ONE WILDLY ILL-ADVISED RIDE

Posted by on 31 Jul 2016 | Tagged as: AMC, American Whitewater, Appalachian Mountain Club, Connecticut River Atlantic Salmon Commission, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, CRWC, Dead Reach, Dr. Boyd Kynard, EOEEA, Executive Office of Energy and Environmental Affairs, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, Fish and Aquatics Study Team, GDF-Suez FirstLight, Jack Buckley, John Bullard, MA Division of Fish and Wildlife, NMFS, NOAA, Regional Director of the National Marine Fisheries Service, Secretary Matthew Beaton, Society of Environmental Journalists, University of Massachusetts, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Wendi Weber

The following piece appeared in The Recorder, www.recorder.com on July 30, 2016, under the heading, “Rafting over prime sturgeon habitat unwise; State officials need to be smarter.”

Copyright © 2016 by Karl Meyer

ONE WILDLY ILL-ADVISED RIDE

A photo from May 25, 2016 posted on American Whitewater’s website shows Massachusetts’ Secretary of the Executive Office of Energy and Environmental Affairs Matthew Beaton and his staff lumbering across a small run of Connecticut River whitewater on a large raft. The short rapid they just surfed over is at a place called Rock Dam. It drops directly into a small, crescent-shaped pool–the sole natural spawning and nursery site for the federally-endangered Connecticut River shortnose sturgeon.

That Turners Falls site is the last place you’d want to see the Commonwealth’s highest environmental official rafting in May. Rock Dam is critical habitat for survival of the river’s most endangered migratory fish. There’s no other place like it in the ecosystem. It’s also where the state-endangered yellow lamp mussel was last recorded in this reach. Ecological protection is key to preserving the natural heritage there for future generations.

Why Secretary Beaton was at Rock Dam on the heels of the state’s failure to protect endangered timber rattlesnakes in their remaining habitat is a puzzlement. That site is literally where the Connecticut has long been left for dead. Each spring it is alternately starved and inundated—making spawning and survival of young for shortnose sturgeon nearly impossible. Rapid pumped storage hydro fluctuations also help make successful upstream passage for wild American shad, sea lamprey, and blueback herring a 1-in-10 proposition above Turners Falls.

The EOEEA was joyriding on “test” flows returned there specifically for environmental protection. They were meant to allow wild fish to reenter critical habitats where they might successfully gather; then spawn—in a natural pool that would subsequently nurture developing young in critical weeks lasting through mid-June. Those flows were delineated by John Bullard, Regional Director of the National Marine Fisheries Service, to not drop below minimum thresholds that would drive spawning sturgeon out. NMFS mandated the higher limits through June 3rd to ensure sturgeon had sufficient time there. That meant healing water for the most impoverished 2.7 miles of habitat on the entire 410 mile Connecticut.

The shortnose is a dinosaur-age fish—a yard-long creature with a shark-like tail and toughened leathery “scutes” instead of spindly scales. It’s the second species listed under the Massachusetts Endangered Species Act, and the most exhaustively studied endangered migratory fish in the river. It has long had a federal recovery plan, one now including the boatload of science documenting building blocks necessary for its survival. None call for boaters bashing over them during spawning gatherings, or beaching in shallows where developing embryos shelter. If this iconic fish is ever to begin the road back from the brink of extinction, mandated protections and uninterrupted flows are critical at Rock Dam.

Dr. Boyd Kynard, formerly of the US Fish & Wildlife Service, the USGS Conte Lab and UMass, led the 17 years of studies that documented Rock Dam as the species’ sole natural spawning site in the ecosystem. He recently stated, “As to protection of the pre-spawning, spawning, and rearing area at Rock Dam, exclusion dates for boating should be the same as the dates for water flow, 15 March to 15 June.”

A “watered” Rock Dam had long-offered sturgeons a wide choice of depths and flow levels they could selectively adjust, and readjust to, when natural surface flow or river temperatures fluctuated beyond optimal conditions for spawning. And that cobble and sand pool was ideal for dispersing tiny eggs and young. Only when flow is present does Rock Dam regain its function as an ancient species shelter, protecting early life stages in currents circulating through cobbled shoals.

In the current 5-year Federal Energy Regulatory Commission relicensing process that will govern hydro operations and ecological conditions here for decades, the Connecticut River Watershed Council and Appalachian Mountain Club are jointly advocating new access points into this delicate habitat for whitewater interests. Both have sat at FERC hearings where Rock Dam has been delineated as critical habitat. In joint AMC-CRWC testimony to FERC they’ve argued their interests in increased flows stem from aquatic habitat concerns, as well as recreation desires. Yet it was AMC that posted dates of those ecological study flows to their website, urging whitewater enthusiasts to exploit them: “Fish Study to Provide Paddling Opportunities: May – June 2016”

Secretary Beaton needs better advice.

Several expert appointees represent the Commonwealth on the Connecticut River Atlantic Salmon Commission. Jack Buckley, Director of MA Fisheries and Wildlife studied Connecticut River shortnose sturgeon at UMass. Mr. Buckley’s Anadromous Fish Project Leader Caleb Slater is also well versed on critical Rock Dam habitat. And the US Fish & Wildlife’s Region 5 Director Wendi Weber also sits at that CRASC table. Dr. Weber studied shortnose sturgeon in Georgia’s rivers. Ultimately, turning a failing Connecticut River migratory fisheries restoration in Massachusetts into a success story will require government leaders embracing solid government science.

Karl Meyer is on the Fish and Aquatics Study Team for FERC hydro-relicensing studies of the Turners Falls and Northfield Mountain Pumped Storage projects. He is a member of the Society of Environmental Journalists.

Citizens win: back science and re-water CT’s Dead Reach

Posted by on 25 Jul 2016 | Tagged as: 5-year FERC licensing process, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Dead Reach, endangerd shortnose sturgeon, Federal Energy Regulatory Commission, Federal Energy Regulatory Commission Chairman, FERC, FERC Chairman Norman C. Bay, fish passage, New Hampshire, Senator Bernie Sanders, shortnose sturgeon, Test flows, Turners Falls, Turners Falls dam, Vermont

P1000358
Flow through the DEAD REACH at Rock Dam, (click to enlarge).

**2016-07-19BERNIE SANDERS-FERC CHAIR BAY**

If you have a moment, CLICK and read the document **highlighted** immediately above and read carefully. NOTE: you’ll have to click, then click again in new window.

If you do, you will see a significant victory for the Connecticut River ecosystem. The Dead Reach of the river has been strangled by power company flows diverted out of the riverbed here for generations. Essentially, with just 400 cubic feet per second of flow mandated in the river below Turners Falls Dam for the last 44 years, the Connecticut has been left for dead when it comes to upstream migrants and endangered shortnose sturgeon each spring. Its been the great ugly secret of New England’s Great River for generations, kept quiet by fisheries agencies and watchdog groups alike.

But this year, when FERC relicensing study flows were proposed that would potentially destroy any chance of spawning success in the Dead Reach for the endangered Connecticut River shortnose sturgeon at Rock Dam, citizens stood up for published state and federal science, while fish agencies and NGOs stood on the sidelines.

The result: 40% more water was ultimately reintroduced into that desperately de-pauperized Dead Reach habitat throughout May and into early June–water that should have been demanded for fisheries protection decades ago. Instead of releasing just 1500 cfs into that reach, citizen input caused that number to be raised to 2,500 cfs as the minimum amount FirstLight would have to let flow through the ancient channel.

This was a victory for the river–and not one engineered by Senator Sanders(though his letter of inquiry was a welcome addition), who didn’t send his query to FERC until mid-June. FERC commenters were concerned folks from around the region. A close look at the files shows most were local Bay Staters simply looking out for their home river. They understood what you do when there is key information available: you don’t play politics; you stand up for good science.

This represents a victory for the implementation of long-range, public research findings taking precedence in the decision-making process on river flows. And it occurred despite any agency or NGO backing, or input.

Any increase in flows in this broken stretch of the Connecticut is a victory. However, 40% of very little, is simply not enough. That 2,500 cfs represents the ABSOLUTE bare minimum amount of water necessary just to have migratory fish move upstream upstream here, and allow sturgeon the possibility of remaining on their only documented natural spawning ground in this ecosystem to attempt reproduction. Much more flow is needed to restore this habitat, nourish passage of spring migrants to Vermont and New Hampshire, and allow shortnose sturgeon to successfully spawn and raise young, beginning their long road to recovery.

Politics and wimpy advocacy here, rather than solid science and public input, have been allowing the Connecticut to be run into the ground for generations now. This spring was a little different.

AN INSENSITIVITY OF PLACE

Posted by on 29 May 2016 | Tagged as: 5-year FERC licensing process, AMC, American Whitewater, Appalachian Mountain Club, By Pass Reach, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, CRWC, Dead Reach, ecosystem, endangerd shortnose sturgeon, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC Comments, Gary Sanderson, Greenfield Recorder, New England FLOW, Northfield Mountain Pumped Storage Station, Rock Dam, Rock Dam Pool, Station 1, The Recorder, Turners Falls, Turners Falls dam, whitewater boating

An Insensitivity of Place

Copyright © 2016 by Karl Meyer (CLICK on any photo to ENLARGE)

DSCF8475

There’s a big difference between theory and practice. So too is there often a huge divide between what is said and what is done—and a giant gap between how you portray your intentions in writing, and how you actually carry yourself in the real world. The difference between those things is what most often turns out to be true.

At the Rock Dam, the endlessly-beleaguered and sole natural spawning site for the state- and federally-endangered shortnose sturgeon in the entire Connecticut River system, that difference came into high resolution last week. While I looked on four people in helmets and safety gear lumbered in a huge blue raft over the tiny, watered notch leading into that self-same shortnose sturgeon spawning pool. Four other decked-out compadres looked on admiringly from atop the low ledge that helped form this little ancient pool thousands of years back.

The “drop” for this joyride might have been a total of 4 feet at best, perhaps a third of the length of the giant boat. For any shortnose sturgeon that might have been using this unique ecological site to accomplish the most basic act of survival—spawning, it would’ve been the equivalent of the Starship Enterprise plopping down atop your kiddy pool party. Basically, party over. But hey, those fish are only the sole federally-endangered migratory species in the entire river. Hope you enjoyed the ridiculously short, half-second rush… Yahoo!

And the real kicker is, they were doing this within the known documented time-window at Rock Dam for shortnose sturgeon to be present and attempting to spawn successfully. This was a Sunday, but the previous Wednesday I’d seen rafts being trailered away from the site in the “Patch” section of Turners Falls. I didn’t quite put it together until Gary Sanderson’s column came out in The Recorder the next day, noting the obtuseness of rafters and kayakers he’d seen repeatedly making the same disrespectful maneuvers at Rock Dam earlier in the week.

DSCF8472

But here’s the theory and practice divide. During the current 5-year Federal Energy Regulatory Commission relicensing hearings for the Turners Falls and Northfield Mountain Pumped Storage projects, these whitewater groups have been at the table advocating for increased flows and access for the public on this short section of river. Chief among these have been American Whitewater and New England FLOW, with the Appalachian Mountain Club partnered with the Connecticut River Watershed Council submitting formal testimony in favor of whitewater boating interests here.

AMC and the Watershed Council in submitted testimony are advocating opening up this most-biologically-damaged stretch of the river for the last half century to increased access at three sites over a tiny reach that is just 2.7 miles long: “Improvements would need to be made to a put-in at the upstream end of the run downstream of Turners Falls dam, the take-out at Poplar Street, and access at No. 1 station and at the Rock Dam.” I wonder how many boats, rafts and cars per mile of river that constitutes.

DSCF8476

All groups in their statements and submitted testimony made reference to their concerns for the protection of aquatic habitats here, as well as adherence to the Clean Water Act in this Dead Reach stretch of the Connecticut that includes the extremely critical spawning habitat of the shortnose sturgeon—which consists solely of the small, semi-circular pool that forms below Rock Dam–along with its tiny little 4 foot drop. Shortnose congregate at Rock Dam for spawning from early April through the end of May. Let’s run giant rafts over them and invite crowds of kayakers to overwhelm the river and rocks here to demonstrate respect and concern for a river struggling for life here these last 50 years.

This is self-interested behavior only a little removed from that of the power companies, and, like the power companies, there is cash waiting in the wings for using the river in this most self-considered way. So, well done, whitewater boating interests! We at least now have a tiny picture of what your practice, rather than theory, might constitute. And, hey, did it ever cross your minds that some people actually consider the Rock Dam a sacred place..?

No “Springtime for Sturgeon in Holyoke…”

Posted by on 06 May 2016 | Tagged as: Connecticut River, Connecticut River ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, Holyoke Fish Lift, Holyoke Gas & Electric, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Rock Dam Pool, shortnose sturgeon, Turners Falls, US Fish & Wildlife Service, USFWS

SHadFalls2MtTom
HG&E’s Holyoke Dam with Mt. Tom in background(click to enlarge)

No “Springtime for Sturgeon in Holyoke…” Unenforced FERC License continues the woes for the Connecticut’s only federally endangered migratory fish

Copyright © 2016 by Karl Meyer

For endangered shortnose sturgeon on the Connecticut River this year has been the best thing and the worst thing to happen to them since 1849. In an infinitely promising development over a dozen sturgeon(13 thus far)have found their way into the retooled Holyoke Fish Lift this spring—and all were lifted 30 feet toward upstream spawning habitats at the facility. However, in a most ugly turn of events for a creature listed under the Endangered Species Act since 1967, every one of those sturgeon was subsequently dropped back downstream by humans working there. They literally gained ten yards… after 167 years. Sorry kids, wait ‘til next year–or maybe the one after that.

In 2002 Holyoke Gas and Electric was issued a FERC license under which they were required to complete construction of a fish lift providing up- and downstream access for endangered sturgeon by 2008. FERC, responsible for enforcing those license requirements as well as the tenets of the ESA, failed to enforce their requirements, leaving those improvements unconstructed, year after year. The National Marine Fisheries Service, US Fish & Wildlife Service, and MA Division of Fisheries & Wildlife sat on their hands respecting their responsibilities to act. Nor did any so-called “watchdog” group fulfill their role–to make the enforcers enforce.

This was just the latest failure in a foundering Connecticut River ecosystem steered by money and politics rather than legal obligations, science, and enforcement of the public trust. Just consider that one of the Connecticut River Watershed Council’s Board Members has worked for Holyoke Gas & Electric at their fish lift for a decade… Then consider the resounding silence on enforcement.

This year–a full 9 springs beyond their license obligations, HG&E finally completed that mandated construction at the Holyoke Fish Lift. That says a mouthful about FERC, their licensing process, private industry, and whether anyone is actually protecting the public’s fish and river.

Grimly this spring, when the most sturgeon embarking on upstream spawning runs since the building of the railroads made it to the top of those South Hadley Falls, all were captured and “released downstream” of Holyoke Dam. This bit of brilliance comes via the orders—or lack thereof, of NOAA’s National Marine Fisheries Service. Their failure to act again denies any new genetic input into the tiny upstream population keeping this species’ flickering spark alive across the centuries up at their sole natural spawning site, the Rock Dam in Turners Falls.

Below Holyoke, generation after generation of these long-lived fish have been relegated to simply growing to maturity, repeatedly attempting to return upstream, and ultimately expiring without ever having the chance to pass on their genes. That goes back to the time of President Zachery Taylor.

In one very cruel act of fate, any shortnose sturgeon finding themselves downstream of the newly constructed Holyoke Dam in 1849, were forever barred from reaching their sole natural spawning site in the river system—that ancient Rock Dam pool in Turners Falls. What that has meant is that hundreds upon hundreds of these fabulously evolved fish–across more than a century and a half, have been relegated to the status of “reproductive nulls,” unable to spawn in their natal river system.

Pick your favorite bad actor in this failed scenario–there are a half-dozen choices.

Shortnose sturgeon: ignoring published research

Posted by on 04 Apr 2016 | Tagged as: Connecticut River shortnose sturgeon, Dr. Boyd Kynard, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, FERC Comments, Jack Buckley, John Bullard, Julie Crocker, Kimberly D. Bose, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Rock Dam Pool, Secretary Kimberly Bose, shortnose sturgeon, US Fish & Wildlife Service, USFWS, Vince E. Yearick, Wendi Weber

KM-Rock Dam program 4-23-16P1000433

TOP: Rock Dam program, 4-23-16 (click to enlarge)

Bottom: The ROCK DAM: shortnose sturgeon spawning site (click to enlarge)

The following testimony was submitted on March 18, 2016, to the Federal Energy Regulatory Commission on behalf of the biological needs of the federally-endangered Connecticut River shortnose sturgeon at its sole documented natural spawning site in the Connecticut River ecosystem.

Karl Meyer, M.S.

85 School Street # 3

Greenfield, MA  01301                                       March 18, 2016

 

The Honorable Kimberly D. Bose, Secretary

Federal Energy Regulatory Commission

88 First Street, NE

Washington, DC  20426

 

SUPPLEMENTAL INFORMATION: RE: P-1889-081 and P-2485-063, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

Attach to: PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

This additional information is being submitted subsequent to my receipt of a March 15, 2016 letter from Mr. Vince Yearick, Director, Division of Hydropower Licensing, restating FERC’s intention to sanction spring 2016 test flows that are documented to result in spawning failure and displacement of federally-endangered Connecticut River shortnose sturgeon(SNS), at their sole natural spawning site in this river system. Those findings come from 20 years of research conducted by government scientists from both the US Fish & Wildlife Service and the US Geological Survey.

I am submitting an index and key chapters from this exhaustive body of shortnose sturgeon research published in LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4. Chapter 3 directly addresses SNS spawning failure and displacement at the Rock Dam in the Connecticut’s By Passed Reach, and clearly indicates that test flows of 1500 cfs will not be protective of a species listed since 1967 under the federal Endangered Species Act.

From P. 107 (PDF-page numbers and numbers in the actual text are the same), “Spawning failure in unregulated rivers likely occurs, but it should be rare because females have adapted to natural fluctuations in the river discharge. Spawning failure (when fish were present) occurred at MontSR due to river regulation, but spawning did not fail due to peaking operations. Regulation created bottom velocities that were too low or exceeded the preference of females or created a low discharge that either prevented female access to the RockD or failed to attract them.”

Findings and data from pages 101 and 102 should provide further guidance to FERC in reexamining this decision. In his response Mr. Yearick argues that the low test flow of 1500 cfs put forth for Study 3.3.19 is somehow key in making correlations to last year’s American shad passage tests from Study 3.3.2. However, that is by no means clear (note–the 3.3.2 results have yet to be made available to Stakeholders) as that study also included tests flows of 1000 cfs and 6300 cfs—flows also not being included in order to make any useful correlation with Study 3.3.19.

Further, in regard to the failure or oversight in the protective responsibilities of the National Marine Fisheries Service to submit objections in this instance (as well as the USFWS and MA Division of Fisheries and Wildlife, who also have federal and state ESA mandates), those failures in no way release the FERC from its own responsibilities under the federal Endangered Species Act. In FERC’s own words, from: Hydropower Relicensing-Get Involved, A GUIDE FOR THE PUBLIC: “Is the Commission subject to other federal laws? Yes. The Commission must comply with a variety of federal laws, such as the Clean Water Act (to protect water quality), the Endangered Species Act (to protect threatened and endangered plant and animal species) and the National Historic Preservation Act (to protect culturally significant places and historic properties).”

Regarding Mr. Yearick’s citing of Article 34 as permitting the harming of protected species in the current license, he fails to note the following tenets included in that self-same Article regarding continuous minimum flows and modifications thereof: “These flows may be modified temporarily: (1) during and to the extent required by operating emergencies beyond the control of the Licensee; and (2) in the interest of recreation and protection of the fisheries resources, upon mutual agreement of the Licensees for Projects 1889 and 2485 and the Massachusetts Division of Fisheries and Wildlife.”

Please also note that, with the marked improvements shown in American shad passage at Turners Falls in 2015 which appear to correlate well with the significant increases in flow through the By Passed Reach, it is highly unlikely that any of the Stakeholder Agencies would consider requesting a Licensed flow of 1500 cfs when the biological needs and passage of both federal-trust and federally-endangered migratory fish require significantly more volume to fulfill their spawning requirements.

Lastly, 8 years in arrears of its license agreement signed in 2002 for FERC P-2004–to have completed upstream access for federally endangered Connecticut River shortnose sturgeon by 2008, Holyoke Gas & Electric has completed modifications to its fishway. That should allow SNS their first access and reintroduction to their natural spawning grounds in 168 years. In my mind, it would be patently criminal to greet these endangered fish on their first spawning trip upstream since 1849 with sanctioned flows guaranteed to displace them and cause spawning failure.

Thank you for your careful attention to this critical matter.

Sincerely,

Karl Meyer, Fish and Aquatics Study Team, P-2485 and P-1889

Please see attached chapters in PDF format, as well as included index and book cover.

Cc’d via email to:

Brandon Cherry, FERC

William Connelly, FERC

James Donohue, FirstLight

Julie Crocker, NOAA

Bjorn Lake, NOAA

John Warner, USFWS

Caleb Slater, MA Division of Fisheries & Wildlife

John Bullard, Regional Administrator, NOAA Fisheries Greater Atlantic Region

Wendi Weber, Director, USFWS Region 7

Jack Buckley, Director, Massachusetts Division of Fisheries & Wildlife

Dr. Boyd Kynard

How to Submit Comments to the Federal Energy Regulatory Commission (FERC)

Posted by on 16 Mar 2016 | Tagged as: E-Comments, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC Comments

P1000433

PICTURED: The Rock Dam in Turners Falls; the sole documented natural spawning site for the Connecticut River shortnose sturgeon in this ecosystem. (Click to enlarge.)

SUBMITTING INDIVIDUAL COMMENTS TO FERC: This example is from my own recent E-Comments

Write up your Comments in Letter form, FIRST

Compose comments in a Word doc, simple and direct, you are allowed up to 6000 characters in a FERC E-Comment, which leaves room for 3 or 4, concise paragraphs, sample letter at bottom:

Include DATE, your name, address, and phone

Send them care of:

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

You must include Project numbers in your submission: in this case P-2485 and P-1889 (P-2485 is Northfield Mountain; P-1889 is Turners Falls Dam and Power Canal. You can do this after your salutation!) See next two lines.

Dear Secretary Bose,

RE: P-2485 and P-1889, protecting federally-endangered Connecticut River shortnose sturgeon

This is the opening paragraph from my Stakeholder Comment:

“I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.”

Complete your Word Doc, end with your “Thank you” name, and town

Below that: indicate any individuals, agency heads or representatives you are cc-ing:

Then …..

It is not required, but you might want to register for a FERC E-Subscription for you chosen Projects, in my case, P-2485 and P-1889: Register as an individual, no affiliation. This will take a little more time, and you may choose not to. But, this way you will be Notified, with a Link to all other’s new Stakeholder Comments as they get posted.

** Also, if you get hung up anywhere along the way call the FERC 800 phone #. They are very nice!
Somewhere along the way you will have had to click on HYDRO Projects. OK, to continue…

Go to: www.ferc.gov
Go to: Documents and Filings
Go to: E-Comment
Click on: E-Comment Bar (“Does not require e-Registration”)
Fill out on-line form: All required fields
Type in the googly characters: in the field at bottom
Hit the “Authorize” button

Then: Go to your email, where you will soon receive a FERC email
Click the link that takes you to your FERC e-Comment file
Your filled-in data: will appear in the boxes

Down below is: the empty TEXT Box–your name and town will appear at the top
(Again, somewhere along you will have had to choose HYDRO Projects, not Oil or Nuclear)
In the Text Box under Docket you will see: Hydro Project Search
Below that is the Box: Enter Docket Number
Type in full project number such as: P-2485, and hit Search
P-2485 comes up, saying Northfield—Tap Plus-Bar at right to SELECT; Plus disappears
Go back in THAT SAME text box and over-write: P-1889, HIT plus-Bar again, and SELECT

NOW: Simply scroll down to the empty TEXT BOX, paste in your comments and HIT: SEND COMMENT

You will pretty quick get a FERC email thanking you for Commenting.
You’ll pretty quick get an email saying it has been received.
If you have signed up for an e-Subscription to “hydro” projects P-2485 and P-1889, within an hour a notice of your comments being entered into the FERC record will appear in your mailbox. Voila!

Click on the link to them, and you can review them. This is pretty satisfying. After which, you will get yours and all everyone else’s Comments and Protests to view. They are now part of the public record, read and reviewed by FERC, the utility, and all other fed/state Stakeholders, as well as available to the public and media.

(NOTE: the full example Comment letter below came in at 4,263 characters, with spaces—so you have some room)

** DON’T forget to copy your letter and forward to any CCs you’ve noted via email.

Pat yourself on the back–your comments are now in the Public Files for these FERC decisions.

(Here is my full comment letter, as example)

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 March 4, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.

Though my FERC Stakeholder comments of January 28, 2016 specifically addressed this ESA issue, FirstLight did not respond to the endangerment issue in its RSP revisions. Further, I had made this issue clear to FirstLight and its agents, FERC staff, and key stakeholder agencies in an email delivered on January 20, 2016. I again reiterated the endangered species impacts to those same parties in an email delivered on February 24, 2016. Madam Secretary, I again made my concerns about spawning interference and failure to you and for the FERC record in a letter delivered February 26, 2016. All are available for perusal in the FERC record for P-2485 and P-1889.

Shortnose sturgeon gather at this spawning and nursery site annually between April 22 and May 25 for pre-spawning and spawning. Further, the complex of key biological characteristics of flow, varying depths, and cobble/sand habitat provide SNS with protective options that nurture developing Young of the Year throughout June into July.

According to 17 years of published studies at that site documented by Dr. Boyd Kynard and research colleagues, a continuous minimum flow of 2500 cfs is required to protect sturgeon spawning and rearing at this site. Therefore, I PROTEST the findings of the FERC Revised Study Plan determination issued by FERC on February 25, 2016, and request that only continuous protective minimum flows of 2500 cfs be allowed in this study, and throughout the 2016 SNS spawning and rearing season, as well as all ensuing springs.

The following publication has been referenced in the FERC ILP for these projects by both federal and state stakeholder agencies, FERC, as well as FirstLight and their agents.

“LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4

“Effect of hydroelectric operations on spawning”

Page 101, bottom: “During the 11 yr spawning failed (excluding the failed migration in 2002), when discharge levels were too low for 5 yr and too high for 4 yr. During one yr (2007), discharge during April was both to low and too high. When spawning failed at RockD due to low discharge during 4 yr (1995, 1998, 1999, and 2006)m discharge decreased to <70 m3 s-1 for at least 4 d by 30 April (Fig. 14), the earlier period of low discharge likely marked a threshold making the RockD unattractive to spawning fish.”

Further published data, tables, and required flows necessary in this reach appear on pages 101-102 of LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEIONS.

I would welcome a FERC hearing on this critical ESA issue and would make myself available for testimony. Thank you for your attention to this pressing matter.

Sincerely,
Karl Meyer
Fish and Aquatics Study Team, P-2485 and P-1889

Cc’d via email to:
Brandon Cherry, FERC
James Donohue, FirstLight
Julie Crocker, NOAA
John Warner, USFWS
Caleb Slater, MA Division of Fisheries & Wildlife

Stakeholder PROTEST of FERC Revised Study Plan finding endangering Connecticut River shortnose sturgeon

Posted by on 07 Mar 2016 | Tagged as: Connecticut River shortnose sturgeon, Dead Reach, Dr. Boyd Kynard, endangerd shortnose sturgeon, Endangered Species Act, ESA, Extinction, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Secretary Kimberly Bose, US Fish & Wildlife Service, USFWS

(The following Stakeholder testimony was submitted to FERC on March 4, 2016)

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 March 4, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.

Though my FERC Stakeholder comments of January 28, 2016 specifically addressed this ESA issue, FirstLight did not respond to the endangerment issue in its RSP revisions. Further, I had made this issue clear to FirstLight and its agents, FERC staff, and key stakeholder agencies in an email delivered on January 20, 2016. I again reiterated the endangered species impacts to those same parties in an email delivered on February 24, 2016. Madam Secretary, I again made my concerns about spawning interference and failure to you and for the FERC record in a letter delivered February 26, 2016. All are available for perusal in the FERC record for P-2485 and P-1889.

Shortnose sturgeon gather at this spawning and nursery site annually between April 22 and May 25 for pre-spawning and spawning. Further, the complex of key biological characteristics of flow, varying depths, and cobble/sand habitat provide SNS with protective options that nurture developing Young of the Year throughout June into July.

According to 17 years of published studies at that site documented by Dr. Boyd Kynard and research colleagues, a continuous minimum flow of 2500 cfs is required to protect sturgeon spawning and rearing at this site. Therefore, I PROTEST the findings of the FERC Revised Study Plan determination issued by FERC on February 25, 2016, and request that only continuous protective minimum flows of 2500 cfs be allowed in this study, and throughout the 2016 SNS spawning and rearing season, as well as all ensuing springs.

The following publication has been referenced in the FERC ILP for these projects by both federal and state stakeholder agencies, FERC, as well as FirstLight and their agents.

“LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4

“Effect of hydroelectric operations on spawning”

Page 101, bottom: “During the 11 yr spawning failed (excluding the failed migration in 2002), when discharge levels were too low for 5 yr and too high for 4 yr. During one yr (2007), discharge during April was both to low and too high. When spawning failed at RockD due to low discharge during 4 yr (1995, 1998, 1999, and 2006)m discharge decreased to <70 m3 s-1 for at least 4 d by 30 April (Fig. 14), the earlier period of low discharge likely marked a threshold making the RockD unattractive to spawning fish.”

Further published data, tables, and required flows necessary in this reach appear on pages 101-102 of LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEIONS.

I would welcome a FERC hearing on this critical ESA issue and would make myself available for testimony. Thank you for your attention to this pressing matter.

Sincerely,
Karl Meyer
Fish and Aquatics Study Team, P-2485 and P-1889

Cc’d via email to:
Brandon Cherry, FERC
James Donohue, FirstLight
Julie Crocker, NOAA
John Warner, USFWS
Caleb Slater, MA Division of Fisheries & Wildlife

FERC sanctions crippling flows for federally-endangered Connecticut River shortnose sturgeon

Posted by on 01 Mar 2016 | Tagged as: 5-year FERC licensing process, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NOAA, US Fish & Wildlife Service

The following Stakeholder Comments concerning proposed study flows that will wipe out this season’s spawning for federally-endangered Connecticut River shortnose sturgeon at their only documented natural spawning site in the river system were submitted to FERC Secretary Cheryl on Friday, February 26, 2016. They include comments submitted on Wednesday, February 24, 2016 to FERC staff, federal and state fisheries agents responsible for endangered species protection, and FirstLight–who proposed to include the crippling 1500 cfs(cubic feet per second) flows in FERC-ordered Study 3.3.19.

On Thursday, February 24, 2016, Vince E. Yearik, FERC Director of the Division of Hydropower directed FirstLight’s James Donohue that the ruinous 1500 cfs flows will be allowed at the Connecticut River shortnose sturgeon’s only documented natural spawning site in the spring of 2016.

My Stakeholder Comment letter, on the FERC official record for P-2485 and P-1889, is directly below.

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 February 26, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485

Dear Secretary Bose,

The comments below respecting federally-endangered Connecticut River shortnose sturgeon and Study 3.3.19 were delivered via email to GDF-Suez FirstLight�s James Donohue, FERC staff including Brandon Cherry, and Caleb Slater(MA), Julie Crocker(NOAA), and John Warner(USFWS) on 2/24/2016.

Thank you,
Karl Meyer

Dear Chris et al,
I commented to you and in the FERC record on your RSP for Study 3.3.19, the Ultrasound Study in P-2485 and P-1889, to repel fish from Cabot Tailrace. Since I was somehow left off the email list in the �call for comments� that went out on 2/11/2016, I will take the opportunity to comment at this time.
In your newly-revised RSP you failed to reply to this comment of mine in particular:

�The final week should be at a minimum of 2,500 CFS�which, as FL has indicated in their response to a new Stakeholder Study suggested at the Rock Dam for shortnose sturgeon spawning: 2,500 CFS is the absolute minimum, uninterrupted flow necessary through the Bypass from April 25 � May 22, in order to not interfere with the spawning of a federally endangered species at Rock Dam. In their response, FL cited �Kynard� et al. Minimum flows to keep SNS embryos and eggs motile, watered, and viable are required there throughout the month of June.�

FirstLight has now indicated it intends to use test flows including 1500 cfs in its Ultrasound Study. This is unacceptable, as data shows this will harm a federally endangered species, the Connecticut River shortnose sturgeon. FirstLight has cited Kynard, Kieffer et al; Life History and Behaviour of the Connecticut River shortnose and other sturgeons, in their official FERC comments. Both FERC and the agencies are in possession of the scientific study data contained therein. An examination of Chapter 3 and the �Effects of hydroelectric operations on spawning� makes it quite clear that 2500 cfs is the minimum continuous flow needed to allow females to sustain a presence at the site and complete successful spawning. Flows go below that level�and 1500 cfs is far below that required threshold, will cause sturgeon spawning to fail.

A continuous flow of 2500 cfs is the only protective flow that should be allowed in the Ultrasound Study�it is also necessary throughout the month of June to protect the Early Life Stages of shortnose sturgeon. Please make the required modifications, as I�m certain the agencies and FERC will not give you license to run afoul of the federal Endangered Species Act, as well as similar state statutes.
A review of the FERC record, as well as your proposed Revisions for 3.3.19 are included below. Thanks.
Best,
Karl Meyer,
Fish and Aquatics Study Team

In 2015, FERC agreed with FirstLight and rejected requested snorkeling studies to determine the fish assemblage in the By Pass Reach out of an abundance of caution for impacts they might have on federally-endangered shortnose sturgeon whose only documented natural spawning site is the Rock Dam Pool in that reach.
Though the record clearly misstates that that snorkeling survey request was for the By Pass Reach downstream of Turners Falls Dam�written as �downstream of Cabot Station�, the protected status and determination to �do no harm� was quite clear in FERC�s reply. Excerpts from FERC Staff directly below.
From 01/22/2015, FERC Study Modifications Determination Letter

Study 3.3.11 – Fish Assemblage Assessment
�Requested Study Modifications

The U.S. Fish and Wildlife Service (Interior) proposes modifying the study to require FirstLight to conduct snorkeling surveys in the reach downstream of Cabot Station, in order to avoid all effects on shortnose sturgeon during the spawning season. The Nature Conservancy and Karl Meyer support Interior�s proposed study modification.

Comments on Requested Study Modifications

To avoid all effects on shortnose sturgeon during the April-June period in the reach downstream of Cabot Station, FirstLight states that it will rely on sampling from the project impoundment, sampling of the reach downstream of Cabot Station during other times of the year (after June 30), and existing data from a 2009 electrofishing survey of the area downstream of Cabot Station.

Discussion and Staff Recommendation

The goal of this study is to provide general information on fish species that are present in the impoundment and in the river downstream of the dam and Cabot Station. Based on the description in the modified study plan, FirstLight�s proposed method will provide information on species occurrence, species distribution, relative abundance, and habitat associations that will adequately describe the existing fish community. Because FirstLight�s proposed methods would achieve the goals of the study while avoiding effects on spawning sturgeon, we conclude that snorkeling is not necessary and the study plan filed with the ISR should be approved without modification.�

And�FirstLight�s current revised flow plan for 3.3.19:

�This study would establish a high frequency sound (ultrasound) array across the entire Cabot Station tailrace and determine the effect of the ensonified field on upstream migrating shad moving by Cabot Station. Bypass reach test flows during the study will include flows of 1,500 cfs, 2,500 cfs and 4,400 cfs. These flows will be released depending on river flow conditions. When possible, flows will alternate with the array on for one day then off for one day at 1,500 cfs, followed by one day on and one day off at 2,500 cfs, then one day on and one day off at 4,400 cfs. This sequence will be repeated throughout the study depending on river flow. The field study will include two components: a) DIDSON count of shad entering the Cabot fish ladder and b) detection of telemetered adult shad to determine their movements after they encounter the sound field.�

FERC Stakeholder comments: Turner Falls Canal ultrasound study

Posted by on 06 Feb 2016 | Tagged as: American shad, Cabot Station, Connecticut River shortnose sturgeon, Dr. Boyd Kynard, endangerd shortnose sturgeon, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, Fish and Aquatics Study Team, GDF-Suez FirstLight, Northfield Mountain Pumped Storage Station, Relicensing, Revised Study Plan, Rock Dam, Rock Dam Pool, Secretary Kimberly Bose, shad, Station 1, Turners Falls, Turners Falls dam, Turners Falls power canal

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
January 28, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, ILP for Turners Falls/Cabot Station and the Northfield Mountain Pumped Storage Project

Dear Secretary Bose,

The following comments pertain to an RSP and failures on the part of FirstLight Hydro Generating Company in following FERC’s SDL on Study 3.3.19 and Study 3.3.2. They were shared with FirstLight’s team and FERC’s Brandon Cherry on January 20, 2016:

As one of the requesters for an ultrasound study at Cabot Station, here are my comments, suggestions and observations for ways to gain the best applicable results from Study 3.3.19-Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace.

Unfortunately, FirstLight has not provided Stakeholders with any preliminary findings from the telemetry data gathered in Study 3.3.2, which would be a great help in addressing any changes or improvements needed for a successful 3.3.19 Ultrasound Study.

As stated in their Study Determination Letter under Discussion and Staff Recommendations, FERC was very clear that 3.3.2 information on: (1) “delay,” (2) “bypass flows,” and (3) “effects of Station 1 operations on upstream shad migrations,” be brought over and included in the design recommendations for 3.3.19:

“These evaluation data can be used to inform the methods and design of this study (e.g., ultrasound array design, layout, and placement; array testing at appropriate bypass flows) (section 5.9(b)(6)).”

FERC further stated in their SD Letter to FirstLight, “The amended study 3.3.19 should address stakeholder comments and recommendations. If FirstLight does not adopt a recommendation, FirstLight should provide its reasoning based on project-specific circumstances (e.g. Study 3.3.2 results).”

Revised Study Plan 3.3.19 ignores FERC’s guidance on the inclusion and application of “bypass flows” and “effects of Station 1 operations on upstream shad migrations” in its design. Neither key issue is addressed in their proposal. Bypass flows, which are key to any application of acoustic guidance to keep shad moving upstream in the Bypass, are not included at all. Stakeholders originally requested this Study be done for two years, with bypass flows tested throughout.

Further, the only mention of Station 1 is in a footnote, without any reference to testing its effects “on upstream shad migration operations.” FirstLight merely notes that hourly data on discharges at that site will be included—with no insight on how that data would be applicable if fish are not monitored for migratory delay, with and without flows, emanating from that site.

Since the thrust of the Study is aimed at getting fish up through the Bypass, I question why just three monitoring sites are suggested to be deployed upstream of Cabot Station itself.

• Sonic guidance at Cabot should be deployed in such a way that it encourages upstream movement as much as possible—and avoids biasing fish movements toward downstream retreat. It should also be deployed in a way that, when in ON mode, it also ensonnifies the entrance to Cabot Ladder, as the thrust of the study is to have fish avoid the power canal.

• Ensonification should NOT be engaged in two hour increments, as this would likely be a source of stress and disorientation for fish. Employ the tests in 24 hour cyles, one full day on, one full day off.

• Data should also be provided on the hourly operation and number of gates open at the Emergency Spill Gates off the Canal at Cabot.

• I’d suggest removing the monitor upstream of the mouth of the Deerfield and placing it at the Rock Dam pool, a site where shad–and anglers have a historic presence in the Bypass. The agencies, as well as the anglers, are concerned with finding out where fish gather and stall in this reach on their way northern MA, VT, and NH.

• Another monitor needs to be placed at Station 1, another known fishing site. I interviewed a fisherman there last year with Station 1 running. There were scores of fish visible, treading water in the outflow. He flatly said there are “always shad here” when Station 1 is generating.

• Station 1 should be monitored and switched On and Off in tandem with the Cabot ensonification to highlight impacts, false attraction, drop-backs to Rock Dam and elsewhere, and delays.

• Flow data, hours and number of units in operation, and any interruptions in flow at Station 1 should be included in the Study.

• Several more monitors need to be deployed at the Dam and the Spillway entrance to capture the early, freshet aggregation of fish there—as this is what’s at the core of this study.

• Given that this study will only have one sampling season, it is vitally important that it has enough reach to be applicable for informing a hydro-relicensing that may remain in place for two decades. One month testing and data collection is needed at minimum.

• Further, given the “drop out” rate for handled fish, the number of tagged fish included from FirstLight’s consultants should be doubled to 200, in order to have an acceptable sample entering the project reach.

• Test flows from May 15th through mid-June: two weeks at 5,000 CFS; third week at 4,000 CFS. The final week should be at a minimum of 2,500 CFS—which, as FL has indicated in their response to a new Stakeholder Study suggested at the Rock Dam for shortnose sturgeon spawning: 2,500 CFS is the absolute minimum, uninterrupted flow necessary through the Bypass from April 25 – May 22, in order to not interfere with the spawning of a federally endangered species and be subject to court action. In their response, FL cited “Kynard” et al. Minimum flows to keep SNS embryos and eggs motile, watered, and viable are required throughout the month of June.

Thank you,
Karl Meyer, Fish & Aquatics Study Team

CASHING IN ON A CASH COW

Posted by on 15 Jan 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River shortnose sturgeon, Daily Hampshire Gazette, endangerd shortnose sturgeon, Endangered Species Act, Energy Capital Partners, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, fossil plant, GDF-Suez FirstLight, ISO, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, non-renewable, Northfield Mountain, Northfield Mountain Pumped Storage Station, Rock Dam, shortnose sturgeon, The Greenfield Recorder, The Pioneer, The Recorder, Turners Falls dam, Uncategorized, US Fish & Wildlife Service, USFWS, Vermont

The following piece appeared in the Daily Hampshire Gazette(www.gazettenet.com) and the Recorder(www.recorder.com) in the first week of January 2016.

CASHING IN ON A CASH COW

Copyright © 2015 by Karl Meyer

Ever dreamed of owning your own bank? I got a deal for you! Northfield Mountain Pumped Storage Project is for sale again, along with the Turners Falls canal and dam—and a string of little assets down in Connecticut. But Northfield’s the cash cow. Fourth time in a decade they’re unloading this golden calf–always at a tidy chunk of change. A quickie corporate win-win! It’s really like an A.T.M., run at the expense of the Connecticut River ecosystem.

Place works like a giant toilet–suck huge amounts of the river backward and uphill, then flush it all back and—viola, money spews out the other end. Could be ours! They’re holding bidder tours as we speak. I just need a few partners with ready credit. We go in on short-money and cash-in on the no-brainer electricity “spot market” for a few years. Then, with inflated power-price futures in play, we offload this puppy for a final cash-out of 30%–maybe 50%!

Here’s how it goes down. With the cheerleading of Northfield’s not-so-silent partner, ISO New England–the “independent” system operator (created by the Federal Energy Regulatory Commission), we simply slow dance this darlin’ past the banks, the FTC and FERC. Then, in 2016, its sweet business-as-usual—maybe with new shirts for employees.

Trust me, this works every time. Everyone walks away with full pockets—without the public knowing what hit them. Northfield got wholesaled in 2006 by Northeast Generations Services(formerly WMECO—formerly of Northeast Utilities, now Eversource—you follow?) They grabbed a quick $1.34 billion for the package, slipping it to a trio of Jersey venture capitalists, Energy Capital Partners. ECP renamed their little project FirstLight Energy. Those smartest-guys-in-the-room hung-in and grabbed Northfield’s peaking spot-market profits for two years, before off-loading it for a nifty $1.89 billion in that crazy year, 2008.

With that, GDF-Suez, third owner in four years, swept in–the world’s largest private energy corporation, based in France. They’ve been gobbling up contracts to run water systems across the US under the name Suez United Water. But GDF-Suez recently did a clever name-change to Engie, keeping the public totally confused. They got game! The true costs of these premium-priced plant sales get buried in the list of acronyms on electric bills. It’s like owning a 25-mile stretch the Connecticut River to dip into for cash any time you please.

This is a turn-key operation–with us, the new guys, pushing the buttons. The joke is that the public thinks Northfield is a hydropower operation, while this baby has never produced a single watt of its own energy. It’s imported!–huge swatches of bulk electricity now run-in from outside the region to suck a mountain’s worth of flow from the Connecticut up to a reservoir. Then, dump it out on the power lines when prices peak. It’s hugely inefficient, now largely carbon-based—and massively damaging to the river. But amazingly profitable!

That’s where we come in. Sure it was built as a sister to the region’s nukes to gobble up their monstrous stream of unused electricity–because nukes can’t shut down their feverish output at night. That’s how you get to put in a giant straw and suck the Connecticut uphill at a rate of 15,000 cubic feet per second–more than enough to pull the river backward for a mile downstream under low flow conditions. But who’s watching? When the region’s last nuke shut down, nobody said ‘boo!’ with Northfield going fossil. What climate change?

And when it became clear years back that Northfield operations were imperiling spawning success for the federally-endangered shortnose sturgeon at the Rock Dam in Turners Falls–their singular natural spawning site going back into pre-history, again, nobody came forward. Not the US Fish & Wildlife Service, the National Marine Fisheries Service or the MA Division of Fish & Wildlife—or any river protection group. No bureaucrats, no suits–nobody. At Turners Falls—instead of 70% of migratory fish heading upstream toward Vermont and New Hampshire, they squeeze out 4%. We have it made!

Still skeptical? ISO and FERC are addicted to Northfield—even though its power-flush characteristics might come into play maybe a handful of times a year, if at all. For this they let owners cash in on the river whenever y they want. In 2012, the owners of this “asset” collection of 1500 megawatts(of which over 1100 MW derived from Northfield alone) told investors a full 40% of their profits were realized from “Capacity Fees.” What that means is you get paid for holding back the Connecticut! They’re not required to use it at all if they don’t want to—just flush when prices are high. Paid for being you! Of course another 50% of profit comes from generating, though the public doesn’t know it only operates a few hours a day when prices are highest.

Here’s the kicker: in 2014, after a cry-wolf energy deficit winter that never materialized, FERC–with ISO as cheerleader, sanctioned the doubling of those “capacity fees”. Plants are now collecting 2X the amount they were two years back, for having the potential to dump some power on the lines—not for actually generating. Paid for being you! With 1100 potential megawatts at Northfield, how quick can you say “windfall at the public’s expense?” Lastly, Northfield petitioned FERC the last two winters to increase its reservoir storage by a full 25%, with ISO their biggest cheerleader. FERC agreed, twice. Double-dip with a cherry, anyone?

This thing’s a cinch! Even with all the nukes shut—when this should have been moth-balled to emergency use as more climate-warming, spent nuclear junk, it soldiers on as a virtual river monopoly with the blessings of FERC and ISO. Trust me, no one goes to court. Ecosystem damage, costs to the public? Fuggetaboutit!