield Mountain Pumped Storage Project, P-1889, P-2485, Peter Brandien, Public Comment period, Public Sector Pension Investments, Rock Dam, Sam Lovejoy, Sean McDermott, shad, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Steven Mattocks, Timothy L. Timmermann, Turners Falls, US Fish & Wildlife Service, Vermont, Wendi Weber

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future Copyright © 2021 by Karl Meyer

Kathleen Theoharides, Massachuetts’ Secretary of the Executive Office of Energy & Environmental Affairs before launching on a PR kayak tour of the river at FirstLight’s dock next to the intake of the Northfield Mountain Pumped Storage Project, October 2020. Photo Copyright © 2020 by Karl Meyer

NOTE: as a journalist and citizen I’ve been a participating stakeholder for nearly a decade in the ongoing Federal Energy Regulatory Commission relicensing process for the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot hydro operations. In that light, I encourage people to first view the half-hour segment of Local Bias, linked below. Then, return to this post and its resource list below for ways to participate in the critical decisions now being made about the Connecticut River. They will impact its currently crippled ecosystem for generations to come.

LOCAL BIAS link: https://youtu.be/IX2Rv2NYq3s

Since 1872 the US Supreme Court has made it the law of the land that migratory fish on US Rivers are guaranteed safe upstream and downstream passage at dams and industrial river sites. That decision was centered on a Massachusetts case at the Holyoke Dam. One hundred forty-nine years later that law remains essentially unfulfilled at an endangered species’ critical spawning and nursery site on the Connecticut River at Montague, MA, as well as at the Turners Falls Dam in that town.

Further, that law remains glaringly unenforced and unimplemented at the Northfield Mountain Pumped Storage Project in Northfield MA, where the river is literally sucked into reverse, and millions of eggs and downstream running juvenile American shad are pulled to their “functional extirpation”(vacuumed to their deaths) yearly, on their way to the ocean from Vermont and New Hampshire spawning reaches. The Commonwealth of Massachusetts has now owed Vermont and New Hampshire—and really all of New England, a living river for almost exactly a century and a half.

Warning sign announcing the dangers of Northfield’s massive intake suction. Photo Copyright © 2021 by Karl Meyer

The current Canadian parent-owners of that net-loss power regeneration/resale site are proposing only an ineffective, seasonal “barrier net” at the vacuum mouth of this facility, the very ‘solution’ that leaves this monstrous sucking in place to kill all those Vermont and New Hampshire produced eggs and baby shad, crippling the prospects for returning adult shad to those states from the Atlantic four years in the future.

The donuts and coffee were on FirstLight for the state officials and representatives taking part in last October’s little PR kayak tour. Photo Copyright © 2020 by Karl Meyer

Northfield Mountain’s net-power-loss energy consumption literally swallows and squanders the entire annual energy equivalents of whole cities and counties as it ravages the Connecticut River, using it as a crushing and deadly energy relay switch.

FirstLight is applying to FERC—backed up by a power-hungry, ecosystem-and-climate-indifferent ISO-New England, for a license to kill for decades to come. Northfield Mountain wastes monstrous amounts of grid energy, while ravaging New England’s critical main ocean connection and planetary cooling artery…

Below are resources available to the public for interacting and participating with the Federal Energy Regulatory Commission in licensing decisions, and government agency officials charged with implementing the public trust on the Connecticut River.

www.karlmeyerwriting.com/blog

NOTE: the landmark US Supreme Court environmental decision centered on the Connecticut River came back in 1872 in Holyoke Company v. Lyman, requiring safe up- and down-stream protection for migratory fish.

Send public comments on relicensing of the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot Hydro Stations to the Federal Energy Regulatory Commission. The “project numbers” must be included, as well as your name and address, in order to become part of the public record. They should be concise, citing specifics in a paragraph or two, noting Northfield Mountain P-2485 and Turners Falls/Cabot P-1889.

Send via www.ferc.gov, usingE-comment, with the salutation going to: “Kimberly D. Bowles, Secretary.” Those comments can also include a cc to the current chair of the Federal Energy Regulatory Commission: Richard Glick.

Decisions concerning foreign interests and use of the Connecticut River are happening at this time, and the river in Massachusetts has sat largely emptied or dead here for half a century—a situation enabled by the Commonwealth and its officials’ enduring, ugly and pointed environmental neglect.

To gain effect, letters can be cc’d to federal-and-state officials who are the vested stakeholders representing the public in the protection of the river and resources. Those publicly recorded FERC entries can also be forwarded to local newspapers and media outlets.

LIST of executives–plus officials from federal and state agencies who represent the public in protecting the Connecticut, its migratory fish, aquatic animals and habitats through their “conditioning authority” powers:

ENERGY executives in the private/quasi-public sphere:

Mr. Gordon van Welie, President and CEO, ISO-New England, the “independent” system operator:
Phone (413) 540-4220

Mr. Peter Brandien, Vice President of System Operations, ISO-New England:

E-mail: pbrandien@iso-ne.com .

NOTE: Mr. Brandien writes the annual support letter that facilitates the daily commercial damage to the Connecticut wrought by the Northfield Mountain Pumped Storage Project. ISO has never acknowledged to the public that NMPS is NOT essential to the DAILY functioning of the power grid. Instead it encourages and shackles the public to those peak-priced, daily ravages as NMPS is handsomely paid to hold back several hours of reserve emergency-function megawatts for ISO’s 20th Century bulk power grid in case of a rare blackout (like the one in 2003), and also for occasional use–at scattered intervals, in controlling grid fluctuations.

ISO should have ago been curtailed as a functionary for private mega power interests. Today’s grid should already be based on distributed generation and micro-grid functions in this time of climate chaos and cyber crime. Energy and storage should be located nearest to where it is produced and used. Future linking of river-ravaging NMPS to 200-mile-distant wind turbines is wholly criminal when compressed air storage can be located close to metro/industrial coastal centers—including implementation at sites like Everett, Somerset, New Bedford, and elsewhere. That would render the system resilient, local and detachable–and rescue New England’s Connecticut River ecosystem to support generations to come across the next half century.

But, today and into the future, counter to Holyoke Co. v. Lyman, , ISO will happily sell off a US ecosystem’s daily life to foreign venture capital interests, keeping NMPS in lucrative daily play for decades into the future. The bottom line function of ISO-New England—forget ecosystems and climate, is apparently commercial first, and foremost. In their own words: to “protect the health of the region’s economy and the well-being of its people by ensuring the constant availability of competitively-priced wholesale electricity—today and for future generations.” They love to employ the term “clean”, but never elaborate on glaring incongruities, fallacies or impacts. Future generations apparently will have no need of living ecosystems, just an endless stream of “competitively-priced” energy. They NEVER mention energy CONSERVATION…

FEDERAL PUBLIC officials:

For endangered Connecticut River shortnose sturgeon, freshwater mussels, as well as American shad, blueback herring and American eel:
Donna Wieting, Director of Protected Resources, National Marine Fisheries Service, NOAA Fisheries:
Phone: 301-427-8400

Also, for endangered shortnose sturgeon, as well as American shad, blueback herring and American eels: Mr. Sean Mcdermott, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Sean.mcdermott@noaa.gov

Also at NMFS, protecting shortnose sturgeon and their habitat: Ms. Julie Crocker, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Julie.crocker@noaa.gov

For federal protection and enforcement of the Clean Water Act on the Connecticut River: Mr. Timothy L. Timmermann Office of Environmental Review, EPA New England Region 1, Boston MA 02109-3912:

E-mail: timmermann.timothy@epa.gov

For all migratory fish and safe passage on the Connecticut including American shad, herring, and endangered sturgeon: Wendi Weber, US Fish & Wildlife Service Region 5, Hadley MA 01035:

E-mail: wendi_weber@usfws.gov

MASSACHUSETTS state officials:

Kathleen Theoharides, Secretary of the MA Executive Office of Energy & Environmental Affairs 100 Cambridge St., Suite 900, Boston, MA 02114:
Main Phone at (617) 626-1000

For Massachusetts clean water and wetland habitat protections on the Connecticut: Mr. Brian Harrington, Bureau of Water Resources Deputy Regional Director, Massachusetts Department of Environmental Protection, 436 Dwight Street, Springfield MA 01103:

E-mail: Brian.d.harrington@state.ma.us

Also from MA DEP: Mr. David Cameron, PWS Section Chief, Massachusetts Department of Environmental Protection, 436 Dwight St., Springfield, MA 01103:

E-mail: David.cameron@state.ma.us

For state-endangered shortnose sturgeon and all Connecticut River migratory fish in MA: Mr. Jesse Leddick, Chief of Regulatory Review, Massachusetts Division of Fisheries and Wildlife, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: Jesse.Leddick@mass.gov

Also at MA Div. of Fish & Wildlife: Mr. Steven Mattocks, Massachusetts Division of Fisheries and Wildlife, Fisheries, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: steven.mattocks.@mass.gov

CONNECTICUT RIVER: maybe not left for DEAD after all

Posted by on 04 May 2021 | Tagged as: American shad, Anadromous Fish Conservation Act, Andrew Fisk, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River Watershed Council, Conte National Fish & Wildlife Refuge, CRC, Daniel McKiernan: Director MA Division of Marine Fisheries, Delaware LLC, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Julie Crocker, Kathleen Theoharides, MA Division of Fish and Wildlife, Martin Suuberg, Martin Suuberg: Commissioner MA Department of Environmental Protection, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Ron Amidon: Commissioner MA Dept. of Fish and Game, Source to Sea Cleanup, State of Delaware, The Greenfield Recorder, Traprock Center for Peace and Justice, US Fish & Wildlife Service, USFWS, Wendi Weber

CONNECTICUT RIVER: maybe not left for DEAD after all

Following the Great Earth Week Walk for River Survival to the Northfield Mountain Pumped Storage Project on April 24th, it’s been inspiring to see people publicly raising their voices to pull the grim, daily carnage of that power-hungry machine out from the shadows. One of particular insight was written by Susan Olmsted and appeared in The Recorder on April 30:
https://www.recorder.com/my-turn-olmsted-NorthfieldHydroStation-40211638 . Later, Ms. Olmsted relayed those same points into the public record of Federal Energy Regulatory Commission’s relicensing comments for the Northfield docket: FERC P-2485. Those are the routes to raising the public profile of our endlessly crippled River—its fate all but buried under confidentiality agreements and generations of inaction by the responsible agencies and so-called protectors. They all continue to lay low in a process that will decide our river’s ultimate viability for decades.


At the NMPS Intake. Photo Copyright © 2021 by James Smethurst

I again must thank the Traprock Center for Peace and Justice and Anna Gyorgy for organizing the event. Having written about this broken river for decades, and now having served on the Fish and Aquatics Study Team in this endless FERC process since 2012, it was an honor to speak up for the river with a caring and determined crowd in attendance. As I’ve noted to several people, last October I witnessed MA Energy Secretary Kathleen Theoharides and Watershed Council/Conservancy Director Andy Fisk launch a PR canoe tour for elected officials–directly upstream of the killer suction pipes of Northfield. In grim, self-serving fashion neither stepped up to the TV cameras or spoke with attendant reporters to proclaim, “This thing is our river’s greatest killer, it should be closed; this company, FirstLight, wholly re-registered these holdings out of state into Delaware as tax shelters two years back—they have no business here.” Shame on them both.

Watershed Council/CRC Director Andy Fisk, in vest, Chairs the Connecticut River Atlantic Salmon Commission 12/10/2018

BTW, we spoke at some depth on the Walk about the NU/Eversource building-of, and current massive connections to NMPS–and also the long-standing financial and Source to Sea greenwashing links between the Watershed Council/Conservancy and Eversource? Well, here’s a little late-breaking Eversource monopoly news: https://www.eenews.net/stories/1063731537

Personally, I would feel I’d failed our Great River, this ecosystem and coming generations had I never stood in front of this killer to bear witness to the truth. NMPS is a killer, and no configuration that leaves its grim sucking mouth open for ANY part of the year will retrieve it from being the most lethal machine ever deployed on the Connecticut. After so many years I am grateful that I had that opportunity–to stand up with other people and keep faith with our river–and link with those who will depend on its living waters in the future.


Revival Walk Crowd April 24, 2021 Photo Copyright © 2021 by David Keith

I don’t think a single person in attendance that day believes the snake-oil logic for continuing NMPS: that wasting massive amounts of energy to actually pull a river backward for miles–sucking 100s of millions of fish to their deaths as it wrenches its deadened water up a mountain, will ever be any kind energy “clean” or “green” solution on a heating-up planet whose ecosystems are unraveling. FirstLight’s will merely continue the laying-waste to our long-crippled river. It has nourished life here for millennia; they want to trade that in for their few hours of peak-priced energy.


MA Secretary of Energy & Environmental Affairs Kathleen Theoharides talks to the media–just yards away from Northfield’s deadly intake on a fluff PR tour on the river, October 2020. Photo Copyright © 2021 by Karl Meyer

It’s important to remember that this machine’s emplacement ran counter to one of the most significant landmark environmental decisions ever from the US Supreme Court, centered right here on the Connecticut River in 1872. In Holyoke Company v. Lyman the Court decided private operators of dams and facilities on the Connecticut—and thence, for all rivers, must provide safe upstream and downstream passage for migratory fish. Nearly 150 years later, this machine continues crushing millions of migratory fish—among them federal trust American shad, blueback herring and American eels. That killing occurs for eggs, larvae, juveniles and adult fish across the many months of their full migratory life cycles.

With the presence of a real watchdog, NMPS’s illegal presence never would have arisen here. There were decades to have sued for its shutdown. Today, neither its operation–nor FirstLight’s thin mitigation proposal to put up a partial, temporary net across its mouth annually that might spare some adult shad and eels from its suction just two months out of their killing year, even remotely passes the smell test for legal operation in a US Fish & Wildlife Refuge.

Raising public voices and flushing the buried dealings in this race-to-the-bottom FERC relicensing process is now the key to having some real impact in saving the Connecticut.

This Great River still feeds bodies and souls. It’s been struggling for well over half a century without an entity taking on the necessary mandate to “enforce” and take on the employ of a day-to-day legal team worthy of facing down predator corporations. This is an ecosystem destined to failure if citizens stay on the sidelines. But people are getting it; and standing up. Maybe this critical life-line of a river can be revived for the coming half century, to again nourish those of the future.

WORTH NOTING: Massachusetts and federal agency officials responsible for securing a living Connecticut River for your great, great, grand kids–upstream and down, through to Vermont and New Hampshire:

Kathleen Theoharides: Sec. of MA Energy & Environmental Affairs
Martin Suuberg: Commissioner MA Department of Environmental Protection
Ron Amidon: Commissioner MA Dept. of Fish & Game
Daniel McKiernan: Director MA Division of Marine Fisheries
Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA (endangered CT River shortnose sturgeon habitat)

GREAT CONNECTICUT RIVER SURVIVAL WALK DRAWS BIG MULTI-STATE CROWD

Posted by on 27 Apr 2021 | Tagged as: 1872, American shad, Bellows Falls VT, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Refuge, Conte National Fish & Wildlife Refuge, Daniel McKiernan, Delaware LLC, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, Haddam nuclear plant, Holyoke Dam, ISO New England, Julie Crocker, Kathleen Theoharides, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Martin Suuberg, Martin Suuberg:, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Millstone 1, National Marine Fisheries Service, National Marine Fisheries Service, net-loss power, NMFS, NOAA, Northeast Utilities, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, NU/WMECO, P-2485, PSP Investments, Public Sector Pension Investments, river cleanup, Riverkeeper, salmon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, State of Delaware, Treasury Board of Canada, Uncategorized, United States Supremed Court, US Fish & Wildlife Service, Vermont, Vermont Yankee

GREAT CONNECTICUT RIVER SURVIVAL WALK DRAWS BIG MULTI-STATE CROWD

Claire Chang of the Solar Store of Greenfield speaks to attendees. Note: see http://solarisworking.org/. Photo Copyright © 2021 by James Smethurst. All Right Reserved

Northfield MA. The biggest story on the 410-mile long Connecticut River this Earth Week did not center on yet another promo video or soft news story about people doing trash cleanups. It took place on Saturday, April 24th, when more than 70 people of all ages–from as far as Springfield, South Hadley and Northampton MA–all the way upstream to Putney VT, turned out for a 3-mile river walk to learn about the 50 years of devastation that the Northfield Mountain Pumped Storage Station has wrought on their four-state ecosystem.

THE DAY’S SPEAKERS BEARING WITNESS

Attendees heard from host, Traprock Center for Peace and Justice’s Anna Gyorgy, about the long, deep connection of this river killing to nearly 50 years of nuclear power excess and damages (www.traprock.org). They heard from Claire Chang of the Solar Store of Greenfield about alternative energy, solar installation and bulk storage alternatives to destroying whole ecosystems. And, I spoke at length about the long, grim and deadly history that has brought us to a crossroads for a living future for the Connecticut River vs. this massively violent machine.

WHERE THE RUBBER NEVER MET THE ROAD

What people heard about was that shutting up NMPS’s killer intake pipes is the only river cleanup that matters. Doing just that would have saved a now-crippled ecosystem–had there been an actual watchdog organization on the Connecticut in 1972–or again, when Vermont Yankee’s license expired in 2012. Those are the cleanups that would have spared an entire ecosystem, decade-upon-decade of this hide-in-plain-sight sucking wound.

THE LEGACY OF FAILURES

They learned the Commonwealth Massachusetts has endlessly failed this ecosystem, facilitating its exploitation to the detriment of 3 other New England states by not protecting it. And, that the federal and state fish agencies have failed it as well by first chasing, then never relinquishing, their long-failed salmon experiment, for a fish not seen here since 1809. And also that the NGO claiming guardianship here since 1952, massively failed New England’s River–never stepping up to challenge and prosecute the devastation of the power companies, nor calling out or suing government agencies charged to protect it under state and federal law.

LANDMARK SUPREME COURT DECISION 1872: HOLYOKE CO. v. LYMAN

Living rivers do not flow backwards. People walked a mile and a half to the intake pipes of a deadly machine that has laid waste to billions upon billions of fish across a half century—literally suctioning them to death while pulling miles of river current into reverse. Folks learned that building of this net-power-loss, river-gorging appliance and the deadly impacts it created on migrating fish, particularly American shad—actually flew in the face of the 1872 landmark Supreme Court decision in Holyoke Company v. Lyman, a full century before NMPS was built. Given that law, it had no right to exist here at all.</strong>

Photo Copyright © 2021 by Robert Flaherty All Rights Reserved.

What did that landmark decision require of dam system owners and private companies operating on the Connecticut–and on all rivers of the United States a century and a half ago? It said all must provide safe fish passage, upstream and down of their facilities, as “public rights.” Visitors also learned that the Canadian owners of this 365-day-a-year slicing machine want only to provide a flimsy net, part way across its killer mouth, for just over two months out of the year. That will largely leave the eggs, larvae and juveniles of most species—including migrants, in full peril. Names of agency leaders charged with saving the river for our grandkids were supplied.

NOTE:text below derives from a The GREAT RIVER WALK handout

NO NEW LICENSE TO KILL: THE NORTHFIELD MOUNTAIN PUMPED STORAGE STATION: A HALF CENTURY OF WASTE, DEATH AND ECOSYSTEM DESTRUCTION.</strong> Notes from Karl Meyer, FERC relicensing Stakeholder and Intervener since 2012

To COMMENT: Federal Energy Regulatory Commission Project License P-2485 (www.ferc.gov E-comments) Include your name, address, project # P-2485 and a brief. specific remedy for FERC to apply.

Owner:venture-capital firm PSP Investments, a Canadian Crown Corporation.
Operating in MA as: FirstLight Power Resources.
Current tax sheltering llc registration since 2018 out of MA & New England: in Dover, Delaware

NMPS is an energy consumer. It has never produced a single watt of virgin electricity. Every day this machine consumes huge pulses of electricity from the power grid to suck massive gulps from the Connecticut backward and uphill for hours on end at a rate of up to 15,000 cubic feet per second(cfs). That sucking pulls the Connecticut backward at times for over 3 miles downstream. SOURCE: FERC P-2485 relicensing Study 3.3.9 appendices.

This is not a hydropower plant; it is an energy wasting machine operating exactly like an electric toilet. It runs on imported electricity, profiting on the buy-low/re-sell high model.

RUNNING BACKWARD FOR DECADES

**VIEW Federal Power Commission document with link HERE FPC 1974 flow reversals

That 15,000 cfs is the equivalent of 60, seven-bedroom mansions being swallowed each minute, for hours on end—with everything from tiny fish eggs to full sized American eels obliterated by its turbines. Twenty-four species are subject to that suction. For shad alone it’s estimated that over 2 million juveniles and 10 million eggs and larvae die here annually. That’s just one species. How many billions of fish die annually, across all species—and now across 49 years? A fixed, monitored, year-round barrier screen, fully across its mouth was required.

NMPS then later sends that deadened water back down in peak-priced pulses for a few hours in the morning and afternoon at up to 20,000 cfs. A living river goes in, all that comes out is dead. The Northfield Mountain Pumped Storage Station does its killing in the heart of the Silvio O. Conte Connecticut River National FISH & Wildlife Refuge. This Canadian company is operating in the heart of a four-state ECOSYSTEM, crippling and pulling it apart daily. It should be relegated to rare emergency use.

The scheme to pair this eviscerating machine with future ocean wind is a nightmare—fully a Greek tragedy. Ocean wind sent to kill its river babies. Future generations require a living river.

Energy should be consumed close to where it is produced. That is where the load is. In New England that load is at the coast. Large-scale compressed air plants can be built at New Bedford, Everett, Boston, Somerset and Middltown RI for large-scale wind energy storage. If FERC allows massive LNG export farms to be built at the coast, it can require space for “local” energy storage—right near all those current “natural” gas tank farms of today.Storage needs to be adjacent to those metro cities where it is consumed. That battery storage can be constructed is a given.

In the age of Climate disruption the goal of an electricity network–one safe from mass outages due to cyber attacks and wind and flood events–disrupting the current corporate mega-grid built for huge area energy relays, should be micro-grids and distributed generation.

That decreases vulnerability and will encourage CONSERVATION—never mentioned by the Federal Energy Regulatory Commission or ISO-New England. That is the formula that begins to tackle climate disruption. It is time for Re-Regulation of the power grid. It is time for TRANSPARENCY in the Commonwealth’s energy policy–done behind closed doors with monopoly capital interests running the ISO-NE and NEPOOL table, while excluding even journalists from meetings. This plant squeezes the life out of approximately 1-1/2 billion gallons of Connecticut River water daily—its deadened re-sale power for export—for “load” consumers far from the small towns and cities of this 4 –state ecosystem.

NMPS was built by WMECO/Northeast Utilities(NU) to run off the bloated excess juice of their Vermont Yankee nuclear plant, 15 miles upriver. VY closed forever in 2014. NU today remains massively wired into and out of this facility’s energy resale loop. Today NMPS deadly consumption continues on 50% climate scorching natural gas, 25% nuclear from NH and CT, and 10% actual hydropower from Canada.


The massively fouled Connecticut River and NMPS’s intake tunnels on September 6, 2010. Photo Copyright © 2021 by Karl Meyer

In 2010 NMPS choked on its own effluent, and unexpectedly did not run for over half a year after fouling its massive tunnels with silt and muck. Shut down from May 1st thru early November– after being hit with a “cease and desist” order from the EPA for secretly and illegally dumping that grim effluent directly into the Connecticut for months, in gross violation of the Clean Water Act. Nobody lost power during NMPS’s surprise shutdown for over half a year. That’s despite arguments from grid operator ISO-New England about how necessary its killer, daily re-sale juice is to keeping the lights on. Even during record-breaking summer heat in 2010—when VT Yankee even shut down for refueling, the power grid held together just fine.

What did happen in the 4-state ecosystem—quieted without Northfield’s massive disruption, was that dismal fish passage for American shad just downstream at Turners Falls dam shot up 800% above yearly averages for the previous decade. That was the ugly decade when NMPS began operating differently—after Massachusetts decided to deregulate electricity markets.

NMPS is an ecosystem-crippling, anti-gravity machine, gobbling vast amounts of energy to send a river into reverse and uphill—a buy-low/re-sell-high, cash cow regenerating set-up.

This machine is a crime against nature.

At a time when the planet is dying, you revive ecosystems. This river belongs to our grandchildren and the future, not to greedy foreign investment firms. The corporate concern here is merely the weight of water—live fish and living rivers are nuisance expenses. What would suffice here would be a bunch of pulleys and a giant anvil, like a Roadrunner cartoon. Stop killing the future for our kids.

ORIGINAL OWNER/BUILDER: WMECO/Northeast Utilities—completed in 1972 to run off the excess electricity from its sister plant, Vermont Yankee nuclear station, completed in 1972. NU also had ownership in VT Yankee. Today NU/Northeast Utilities is “doing business as” Eversource. Eversource remains massively wired into and out of NMPS/FirstLight facilities.
Eversource/NU never left us. They just decided to dump their creaky and massively-fined nuclear plants at Millstone and Haddam, to become a bigger, more concealed monopoly. What they did was transfer emphasis to T & D–Transmission and Distribution. They would make their bucks by CONTROLLING THE ENERGY TOLL ROAD. Note the massive new wire structures and the some 18-line-long laundry list of charges on your energy bill for simply for T & D. They have as yet not figured out how to get a kick back for delivering STATIC ELECTRICITY.

Eversource is perennially green-washed through its major-money sponsorship of the Connecticut River Watershed Council/Conservancy’s “Source to Sea Cleanup.” NU/Eversource and the Council (founded 1952) have a long, close, deep-pocketed history. Thus, this green-washed, river-killing apparatus has been quietly-enabled for decades.

A 2021 Brown University study named Eversource as MA’s largest energy spender against clean energy and climate legislation: https://ibes.brown.edu/sites/g/files/dprerj831/files/MA-CSSN-Report-1.20.2021-Corrected-text.pdf

The following companies are now in business as “wholly owned subsidiariesof Eversource:
Connecticut Light & Power, Public Service Company of New Hampshire, PSNH Funding LLC 3, NSTAR Electric Company, Harbor Electric Energy Company, Yankee Energy System, Inc., Yankee Gas Service, NSTAR Gas Company of Mass.(EGMA), Hopkinton LNG Corp., Eversource Gas Transmission II LLC, Eversource Holdco Corporation, Eversource Investment LLC, Eversouce Investment Service Company LLC, Aquarion Company, Aquarion Water Company, Aquarion Water Company of Connecticut, Aquarion Water Company of Massachusetts, Inc., Aquarion Water Capital of Massachusetts, Inc., Aquarion Water Company of New Hampshire, Inc., NU Enterprises, Inc., IP Strategy LLC, Eversource Energy Service Company, The Rocky River Realty Company, Holyoke Water Power Company. Eversource has residual interest in nuclear plants they’ve sold: Seabrook NH and Millstone CT.

Part ownership in: Alps to Berkshires LLC, 50% in transmission line to NY State, 15% ownership in Algonquin Gas Transmission LLC, BSW Holdco LLC, BSW ProjectCo LLC, Bay State Holdco LLC, Bay State Wind LLC, Northeast Wind Energy LLC, North East Offshore, LLC, New England Hydro-Transmission Electric Company, New England Hydro-Transmission Corp. Eversource also has interest and ownership in companies that own and manage decommissioned nuclear plants they once owned, including: Connecticut Yankee Atomic Power Company, 65%, Maine Yankee Atomic Power Company, 24%, Yankee Atomic Electric Company, 52%. SOURCE: https://www.eversource.com/content/wma/about/about-us/doing-business-with-us/affiliates/list-of-affiliates

RESPONSIBLE FOR SECURING A LIVING RIVER FUTURE FOR OUR KIDS:

Kathleen Theoharides: Sec. of MA Energy & Environmental Affairs
Martin Suuberg: Commissioner MA Department of Environmental Protection
Ron Amidon: Commissioner MA Dept. of Fish & Game
Daniel McKiernan: Director MA Division of Marine Fisheries
Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA

It is time to break up the monopolies, re-regulate energy in Massachusetts for our children’s sake—and:RESTORE the CONNECTICUT RIVER ECOSYSTEM.

Who is protecting New England’s Great River??

Posted by on 15 Jul 2019 | Tagged as: Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered Connecticut River shortnose sturgeion, FERC, FirstLight Power, Fish and Aquatics Study Team, limited liability corporation, LLC, Northfield Mountain Pumped Storage Station, Rock Dam, Rock Dam Pool, shortnose sturgeon, Society of Environmental Journalists, State of Delaware, The Daily Hampshire Gazette, The Greenfield Recorder, Treasury Board of Canada, Turners Falls dam, US Fish & Wildlife Service, US Geological Survey, US Geological Survey's Conte Fish Lab, USFWS

The following piece appeared in The Greenfield Recorder on June 27, 2019, and in the Daily Hampshire Gazette on July 17, 2019. The original title ran as “Sturgeon Revival on the Connecticut.” www.recorder.com, www.gazettenet.com .
Ruined Rock Dam spawning and nursery site on May 17, 2019. At upper left is one of the extremely sensitive island habitats that rafters repeatedly trammeled. NOTE: Click, then click twice more to enlarge. Photo Copyright © 2019 by Karl Meyer, All Rights Reserved.

Story, Copyright © 2019 by Karl Meyer. All Rights Reserved.

Something remarkable occurred below Turners Falls this May: four dozen federally-endangered Connecticut River shortnose sturgeon were discovered at their embattled spawning and nursery site–the largest documented aggregation since long-term research began there in 1992.

In the afternoon of May 8, 2019 when US Geological Services biologist Micah Kieffer walked down to the river near the Silvio O. Conte Anadromous Fish Research Center, he got a surprise “burp” on the receiver he carried. That meant just one thing: a radio-tagged sturgeon was nearby. Since early spring consistent high flows had coursed down the riverbed—a rarity in the oft-emptied, 3-mile reach below the Turners Falls Dam controlled by FirstLight Power. Kieffer hustled back to the USGS Lab, gathering armloads of equipment and securing a boat. By nightfall he’d set out nets, hoping to find a few sturgeon where they’ve likely spawned for thousands of years–a unique, cobble-bottomed pool downstream of the dam.

The big shock came first thing next morning. Weighing down the nets were 48 squirming, 2-3 foot long, endangered sturgeon–one female “running eggs”; the males all running sperm. Kieffer worked quickly to catalogue each fish; returning all to the current. Across a quarter century of intensive federal research started under Amherst’s Dr. Boyd Kynard and continuing under Kieffer, this was a critical discovery near a place called Rock Dam—which hosts a single, tiny rapid. That site is critical to the shortnose’ recovery—it’s a unique biological refuge, and their only documented natural spawning site in the ecosystem.

Life-giving spring flows have been rare below Turners Falls Dam for nearly a half century. Most years currents get violently see-sawed up and down and diverted in and out of the riverbed at that dam via computers operated from inside the 1972 Northfield Mountain Pumped Storage Station, seven miles upstream. Those disruptions help service the massive water and energy appetite of Northfield’s pumped storage electricity regeneration and resale regime. Most years spawning success for this 200 million year-old sturgeon species fails at Rock Dam. That flow chaos has also long-handicapped the stalled, four-state federal Connecticut River Cooperative Fisheries Restoration for shad and herring here.

But this year, nourishing high flow continued through that critical biological reach right into the height of shortnose spawning season—which extends to late May. Operating with minimal staff, Kieffer again managed to anchor “day-set” nets in the river on May 15th and 16th. He got 11sturgeon on each of those days. But when nets were set again on May 17th he suddenly found himself skunked.
Exposed, dewatered shoals in shortnose sturgeon spawning and nursery habitat below Rock Dam.
Photo Copyright © 2019 by Karl Meyer. All Rights Reserved. Click x3 to ENLARGE>

At 7:30 on the morning of May 17th, just a single gate spilled a thin stream of water into the channel below Turners Falls Dam. Though river flows had been slowly subsiding, when FirstLight pinched those gates shut they were pulling the plug on spawning flows. According to Dr. Boyd Kynard in his 2012 book, Life History and Behavior of Connecticut River Shortnose and Other Sturgeons, “Flow reductions that occurred while fish were spawning at RockD caused SNS to leave the area, and after females left, they did not later return to RockD spawning habitat.” What’s worse, that abrupt tamp-down dewatered the cobble bottom and shoals below Rock Dam where spawned eggs and embryos shelter and develop through June. It’s deadly.

Later that morning two gates were opened, re-ramping currents in the river. Over the ensuing days US Fish & Wildlife Service representatives noted gates alternately waffling flows up and down in sturgeon spawning time—from two open, down to one; later up to three. Perhaps encouraged by those settings, on May 29th a rafting company was seen repeatedly sending loaded, lumbering rafts over Rock Dam and walking them up onto sensitive island habitats.

FirstLight and those commercial rafters have long been apprised and legally aware of the presence of endangered sturgeon—federal studies are part of the relicensing record here. Liability is spelled out under the Endangered Species Act. A single act of interference with a federally endangered sturgeon carries a penalty of $49,000 and possible jail time. Those dam settings resulted in grim biological conditions at a time FirstLight should have been exercising utmost care: this was in the midst of their providing experimental flows from the dam to fulfill license requirements for migrating shad while meeting sturgeon spawning needs.

This December, FirstLight reregistered their Northfield and Turners Falls facilities in a series of tax-sheltered, limited liability corporations in the State of Delaware. As a venture capital firm, parent-owned by the Treasury Board of Canada, they’re seeking a new federal license to operate on this U.S. River in our Commonwealth for decades to come. This critical reach should not become a cash-cow playground for corporate shareholders or joyriding rafters. It’s time to celebrate the shortnose sturgeon, and time to let a river heal.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

Next Page »