CONNECTICUT RIVER: maybe not left for DEAD after all

Posted by on 04 May 2021 | Tagged as: American shad, Anadromous Fish Conservation Act, Andrew Fisk, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River Watershed Council, Conte National Fish & Wildlife Refuge, CRC, Daniel McKiernan: Director MA Division of Marine Fisheries, Delaware LLC, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Julie Crocker, Kathleen Theoharides, MA Division of Fish and Wildlife, Martin Suuberg, Martin Suuberg: Commissioner MA Department of Environmental Protection, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, Ron Amidon: Commissioner MA Dept. of Fish and Game, Source to Sea Cleanup, State of Delaware, The Greenfield Recorder, Traprock Center for Peace and Justice, US Fish & Wildlife Service, USFWS, Wendi Weber

CONNECTICUT RIVER: maybe not left for DEAD after all

Following the Great Earth Week Walk for River Survival to the Northfield Mountain Pumped Storage Project on April 24th, it’s been inspiring to see people publicly raising their voices to pull the grim, daily carnage of that power-hungry machine out from the shadows. One of particular insight was written by Susan Olmsted and appeared in The Recorder on April 30:
https://www.recorder.com/my-turn-olmsted-NorthfieldHydroStation-40211638 . Later, Ms. Olmsted relayed those same points into the public record of Federal Energy Regulatory Commission’s relicensing comments for the Northfield docket: FERC P-2485. Those are the routes to raising the public profile of our endlessly crippled River—its fate all but buried under confidentiality agreements and generations of inaction by the responsible agencies and so-called protectors. They all continue to lay low in a process that will decide our river’s ultimate viability for decades.


At the NMPS Intake. Photo Copyright © 2021 by James Smethurst

I again must thank the Traprock Center for Peace and Justice and Anna Gyorgy for organizing the event. Having written about this broken river for decades, and now having served on the Fish and Aquatics Study Team in this endless FERC process since 2012, it was an honor to speak up for the river with a caring and determined crowd in attendance. As I’ve noted to several people, last October I witnessed MA Energy Secretary Kathleen Theoharides and Watershed Council/Conservancy Director Andy Fisk launch a PR canoe tour for elected officials–directly upstream of the killer suction pipes of Northfield. In grim, self-serving fashion neither stepped up to the TV cameras or spoke with attendant reporters to proclaim, “This thing is our river’s greatest killer, it should be closed; this company, FirstLight, wholly re-registered these holdings out of state into Delaware as tax shelters two years back—they have no business here.” Shame on them both.

Watershed Council/CRC Director Andy Fisk, in vest, Chairs the Connecticut River Atlantic Salmon Commission 12/10/2018

BTW, we spoke at some depth on the Walk about the NU/Eversource building-of, and current massive connections to NMPS–and also the long-standing financial and Source to Sea greenwashing links between the Watershed Council/Conservancy and Eversource? Well, here’s a little late-breaking Eversource monopoly news: https://www.eenews.net/stories/1063731537

Personally, I would feel I’d failed our Great River, this ecosystem and coming generations had I never stood in front of this killer to bear witness to the truth. NMPS is a killer, and no configuration that leaves its grim sucking mouth open for ANY part of the year will retrieve it from being the most lethal machine ever deployed on the Connecticut. After so many years I am grateful that I had that opportunity–to stand up with other people and keep faith with our river–and link with those who will depend on its living waters in the future.


Revival Walk Crowd April 24, 2021 Photo Copyright © 2021 by David Keith

I don’t think a single person in attendance that day believes the snake-oil logic for continuing NMPS: that wasting massive amounts of energy to actually pull a river backward for miles–sucking 100s of millions of fish to their deaths as it wrenches its deadened water up a mountain, will ever be any kind energy “clean” or “green” solution on a heating-up planet whose ecosystems are unraveling. FirstLight’s will merely continue the laying-waste to our long-crippled river. It has nourished life here for millennia; they want to trade that in for their few hours of peak-priced energy.


MA Secretary of Energy & Environmental Affairs Kathleen Theoharides talks to the media–just yards away from Northfield’s deadly intake on a fluff PR tour on the river, October 2020. Photo Copyright © 2021 by Karl Meyer

It’s important to remember that this machine’s emplacement ran counter to one of the most significant landmark environmental decisions ever from the US Supreme Court, centered right here on the Connecticut River in 1872. In Holyoke Company v. Lyman the Court decided private operators of dams and facilities on the Connecticut—and thence, for all rivers, must provide safe upstream and downstream passage for migratory fish. Nearly 150 years later, this machine continues crushing millions of migratory fish—among them federal trust American shad, blueback herring and American eels. That killing occurs for eggs, larvae, juveniles and adult fish across the many months of their full migratory life cycles.

With the presence of a real watchdog, NMPS’s illegal presence never would have arisen here. There were decades to have sued for its shutdown. Today, neither its operation–nor FirstLight’s thin mitigation proposal to put up a partial, temporary net across its mouth annually that might spare some adult shad and eels from its suction just two months out of their killing year, even remotely passes the smell test for legal operation in a US Fish & Wildlife Refuge.

Raising public voices and flushing the buried dealings in this race-to-the-bottom FERC relicensing process is now the key to having some real impact in saving the Connecticut.

This Great River still feeds bodies and souls. It’s been struggling for well over half a century without an entity taking on the necessary mandate to “enforce” and take on the employ of a day-to-day legal team worthy of facing down predator corporations. This is an ecosystem destined to failure if citizens stay on the sidelines. But people are getting it; and standing up. Maybe this critical life-line of a river can be revived for the coming half century, to again nourish those of the future.

WORTH NOTING: Massachusetts and federal agency officials responsible for securing a living Connecticut River for your great, great, grand kids–upstream and down, through to Vermont and New Hampshire:

Kathleen Theoharides: Sec. of MA Energy & Environmental Affairs
Martin Suuberg: Commissioner MA Department of Environmental Protection
Ron Amidon: Commissioner MA Dept. of Fish & Game
Daniel McKiernan: Director MA Division of Marine Fisheries
Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA (endangered CT River shortnose sturgeon habitat)

CONNECTICUT RIVER DEADBEAT DEFENSE: endangered species habitat orphaned–again

Posted by on 29 Mar 2021 | Tagged as: Connecticut River Atlantic Salmon Commission, Connecticut River Conservancy, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, FirstLight Power Resources, Julie Crocker, National Marine Fisheries Service, NMFS, NOAA, Nolumbeka, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Turners Falls power canal, Uncategorized, US Environmental Protection Agency, water lab

Photo Copyright © 2021 by Karl Meyer

This is the Rock Dam pool in the Connecticut River at Montague MA on March 10, 2021–just a month from the date male Connecticut River shortnose sturgeon will begin arriving here at the only documented natural spawning habitat for this federal- and state- endangered migrant in this ecosystem. The Rock Dam has been bathed in a grim red soup leaching out of the failing riverbanks adjacent to the Turners Falls power canal–just 400 feet distant, throughout the fall and winter. The riverbanks continue to crumble and ooze into this cobble lined pool today.

What is contained in the red sludge oozing from the crumbling banks besides the long-known iron and manganese? Is it harmful to developing early life stage sturgeon? What is its source, with the diverted Connecticut’s flow looming just above and 400 feet away–as pulses of its current are run through the Turners Falls power canal? Is it actually the Connecticut River trying to return to its own natural riverbed? Is the canal dike failing? Who is responsible for stopping the riverbank failures here–for enforcing the Endangered Species Act, Clean Water Act, to name just a few–at the Commonwealth and at the federal levels??

And, where oh where can you find a river watchdog with a legal team, an enforcement mandate, and an injunction weeks before these endangered fish return? Certainly not on the Connecticut River.

Clean water. Healthy habitat. Thriving communities. That is the banner slogan of the Connecticut River Watershed Council, recently renamed the Connecticut River Conservancy. Here is a month old statement from that outfit: “We’re not going to test it,” Andrew Fisk, Director, Connecticut River Conservancy. Fisk, who has a water quality testing lab at his Greenfield office, also sits at the head of the Connecticut River Atlantic Salmon Commission. The CRC also sits on the CT River Streambank Erosion Committee, and sponsors cultural programming that would beg an investigation and the preservation of the failing banks at this ancient fishing site.


March 10, 2021. Looking up the Connecticut River’s grim failing riveranks on FirstLight Power-owned property at the Rock Dam site in Cabot Woods, adjacent to the TF power Canal.Photo Copyright © 2021 by Karl Meyer

NATIONAL MARINE FISHERIES SERVICE out of Gloucester MA, under the National Oceanographic and Atmospheric Administration, has lead responsibility for the Connecticut River shortnose sturgeon. Shortnose sturgeon fall under their Office of Protected Resources. Though their representatives including Kimberly Damon-Randall, Julie Crocker, and and Michael Pentony have attended some of the bi-annual federal-state meetings here on the Connecticut, NMFS has sat mum and on its hands, as the critical habitat continues failing for the shortnose sturgeon at Rock Dam. No investigation, no protection, no worries.

TEXT IMMEDIATELY BELOW IS FROM THE NOAA/NMFS website:

“NOAA Fisheries and the U.S. Fish and Wildlife Service share responsibility for implementing the ESA. NOAA Fisheries is responsible for endangered and threatened marine and anadromous species—from whales and seals to sharks, salmon, and corals.

Under the ESA, the federal government has the responsibility to protect:
Endangered species—species that are in danger of extinction throughout all or a significant portion of their range.
Threatened species—species that are likely to become endangered in the foreseeable future.
Critical habitat—specific areas that are:

Within the geographical area occupied by the species at the time of listing, if they contain physical or biological features essential to conservation, and those features may require special management considerations or protection.”


March 11, 2021. Here, a woman stands in the a compact-car size sink hole along with disappearing hemlock saplings on the Connecticut River bank that’s slumping into Rock Dam spawning habitat.Photo Copyright © 2021 by Karl Meyer


Here that same woman stands looking directly up at that sink hole from below on the Connecticut River bank. She’s seen atop further, newer slumping sludge now heading into the river and Rock Dam spawning habitat on March 11, 2021.Photo Copyright © 2021 by Karl Meyer

Photo Copyright © 2021 by Karl Meyer

And these following three pictures, all from March 28,2021–less than two weeks before the first shortnose sturgeon arrive here, show the grim and burgeoning sludge and intrusions into critical Connecticut River spawning habitat at the Rock Dam. The main stem river in all photos is to the left.

Riverbank and species protection here, both federal and state, falls under the current Federal Energy Regulatory Commission license to operate facilities on the Connecticut River.

How can so many institutions fail so miserably at protecting the public’s river?


Connecticut River at Rock Dam, March 28,2021Photo Copyright © 2021 by Karl Meyer


Sludge running into the Connecticut River at Rock Dam, March 28, 2021.Photo Copyright © 2021 by Karl Meyer

SUNSHINE WEEK: a two for one exploring our river’s NUCLEAR NIGHTMARE, ISO-NEW ENGLAND and the public’s RIGHT TO KNOW!

Posted by on 18 Mar 2021 | Tagged as: anti-gravity machine, climate-destroying, climate-scorching, Connecticut River ecosystem, Connecticut River Watershed Council, conservation, Eversource, Federal Energy Regulatory Commission, FirstLight, FirstLight Power Resources, Greenfield Recorder, Holyoke Gas & Electric, ISO New England, ISO-NEW ENGLAND, net-loss power, Northeast Utilities, Northfield Mountain Pumped Storage Station, nuclear nightmare, Peter Brandien, Uncategorized

NOTE: Since this is SUNSHINE WEEK, highlighting the PUBLIC’S RIGHT TO KNOW, the following posts contain material that few might know otherwise, or see anywhere else. The first, immediately below, is my piece that appeared in The Recorder on March 13. BUT PLEASE, do continue reading as the second offering is my letter and information request to Mr. Peter Brandien, Vice President of System Operations at ISO-New England. Brandien recently wrote a glowing endorsement of the grim machinery at Northfield Mountain to the Federal Energy Regulatory Commission. Here, I reply to his letter, and invite him to take part in a public forum on the future of the Connecticut River ecosystem.

THE CONNECTICUT’S NUCLEAR NIGHTMARE
Copyright © 2021 by Karl Meyer

This April 30th the Northfield Mountain Pumped Storage Station, the most efficient aquatic killer of all nuclear age machines installed on the Connecticut, begins its 4th year without a new federal license. NMPS’s massive suction kills everything it inhales. Federal studies on America shad show tens of millions of eggs and larvae extinguished annually, plus the deaths of over 2 million juvenile shad sucked in on migrations to the sea. Its unstudied impacts on 20 odd other resident and migrant species leave plenty more death to ponder.

Vermont Yankee—the nuke Northfield once sucked its energy from, closed in 2014. Rather than creating virgin electricity, NMPS is a net-loss, gravity-defying machine that consumes 30% more juice than it returns to the grid. Its annual power deficit is so high it actually cancels out most of the real hydropower input generated yearly in the Turner Falls canal. Today half of NMPS’s net power loss operations are powered on climate-scorching natural gas, another quarter comes from imported nuclear, and the rest largely from shipped-in Canadian hydro.

The New England power grid has and can chug along without NMPS’s massive daily impacts. But it’s a big-grid cash cow that ISO-New England–the “independent” system operator, has long kept ratepayers tied-to for its few hours of deadly, once-through, stored generation. That deadly, daily regime should have long ago been stopped–relegated to its early-stated use in rare power emergencies. But the Baker Administration and PSP Investments, NMPS’s Canadian parent owners, are looking to pair-up and shackle further use of this ecosystem crippler with distant ocean turbines for decades. It’s a twisted, fairytale climate “solution”—an environmental nightmare for future generations. The Greek myth will be told as “Ocean Sent to Kill Its River Children.”

This April 30th Hudson Riverkeeper will celebrate the end of a long nuclear-age nightmare. Entergy’s last Indian Point nuke shuts down for good that day, years before its license expires. That comes via legal agreements hammered out by Riverkeeper along with the State of New York—and joined by the group Scenic Hudson. That early shutdown will reportedly save the 1.2 billion fish, larvae and eggs sucked to their deaths in Indian Point tunnels where flow is massively swallowed at rates of 2-1/2 billion gallons per day. Northfield Mountain’s river gorging is yet more grim. Its anti-gravity, twice-through turbines render it fully lethal.

Riverkeeper’s victory actually dates to 1966 when a small group of commercial and recreational anglers formed the Hudson River Fishermen’s Association, vowing fight Consolidated Edison. Giant Con Ed wanted to blast apart Storm King Mountain for a cavernous, river-suctioning pumped storage plant. Huge slugs of energy would be needed to suck hours-long river diversions uphill to a reservoir. The mega-juice needed for that massive lifting would hail from the excess output of the Indian Point nuclear station. But HRFA saw pumped storage as a pact with the devil, a grim fish shredder. They took to the streets; then dragged Con Ed into court.

It took 15 years, but in 1980 HRFA and Scenic Hudson won that David and Goliath battle against Con Ed’s building of Storm King. It’s credited as spurring the environmental movement in the United States. HRFA changed its name to Riverkeeper in 1980. Today its take-no-prisoners mission in prosecuting corporate offenders is a model of river defense. Riverkeeper and its offshoot Waterkeeper now boast over 350 chapters across the US and worldwide. They’ve won cases on the Hudson against the likes of Exxon-Mobil, General Electric—even New York State, itself.

In Massachusetts, Northfield’s nuclear-age killing continues daily–though this river’s last nuke, Vermont Yankee, shut in 2014. NMPS has been the festering daily wound to this ecosystem from the Vernon Dam to Turners Falls since it was completed by WMECO/Northeast Utilities in 1972 to run on VY’s juice. VY and Northfield came on line together. Founded in 1952, The Connecticut River Watershed Council was over a decade old when NU/WMECO proposed their contraption in the mid-60s. Sadly, CRWC never challenged them. They were fully 20 years old when Northfield went live. Forty decades on CRWC remained silent again on NMPS in 2014 when VY closed.

While HRFA waged its battle, opportunity was endlessly squandered here. Today NU remains the perennial major funder/sponsor of CRWC’s marquee “Source to Sea Cleanup.” They now do business as Eversource while CRWC is renamed the Connecticut River Conservancy. A close financial relationship has long existed between the two. In January Eversource was cited as the largest spender in opposing climate and clean energy bills in the Bay State. The study, “Whose Delaying Climate Action in Massachusetts,” was authored by Galen Hall, Trevor Culhane, and J. Timmons Roberts of Brown University’s Climate and Development Lab. Why do the green-washing for a corporation that built our river’s worst nightmare? For mission, fight and enforcement, other models exist.

Karl Meyer is has been a member of the Fish and Aquatics Studies Team for the federal relicensing of the Northfield Mountain Pumped Storage and Turner Falls hydro projects since 2012. Meyer lives in Greenfield MA. He is a member of the Society of Environmental Journalists.

BELOW: my March 18, 2021 Letter to Mr. Peter Brandien, Vice President of System Operations, ISO-New England (the “independent” system operator)

Photo: The emptied and dead Northfield Mountain Pumped Storage Reservoir in 2010 when an earlier FirstLight incarnation choked on its own suctioned silt, failed massively, and was later caught dumping its muck directly into the Connecticut River for MONTHS until sanctioned by the EPA for gross violation of the Clean Water Act. Northfield sat idle, emptied, and sanctioned by the EPA, and didn’t operate from May until November. The power grid held together just fine… Photo Copyright © 2021 by Karl Meyer

Dear Ms. Horgan and Mr. Brandien of ISO-New England,

Thank you for sharing your endorsement of PSP Investments FirstLight Power facilities, registered in Delaware and owned by that Canadian venture capital firm with us all. I’m sure you make them very happy. As both a stakeholder participating in the FERC investigations to explore the now-extended federal licenses of the projects you mention, P-2485, and P-1889, I have a few questions I’d love answered–particularly since I’m a journalist, and this is Sunshine Week, a time designated to spotlight government transparency and accountability. It’s about the public’s right to know.

Please, Mr. Brandien, can you tell us–in general terms of course, exactly how many times this past year that the Northfield Mountain Pumped Storage Project was called up for immediate emergency use–or whether is was used in that capacity at all? Just broadly, please? Not at all? Once, in a year? Twice? I recall two, perhaps three times large utility suppliers were given a little standby notice, and cautioned not to promise out all their juice. But that is different than NMPS, and nonetheless, here we are talking about a few individual days out of the entire operating year.

Was there even a single grid slump or disruption where the year-round power loss and consumption of that NMPS machine actually was deployed by ISO, or is it just a hugely impactful standby machine–allowed to make gobs of profit and net-loss dumps onto the wires as an everyday hostage supported by ratepayers?

I’m wondering if you ISO folks have ever heard of conservation? It’s a term even older than NMPS. Another term of similar vintage is ecosystem–do you know that one? I’m wondering if you have grandchildren at all–those little people who are now relying on us to pass along living ecosystems?

I find it funny how your grid works at times. Here, at places like Northfield, the river gets reversed, the ecosystem pulls apart, and millions of fish and aquatic creatures are extirpated with its daily use, while the profits get washed through Delaware, then head to Canada. As I have written, the massive waste to pump a river uphill there erases nearly all the megawatt input created by actual hydro downstream at Cabot Station and Station 1. Meanwhile, FirstLight has promised out some 40% of that downstream juice as “clean” and “renewable” power to Eastern Massachusetts towns far from this Valley–even from where you are located in Holyoke. That leaves no local energy for the residents where that hydropower is produced. Are you familiar with the term environmental justice?

One last funny twist here. As noted, we share the same valley–you are in Holyoke. I’m pretty sure the struggling folks in Holyoke have very little understanding that a special line from the Holyoke Gas and Electric Company Dam feeds directly to the Massachusetts Green High Performance Computing Center run mostly for private interests including Harvard University, the Massachusetts Institute of Technology, University of Massachusetts, Northeastern University and Boston University, as well as EMC Corp., of Hopkinton, an information storage, backup and recovery firm, and Cisco Systems Inc., a California-based Internet network equipment maker. That dedicated line sucks up something like 30% of all the hydro generated at the Holyoke Dam to run a heat sink of 16,000 high speed computers in a nearby building that employs slightly more than a dozen people. Who does this benefit in ISO’s big picture? Climate, ecosystems?; the grandchildren?–the citizens of Holyoke? You also run a massive bank of computers at your facility in that town. I know that you have some “green” plantings and solar panels around the facility, but could you tell use how much juice you consume in a year?

Finally, as a journalist I’d like to offer an opportunity for a public discussion about energy and the future of the Connecticut River ecosystem. I appear at times on a few local radio stations down in Northampton. It would be illuminating to put together a public forum on these topics and you can share with Valley citizens what you have in store for our futures. I’m quite serious. Please let me know, and I’m sure I can get it arranged.

Oh, and PS: We’d love to see the ban on journalists ended at NEPOOL, the big corporate steering ship that tilts and informs so much of your policy.

Sincerely and all best wishes,
Karl Meyer
Fish and Aquatic Studies, P-2485; P-1889.

Karl Meyer, MS
Member of the Society of Environmental Journalists

REIMAGINING A RIVER, Part 2: Not Nearly Hydro Power; Not Renewable Energy

Posted by on 17 Jun 2020 | Tagged as: American shad, B. D. Taubert, Clean Water Act, climate-destroying, Connecticut River, Connecticut River Conservancy, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, Environmental Protection Agency, EPA, Federal Energy Regulatory Commission, FERC, FirstLight, Fracked Gas, GHG, Hudson Riverkeeper, ISO New England, ISO-NEW ENGLAND, Mike Dadswell, Natural Gas, Nepool, Nepool, Phil Glick, Sam Lovejoy, Turners Falls dam, Turners Falls power canal, Uncategorized, Waterkeeper Alliance

THIS GREAT AND BROKEN RIVER VII

Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED.

Issue # 7, Part 2, REIMAGINING A RIVER: Not Nearly Hydro Power; Not Renewable Energy, Northfield Mountain’s Transition from Nuclear-fueled Net-loss Energy to Natural and Fracked Gas Net-loss Energy.

Author’s Notes: It is impossible to write at this time without mentioning the obvious. The country is in a moral crisis right now and it is time to stand up for the rights of Black people, and for the survival–and revival, of our democracy. This is a precious opportunity, one that we squander at our peril.

In the river-keeping world, there is also an opportunity for change that must be grasped now. The relicensing of MA CT River hydro and pumped storage projects is quietly moving toward its end game. A new model for protecting the ecosystem for coming generations is imperative. These licenses will govern conditions on the mainstem river for decades to come, and there is not a credible organization on the ground here that’s up to the task. The link below was forwarded to me. This is what’s called for. It will take hard work, money, and organizing. I hope there are those out there ready to contribute for the love of New England’s Great River.

https://waterkeeper.org/news/waterkeeper-alliance-to-appear-in-the-visionaries-series-on-pbs/


9-6-2010: Northfield Mountain Pumped Storage Station under EPA Sanction for violations of the Clean Water Act forced to dredge the hundreds of tons of muck they dumped into the River over a 3 month span.Photo-Copyright-©-2020-by-Karl-Meyer All Rights Reserved. (Click X3 to enlarge, use back arrows to return to text)

The Connecticut River has been running in reverse in northern Massachusetts for nearly half a century now. Daily at Northfield—125 miles from Long Island Sound, New England’s Great River is strangled away from its ancient gravitational course and literally forced to run counter to its nature. It’s not some bizarre phenomena related to distant tides, nor even some twisted water park trick. It’s caused by the lethal, ecosystem choking mechanisms of the Northfield Mountain Pumped Storage Station.

That river suction and reversal is the by-product of a massive, net-energy-loss, power re-generation scheme begun in the early 1970s. Originally running on the profligate excesses of nuclear power, today NMPS plugs in daily to suck giant streams of climate heating, natural-gas- produced megawatts from a bloated New England power grid. By yanking the river backward, Northfield’s huge energy and water appetite results in damage across parts of three states. Just a fraction of its ecosystem impacts have ever been fully measured and understood.

Since 1972 there’s been just seven months out of one year where those impacts were silenced. Beginning in May of 2010–and for the first time in the decade after Massachusetts implemented electricity deregulation, American shad passage at the Turners Falls Dam showed dramatically, exponentially, renewed signs of life. The big mystery was: why?

EPA-ordered Dredge Spoil Dump Site Mountain on Rt. 63 site after NMPS choked on its own silt and shut down for 7 months. Today that scar is covered by a friendly looking solar array. Photo Copyright © 2020 by Karl Meyer (Click x3 to enlarge, back arrows to return)

By June of that spring, with the abrupt silencing of grim river conditions created by Northfield’s massive sucking and surging, 5 miles upstream of Turners Falls Dam, the rising shad passage results could not be ignored. Fish passage in the river and up through the power canal past that dam was already known to be sorely impacted by the annual deluge-and-dearth flows that Northfield visited on the Connecticut. Without its suck and surge, ecosystem conditions changed immediately. Shad passage at Turners Falls soared to more than 500% above the average for the prior decade. And, no surprise, the New England power grid worked just fine without the daily addition of Northfield’s costly peak inputs.

The Northfield Mountain Pumped Storage Project was designed as a net-power-loss, buy-low/sell-high, money-making cousin to the now-closed Vermont Yankee nuclear plant. It was built to profit by piggy-backing on VY’s nightly over-bloat of cheap, excess megawatts. With VY as its engine, Northfield started massively twisting the Connecticut into a broken, reversing knot in northern Massachusetts, 125 miles from the sea.

When it came on-line in 1972, NMPS corralled for its use a full 20 miles of river—slowed and stilled behind the Turners Falls Dam all the way into southern Vermont and New Hampshire at Vernon Dam. Since that time it’s been yanking the Connecticut’s currents into reverse and sideways daily, ultimately sucking them a mile uphill into their 4 billion gallon reservoir via net-loss grid megawatts. But with Vermont Yankee closed in 2014, Northfield is today juicing an ecosystem by gorging on climate changing, natural gas produced megawatts–which is what now powers half of all New England’s energy consumption. And, ironically, the bulk of traditional hydropower consumed in this six-state region is actually produced hundreds of miles away in Canada.

Plugged-in to run via four giant, reversible turbines, the Federal Power Commission in 1972 sanctioned NMPS to operate as a net-loss emergency back-up and peak demand regeneration appliance. It would do so by consuming 25% percent—or at times over 30% more, electricity than it would ever later re-feed into the power grid as peak-priced megawatts. After Northfield’s dumping in of its 6 hours of peak-priced, net-loss energy, it would then be completely dead-in-the-water and have to begin its daily cycle of gobbling up virgin grid juice to suction the river uphill again. Consumers would pay for Northfield’s privileged permission.

Upon start-up NMPS’s daily net-loss operations became the most disruptive and efficient fish killing machine in a four-state ecosystem. Northfield kills virtually everything it sucks into its turbines for hours at a time, drawing in at up to 15,000 cubic feet per second everything from tiny fish eggs to full-size American eels. That deadly draw is known as entrainment, with the result being all fish disappearing through its pumping turbines termed “functionally extirpated.” The daily carnage continues down to this day.


7-20-2010: Clouds of Silt Plume around a nearly-invisible French King Rock in the Connecticut River from FirstLight’s illegal silt dumping. Photo Copyright © 2020 by Karl Meyer (Click x3 to enlarge)

A 2016 FirstLight consultant’s study estimated NMPS’s operations resulted in the loss of just 2,200 juvenile American shad. Yet study results released in 2018 by the US Fish & Wildlife Service and MA Fisheries & Wildlife estimated the carnage from a year of Northfield’s operations was massively higher. Their study estimated a single year loss of 1,029,865 juvenile shad. And that’s for just one of four migratory fish species subject to its suction annually—the others are American eel, blueback herring and sea lamprey. Consider then, that there are another 20 resident fish species sharing that same Northfield reach of the Connecticut, plus recent findings that federally endangered shortnose sturgeon may also be present. The more NMPS runs, the more life it kills.

As far as Northfield’s massive energy consumption impact goes, here are a few recent statistics: In 2018 FirstLight reported to the Federal Energy Regulatory Commission that NMPS consumed 1.205 billion Gross Kilowatt Hours pumping the river backward and uphill to its reservoir. After doing so, it later reproducing just 907 million GKH of peak-priced power. In the following year, 2019, NMPS consumed 1.114 billion GKHs, while only actually regenerating just 828 million GKHs to send back through the wires.

The tritium-leaking Vermont Yankee Nuclear Station closed in 2014, putting an end to its 42 year run of heating up the Connecticut River—but leaving in its wake a deadly thousand-year legacy of high-level radioactive waste. Since that time NMPS’s net-loss megawatts have transitioned from running on nuclear to being the ugly by-product of sucking in the climate-changing megawatts from a New England grid largely run via natural gas. Natural and fracked-gas today supply nearly half of all New England’s electric power. And Massachusetts, living far beyond its means, is the grid’s biggest customer.

The bloated power grid all that juice is relayed over is today run, supported and marketed by the likes of the Federal Energy Regulatory Commission, ISO-New England, Nepool, and a host of private corporate interests. The public is essentially shut out of both ISO-New England and Nepool decision making, as is the media. That is living proof of the failure of energy deregulation here. We’re failing our kids.

In that vein, there is another way to examine the absurdity of NMPS’s benefits vs. ecosystem impacts. FirstLight’s Northfield Mountain Pumped Storage Station’s annual net-loss-energy consumption largely erases the output of traditional, locally-produced Connecticut River hydropower from FirstLight’s own Turners Falls power canal and Cabot Station just downriver.
FirstLight’s 2018 actual hydropower operations 5 miles downstream at their power canal and Cabot Station reported generating 316 million Gross Kilowatt Hours of electricity. In 2019 FirstLight again reported on those hydro operations, which totaled 357 million GKHs. There was a 398 million GKH deficit produced by Northfield pumping the river uphill in 2018—used to later regenerate second-hand juice. That deficit erased nearly all 316 million GKH of the hydropower FirstLight produced downstream. In 2019, Northfield’s deficit of 286 million GKHs whittled the contribution of all Turners Falls hydro operations down to just 71 million GKH of the 357 it produced. The river and consumers pay dearly.

FERC, today, is comprised of just four commissioners, three of them Trump appointees who consistently vote to sanction big, climate-heating GHG extraction and export schemes for giant corporations. The lone Democrat, Phil Glick, is the sole voice calling on the Commission to consider climate impacts. Piggy-backing net-loss, river-killing power on top of imported, climate-destroying GHG generation is a grim business. FERC and ISO-New England have fashioned a huge, consumptive system where the public never has to give a thought to its unseen, climate-killing energy sources. Their scheme has blithely conditioned the public to always having at its fingertips a seemingly-limitless energy supply—deceptively cheap, always on hand, and available at a moment’s notice. By design here’s no thought process involved; no downside visible. That, in itself, is a crime against future generations.

In its current, over-bloated, over-subscribed power configuration, the New England power grid could run just fine without the daily depredations of NMPS’s peak use. Solar proliferation has recently resulted in the addition of 3400 megawatts of locally-produced renewable energy, nearly tripling the imported, 1100 MW of brief, peak, second-hand output from NMPS. Particularly in spring–when energy use is lowest and fish are migrating, spawning and a river is regenerating its life, Northfield’s deadly use should be limited to emergency output only. The carnage needs to stop.


9-3-2010: The Mountain of NMPS Dredged Sludge Growing along Rt. 63 after EPA’s Clean Water Act sanctions. Photo Copyright © 2020 by Karl Meyer (Click X3 to enlarge, back arrow to return)

Ironically, while Northfield Mountain was being proposed and ultimately built, a new coalition of anglers and environmentalists over on the Hudson River fought off plans for a similar pumped storage station proposed by energy giant Consolidated Edison in the late 1960s. That very public and consolidated action by citizens saved both the Hudson River and the top of scenic Storm King Mountain from becoming cogs in a killer machine like the one here. The on-the-ground result was ultimately an organization now known as Hudson Riverkeeper. Sadly, a similar battle wasn’t waged here to save the Connecticut. The top of Northfield Mountain was blasted to oblivion to create a 4 billion gallon reservoir and two massive, mile-long water shafts were sunk through rock to begin sucking up a river.

That failure to thwart Western Mass Electric/Northeast Utilities’ pumped storage scheme occurred even though the Connecticut River Watershed Council would be 20 years old in 1972 when NMPS finally plugged itself in. However, since that battle for the Hudson, the Hudson Riverkeeper and WaterKeeper alliances have blossomed into key organizations in ecosystem protection, proliferating and thriving via a very public investigation, enforcement and litigation model. They are upfront and vocal about consistently taking offending corporations to task and prosecuting them.

The only solace in the River’s history here in Northern Massachusetts is that the public got wise to the environment–and to the unending downsides of nuclear waste and building fleets of reactors and river diversions. In the early 1970s Northeast Utilities proposed another two nuclear plants, twins, both to be built on the Montague Plains. Their hot wastewater would be flushed into the nearby Connecticut River. They never got built.

On February 22, 1974, Sam Lovejoy of Montague Massachusetts set about loosening the bolts and toppling a Northeast Utilities weather testing tower, installed there to monitor winds to inform the planning layout for nuclear emergency evacuations—just in case there might be a little meltdown at the twin nuke site. That act of courage and civil disobedience, undertaken with deliberation and with an understanding of its potential civil consequences, bolstered a gathering opposition to the project. It ultimately helped galvanize a growing opposition to dozens of proposed reactors across the country.

It was a combination of that direct public opposition, Lovejoy’s protest and the subsequent discovery of larval shortnose sturgeon by research biologists Mike Dadswell and B.D.Taubert that ended what would today be yet another sprawling nuclear waste dump sitting above the Connecticut River. Again, a strong leadership role was not played by the Watershed Council. What ultimately made the difference was concise action, public engagement, and legal action in the courts. This was a victory for those who take full responsibility for the public turf they lay claim to.

The Connecticut River Watershed Council just recently became the Connecticut River Conservancy, but it still remains an organization laying claim to protecting the mainstem Connecticut across four states while not employing a single staff lawyer. Nor has it adopted a mission mandate to enforce and prosecute–continuing the model of a CRWC legacy dating back to 1952. The Connecticut River has long deserved better.

REIMAGINING A RIVER: The Year without Northfield Mountain

Posted by on 01 Jun 2020 | Tagged as: American shad, Clean Water Act, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River Coordinator, Connecticut River pollution, Connecticut River Watershed Council, CRASC, Daily Hampshire Gazette, EPA, Federal Energy Regulatory Commission, FirstLight, fish passage, Gary Sanderson, Greenfield, hatchery, Holyoke Dam, ISO New England, Larry Parnass, MA Division of Fish and Wildlife, migratory fish, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Old Saybrook CT, pumped storage, Riverkeeper, salmon, salmon hatchery, The Daily Hampshire Gazette, The Greenfield Recorder, The Recorder, Turners Falls dam, Turners Falls power canal, US Environmental Protection Agency, USFWS

THIS GREAT AND BROKEN RIVER VII

Copyright © 2020 by Karl Meyer. ALL RIGHTS RESERVED.

Issue # 7, Part 1, REIMAGINING A RIVER: The Year without Northfield Mountain


Sunderland Bridge over the Connecticut. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge, back arrows to return to text)

AUTHOR’S NOTE: I have found it difficult to write these past days. I am heartsick for my country. Are we to be a fair, generous and courageous people, or just a collection of frightened, soulless bystanders? What world do we want our children to grow up into? I have not been without a few tears at times over the past week. But, I know that good work and living rivers benefit all; they do not hate, judge, murder, or discriminate. So, noting that all of us have some heart-work to do, I continue here, with this also…

On May 1, 2010, I began a 5-day cycling trip from Greenfield MA, downstream to Long Island Sound and back again along the Connecticut River. I set out by bike to highlight and blog about the massively wasteful and misplaced emphasis on the forever-failed, hatchery-produced, 40 year-old salmon program for the river. Meanwhile, across the preceding decade, the formerly growing and robust American shad runs had concurrently experienced precipitous declines in fish passage returns at Holyoke Dam. More importantly, the shad run was literally flirting with extinguishment upstream of the Turners Falls Dam.


Miserable shad tally board at TF Fishway, 2007. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge, back arrows to return to text)

The plunge at Turners Falls had taken hold pretty much simultaneously with the implementation of newly-legislated electricity deregulation in Massachusetts. It gave owners of the Northfield Mountain Pumped Storage Station a license to unleash new, lucrative and disruptive flow regimes in the river—just 5 miles upstream of Turners Falls Dam. Ironically, that same May Day when I left for the mouth of the river, was the day that Northfield Mountain was scheduled to shut down to begin mucking out the decade’s worth of silt and muck they’d inhaled up into their 4-billion gallon mountaintop reservoir.


Cyclist’s Shad Dinner, Saybrook CT. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge, back arrows to return to text)

Unbeknownst to me–and to NMPS management, once they shut down and started draining their reservoir that net energy loss contraption would not suction the river again for over half a year. They broke their regenerating plant; their muck half-filling the mile-long tunnels connecting it to the river. FirstLight then tried to hide their plight and the evidence as they turned around and massively polluted the river for months. That came to an abrupt halt when the EPA(remember them?) issued a “Cease and Desist” order against them extensive violations of the Clean Water Act.

But, a great upshot benefit soon came into focus: with the river not suctioned and ramping up-and-down at Northfield, successful fish passage at Turners Falls Dam jumped back to well over 400% over 2009 totals–leaping to 16,422 shad passing in 2010(though likely significantly more, since FirstLight’s fish counting software was curiously ‘inoperable’ on 17 different days that spring), while just 3,813 shad squeezed past Turners Falls in 2009. Overall, that 2010 rise peaked at over 500% above that decade’s previous passage averages there. I returned to Greenfield on May 5, 2010, and learned of NMPS’s disastrous de-watering that same afternoon. It was of great interest, but its significance wouldn’t be understood for weeks until the unusual and increasing shad tallies passing Turners began coming in.

Just 3 years earlier, after spending over half a decade working at the Northfield Mountain Recreation Center (where I’d even for a time been secretary for the Safety Committee up inside the pumped storage power plant), I quit. The dismal shad runs, just downstream, were chewing on my soul.


Lynde Pt. Light at the River’s Mouth, Old Saybrook CT. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge, back arrows to return to text)

By that May of 2010, I’d been doing part-time work for the Connecticut River Watershed Council for a few years. I immediately informed the Council of Northfield’s predicament when I got back. Sadly, I then had to watch their back-seat, kid-gloves handling of an opportunity to prosecute and hold the power company responsible for massive pollution. They stayed quietly in the background, letting the Massachusetts DEP and MA Div. of Fish & Wildlife take charge of holding FirstLight’s feet to the fire. It was a massive opportunity to begin taking on the gross daily river depredations of Northfield Mountain, but it was mostly just squandered here in Massachusetts.

The Commonwealth and MA Fish & Wildlife did little, though some effort by MA DEP and Natural Heritage ultimately bargained for a study of erosion effects on endangered dragonflies as some sort of restitution. I later felt compelled to quit the Watershed Council, which I did five months later. They weren’t players, likely because their board was full of former power company managers and folks still working as consultants, who might see some power company contract work in the future. It was just wrong that–as one of the oldest river organizations on the East Coast, they didn’t have a single lawyer on staff, nor have a mission that mandated enforcement. This was no Riverkeeper.

It wasn’t really until early that June that I began to realize the full ramifications of Northfield’s shutdown. Fish passage numbers just began creeping higher and higher at Turners Falls. I attended a June 22nd meeting of the Connecticut River Atlantic Salmon Commission (CRASC)—the Congressionally-authorized fed/state fisheries organization charged with managing and protecting migratory fish on the Connecticut. I asked the agency reps if they’d noticed the numbers and whether they’d been doing any studies on the relationship between the big shad passage at Turners and the turbine disaster upstream at Northfield. “We haven’t looked at it,” said a relatively new USFWS Connecticut River Coordinator Ken Sprankle.


Jilted American shad flashes CRASC attendees at the TF Power Canal. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge, back arrows to return to text)

Even then, I was as yet unaware that NMPS was STILL not operating. But I got a curious look from FirstLight’s Bob Stira, also in attendance, when I posed that question. That look–and the immediate notice of the shutdown of Northfield Mountain’s reservoir trails that same afternoon, is what soon sent me on a recon trip with a camera up to that reservoir. I started crunching numbers and writing. On a Sunday morning one week later I found an unposted back woods trail up to the reservoir, and there was the whole story.

Days earlier, I’d independently handed over some initial fish passage numbers and gave a few pointed quotes in an email to Gary Sanderson, sports and outdoors editor at The Recorder. Gary enthusiastically included them in his column along with his own comments. The following week, after FirstLight’s sudden and inexplicable closure of trails leading to the reservoir–plus immediately moving their riverboat tour boarding site from Northfield down to Barton Cove in Gill, I snuck up and took a photo of that emptied reservoir with two fat earth movers sitting silent in the silt-filled bed.


Emptied Northfield Mountain Reservoir. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge, back arrows to return to text)

Their riverboat got moved downriver to hide from the public the chocolate colored river that Northfield’s dumping was creating at intake tunnels next to the Riverview dock site. The silt cloud reached all the way down to the French King Bridge.


Muck-plagued Connecticut River beneath the French King Bridge. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge, back arrows to return to text)

In late June, Daily Hampshire Gazette Editor Larry Parnass ran my rather telling Northfield Reservoir photo above my expository OpEd bringing to light the disaster there–and the surprise fish passage bonanza occurring at Turners Falls Dam. It wasn’t until the first week of August that the EPA finally stepped in to order FirstLight to cease and desist. They’d been dumping the equivalent of 40-50 dump truck loads of reservoir muck directly into the Connecticut for over 90 straight days. That EPA order would keep Northfield shutdown well into November.

Despite Northfield’s claims of the usefullness of its daily input, and the touted critical emergency readiness of their net-energy loss machine to the grid, no one in New England went without electricity in the long months their river-strangling contraption was lifeless. The only mourners during its 7 month coma appeared to be two climate-change cheerleaders: ISO-New England and the Federal Energy Regulatory Commission. Yet even during a long hot summer–one in which Vermont Yankee shut down for a week to refuel, everyone had essential power. The public didn’t miss Northfield, the shad run blossomed, and a river came back to life.

Why no FISH?, STILL???

Posted by on 30 Apr 2019 | Tagged as: American shad, Atlantic salmon, Bellows Falls Fishway, blueback herring, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, CRASC, Daily Hampshire Gazette, Dr. Boyd Kynard, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Gary Sanderson, Greenfield Recorder, Holyoke Fish Lift, MA Division of Fish and Wildlife, Montague Reporter, National Marine Fisheries Service, National Marine Fisheries Service, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, Public Law 98-138, Rock Dam, shad, shortnose sturgeon, The Greenfield Recorder, The Recorder, Turners Falls, Turners Falls power canal, Uncategorized, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Vernon Dam Fishway

The disastrously-emptied Northfield Mountain Pumped Storage Reservoir, June 27, 2010. (CLICK, then Click several times more for FULLEST VIEW) Copyright © 2019 by Karl Meyer. All Rights Reserved.

WHY no FISH…
All photos and text Copyright © 2019 by Karl Meyer. All Rights Reserved.

By clicking on the blue link WHY no FISH… above, and then clicking it again on the following page, you will open an old PowerPoint presentation that I gave to the Pioneer Valley Chapter of Trout Unlimited in Holyoke in December 2010. It will take several minutes to load, but is then largely self-explanatory, with text available below photos, or by clicking the text tab.

On April 30, 2010 I embarked on a journey to the mouth of the Connecticut River by bicycle, to document the grim crippling of the river and its shad runs due to the lack of enforcement and engagement of fisheries agencies and river organizations. At the time, they were all still cheerleaders for a failed salmon program, ignoring the stark facts of the impacts of the Northfield Mountain Pumped Storage Project on American shad and federally endangered shortnose sturgeon.

At the time I was doing part-time work at the Connecticut River Watershed Council, but quit out of frustration and disappointment just a few months after.

Notably, just a year later, the US Fish & Wildlife Service cancelled its long-failed salmon hatchery and “restoration” program on the Connecticut. A year after that, the river conversation became about the impacts of flows in the Dead Reach of the Connecticut, and Dr. Boyd Kynard’s groundbreaking book focusing on federally endangered shortnose sturgeon at the Rock Dam was released–though only following an unconscionable 3-month embargo of his research data by the US Geological Service.

Nearly a decade later, Northfield Mountain remains the Connecticut River ecosystem’s deadliest machine, directly impacting riverine life and migratory fish abundance in three states.

The Connecticut River now has TWO “conservancies”, but not a single NGO that makes any claims for ENFORCEMENT being a chief (or really ANY) component of their mandate. And ENFORCEMENT is a requisite for any true ecosystem restoration and river protection outfit that means to carry out its mission. This is a four-state ecosystem without a legal team. The Connecticut remains a river unprotected.

Fish Futures on a Broken River

Posted by on 04 Nov 2017 | Tagged as: 5-year FERC licensing process, American shad, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, Daily Hampshire Gazette, Dr. Boyd Kynard, Endangere Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, fish passage, Holyoke Fish Lift, National Marine Fisheries Service, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Station, PSP Investments, Rock Dam Pool, Rutland Herald, shad, Shortnose Stout, shortnose sturgeon, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, USFWS, Vermont, Vermont Digger

Copyright © 2017 by Karl Meyer, All RIGHTS RESERVED

FISH FUTURES ON A BROKEN RIVER

(NOTE: the following appeared in The Rutland Herald, wwww.rutlandherald.com, and on the pages of Vermont Digger, www.vtdigger.org in October)

It’s been decades since migratory fish on New England’s Great River got a break–bleak since deregulation came to federally-licensed electricity plants on the Connecticut beginning in 1998.

Deregulation turned a regional market into a venture capital free-for-all, opening the door to speculators and foreign interests controlling public resources. In less than 20 years the Vernon hydro station changed hands three times. The Vermont Yankee nuclear plant next door is currently courting a third owner. Downstream the Northfield Mountain Pumped Storage Station and Turners Falls hydro complex flipped four times between investors. Further south, the Holyoke hydro station sold only once in 2002.

None of this proved healthy for an ecosystem.

The post-deregulation decade saw a steep slide in American shad passing Holyoke Dam. After two decades of averages well above 300,000 fish, yearly numbers plunged to near half that—a far cry from the 720,000 passed in 1992. Things were even more desperate at Turners Falls Dam. There, impacted by the massive water appetite and violent, peaking flows sent downstream by the Northfield Mountain Pumped Storage Station, passage dropped below 1% some years. For a decade, just 3 or 4 migrating shad in 100 were tallied emerging alive upstream. Today’s numbers languish near 1980s levels.

The federal license signed by Holyoke Gas & Electric in 2002 required they complete lift improvements at Holyoke by 2008 to pass endangered shortnose sturgeon upriver. Sturgeon were literally unable to spawn–blocked at that dam from reaching their only documented natural spawning site, a fail-safe refuge known as the Rock Dam Pool at Turners Falls. Year-in, year-out, that mandate went unenforced. It was finally met last year.

(Note: below, the flow-starved CT in Turners Falls looking downstream toward Rock Dam.CLICK, THEN CLICK AGAIN TO ENLARGE)

In 2004 federal fish biologist Dr. Boyd Kynard handed results of 15 years of Connecticut River shortnose sturgeon research to the National Marine Fisheries Service. He and colleagues had documented that that Rock Dam spawning site for the only federally-endangered migratory fish on the river was being decimated by industrial practices. Yearly gatherings failed for the few dozen spawning-ready sturgeon surviving upstream of Holyoke—as they attempted to continue a tenuous 200 million year-old genetic line. But NMFS didn’t come to their aid; no watchdog intervened.

Ultimately, decades of research by Kynard and company was compiled into Life History and Behaviour of Connecticut River Shortnose and other Sturgeons, published by the World Sturgeon Conservation Society. After experts at the Europe-based WSCS published the book in early 2012, the US Geological Service (where Kynard retired as a federal fish scientist) began making belated objections, halting all publication for a time. Their objections caused a de facto embargo of its sale in the U.S through that spring.

USGS cited editorial and style concerns in “recalling” three chapters on sturgeon biology and spawning—including the data and text showing industrial flows caused spawning failure at Turners Falls. Nearly a dozen state, federal, and university contributors to the book cried foul, citing censorship and the public’s right to government information. In June, concurrent with press inquiries and a letter from Congressman John Olver questioning the withholding of public science, USGS suddenly withdrew all its objections—days before an article highlighting the issues appeared in The Daily Hampshire Gazette. Federal agencies now had the facts. Yet despite the Endangered Species Act, none took action.

In spring of 2014 a popular beer, Shortnose Stout, debuted in the region. Its label displayed Kynard’s website and highlighted spawning conditions at Turners Falls. The Connecticut River Watershed Council soon stepped up to collect donated profits from its sale, yet those sturgeon were left hanging once more. Today conditions at Rock Dam remain as ruinous as when the first 2004 findings were released.

In 2015 the controversial chapters from Kynard’s book got entered into the public record in the current Federal Energy Regulatory Commission’s relicensing process for Northfield Mountain and Turners Falls. With that science on the record, things changed at federal proceedings. Sturgeon spawning became a key factor in flow discussions for future FERC licenses there mandating river conditions. This June, new restoration targets to meet failed 50 year-old federal Anadramous Fish Conservation Act requirements were released by the US Fish & Wildlife Service. With passage failed for half a century at Turners Falls, new shad targets mandate 397,000 fish passing annually. New owner, Canada Public Pension Investments, will be on the hook to build lifts and safeguard sturgeon spawning.

In August a fisherman near Vernon landed an endangered shortnose sturgeon–a fish thought not to exist above Turners Falls. He took a photo and released the fish, sending the picture to officials who confirmed it; then forwarded it to the National Marine Fisheries Service. There is reason to believe that landing may not be an isolated occurrence. NMFS is taking the confirmed capture seriously. Is a remnant shortnose population clinging to life in Vermont and New Hampshire waters? Did someone release them there? Either way, federal law requires owners at Vernon Dam, VT Yankee and Northfield Mountain to protect the migratory fish of the United States as a public trust. After decades of speculation, it’s high time our fish had their day.

NOTE: author Karl Meyer was the idea-creator and author of the beer brand Shortnose Stout. He neither requested or received any compensation or recognition for his work, which was solely aimed at getting important information to the public.

DON’T SHORT-SELL NEW ENGLAND’S GREAT RIVER

Posted by on 17 Mar 2017 | Tagged as: Alex Haro, American Whitewater, Andrew Fisk, Bob Nasdor, Caleb Slater, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, CRWC, Dr. Boyd Kynard, ecosystem, Endangered Species Act, ESA, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeon, federally-endangered shortnose sturgeon, FERC, FERC licensing process, FirstLight, Holyoke Gas & Electric, John Warner, MA Division of Fish and Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain Pumped Storage Station, PSP Investments, public trust, Relicensing, Sean McDermott, Society of Environmental Journalists, The Nature Conservancy, Turners Falls, Turners Falls dam, US Fish & Wildlife Service, US Geological Survey

(Note: the following piece appeared in The Recorder, www.recorder.com, on March 11, 2017 under the heading: “Who will protect Connecticut River?”)

DON’T SHORT-SELL NEW ENGLAND’S GREAT RIVER

Copyright © 2017 by Karl Meyer

Canadian investors are looking to purchase the Connecticut River for a few decades, cheap and quick. Canada’s Public Sector Pension Investment Board bought up the Northfield Mountain Pumped Storage Station and Turners Falls hydro complex last year as part of PSP Investments. Their New England power play comes in the middle of the 5-year relicensing process for both facilities. That Federal Energy Regulatory Commission process will decide future conditions impacting this four-state ecosystem for decades.

The long-failed Cabot Station Fish Ladder on the Connecticut and competing flows flushing down the Turners Falls Power Canal’s Emergency Spillway. (Note:CLICK, THEN CLICK AGAIN TO ENLARGE.)

Thus, PSP may soon hold sway over what’s long been the most desolate 10-mile stretch of the entire Connecticut. It includes 2.1 miles of riverbed sitting empty for months at a time below Turners Falls Dam. It also includes the reach where, nearly 20 years back, federal fisheries expert Dr. Boyd Kynard found his boat being yanked backward—the Connecticut pulled into reverse by the suction of the Northfield Mountain Pumped Storage Station while he was drifting for bass a mile downstream near the French King Bridge. Looked at fully, it encompasses the entire reach where a 50 year federal migratory fisheries restoration program has long foundered.

On March 7th, after four years of meetings, thousands of pages of reports–and with volumes of study information incomplete and disputed, owners of these FirstLight-branded facilities are hoping select interests agree to take licensing talks underground. They’ll be fishing for backroom deals at a Boston area hotel well before this process has had a full public vetting. FL wants to take this little party private, fast. They’re asking invitees to agree to an embargo on public information about settlement talks, positions and decisions.

The key phrase in their invitation reads: “Because this meeting is intended to initiate confidential settlement discussions, it will not be open to the press or general public.” That’s FirstLight’s Director of Massachusetts Hydro Gus Bakas. His selected invitees include the National Oceanographic and Atmospheric Administration(Sean McDermott), US Fish & Wildlife Service(John Warner), US Geological Survey(Alex Haro), MA Fish & Wildlife(Caleb Slater), towns including Erving, Gill, Northfield, Montague, the Franklin Regional Council of Governments, The Nature Conservancy(Katie Kennedy), the Connecticut River Watershed Council(Andrew Fisk), and American Whitewater(Bob Nasdor).

That FirstLight stipulation is part of the quick-bait to get stakeholders thinking the time is right to cut deals. Sign-up, shut up; then we’ll talk. Cash out with what you can get for your agency, town, non-profit; or your fun-time rafting interests. Promises from this venture capitalist firm–in what’s become an ownership merry-go-round for these facilities, will surely all come true.

Ironically, many of these invitees descend directly from those who failed to step in and step up for the decimated river here decades back. They’re agencies and so-called watchdogs who failed to enforce laws and conditions negotiated when they were signatories to settlement talks for NMPS and Turners Falls nearly 40 years back–and for the 1999 FERC license negotiated for Holyoke Dam as well. At that site, Holyoke Gas & Electric just finally completed required improvements for endangered shortnose sturgeon last spring. Their license had mandated they be completed in 2008. Eight years, nine–no suits, no injunctions; no action.

Maybe that’s because the Watershed Council’s board chair works for HG & E, or because a significant number of board members are retirees from the region’s legacy power companies. Or, might it be because CRWC receives grant monies from National Marine Fisheries, US Fish & Wildlife, and MA Division of Fisheries, that these agencies were never taken to court for the withering spawning conditions and crippling flows experienced by federal trust American shad and federally endangered sturgeon in the reaches from Turners Falls to Northfield?

So who can our river look to for environmental protections under the National Environmental Policy Act, the Fish and Wildlife Coordination Act, the Endangered Species Act, and the Clean Water Act in the future?

Fourteen months remain in this relicensing. Key reports won’t be available until April, while other critical study information won’t be out until July. Some studies may need repeating. The best future for New England’s River will not be well served by quick-and-dirty agreements made in the shadows. Remember, Dear Stakeholders, it’s your names that will be forever associated with the conditions on a future Connecticut River—the river your grandchildren will be relying on. This is no time to sell the Connecticut short. What’s your price for a river’s soul?

Karl Meyer of Greenfield is on the Fish and Aquatics Study Team in the FERC relicensing for the Northfield Mountain and Turners Falls hydro facilities. He is a member of the Society of Environmental Journalists.

(Note: Bob Nasdor is former director of the Massachusetts Commission on Open Government.)

END

Rolling over on a River: the real cost of pumped storage energy

Posted by on 26 Oct 2016 | Tagged as: American shad, climate change, Connecticut River, Connecticut River ecosystem, Connecticut River Watershed Council, Daily Hampshire Gazette, ecosystem, Entrainment, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeion, federally-endangered shortnose sturgeon, FERC, fossil fuels, Greenfield Recorder, ISO New England, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, nuclear power, Public Comment period, public trust, pumped storage, Relicensing, shad, shortnose sturgeon, Society of Environmental Journalists, The Recorder, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2016 by Karl Meyer

(Note: this essay appeared in September and October in these MA and VT media and newspaper outlets: Vermont Digger, www.vtdigger.org ; The Daily Hampshire Gazette; and The Recorder.)

besttfemptybed

The de-watered CT below Turners Falls Dam that few people see. (Click, then click again to enlarge.)

Rolling over on a river

Since time began rivers have been the Earth’s arteries—the foundation of its ecosystems. Here in New England it’s “last chance” time for our Great River. On April 30, 2018 the fate of the long-foundered Connecticut River migratory fisheries restoration—and the survival of a four-state river ecosystem, will be decided for what’s essentially forever. New Federal Energy Regulatory Commission hydro licenses are expected to be signed then by government agencies and the Canada Pension Plan Investment Board–latest purchaser of the Turners Falls and Northfield Mountain projects. That company’s stated investor mandate is “to maximize investment returns without undue risk of loss.”

Over two generations ago public-trust mistakes were made favoring power companies, fish hatcheries, and high-end salmon-fishing interests that rendered eight miles of the Connecticut in Massachusetts a massively-suctioned, partially-dewatered flush sink. Sanctioned by fisheries agencies and non-profits, those decisions, severed an ecosystem in two. They forced all migrating fish into a deadly power canal, leaving three emptied miles of riverbed below Turners Falls Dam, while four turbines at the Northfield Mountain Pumped Storage Station five miles upstream consumed massive amounts of nuclear energy to suck a river backward and uphill to a mountaintop reservoir.

Those turbines were built to run on the promised endless supply of overproduced juice generated nightly at the local, now-closed, Vermont Yankee nuke, 15 miles away. Today, running on giant slugs of imported fossil fuel, they continue to spin, sucking the river up in endless gulps into a 4 billion gallon pool a mile up Northfield Mountain. That daily suctioning creates riverbank eroding “tides” higher than those at Hyannisport, MA—with some rivaling the ten-foot fluctuations of Fundy Bay.

Back then, predecessors of today’s National Marine Fisheries Service, the US Fish & Wildlife Service, Massachusetts’ Fish & Wildlife and the Connecticut River Watershed Council signed off on an agreement with the Federal Power Commission and Western Massachusetts Electric that strangled the river in northern Massachusetts. It resulted in the failure of migratory fish passage and a promised renewal of the river’s ancient seafood resources upstream to Vermont, New Hampshire, and northern Mass. Few American shad emerged alive after diversion into that canal. It also failed the shortnose sturgeon—this river’s only federally endangered migratory fish, leaving it without flow or monitoring at its only documented natural spawning site.

Upstream at Northfield the destruction was yet more complete. The suck and gush appetite of that nuclear-charged contraption virtually disassembled the river. It gulped flow at a rate of 15,000 cubic feet per second, often for hours at a time—drawing on the river pool above Turners Falls Dam where, 70% of the time, the Connecticut’s natural routed flow is less than 15,000 cfs. Boaters a mile downstream could find themselves drifting upriver via Northfield’s unearthly pull. All fish and organisms drawn up through the sphere of that suction were deemed “functionally extirpated”–dead to the ecosystem by virtue of being sieved twice through the turbines. It was evolution in reverse, a river ripped away from its eternal run to the sea.

Today, climate-blind FERC labels Northfield as a source of “renewable clean” energy—but there’s nothing clean, renewable or sustainable about its imported, twice-produced, peak-priced electricity crippling this river. ISO New England, FERC’s Northfield-cheering, ever-energy-hungry cousin, also ignores climate and its environmental dismemberment. “Pumped storage” is not hydropower—not even by the industry’s own technical terminology. Northfield-produced power in fact represents the heavy planetary burden of fossil fuel used to push a mountain of water uphill, merely as a weight to produce high-cost, second hand electricity. It cares nothing of rivers, fish or ecosystems.

If bureaucrats again fail the public trust and don’t demand critical habitat protections, flows, and the day-to-day monitoring needed to fulfill U.S. environmental statutes, Canadian pension speculators will be left as the de facto controlling interests on our river. The new owners have asked FERC to merge two separate licenses for Northfield and Turners Falls into a single new license dubbed the “Northfield Project.” What’s represented as mere bureaucratic streamlining would actually enshrine, by precedent–next time and forever, river-killing pumped storage.

Any responsible environmental agency should deny this single-license merger, and seek to have Northfield kept in use as emergency infrastructure only—with the ultimate remedy it’s dismantling in tandem with a move to a decentralized, far less vulnerable system than today’s expanding mega-grid. Massachusetts legislators are currently signing onto backroom energy deals for a glut of future hydropower from Quebec. Some 1,200 megawatts of those penciled-in imports could easily replace the few hours of daily juice Northfield puts out–while keeping it available for rare emergencies. Though the new Canadian power imports largely ignore conservation and innovation, they could be employed to end the river carnage here and begin restoring a future for a critical New England ecosystem.

(Note: timely public comment on licensing issues is carefully considered by FERC. Go to: http://ferc.gov/docs-filing/ecomment.asp and use “E-Comment.” Check “Hydro” and address to Secretary Kimberly D. Bose, using the required identifiers “P-2485” and “P-1889” for Northfield and Turners Falls.)

Karl Meyer lives in Greenfield MA. He is participating in the FERC relicensing process and is a member of the Society of Environmental Journalists.

ONE WILDLY ILL-ADVISED RIDE

Posted by on 31 Jul 2016 | Tagged as: AMC, American Whitewater, Appalachian Mountain Club, Connecticut River Atlantic Salmon Commission, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, Connecticut River Watershed Council, CRWC, Dead Reach, Dr. Boyd Kynard, EOEEA, Executive Office of Energy and Environmental Affairs, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, Fish and Aquatics Study Team, GDF-Suez FirstLight, Jack Buckley, John Bullard, MA Division of Fish and Wildlife, NMFS, NOAA, Regional Director of the National Marine Fisheries Service, Secretary Matthew Beaton, Society of Environmental Journalists, University of Massachusetts, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Wendi Weber

The following piece appeared in The Recorder, www.recorder.com on July 30, 2016, under the heading, “Rafting over prime sturgeon habitat unwise; State officials need to be smarter.”

Copyright © 2016 by Karl Meyer

ONE WILDLY ILL-ADVISED RIDE

A photo from May 25, 2016 posted on American Whitewater’s website shows Massachusetts’ Secretary of the Executive Office of Energy and Environmental Affairs Matthew Beaton and his staff lumbering across a small run of Connecticut River whitewater on a large raft. The short rapid they just surfed over is at a place called Rock Dam. It drops directly into a small, crescent-shaped pool–the sole natural spawning and nursery site for the federally-endangered Connecticut River shortnose sturgeon.

That Turners Falls site is the last place you’d want to see the Commonwealth’s highest environmental official rafting in May. Rock Dam is critical habitat for survival of the river’s most endangered migratory fish. There’s no other place like it in the ecosystem. It’s also where the state-endangered yellow lamp mussel was last recorded in this reach. Ecological protection is key to preserving the natural heritage there for future generations.

Why Secretary Beaton was at Rock Dam on the heels of the state’s failure to protect endangered timber rattlesnakes in their remaining habitat is a puzzlement. That site is literally where the Connecticut has long been left for dead. Each spring it is alternately starved and inundated—making spawning and survival of young for shortnose sturgeon nearly impossible. Rapid pumped storage hydro fluctuations also help make successful upstream passage for wild American shad, sea lamprey, and blueback herring a 1-in-10 proposition above Turners Falls.

The EOEEA was joyriding on “test” flows returned there specifically for environmental protection. They were meant to allow wild fish to reenter critical habitats where they might successfully gather; then spawn—in a natural pool that would subsequently nurture developing young in critical weeks lasting through mid-June. Those flows were delineated by John Bullard, Regional Director of the National Marine Fisheries Service, to not drop below minimum thresholds that would drive spawning sturgeon out. NMFS mandated the higher limits through June 3rd to ensure sturgeon had sufficient time there. That meant healing water for the most impoverished 2.7 miles of habitat on the entire 410 mile Connecticut.

The shortnose is a dinosaur-age fish—a yard-long creature with a shark-like tail and toughened leathery “scutes” instead of spindly scales. It’s the second species listed under the Massachusetts Endangered Species Act, and the most exhaustively studied endangered migratory fish in the river. It has long had a federal recovery plan, one now including the boatload of science documenting building blocks necessary for its survival. None call for boaters bashing over them during spawning gatherings, or beaching in shallows where developing embryos shelter. If this iconic fish is ever to begin the road back from the brink of extinction, mandated protections and uninterrupted flows are critical at Rock Dam.

Dr. Boyd Kynard, formerly of the US Fish & Wildlife Service, the USGS Conte Lab and UMass, led the 17 years of studies that documented Rock Dam as the species’ sole natural spawning site in the ecosystem. He recently stated, “As to protection of the pre-spawning, spawning, and rearing area at Rock Dam, exclusion dates for boating should be the same as the dates for water flow, 15 March to 15 June.”

A “watered” Rock Dam had long-offered sturgeons a wide choice of depths and flow levels they could selectively adjust, and readjust to, when natural surface flow or river temperatures fluctuated beyond optimal conditions for spawning. And that cobble and sand pool was ideal for dispersing tiny eggs and young. Only when flow is present does Rock Dam regain its function as an ancient species shelter, protecting early life stages in currents circulating through cobbled shoals.

In the current 5-year Federal Energy Regulatory Commission relicensing process that will govern hydro operations and ecological conditions here for decades, the Connecticut River Watershed Council and Appalachian Mountain Club are jointly advocating new access points into this delicate habitat for whitewater interests. Both have sat at FERC hearings where Rock Dam has been delineated as critical habitat. In joint AMC-CRWC testimony to FERC they’ve argued their interests in increased flows stem from aquatic habitat concerns, as well as recreation desires. Yet it was AMC that posted dates of those ecological study flows to their website, urging whitewater enthusiasts to exploit them: “Fish Study to Provide Paddling Opportunities: May – June 2016”

Secretary Beaton needs better advice.

Several expert appointees represent the Commonwealth on the Connecticut River Atlantic Salmon Commission. Jack Buckley, Director of MA Fisheries and Wildlife studied Connecticut River shortnose sturgeon at UMass. Mr. Buckley’s Anadromous Fish Project Leader Caleb Slater is also well versed on critical Rock Dam habitat. And the US Fish & Wildlife’s Region 5 Director Wendi Weber also sits at that CRASC table. Dr. Weber studied shortnose sturgeon in Georgia’s rivers. Ultimately, turning a failing Connecticut River migratory fisheries restoration in Massachusetts into a success story will require government leaders embracing solid government science.

Karl Meyer is on the Fish and Aquatics Study Team for FERC hydro-relicensing studies of the Turners Falls and Northfield Mountain Pumped Storage projects. He is a member of the Society of Environmental Journalists.