Connecticut River migratory fisheries restoration

Archived Posts from this Category

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future

Posted by on 21 Jul 2021 | Tagged as: 5-year FERC licensing process, Brian Harrington, Catherine Carlson, climate change, Connecticut River Atlantic Salmon Commission, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, CRASC, Daniel McKiernan, David Cameron, Donna Wieting, E-Comments, Environmental Protection Agency, EPA, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Comments, FERC Commissioner Richard Glick, FERC Secretary Kimberly D. Bose, FirstLight, FirstLight Power, Gordon van Welie, Holyoke Co. v Lyman, ISO-NEW ENGLAND, Jesse Leddick, Julie Crocker, Kathleen Theoharides, Kimberly D. Bose, Landmark Supreme Court Decision 1872, Local Bias, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, NOAA, Northfield Mountain Pumped Storage Project, P-1889, P-2485, Peter Brandien, Public Comment period, Public Sector Pension Investments, Rock Dam, Sam Lovejoy, Sean McDermott, shad, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Steven Mattocks, Timothy L. Timmermann, Turners Falls, US Fish & Wildlife Service, Vermont, Wendi Weber

Connecticut River blog: source of a salmon sham; how the public can steer a river’s future Copyright © 2021 by Karl Meyer

Kathleen Theoharides, Massachuetts’ Secretary of the Executive Office of Energy & Environmental Affairs before launching on a PR kayak tour of the river at FirstLight’s dock next to the intake of the Northfield Mountain Pumped Storage Project, October 2020. Photo Copyright © 2020 by Karl Meyer

NOTE: as a journalist and citizen I’ve been a participating stakeholder for nearly a decade in the ongoing Federal Energy Regulatory Commission relicensing process for the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot hydro operations. In that light, I encourage people to first view the half-hour segment of Local Bias, linked below. Then, return to this post and its resource list below for ways to participate in the critical decisions now being made about the Connecticut River. They will impact its currently crippled ecosystem for generations to come.

LOCAL BIAS link: https://youtu.be/IX2Rv2NYq3s

Since 1872 the US Supreme Court has made it the law of the land that migratory fish on US Rivers are guaranteed safe upstream and downstream passage at dams and industrial river sites. That decision was centered on a Massachusetts case at the Holyoke Dam. One hundred forty-nine years later that law remains essentially unfulfilled at an endangered species’ critical spawning and nursery site on the Connecticut River at Montague, MA, as well as at the Turners Falls Dam in that town.

Further, that law remains glaringly unenforced and unimplemented at the Northfield Mountain Pumped Storage Project in Northfield MA, where the river is literally sucked into reverse, and millions of eggs and downstream running juvenile American shad are pulled to their “functional extirpation”(vacuumed to their deaths) yearly, on their way to the ocean from Vermont and New Hampshire spawning reaches. The Commonwealth of Massachusetts has now owed Vermont and New Hampshire—and really all of New England, a living river for almost exactly a century and a half.

Warning sign announcing the dangers of Northfield’s massive intake suction. Photo Copyright © 2021 by Karl Meyer

The current Canadian parent-owners of that net-loss power regeneration/resale site are proposing only an ineffective, seasonal “barrier net” at the vacuum mouth of this facility, the very ‘solution’ that leaves this monstrous sucking in place to kill all those Vermont and New Hampshire produced eggs and baby shad, crippling the prospects for returning adult shad to those states from the Atlantic four years in the future.

The donuts and coffee were on FirstLight for the state officials and representatives taking part in last October’s little PR kayak tour. Photo Copyright © 2020 by Karl Meyer

Northfield Mountain’s net-power-loss energy consumption literally swallows and squanders the entire annual energy equivalents of whole cities and counties as it ravages the Connecticut River, using it as a crushing and deadly energy relay switch.

FirstLight is applying to FERC—backed up by a power-hungry, ecosystem-and-climate-indifferent ISO-New England, for a license to kill for decades to come. Northfield Mountain wastes monstrous amounts of grid energy, while ravaging New England’s critical main ocean connection and planetary cooling artery…

Below are resources available to the public for interacting and participating with the Federal Energy Regulatory Commission in licensing decisions, and government agency officials charged with implementing the public trust on the Connecticut River.

www.karlmeyerwriting.com/blog

NOTE: the landmark US Supreme Court environmental decision centered on the Connecticut River came back in 1872 in Holyoke Company v. Lyman, requiring safe up- and down-stream protection for migratory fish.

Send public comments on relicensing of the Northfield Mountain Pumped Storage Project and Turners Falls/Cabot Hydro Stations to the Federal Energy Regulatory Commission. The “project numbers” must be included, as well as your name and address, in order to become part of the public record. They should be concise, citing specifics in a paragraph or two, noting Northfield Mountain P-2485 and Turners Falls/Cabot P-1889.

Send via www.ferc.gov, usingE-comment, with the salutation going to: “Kimberly D. Bowles, Secretary.” Those comments can also include a cc to the current chair of the Federal Energy Regulatory Commission: Richard Glick.

Decisions concerning foreign interests and use of the Connecticut River are happening at this time, and the river in Massachusetts has sat largely emptied or dead here for half a century—a situation enabled by the Commonwealth and its officials’ enduring, ugly and pointed environmental neglect.

To gain effect, letters can be cc’d to federal-and-state officials who are the vested stakeholders representing the public in the protection of the river and resources. Those publicly recorded FERC entries can also be forwarded to local newspapers and media outlets.

LIST of executives–plus officials from federal and state agencies who represent the public in protecting the Connecticut, its migratory fish, aquatic animals and habitats through their “conditioning authority” powers:

ENERGY executives in the private/quasi-public sphere:

Mr. Gordon van Welie, President and CEO, ISO-New England, the “independent” system operator:
Phone (413) 540-4220

Mr. Peter Brandien, Vice President of System Operations, ISO-New England:

E-mail: pbrandien@iso-ne.com .

NOTE: Mr. Brandien writes the annual support letter that facilitates the daily commercial damage to the Connecticut wrought by the Northfield Mountain Pumped Storage Project. ISO has never acknowledged to the public that NMPS is NOT essential to the DAILY functioning of the power grid. Instead it encourages and shackles the public to those peak-priced, daily ravages as NMPS is handsomely paid to hold back several hours of reserve emergency-function megawatts for ISO’s 20th Century bulk power grid in case of a rare blackout (like the one in 2003), and also for occasional use–at scattered intervals, in controlling grid fluctuations.

ISO should have ago been curtailed as a functionary for private mega power interests. Today’s grid should already be based on distributed generation and micro-grid functions in this time of climate chaos and cyber crime. Energy and storage should be located nearest to where it is produced and used. Future linking of river-ravaging NMPS to 200-mile-distant wind turbines is wholly criminal when compressed air storage can be located close to metro/industrial coastal centers—including implementation at sites like Everett, Somerset, New Bedford, and elsewhere. That would render the system resilient, local and detachable–and rescue New England’s Connecticut River ecosystem to support generations to come across the next half century.

But, today and into the future, counter to Holyoke Co. v. Lyman, , ISO will happily sell off a US ecosystem’s daily life to foreign venture capital interests, keeping NMPS in lucrative daily play for decades into the future. The bottom line function of ISO-New England—forget ecosystems and climate, is apparently commercial first, and foremost. In their own words: to “protect the health of the region’s economy and the well-being of its people by ensuring the constant availability of competitively-priced wholesale electricity—today and for future generations.” They love to employ the term “clean”, but never elaborate on glaring incongruities, fallacies or impacts. Future generations apparently will have no need of living ecosystems, just an endless stream of “competitively-priced” energy. They NEVER mention energy CONSERVATION…

FEDERAL PUBLIC officials:

For endangered Connecticut River shortnose sturgeon, freshwater mussels, as well as American shad, blueback herring and American eel:
Donna Wieting, Director of Protected Resources, National Marine Fisheries Service, NOAA Fisheries:
Phone: 301-427-8400

Also, for endangered shortnose sturgeon, as well as American shad, blueback herring and American eels: Mr. Sean Mcdermott, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Sean.mcdermott@noaa.gov

Also at NMFS, protecting shortnose sturgeon and their habitat: Ms. Julie Crocker, Greater Atlantic Region Fisheries Office, National Marine Fisheries Service, Gloucester, MA 01930:

E-mail: Julie.crocker@noaa.gov

For federal protection and enforcement of the Clean Water Act on the Connecticut River: Mr. Timothy L. Timmermann Office of Environmental Review, EPA New England Region 1, Boston MA 02109-3912:

E-mail: timmermann.timothy@epa.gov

For all migratory fish and safe passage on the Connecticut including American shad, herring, and endangered sturgeon: Wendi Weber, US Fish & Wildlife Service Region 5, Hadley MA 01035:

E-mail: wendi_weber@usfws.gov

MASSACHUSETTS state officials:

Kathleen Theoharides, Secretary of the MA Executive Office of Energy & Environmental Affairs 100 Cambridge St., Suite 900, Boston, MA 02114:
Main Phone at (617) 626-1000

For Massachusetts clean water and wetland habitat protections on the Connecticut: Mr. Brian Harrington, Bureau of Water Resources Deputy Regional Director, Massachusetts Department of Environmental Protection, 436 Dwight Street, Springfield MA 01103:

E-mail: Brian.d.harrington@state.ma.us

Also from MA DEP: Mr. David Cameron, PWS Section Chief, Massachusetts Department of Environmental Protection, 436 Dwight St., Springfield, MA 01103:

E-mail: David.cameron@state.ma.us

For state-endangered shortnose sturgeon and all Connecticut River migratory fish in MA: Mr. Jesse Leddick, Chief of Regulatory Review, Massachusetts Division of Fisheries and Wildlife, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: Jesse.Leddick@mass.gov

Also at MA Div. of Fish & Wildlife: Mr. Steven Mattocks, Massachusetts Division of Fisheries and Wildlife, Fisheries, 1 Rabbit Hill Rd., Westborough MA 01581:

E-mail: steven.mattocks.@mass.gov

CONNECTICUT RIVER BLOG: DISMAL SPAWNING SEASON ON THIS UNPROTECTED RIVER IN MASSACHUSETTS

Posted by on 05 Jul 2021 | Tagged as: blueback herring, Connecticut River Atlantic Salmon Commission, Connecticut River Conservancy, Connecticut River migratory fisheries restoration, CRASC, Federal Conte Anadromous Fish Research Center, FirstLight Power, John McPhee, Landmark Supreme Court Decision 1872, National Marine Fisheries Service, NMFS, Rock Dam, shortnose sturgeon, The Dead Reach, Turners Falls power canal, Uncategorized, US Geological Survey's Conte Fish Lab, USFWS, Vermont

Connecticut River Blog: dismal spawning season on this unprotected river in Massachusetts Copyright © 2021 by Karl Meyer

*American shad run lowest since 2010
* 2021 shortnose sturgeon passage will likely be the worst at Holyoke in the half decade since it’s lifts were modified to restore the population and allow spawning in critical upstream nursery habitat.

The spillway fish lift and attraction water at Holyoke Dam, June 2, 2021. Photo Copyright © 2021 by Karl Meyer

The migratory fish run on the Connecticut River is done for the season. No one should be celebrating. At Holyoke Dam fish passage was the lowest it’s been in over a decade, with just 238,000 American shad counted passing that site. Seesawing spring flows that at first saw little April rain to fill river channels then quickly ramped up as May was ushered, creating big attraction flow for shad seeking upstream access via the Holyoke lifts.

But for 10 days, beginning April 30th, no lifts ran at Holyoke. HG&E won’t run lifts with flows above 40,000 cubic feet per second, so those shad had to hold there in the currents of a quickly cooling-down river for over a week. Then, as the flows ebbed to lift-able levels they were again left stranded and burning energy for extra days—as turbidity protocols from the National Marine Fisheries Service (NMFS) won’t allow awaiting fish runs to be helped upstream because they might miss tallying a single endangered shortnose sturgeon in the murky waters. Does this make sense–even for the sturgeon, or any of this ecosystem’s migrants?

In a time of climate heating chaos, this will only happen more often. Here’s a quick sketch of that migration dead-stop from USFWS Project Leader Ken Sprankle, who works to get regular fish passage updates out to the public: “Sierra at HFL(Holyoke Fish Lift) reported operations since the 4/30 closure did not resume until 5/10, with last weekend through 5/10 impacted by very turbid conditions that did not allow lift operations (sturgeon management factor).”

The parched riverbed in front of Holyoke Dam on June 2, 2021. The usual spring peak for shad runs occurs in late May. For 10 days in early May no lifts operated… Photo Copyright © 2021 by Karl Meyer

At first this might seem understandable—this abundance of caution while holding up thousands of other fish, except that the NMFS is doing literally NOTHING to protect and document shortnose sturgeon spawning success upstream at their critical Rock Dam site, and at a default industrial spawning site below Cabot Station’s ramping outflows. The whole purpose of fish lifts is to come into compliance with the Holyoke Company v. Lyman, landmark 1872 US Supreme Court decision, guaranteeing safe upstream and downstream passage at all dams.

So why hold up ANY fish—including shortnose sturgeon, in merely turbid early season conditions, when the purpose is to make sure all migrants can access upstream spawning habitat? To me, it’s disingenuous to implement a policy that seems more about data collection and missing a sturgeon or three—delaying and holding back runs of SNS and all other fish, when you are not doing a thing to ensure that those few endangered sturgeon have habitat and flow to successfully spawn. Are there any priorities that really put fish and protection first here?

As was noted at a June 24th meeting of the Connecticut River Atlantic Salmon Commission, US Geological Survey sturgeon biologist Micah Kieffer did virtually no work at the Rock Dam, the only documented natural spawning site for shortnose sturgeon in this river system that he helped confirm while working for decades with Dr. Boyd Kynard. Not a single bit of investigation or a gill or egg nets set to see about spawning success—just 250 yards from the Conte Lab where Kieffer works. It appears looking after sturgeon is important everywhere BUT the place where they need protection in order to successfully reproduce.

Micah Kieffer spent a good chunk of this season looking for ghost shortnose sturgeon and chasing fish stories far upstream from their critical habitat all the way to Bellows Falls–which proved as fruitful as finding the Loch Ness Monster. Last year, the emphasis was again chasing ghosting fish upriver that were never found. It has now been three seasons since I begged and badgered Micah to take a receiver down to Rock Dam, just a literal stone’s throw away from Conte Lab. After he took me up on that single visit he ultimately ended up documenting 48 SNS present at their ancient site–the largest spawning aggregation ever recorded there across decades of investigation. The fish were there several more days–that is until Canada-owned FirstLight Power cut off the flows—interfering with the spawning of a US federally endangered species.

De-watered critical sturgeon spawning and nursery habitat at Rock Dam, May 16, 2021. Photo Copyright © 2021 by Karl Meyer

There were likely no suitable conditions allowing SNS spawning and rearing at their Rock Dam nursery again this year. I documented that in my photos of their sheltering cobbles baking in the sizzling June sun. So, so much for anyone protecting endangered fish or habitat. When there is no watchdog, there is no enforcement.

One big reveal at the June CRASC Technical Committee meeting was much-touted news that shortnose sturgeon eggs were recovered below Holyoke Dam. Here’s that event, put down in USFWS’s Fish Passage Report from Ken Sprankle on June 30th: “Some important fisheries news was shared at the CRASC Tech when CTDEEP confirmed they had sampled Shortnose Sturgeon eggs in habitat immediately downstream of the Holyoke Dam. Eighty eggs were collected in a sampling bout using egg mats with genetic confirmation, the first documentation of spawning outside of the Rock Dam and Cabot Station shoal, Turners Falls.” But this was really nothing new. Some minor spawning activity has long been known to occur below that industrial site where sturgeon were blocked from accessing their upstream habitat for well over a century.

Chapter 2 in Life History and Behavior of Connecticut River Shortnose and Other Sturgeons, 2012, published by the World Sturgeon Conservation Society (a chapter authored by B. Kynard, M. Kieffer, B.E. Kynard, M. Burlingame, and P. Vinogradov) states that spawning activity has been documented, understood and accepted since the late 1990’s in the area below Holyoke Dam. This is the place where sturgeon had forever been trapped in a spawning cull de sac—more or less since the first dam there was completed in 1849. So, though it is some new data, it does nothing to protect the SNS’s critical upstream spawning site–or the broken river ecosystem at Turners Falls and well beyond.

More CRASC hubbub was created when it was noted that professional divers looking for yellow lamp mussels stumbled on several dozen young-of-the-year shortnose sturgeon and took videos of them at a major in-river construction site in Springfield. Ironic that those divers were not sturgeon researchers… The big excitement was the cute video of baby fish. But it seems the ‘discovery’ was more a celebration of a random technological happenstance than progress in safeguarding this season’s sturgeon spawning run and success.

Anglers in a motorized raft in fragile Rock Dam habitat May 25, 2021 Photo Copyright © 2021 by Karl Meyer

Here’s just one other twisted shortnose sturgeon kicker: those motivated, early-spring spawning-run shortnose sturgeon that get rejected at Holyoke’s lifts in that April-to-late May spawning window because of high flow or the dreaded “turbidity”, are denied a season’s spawning opportunity at their critical upstream Rock Dam site. But this July a new circumstance has been implemented that could help deny more up-running SNS a shot at successful spawning NEXT year!

For Connecticut River shortnose sturgeon there’s actually a bigger, seasonal early-SUMMER migration peak. It’s an upstream push for shortnose sturgeon attempting to find their way past Holyoke Dam. It occurs at the beginning of July and peaks soon thereafter. This is thought to be a “staging” migration for spawning-age fish–for sturgeon moving upriver to prepare to spawn the following year.

However, this year HG&E decided that maintenance on the fish lifts was overdue, and the federal agencies gave the okay for Holyoke Gas & Electric to shut down its lifts beginning July 1st–keeping them off-line for up to three months. Most sturgeon get lifted at Holyoke in July. Delaying those lift closures by just two weeks could have allowed a significant chunk of that critical SNS run to pass upstream. So much for ESA protections…

The average upstream count at Holyoke these last 5 years has been 58 shortnose sturgeon lifted. This year’s count stands at a paltry 11 fish. Thus, it’s pretty much guaranteed it will be a dismal year for passage upstream to critical habitats—Holyoke Company v. Lyman and all those endangered fish be damned!

There was one … tiny ray of hope noted at the June CRASC meeting. After two years of my reporting and intervening on behalf of the buckling banks, sink holes and grim discharge from the failing Connecticut River banks at Rock Dam, Ken Sprankle has been the sole fisheries person to take note. He actually proposed action. The Connecticut River Conservancy, with their water lab, refused to do testing there, and there was no action whatsoever from the Connecticut River Streambank Erosion Committee. On a river with a watchdog pressure would have been applied to force the National Marine Fisheries or MA DEP to take action on the failing riverbanks—which are the responsibility of FirstLight. Or, more to the point, a watchdog could have gone straight after the corporation. But no one to stepped up in that role. Because there is no watchdog here.

Rock Dam raft runners on May 29, 2019.

However, the USFWS’s Ken Spankle did get a study proposal put together that could potentially document the common-sense linkage of those crumbling banks to the Turners Falls power canal–just 150 feet away, as possible culprit and source of the bank failures and habitat pollution. Isn’t this ultimately a potential TF canal failure—the DIVERTED Connecticut River trying to return to its own riverbed less than 200 feet distant? This–on a protected river, would seem a slam dunk to document during a critical time when a new license for decades to come is in the offing. I raised these issues again in questions to the CRASC in their on-line meeting.

Rafters invade fragile Rawson Island at the Rock Dam site to lug their boat upstream for another tilt at Rock Dam’s tiny rapid, May 29, 2019.

Ken Sprankle needs just $131,000 to get the study done–at a time when a $100-million-plus foreign corporation is seeking to run our river here for decades. But he’s found he can’t find the money amongst and between all these federal and state agencies that would enable it to go forward.

You’d think all of CRASC member agencies would be falling all over themselves to chip in and get this critical information—especially since it was their forebears who ruined an easily restorable fish passage prospect at Turners Falls Dam in the mid-1970s. They did this by turning their backs on constructing a simple fish ladder there. That ruined prospects for a true Connecticut River migratory fisheries restoration for hundreds of thousands of American shad and blueback herring to VT, NH, and northern MA each spring for a full half century.

BTW, in the name of further explanation of the above: the predecessor and immediate precursor of CRASC, is the fed/state fisheries cooperative that—in 1969, turned what should have been an CT River fisheries restoration project into a 43 year odyssey that put the river’s long extinct salmon strain (since 1809) at the top of Connecticut River species restoration pyramid, stumbling right past the needs of American shad and blueback herring. These same two federal agencies and four states signed off on the wretched, river-emptied, three-ladder fish passage based on salmon at this Dead Reach in Turners Falls. That has left this river system broken from mile 122 all the way upstream into southern Vermont and New Hampshire.

Their decision at Turner Falls for fish passage essentially killed a true river restoration when that ladder system was completed in 1980. VT, NH and northern MA never saw a fraction of their promised runs of American shad and herring. CRASC’s current chairperson, Andy Fisk of the Connecticut River Conservancy recently described shad as “lazy” in an interview with the Springfield Republican. I think those shad–as well as John McPhee, would agree American shad deserve a better spokesperson.

Failing Connecticut River banks at Rock Dam, June 15, 2021. Photo Copyright © 2021 by Karl Meyer

I do credit Ken Sprankle, who is extremely busy, for making that pitch and getting a study plan put together. This is a Massachusetts problem—home of the broken Connecticut River, and all those present here should find it shameful. The study would take two seasons. But time is tight for it to have any merit in terms of licensing, and this is a river bureaucracy bathed in INACTION.

In a time when the Dead Reach of the Connecticut has been left half-dead and de-watered at the fragile and failing Rock Dam reach for over half a century, you might think the first priority there would be protection and letting this critical patient have a chance to finally begin to heal. Thus it seems rather ironic and no less a bit dangerous that the Connecticut River Conservancy, Appalachian Mountain Club, American Whitewater and other groups will be doing a big PR push in mid-July to bring more joyriding traffic through the fragile Rock Dam site–which has any number of legitimate critical preservation needs and designations.

A campsite and someone living on the south end of Rawson Island opposite the Rock Dam pool on July 4, 2021. Does this critical habitat merit protection, or merely a flood of new visitors… Photo Copyright © 2020 by Karl Meyer

What seems sure to absolutely create more damage and dishonor at this place are crowds jamming downstream to run the single tiny Rock Dam rapid. Many of us have witnessed the ugly traffic jams and trash sites on the Deerfield River. What will happen when crowds descend on this critical area? Does CRC have a plan to protect this habitat? Will they pay for police and search and rescue operations? Will the AMC? Or does the Town of Montague get stuck with the problem and the bill in this tiny backwater so critical to a restored ecosystem?

Perhaps the full CRASC will have something to say about this at their upcoming meeting? Oh but Andy Fisk of CRC is the CRASC’s chair, so perhaps it’s just fine. I’m sure there’s a plan. Be careful what you wish for! What I’m not certain of is whether the folks living in the little “Patch” section of Turners will be thanking CRC. Certainly the sturgeon won’t…

GREAT CONNECTICUT RIVER SURVIVAL WALK DRAWS BIG MULTI-STATE CROWD

Posted by on 27 Apr 2021 | Tagged as: 1872, American shad, Bellows Falls VT, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Refuge, Conte National Fish & Wildlife Refuge, Daniel McKiernan, Delaware LLC, Eversource, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC license, FirstLight, Haddam nuclear plant, Holyoke Dam, ISO New England, Julie Crocker, Kathleen Theoharides, Landmark Supreme Court Decision 1872, MA Division of Fish and Wildlife, Martin Suuberg, Martin Suuberg:, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Millstone 1, National Marine Fisheries Service, National Marine Fisheries Service, net-loss power, NMFS, NOAA, Northeast Utilities, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Station, NU/WMECO, P-2485, PSP Investments, Public Sector Pension Investments, river cleanup, Riverkeeper, salmon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, Source to Sea Cleanup, State of Delaware, Treasury Board of Canada, Uncategorized, United States Supremed Court, US Fish & Wildlife Service, Vermont, Vermont Yankee

GREAT CONNECTICUT RIVER SURVIVAL WALK DRAWS BIG MULTI-STATE CROWD

Claire Chang of the Solar Store of Greenfield speaks to attendees. Note: see http://solarisworking.org/. Photo Copyright © 2021 by James Smethurst. All Right Reserved

Northfield MA. The biggest story on the 410-mile long Connecticut River this Earth Week did not center on yet another promo video or soft news story about people doing trash cleanups. It took place on Saturday, April 24th, when more than 70 people of all ages–from as far as Springfield, South Hadley and Northampton MA–all the way upstream to Putney VT, turned out for a 3-mile river walk to learn about the 50 years of devastation that the Northfield Mountain Pumped Storage Station has wrought on their four-state ecosystem.

THE DAY’S SPEAKERS BEARING WITNESS

Attendees heard from host, Traprock Center for Peace and Justice’s Anna Gyorgy, about the long, deep connection of this river killing to nearly 50 years of nuclear power excess and damages (www.traprock.org). They heard from Claire Chang of the Solar Store of Greenfield about alternative energy, solar installation and bulk storage alternatives to destroying whole ecosystems. And, I spoke at length about the long, grim and deadly history that has brought us to a crossroads for a living future for the Connecticut River vs. this massively violent machine.

WHERE THE RUBBER NEVER MET THE ROAD

What people heard about was that shutting up NMPS’s killer intake pipes is the only river cleanup that matters. Doing just that would have saved a now-crippled ecosystem–had there been an actual watchdog organization on the Connecticut in 1972–or again, when Vermont Yankee’s license expired in 2012. Those are the cleanups that would have spared an entire ecosystem, decade-upon-decade of this hide-in-plain-sight sucking wound.

THE LEGACY OF FAILURES

They learned the Commonwealth Massachusetts has endlessly failed this ecosystem, facilitating its exploitation to the detriment of 3 other New England states by not protecting it. And, that the federal and state fish agencies have failed it as well by first chasing, then never relinquishing, their long-failed salmon experiment, for a fish not seen here since 1809. And also that the NGO claiming guardianship here since 1952, massively failed New England’s River–never stepping up to challenge and prosecute the devastation of the power companies, nor calling out or suing government agencies charged to protect it under state and federal law.

LANDMARK SUPREME COURT DECISION 1872: HOLYOKE CO. v. LYMAN

Living rivers do not flow backwards. People walked a mile and a half to the intake pipes of a deadly machine that has laid waste to billions upon billions of fish across a half century—literally suctioning them to death while pulling miles of river current into reverse. Folks learned that building of this net-power-loss, river-gorging appliance and the deadly impacts it created on migrating fish, particularly American shad—actually flew in the face of the 1872 landmark Supreme Court decision in Holyoke Company v. Lyman, a full century before NMPS was built. Given that law, it had no right to exist here at all.</strong>

Photo Copyright © 2021 by Robert Flaherty All Rights Reserved.

What did that landmark decision require of dam system owners and private companies operating on the Connecticut–and on all rivers of the United States a century and a half ago? It said all must provide safe fish passage, upstream and down of their facilities, as “public rights.” Visitors also learned that the Canadian owners of this 365-day-a-year slicing machine want only to provide a flimsy net, part way across its killer mouth, for just over two months out of the year. That will largely leave the eggs, larvae and juveniles of most species—including migrants, in full peril. Names of agency leaders charged with saving the river for our grandkids were supplied.

NOTE:text below derives from a The GREAT RIVER WALK handout

NO NEW LICENSE TO KILL: THE NORTHFIELD MOUNTAIN PUMPED STORAGE STATION: A HALF CENTURY OF WASTE, DEATH AND ECOSYSTEM DESTRUCTION.</strong> Notes from Karl Meyer, FERC relicensing Stakeholder and Intervener since 2012

To COMMENT: Federal Energy Regulatory Commission Project License P-2485 (www.ferc.gov E-comments) Include your name, address, project # P-2485 and a brief. specific remedy for FERC to apply.

Owner:venture-capital firm PSP Investments, a Canadian Crown Corporation.
Operating in MA as: FirstLight Power Resources.
Current tax sheltering llc registration since 2018 out of MA & New England: in Dover, Delaware

NMPS is an energy consumer. It has never produced a single watt of virgin electricity. Every day this machine consumes huge pulses of electricity from the power grid to suck massive gulps from the Connecticut backward and uphill for hours on end at a rate of up to 15,000 cubic feet per second(cfs). That sucking pulls the Connecticut backward at times for over 3 miles downstream. SOURCE: FERC P-2485 relicensing Study 3.3.9 appendices.

This is not a hydropower plant; it is an energy wasting machine operating exactly like an electric toilet. It runs on imported electricity, profiting on the buy-low/re-sell high model.

RUNNING BACKWARD FOR DECADES

**VIEW Federal Power Commission document with link HERE FPC 1974 flow reversals

That 15,000 cfs is the equivalent of 60, seven-bedroom mansions being swallowed each minute, for hours on end—with everything from tiny fish eggs to full sized American eels obliterated by its turbines. Twenty-four species are subject to that suction. For shad alone it’s estimated that over 2 million juveniles and 10 million eggs and larvae die here annually. That’s just one species. How many billions of fish die annually, across all species—and now across 49 years? A fixed, monitored, year-round barrier screen, fully across its mouth was required.

NMPS then later sends that deadened water back down in peak-priced pulses for a few hours in the morning and afternoon at up to 20,000 cfs. A living river goes in, all that comes out is dead. The Northfield Mountain Pumped Storage Station does its killing in the heart of the Silvio O. Conte Connecticut River National FISH & Wildlife Refuge. This Canadian company is operating in the heart of a four-state ECOSYSTEM, crippling and pulling it apart daily. It should be relegated to rare emergency use.

The scheme to pair this eviscerating machine with future ocean wind is a nightmare—fully a Greek tragedy. Ocean wind sent to kill its river babies. Future generations require a living river.

Energy should be consumed close to where it is produced. That is where the load is. In New England that load is at the coast. Large-scale compressed air plants can be built at New Bedford, Everett, Boston, Somerset and Middltown RI for large-scale wind energy storage. If FERC allows massive LNG export farms to be built at the coast, it can require space for “local” energy storage—right near all those current “natural” gas tank farms of today.Storage needs to be adjacent to those metro cities where it is consumed. That battery storage can be constructed is a given.

In the age of Climate disruption the goal of an electricity network–one safe from mass outages due to cyber attacks and wind and flood events–disrupting the current corporate mega-grid built for huge area energy relays, should be micro-grids and distributed generation.

That decreases vulnerability and will encourage CONSERVATION—never mentioned by the Federal Energy Regulatory Commission or ISO-New England. That is the formula that begins to tackle climate disruption. It is time for Re-Regulation of the power grid. It is time for TRANSPARENCY in the Commonwealth’s energy policy–done behind closed doors with monopoly capital interests running the ISO-NE and NEPOOL table, while excluding even journalists from meetings. This plant squeezes the life out of approximately 1-1/2 billion gallons of Connecticut River water daily—its deadened re-sale power for export—for “load” consumers far from the small towns and cities of this 4 –state ecosystem.

NMPS was built by WMECO/Northeast Utilities(NU) to run off the bloated excess juice of their Vermont Yankee nuclear plant, 15 miles upriver. VY closed forever in 2014. NU today remains massively wired into and out of this facility’s energy resale loop. Today NMPS deadly consumption continues on 50% climate scorching natural gas, 25% nuclear from NH and CT, and 10% actual hydropower from Canada.


The massively fouled Connecticut River and NMPS’s intake tunnels on September 6, 2010. Photo Copyright © 2021 by Karl Meyer

In 2010 NMPS choked on its own effluent, and unexpectedly did not run for over half a year after fouling its massive tunnels with silt and muck. Shut down from May 1st thru early November– after being hit with a “cease and desist” order from the EPA for secretly and illegally dumping that grim effluent directly into the Connecticut for months, in gross violation of the Clean Water Act. Nobody lost power during NMPS’s surprise shutdown for over half a year. That’s despite arguments from grid operator ISO-New England about how necessary its killer, daily re-sale juice is to keeping the lights on. Even during record-breaking summer heat in 2010—when VT Yankee even shut down for refueling, the power grid held together just fine.

What did happen in the 4-state ecosystem—quieted without Northfield’s massive disruption, was that dismal fish passage for American shad just downstream at Turners Falls dam shot up 800% above yearly averages for the previous decade. That was the ugly decade when NMPS began operating differently—after Massachusetts decided to deregulate electricity markets.

NMPS is an ecosystem-crippling, anti-gravity machine, gobbling vast amounts of energy to send a river into reverse and uphill—a buy-low/re-sell-high, cash cow regenerating set-up.

This machine is a crime against nature.

At a time when the planet is dying, you revive ecosystems. This river belongs to our grandchildren and the future, not to greedy foreign investment firms. The corporate concern here is merely the weight of water—live fish and living rivers are nuisance expenses. What would suffice here would be a bunch of pulleys and a giant anvil, like a Roadrunner cartoon. Stop killing the future for our kids.

ORIGINAL OWNER/BUILDER: WMECO/Northeast Utilities—completed in 1972 to run off the excess electricity from its sister plant, Vermont Yankee nuclear station, completed in 1972. NU also had ownership in VT Yankee. Today NU/Northeast Utilities is “doing business as” Eversource. Eversource remains massively wired into and out of NMPS/FirstLight facilities.
Eversource/NU never left us. They just decided to dump their creaky and massively-fined nuclear plants at Millstone and Haddam, to become a bigger, more concealed monopoly. What they did was transfer emphasis to T & D–Transmission and Distribution. They would make their bucks by CONTROLLING THE ENERGY TOLL ROAD. Note the massive new wire structures and the some 18-line-long laundry list of charges on your energy bill for simply for T & D. They have as yet not figured out how to get a kick back for delivering STATIC ELECTRICITY.

Eversource is perennially green-washed through its major-money sponsorship of the Connecticut River Watershed Council/Conservancy’s “Source to Sea Cleanup.” NU/Eversource and the Council (founded 1952) have a long, close, deep-pocketed history. Thus, this green-washed, river-killing apparatus has been quietly-enabled for decades.

A 2021 Brown University study named Eversource as MA’s largest energy spender against clean energy and climate legislation: https://ibes.brown.edu/sites/g/files/dprerj831/files/MA-CSSN-Report-1.20.2021-Corrected-text.pdf

The following companies are now in business as “wholly owned subsidiariesof Eversource:
Connecticut Light & Power, Public Service Company of New Hampshire, PSNH Funding LLC 3, NSTAR Electric Company, Harbor Electric Energy Company, Yankee Energy System, Inc., Yankee Gas Service, NSTAR Gas Company of Mass.(EGMA), Hopkinton LNG Corp., Eversource Gas Transmission II LLC, Eversource Holdco Corporation, Eversource Investment LLC, Eversouce Investment Service Company LLC, Aquarion Company, Aquarion Water Company, Aquarion Water Company of Connecticut, Aquarion Water Company of Massachusetts, Inc., Aquarion Water Capital of Massachusetts, Inc., Aquarion Water Company of New Hampshire, Inc., NU Enterprises, Inc., IP Strategy LLC, Eversource Energy Service Company, The Rocky River Realty Company, Holyoke Water Power Company. Eversource has residual interest in nuclear plants they’ve sold: Seabrook NH and Millstone CT.

Part ownership in: Alps to Berkshires LLC, 50% in transmission line to NY State, 15% ownership in Algonquin Gas Transmission LLC, BSW Holdco LLC, BSW ProjectCo LLC, Bay State Holdco LLC, Bay State Wind LLC, Northeast Wind Energy LLC, North East Offshore, LLC, New England Hydro-Transmission Electric Company, New England Hydro-Transmission Corp. Eversource also has interest and ownership in companies that own and manage decommissioned nuclear plants they once owned, including: Connecticut Yankee Atomic Power Company, 65%, Maine Yankee Atomic Power Company, 24%, Yankee Atomic Electric Company, 52%. SOURCE: https://www.eversource.com/content/wma/about/about-us/doing-business-with-us/affiliates/list-of-affiliates

RESPONSIBLE FOR SECURING A LIVING RIVER FUTURE FOR OUR KIDS:

Kathleen Theoharides: Sec. of MA Energy & Environmental Affairs
Martin Suuberg: Commissioner MA Department of Environmental Protection
Ron Amidon: Commissioner MA Dept. of Fish & Game
Daniel McKiernan: Director MA Division of Marine Fisheries
Wendi Weber: Director Region 5, U.S. Fish & Wildlife Service
Julie Crocker: Branch Chief, Endangered Fish Recovery unit, NOAA, Gloucester MA

It is time to break up the monopolies, re-regulate energy in Massachusetts for our children’s sake—and:RESTORE the CONNECTICUT RIVER ECOSYSTEM.

An Upstream Invitation: COME VISIT; THEN PLEASE SUE US!

Posted by on 21 May 2020 | Tagged as: American shad, bascule gates, Bellows Falls VT, blueback herring, Connecticut River, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, Dead Reach, Deerfield River, Dr. Boyd Kynard, endangerd shortnose sturgeon, False attraction, Federal Energy Regulatory Commission, FERC, FERC license, fish passage, Greenfield, Holyoke Fish Lift, MA Division of Fish and Wildlife, Massachusetts Division of Fish & Wildlife, migratory delay, New Hampshire, Rock Dam, shad fishing, The Dead Reach, Turners Falls, Turners Falls dam, Turners Falls power canal, US Geological Survey's Conte Fish Lab

THIS GREAT AND BROKEN RIVER V

Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED.

Issue # 5, An Upstream Invitation: COME VISIT; THEN PLEASE SUE US!

Dear Vermont and New Hampshire (and northern MA):

Our Connecticut River–as grimly battered by diversions and reversing industrial currents as it is down here in Massachusetts, is way better than yours upstream. That’s not very neighborly to say, but it’s true. Your states probably should’ve sued our Commonwealth years back for depriving you of a living river. It’s what’s been owed you. Down here we have a spring river with at least a credible ocean connection stretching all the way from Long Island Sound to just past the mouth of the Deerfield River. It really isn’t fair you don’t…


Just a single bascule gate open with thin spill at Turners Falls Dam, May 20, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge, back arrow to return to text)

Case in point: as of May 20, 2020, Holyoke Dam had passed some 130,000 American shad upstream. Enough federal and state fisheries data from studies has been produced to safely estimate that as many as 100,000 may have arrived at Turners Falls, just 36 miles distant, still heading upstream. The only data from Turners Falls Dam was reported as of May 8, 2020, showing a total of 38 shad successfully passing that site…

In the interest of good relations, I’d like to invite you downstream to experience what you’re missing. After all, everyone has a right to a living Connecticut River. Some of us just have a little more right, while others—living upstream, have forever had almost none at all. Ironically, that none even includes Bay State residents living in the towns of Greenfield, Gill, Turners Falls, Erving, and Northfield. An ocean connection for them is barely perceptible as well.

But for the rest of you far northerners, whether you live in Vernon, Brattleboro, Dummerston, Putney, Westminster or Bellows Falls VT–or Walpole, Westmoreland, Chesterfield, or Hinsdale NH, please come visit your river where it at least still remains partly tethered to its ancient ocean connection. It’s worth the trip.

And, why not bring along fishing pole?—because, truth is, we’ve been hanging on to your fish here for decades. Most of the hundreds of thousands of migrating shad, blueback herring and sea lamprey here annually never get past the Turners Falls Dam—becoming mired in the 2-1/2 mile long Dead Reach and canal diversion leading up to that ponderous obstruction. Turners Falls is where your living river connection with the ocean, ends. Thus, including all three states, 15 towns have been robbed.

Really, come down and experience what us “haves”, have. Meet us at the cull de sac of the Connecticut here, and we’ll show you where your thousands of fish are foundering. They were promised you way back in 1967, but you never received them. This is a peek at the river your kids should be experiencing at up at home today, and the one that’s the birth right of their grand kids decades into the future. Somebody should’ve stood up long ago. There should have been a lawsuit.

BTW: there’s even a free fishing weekend down here on June 6 and 7, where you don’t even need a license to toss in a line. Come! There should still be good numbers of shad and lamprey fighting the good fight upstream–right up to the dead end dam in this largely impassible reach. You need not come far; your ocean connection ends abruptly here in Turners Falls.


The ponderous–difficult for shad to find and access, fish ladder below Turners Falls Dam, May 20, 2020. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge)

If you don’t feel like waiting, and want to catch the peak of the run here in the next week or so, just grab a short term fishing license at the MA Wildlife website. Honestly though, I’m not sure they deserve your business. Massachusetts Division of Fish & Wildlife was the only entity with specific rights to intervene over the last 50 years in the federal (FERC) license governing fish passage conditions at Turners Falls if conditions changed. In the first decade of this century, the long-paltry (6-7%) fish passage success beyond that dam evaporated down to less than 1% percent in some years. That plunge began right after Massachusetts deregulated its electricity generating markets. Those were your fish! That was your last remaining thread of an ocean connection. MDFW did nothing. Like I said, there should’ve been a lawsuit. They sat on their hands. We let you down.

For that reason alone, please come and visit. Come fish. Pop on a shad dart. We’ll be happy to social distance with you.Try your luck where your fish are stuck!

And if you don’t happen to be an angler–but just want to experience what the remains of an ocean- connected ecosystem look like, bring a folding chair and just enjoy the spectacle. A living river can be quite inspiring. And witnessing sleek, healthy fish that have travelled thousands of ocean-going miles and then 120 miles upstream here to their ancient spawning grounds, might just encourage you to take action. You deserve this. And, we know exactly where your lost fish are trapped today—the same places they’ve been spinning their upstream migratory wheels and energies for decades.

The best way to locate the nearest ocean connection on the Connecticut here is to go where the currents are—go where there is still flow in the riverbed. That’s where the agitated shad will be, trying to discover and fight their way through promising upstream currents. They want to go into the flow, but that’s the bit tricky down here–as the power company is constantly jacking the currents up, down, and all around. That’s why its the river’s dead-end. Those see-saw currents and flow diversions are tricking the shad into alien industrial flows producing endless streams of what’s called “false attraction.”

Some sites, as you will see at the company’s Station # 1 outflow into the river adjacent to the Turners Falls Power Canal, dump their industrial effluent, back into the river while creating just a few small amount of hydro power.. That false upstream signal to migrating shad essentially traps them there–for hours or days on end, spending energy in that false current as they await an open upstream path that never comes.

For anglers not tied to anything like a natural setting, the Station #1site teems with scores and scores of tricked shad, ripe for the hooking. It’s a supremely ironic dead end for the fish and run—nosing for hours into a nowhere current. But, for fish-in-a-barrel anglers, this sad site can be a slam dunk.

Other sites are rather more “scenic,” but the same waffling, insufficient flows ultimately lead to dead-end routes for the vast majority of the fish run. Less than 1 fish in 10 annually ever make emerge out of the Turners Falls Power Canal–which all must pass through before popping out beyond that dam toward your Vermont and New Hampshire doorsteps. Most just give up.

Anyway, here are some visit/witnessing recommendations from my personal investigations on May 20, 2020:

Ocean Dead End Stop # 1: Turners Falls Dam, Turners Falls. Take I-91 south to Rt. 2 East. Rt. 2 E to the second set of lights, where you turn left over the Turners Falls Bridge. Park just over the bridge near the Great Falls Discover Center and find your way across the little power canal bridge and down to the river. Note that the paltry flow is unlikely to be drawing any shad upstream to the dam and fish ladder.

Lone, disappointed shad angler in low flows below dam: look far left at center, adjacent to the bend in fish ladder. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge and view; then back arrow)

Ocean Dead End Stop # 2: Station # 1, your false attraction fishing hole. Follow the above directions—crossing the bridge into Turners Falls. Make an immediate right after passing the Great Falls Discover Center. Continue straight after the stop sign, and then make the second right, going over the SECOND, one-way bridge there. Continue along until you see the brick outline of Station # 1 on the right, adjacent to the river. If they are dumping good current here, the fish will be stacked up like sardines, nosing into the flow that will not allow them a path upstream. Anglers fish both sides of this outflow. You’ll find the paths. An exhausting dead end, for your share of the shad run. The two gents here landed 3 shad in the 10 minutes I lingered there.

Station # 1, exhausting attraction flow leading…nowhere. Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge and view; then back arrow)

Station # 1, fish-in-a-barrel fishing! Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge and view; then back arrow)

Station # 1, bring on the net! Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge and view; then back arrow)

Ocean Dead End Stop # 3: the Rock Dam. Continue with the above directions and go along past Station # 1, winding around until you come to G Street. Go right and continue south on G Street—do not recross the canal, or you’ll be off track. Continue down G Street to the end, where it becomes, rather ironically, “Migratory Way,” beyond the sign for the US Geological Services Silvio O. Conte Anadramous Fish Research Center. Follow this route down to the parking turnouts adjacent to the canal, and walk down the path there leading to Cabot Woods.

At the Cabot Woods site you will find a few picnic tables, but, most importantly, several severely eroded paths down to the Rock Dam. Flows to this site, critically important to endangered shortnose sturgeon, have already been tamped down enough to chase those ancient fish out of their spawning ground here. But, those same tamped-down flows weeks later here are keeping tricked shad into thinking the viable upstream flows through the notches here will somehow magically return, giving them a viable route. Sadly, they are not going anywhere. Again, some pretty good fishing here this day. These 5 anglers grabbed three in the 25 minutes I stayed along shore.

Fishing in the oft cul-de-sac attraction flow at the Rock Dam.
Photo Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. (Click X 3 to enlarge and view; then back arrow)

Note: there are far more shad struggling just downstream–attracted by the outflow of the Cabot Station hydro site. But there’s no good fishing access to these flows, some of which are designed to lead the shad into what’s been described as the “world’s longest ladder for shad,” by fisheries biologist Dr. Boyd Kynard. It’s a brutal exercise–fishladder 66 steps to fight through, which dumps them into the alien flows and environments of the power canal…

So, that’s where your fish are. Down here, where the ocean connection breaks. Come and visit! Then, take us to court to get what you deserve. It’s your river too!

THIS GREAT AND BROKEN RIVER

Posted by on 28 Apr 2020 | Tagged as: 5-year FERC licensing process, American shad, Bellows Falls VT, blueback herring, Canada, climate-heating, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, FirstLight Power, Holyoke Dam, Holyoke Fish Lift, Holyoke Gas & Electric, Massachusetts Division of Fish & Wildlife, Micah Kieffer, migratory fish, National Marine Fisheries Service, New Hampshire, Northfield Mountain, Northfield Mountain Pumped Storage Project, pumped storage, Rock Dam, Rock Dam Pool, shad, shortnose sturgeon, State of Delaware, The Great Eddy, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Vermont, Vermont Yankee

THIS GREAT AND BROKEN RIVER

Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED.

Issue # 1, First Daylight for an Embattled Run

The tiniest spark of life reentered New England’s Great River on Tuesday, April 21, 2020. According to Ken Sprankle, Connecticut River Project Leader for the US Fish & Wildlife Service, the fish lifts began operating that morning at the Holyoke Dam, 82 miles from the sea. And on that day the first two migrating American shad of the spawning season were lifted upstream.


Holyoke Dam. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x3.

I got that fragile bit of good news on Earth Day, and it was truly a bright spot in what seems a very distant and fragile time for people, ecosystems, and our beleaguered planet. And during this Covid pandemic, while our warming atmosphere is experiencing a brief respite from the particulate pummeling of jets and cars, the Connecticut is being brutalized as catch basin for all the chemicals, chlorine and antibiotics that are currently being flushing out into–and right through, our sewage treatment plants to the River… As such, the Connecticut had little to celebrate on the 50th Anniversary of Earth Day.

Nonetheless those two fish meant there would at least be some vestige of the spring run that once fed river communities for hundreds of miles along this central artery for untold centuries into the past.

It’s the public’s river, and these are the public’s fish. Those are the facts that I always keep in mind whenever I write or speak about the Connecticut. But there’s also this basic tenet for me: a river is a living system; it exists of its own right and its right to survive and thrive should thus be an unquestioned part of its existence. We humans have a moral obligation to protect the life of rivers, just as they have nourished, protected and supported the very ecosystems we’ve relied on for time immemorial.

For me, to kill a river is an immoral act. To flaunt any part of the legal framework that federal and state law has put in place protecting them is both criminal and repugnant. But maybe that’s just me…

Holyoke Dam looking toward Fish Lifts. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x3.

Now two shad aren’t much in many minds, I’ll admit. But what those two shad—likely early males meant, was that the Connecticut had actually become a living river once more. At least a part of it. That tenuous little reconnection was completed when one fat, industrial bucket of river water was pulled from the downstream side of Holyoke Dam and dumped on the upstream side. Two living, blue-green American shad swam out into 35 miles of upstream river that all downstream fish are denied access to for some six months out of every year. That’s way less than a half-living river.

But what that tiny spark meant, more than symbolically was that—on the most basic level, the Connecticut was reopened along a tiny stretch as a true river–a TWO-WAY highway where migrating and resident fish can move both upstream and down as part of this ancient ecosystem highway.

The Holyoke Dam is historic for two reasons: First, it is the barrier at the center of the 1872 landmark US Supreme Court decision in Holyoke Company v. Lyman that established that dam owners and operators must provide passage for migratory fish—both upstream, and downstream, of their barriers. Second, though imperfect and of the simplest most basic design—i.e. upstream, in-river attraction flows leading migrating fish to be corralled in a closeable, industrial bucket and lifted over the dam–those Holyoke Fish lifts have remained the most successful fish passage on the entire East Coast since 1955.

For the next few months Holyoke’s industrial buckets will facilitate a stuttering recreation of the former Connecticut as a living, 2-way river while American shad, sea lamprey, shortnose sturgeon and blueback herring attempt to access ancient spawning grounds. For many that open habitat reaches all the way to the dam between Bellows Falls VT and Walpole NH–nearly 90 miles upriver. That ancient destination, however, remains a cruel impossibility for all but a fortunate few migrants…

The Great Eddy at Bellows Falls Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x 3.

Once again this spring the vast majority of those hundreds of thousands of fish passing upstream at Holyoke will be thwarted from reaching the wide open spawning habitat anywhere above the Turners Falls Dam. That dam sits just 35 miles upstream of the Holyoke lifts. It’s an easy swim for most– just a day, maybe two.

But once they approach that river reach and barrier there won’t be accommodating riverbed flows or any lifts offering suitable passage upstream. They’ll encounter vacillating, confused flows and a series of obstacle-filled fish ladders that funnel all migrants into the grim habitats of the Turners Falls power canal before any get an outside chance to squeeze past the dam itself. Most never do. Perhaps one fish in ten will succeed–leaving the next 68 miles of Connecticut River habitat impoverished and all but empty of its ancient migrants.

And for shortnose sturgeon, one of this river’s most ancient species and the only federally-endangered migrant in this ecosystem, prospects are yet more dire. With the actual riverbed in the 2 miles below Turners Falls Dam sporadically deluged and emptied of suitable natural current, these fish are all vulnerable to being again robbed of what should be an annual, slam-dunk spawning aggregation at their only documented natural spawning site in the ecosystem–the Rock Dam in Turners Falls. Another season will go by without life-giving mandated flows to this critical habitat due an absence of enforcement protection and license requirements.

Of course, that was to have changed two years back.

The Federal Energy Regulatory Commission licenses for operation of the Turners Falls/Cabot Station hydro sites and the Northfield Mountain Pumped Storage Project expired two years back on April 30, 2018. New flows and fish passage requirements should have been re-nourishing the endlessly pummeled and impoverished river in the beleaguered miles above and below Turners Falls Dam since that time. However, for the crippled run here, there is literally nothing new. Fish at Turners Falls today are almost as effectively blocked from moving upstream into Vermont, New Hampshire and northern Massachusetts waters as they were when the first dam across the Connecticut there blocked these runs beginning in 1798.

Today, the crushing suck-and-surge impacts of Northfield Mountain’s net-energy-loss, peak-price/peak-demand operations continue brutalizing the grimmest 10 miles in the entire ecosystem–cannibalizing the river’s fish runs and chewing through young-of-the-year. Pumped storage is not renewable energy, nor is it anything like the conventional river hydropower much of the public thinks it generates. Northfield Mountain consume vast amounts of virgin electricity from the grid here—most if it generated through imported natural gas, to pump the Connecticut backwards and a mile uphill. NMPS is in reality an energy consumer. It’s massive pull off the grid gets tallied in negative megawatts.

Today, the revival and protection of those long-ago, lawfully mandated runs remains stuck at Turners Falls and Northfield Mountain. The so-called FERC 5-year Integrated Licensing Process(ILP) that should have given them their two basic necessities for survival—water, and a safe, timely route upstream and down, actually began in the fall of 2012. It drags on to this day.

The day after FirstLight at long-last submits its final license application for examination to FERC–and the federal fisheries agencies with conditioning authority on the Connecticut, it will be September. September signals the beginning of the 9th year this supposed stream-lined FERC ILP has been malingering on this river system. FirstLight left off negotiations over a year ago with the US Fish & Wildlife Service, National Marine Fisheries Service, and the Massachusetts Division of Fisheries & Wildlife for required new river conditions and construction of fish lifts. There has been no movement since that time.

Any delay in the construction of a fish lift at Turners Falls, and the requirement for real, life-sustaining flows in the riverbed, benefits this recently-arrived power company. Their interest is in stakeholder and corporate profit—and this is a Canadian-owned outfit that re-registered all of these assets out of Massachusetts, chopping them into a series of tax sheltered Delaware LLCs in late-2018. FERC continues to allow FL “extensions of time” to make their license-required filings, delaying what have long-been federally required mandates for river and migratory fish protections.


The de-watered Rock Dam Pool where shortnose sturgeon attempt to spawn, just after 6:00 a.m., May 17, 2019. Copyright © 2020 by Karl Meyer ALL RIGHTS RESERVED. Click x 3.

FL is now citing that restructuring as another reason for delay in submitting their “final license application” until August 31, 2020—that’s two years and four months of operating and profiting from a destructive and river de- pauperizing extended license. The current extension still requires only 400 cubic feet per second to be released into the Connecticut River bed in the spring migration season through which shad attempt to move upstream in—and embattled,federally-endangered shortnose sturgeon attempt to spawn in. That’s the equivalent of substituting a small brook for a river. Sturgeon spawning fails at the Rock Dam site most years, often caused by the abrupt ratcheting of those spring flows down to little more than that trickle.

Studies and investigations by the federal fish agencies show that a massive increase in sustained spring flows are baseline requirements for a living river here. Last year n the first week of May spring flows of some 10,000 cubit feet per second were coursing down the Connecticut’s “dead reach” here–and right through the Rock Dam pool. Shad anglers were landing fish by the dozen. On May 10, 2019, USGS Conte Lab researcher Micah Kieffer put out a research net overnight in that pool. Then next morning he found 48 federally-endangered shortnose sturgeon weighing it down—the largest aggregation ever recorded there. Kieffer continued his successful sturgeon netting through the following week, until coming up empty on Friday, May 17, 2019. He got “skunked” that day after flows through the Rock Dam reach were abruptly cut by FL to a relative trickle, exposing the cobble-lined shores of that pool where embryos and young develop.

Clearly, those 10,000 cfs flows are what are necessary to restore life to this river. They are required and long overdue—at a season when electricity demand is at some of its lowest points in the year.

The first year license extension by FERC was allowed because of the shuttering of the Vermont Yankee nuclear plant upstream. VY’s excessive, night nuclear megawatts were the grim, 40 year engine that enabled Northfield Mountain to suck the river into reverse and pump it up into a 4 billion gallon reservoir to later re-create second-hand electricity at high prices.

Now restructured, FL appears in no hurry to move ahead with new licenses. Their study results have often been delayed in being handed over to the federal fisheries agencies and study teams in this relicensing–or handed in on the very last day the process requires. They seem happy to tread water and realize profits–while NMPS’s fish-eating, net-energy loss operations continue running along, largely fueled via the imported, climate-scorching, natural gas generated electricity now bloating the grid.

The longer you don’t have to put a shovel in the ground or give this US River its flows for federally-required fish passage, the more money you keep. It’s time FERC stopped letting them off the hook. Stop stringing this process along. It’s time this river was brought into compliance with 1872’s Holyoke Company v. Lyman; it’s time to comply with the federal Endangered Species Act of 1973. It is the public’s river; these are the public’s fish.

Addendum: on Friday, April 24th, USFWS’s Ken Sprankle sent a note that the Holyoke Gas & Electric had shut down its fish lifts due to accumulating debris in its assembly. They would not operate through the weekend, and a fix would be attempted on Monday. Thus, the Connecticut became a one-way stream again anywhere above South Hadley Falls, leaving the next 88 empty miles of river still in midst of an endless vigil–awaiting the migratory runs guaranteed by the Supreme Court 148 years ago. Hopefully, for those migrating shad—and perhaps other early migrants wasting another week’s precious spawning-energy reserves while knocking on Holyoke’s door, those lifts are again operating and in full motion today.

Who is protecting New England’s Great River??

Posted by on 15 Jul 2019 | Tagged as: Connecticut River migratory fisheries restoration, Conte National Fish & Wildlife Refuge, ecosystem, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered Connecticut River shortnose sturgeion, FERC, FirstLight Power, Fish and Aquatics Study Team, limited liability corporation, LLC, Northfield Mountain Pumped Storage Station, Rock Dam, Rock Dam Pool, shortnose sturgeon, Society of Environmental Journalists, State of Delaware, The Daily Hampshire Gazette, The Greenfield Recorder, Treasury Board of Canada, Turners Falls dam, US Fish & Wildlife Service, US Geological Survey, US Geological Survey's Conte Fish Lab, USFWS

The following piece appeared in The Greenfield Recorder on June 27, 2019, and in the Daily Hampshire Gazette on July 17, 2019. The original title ran as “Sturgeon Revival on the Connecticut.” www.recorder.com, www.gazettenet.com .
Ruined Rock Dam spawning and nursery site on May 17, 2019. At upper left is one of the extremely sensitive island habitats that rafters repeatedly trammeled. NOTE: Click, then click twice more to enlarge. Photo Copyright © 2019 by Karl Meyer, All Rights Reserved.

Story, Copyright © 2019 by Karl Meyer. All Rights Reserved.

Something remarkable occurred below Turners Falls this May: four dozen federally-endangered Connecticut River shortnose sturgeon were discovered at their embattled spawning and nursery site–the largest documented aggregation since long-term research began there in 1992.

In the afternoon of May 8, 2019 when US Geological Services biologist Micah Kieffer walked down to the river near the Silvio O. Conte Anadromous Fish Research Center, he got a surprise “burp” on the receiver he carried. That meant just one thing: a radio-tagged sturgeon was nearby. Since early spring consistent high flows had coursed down the riverbed—a rarity in the oft-emptied, 3-mile reach below the Turners Falls Dam controlled by FirstLight Power. Kieffer hustled back to the USGS Lab, gathering armloads of equipment and securing a boat. By nightfall he’d set out nets, hoping to find a few sturgeon where they’ve likely spawned for thousands of years–a unique, cobble-bottomed pool downstream of the dam.

The big shock came first thing next morning. Weighing down the nets were 48 squirming, 2-3 foot long, endangered sturgeon–one female “running eggs”; the males all running sperm. Kieffer worked quickly to catalogue each fish; returning all to the current. Across a quarter century of intensive federal research started under Amherst’s Dr. Boyd Kynard and continuing under Kieffer, this was a critical discovery near a place called Rock Dam—which hosts a single, tiny rapid. That site is critical to the shortnose’ recovery—it’s a unique biological refuge, and their only documented natural spawning site in the ecosystem.

Life-giving spring flows have been rare below Turners Falls Dam for nearly a half century. Most years currents get violently see-sawed up and down and diverted in and out of the riverbed at that dam via computers operated from inside the 1972 Northfield Mountain Pumped Storage Station, seven miles upstream. Those disruptions help service the massive water and energy appetite of Northfield’s pumped storage electricity regeneration and resale regime. Most years spawning success for this 200 million year-old sturgeon species fails at Rock Dam. That flow chaos has also long-handicapped the stalled, four-state federal Connecticut River Cooperative Fisheries Restoration for shad and herring here.

But this year, nourishing high flow continued through that critical biological reach right into the height of shortnose spawning season—which extends to late May. Operating with minimal staff, Kieffer again managed to anchor “day-set” nets in the river on May 15th and 16th. He got 11sturgeon on each of those days. But when nets were set again on May 17th he suddenly found himself skunked.
Exposed, dewatered shoals in shortnose sturgeon spawning and nursery habitat below Rock Dam.
Photo Copyright © 2019 by Karl Meyer. All Rights Reserved. Click x3 to ENLARGE>

At 7:30 on the morning of May 17th, just a single gate spilled a thin stream of water into the channel below Turners Falls Dam. Though river flows had been slowly subsiding, when FirstLight pinched those gates shut they were pulling the plug on spawning flows. According to Dr. Boyd Kynard in his 2012 book, Life History and Behavior of Connecticut River Shortnose and Other Sturgeons, “Flow reductions that occurred while fish were spawning at RockD caused SNS to leave the area, and after females left, they did not later return to RockD spawning habitat.” What’s worse, that abrupt tamp-down dewatered the cobble bottom and shoals below Rock Dam where spawned eggs and embryos shelter and develop through June. It’s deadly.

Later that morning two gates were opened, re-ramping currents in the river. Over the ensuing days US Fish & Wildlife Service representatives noted gates alternately waffling flows up and down in sturgeon spawning time—from two open, down to one; later up to three. Perhaps encouraged by those settings, on May 29th a rafting company was seen repeatedly sending loaded, lumbering rafts over Rock Dam and walking them up onto sensitive island habitats.

FirstLight and those commercial rafters have long been apprised and legally aware of the presence of endangered sturgeon—federal studies are part of the relicensing record here. Liability is spelled out under the Endangered Species Act. A single act of interference with a federally endangered sturgeon carries a penalty of $49,000 and possible jail time. Those dam settings resulted in grim biological conditions at a time FirstLight should have been exercising utmost care: this was in the midst of their providing experimental flows from the dam to fulfill license requirements for migrating shad while meeting sturgeon spawning needs.

This December, FirstLight reregistered their Northfield and Turners Falls facilities in a series of tax-sheltered, limited liability corporations in the State of Delaware. As a venture capital firm, parent-owned by the Treasury Board of Canada, they’re seeking a new federal license to operate on this U.S. River in our Commonwealth for decades to come. This critical reach should not become a cash-cow playground for corporate shareholders or joyriding rafters. It’s time to celebrate the shortnose sturgeon, and time to let a river heal.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

Why no FISH?, STILL???

Posted by on 30 Apr 2019 | Tagged as: American shad, Atlantic salmon, Bellows Falls Fishway, blueback herring, Connecticut River, Connecticut River Atlantic Salmon Commission, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, CRASC, Daily Hampshire Gazette, Dr. Boyd Kynard, Federal Energy Regulatory Commission, federal trust fish, FERC, FirstLight, Gary Sanderson, Greenfield Recorder, Holyoke Fish Lift, MA Division of Fish and Wildlife, Montague Reporter, National Marine Fisheries Service, National Marine Fisheries Service, NOAA, Northfield Mountain, Northfield Mountain Pumped Storage Station, Public Law 98-138, Rock Dam, shad, shortnose sturgeon, The Greenfield Recorder, The Recorder, Turners Falls, Turners Falls power canal, Uncategorized, US Fish & Wildlife Service, US Geological Survey's Conte Fish Lab, Vernon Dam Fishway

The disastrously-emptied Northfield Mountain Pumped Storage Reservoir, June 27, 2010. (CLICK, then Click several times more for FULLEST VIEW) Copyright © 2019 by Karl Meyer. All Rights Reserved.

WHY no FISH…
All photos and text Copyright © 2019 by Karl Meyer. All Rights Reserved.

By clicking on the blue link WHY no FISH… above, and then clicking it again on the following page, you will open an old PowerPoint presentation that I gave to the Pioneer Valley Chapter of Trout Unlimited in Holyoke in December 2010. It will take several minutes to load, but is then largely self-explanatory, with text available below photos, or by clicking the text tab.

On April 30, 2010 I embarked on a journey to the mouth of the Connecticut River by bicycle, to document the grim crippling of the river and its shad runs due to the lack of enforcement and engagement of fisheries agencies and river organizations. At the time, they were all still cheerleaders for a failed salmon program, ignoring the stark facts of the impacts of the Northfield Mountain Pumped Storage Project on American shad and federally endangered shortnose sturgeon.

At the time I was doing part-time work at the Connecticut River Watershed Council, but quit out of frustration and disappointment just a few months after.

Notably, just a year later, the US Fish & Wildlife Service cancelled its long-failed salmon hatchery and “restoration” program on the Connecticut. A year after that, the river conversation became about the impacts of flows in the Dead Reach of the Connecticut, and Dr. Boyd Kynard’s groundbreaking book focusing on federally endangered shortnose sturgeon at the Rock Dam was released–though only following an unconscionable 3-month embargo of his research data by the US Geological Service.

Nearly a decade later, Northfield Mountain remains the Connecticut River ecosystem’s deadliest machine, directly impacting riverine life and migratory fish abundance in three states.

The Connecticut River now has TWO “conservancies”, but not a single NGO that makes any claims for ENFORCEMENT being a chief (or really ANY) component of their mandate. And ENFORCEMENT is a requisite for any true ecosystem restoration and river protection outfit that means to carry out its mission. This is a four-state ecosystem without a legal team. The Connecticut remains a river unprotected.

“Clean, renewable” labels don’t apply

Posted by on 01 Oct 2018 | Tagged as: Ashuelot River, Bellows Falls, blueback herring, canal shad, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River shortnose sturgeon, crippled ecosystem, Dead Reach, ecosystem, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federal trust fish, federally-endangered shortnose sturgeon, FERC, FERC Commissioner Neil Chatterjee, FERC license, FirstLight, Fish and Aquatics Study Team, fish counts, fish kill, fish kill on the Connecticut, fish passage, fishway windows, Holyoke Fish Lift, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Project, Northfield Mountain Pumped Storage Reservoir, Northfield Mountain Pumped Storage Station, nuclear power, PSP Investments, Public Law 98-138, pumped storage, Relicensing, resident river fish, Saxtons River, Scott Pruitt, shad, shortnose sturgeon, Society of Environmental Journalists, Turners Falls, Turners Falls dam, Turners Falls power canal, US Fish & Wildlife Service, USFWS, Vermont, Vermont Digger, Vermont Yankee

Copyright © 2018 by Karl Meyer All Rights Reserved.

NOTE: the following piece appeared in VTDigger, www.vtdigger.org in September under the heading “Clean, renewable” labels don’t apply when crippling an ecosystem.”

TERMS OF ENTRAINMENT: a Connecticut River History


NOTE:in this photo are over 170 juvenile shad, among the many thousands killed in the recent de-watering of the Turners Falls Power Canal. The power canal is where the bulk of the Connecticut River is diverted into for most months of the year. So, when they drain it, they are killing the river. However, if you look at this photo and multiply that death toll by 10,000 you begin to get some idea of the mortality counts for young-of-the-year shad entrained annually–and un-tallied across nearly five decades, at the Northfield Mountain Pumped Storage Station. (CLICK, then CLICK twice more to enlarge photos.)

At 2:41 p.m. on May 20, 2018, a lone blueback herring appeared in the windows at Turners Falls Dam among a school of larger American shad. It was a small miracle. Barely a foot long, it was the first blueback here since 2005, and there would not be another this spring. Like those shad, its life had already spanned four springs, swimming thousands of ocean miles in shimmering schools. It re-crossed bays and estuaries of seven states and two provinces before reaching this Connecticut River juncture. In doing so it had survived sprawling drift nets and repeated attacks from sharks, bluefish, spiny dogfish, cormorants, seals and striped bass.

All these fish were seeking to spawn and give their young a head start as far upriver as currents, time and temperature would allow. Unfortunately, five miles upstream sat the Northfield Mountain Pumped Storage Station, a river vacuuming machine capable of out-killing all their natural predators. For the next 20 miles they’d be vulnerable to its impacts.

NMPS has inhaled river fish of all species and sizes daily for nearly half a century. Results from a river sampling study Juvenile Shad Assessment in the Connecticut River, were released in June by the US Fish & Wildlife Service and MA Division of Fisheries & Wildlife. They estimated NMPS’s 2017 operations resulted in losses of some 15 million shad eggs and larvae, plus the deaths of between 1 and 2-1/2 million juvenile shad. That’s for just one species.

On April 20, 1967, years before Northfield was built, federal agencies and four states signed the Statement of Intent for a Cooperative Fishery Restoration Program for the Connecticut River, agreeing to restore runs of American shad, salmon and blueback herring upstream to Bellows Falls, Vermont and beyond. The migratory shortnose sturgeon had already been listed as endangered. Continuing today under Public Law 98-138, its mandate requires utilization of “the full potential of the fishery resources of the Connecticut River including both anadromous and resident species,” providing “high quality sport fishing,” and meeting “the long term needs of the population for seafood.”

American shad are still commercially fished today just 60 miles downriver. They’ve provided seafood to this valley for ages, yet most people in Vermont, New Hampshire and Massachusetts don’t know they were promised a “just share of the fishery harvest” back in 1967. All remain without, while shad continue to grace dinner and restaurant tables in Connecticut every spring.

Running on imported power via the buy-low/sell-high model, Northfield can suck the river into reverse for up to a mile downstream. It devours everything captured in that vortex at 15,000 cubic feet per second. Think 15,000 milk crates, for hours, to fill a 5 billion gallon mountain reservoir. The result is 100% mortality for all fish entrained. During peak-use and/or peak-price times—or both, it sends the deadened water back through its turbines as twice-produced electricity.

NOTE: more of the TF Canal kill here in another location–including mostly juvenile shad, but also a bluegill, several mud-puppies, and a young sea lamprey. Again, this is just a whisper of the year round fish kill occurring upstream at Northfield Mountain.

Northfield was built to run off Vermont Yankee’s excess nuclear megawatts. But even after VY closed in 2014, its carnage continued, unchallenged, rather than being relegated to emergency use. Having never produced a watt of its own power, its 46 years of accumulating carnage are yet to be tallied. That herring might have been heading for New Hampshire’s Ashuelot or Vermont’s Saxtons River, and those shad were perhaps steering for the Great Eddy at Bellows Falls. Regardless, any progeny would later face Northfield’s net-loss-power impacts heading downriver come fall.

Currently it pumps mostly at night when Canadian owners PSP Investments can purchase cheap electricity to suction the river uphill. Later it’s released as second-hand juice at peak-of-the-day profits. Promoters claim the benefits of dispersed solar and wind power can’t be realized without first relaying their renewable energy across the region to this lethal storage machine for later resale in markets far beyond the Connecticut Valley. “Clean, renewable” labels don’t apply when crippling an ecosystem.

NMPS boosters include (now-former) EPA Director Scott Pruitt, who made a sweetheart visit there last Valentine’s Day along with Federal Energy Regulatory Commissioner Neil Chatterjee. That occurred as PSP was requesting to suction yet more water from the Connecticut and applying for a new long-term FERC license. The next day FERC announced a major policy shift, potentially increasing both Northfield’s daytime use and its profits.

Since an 1872 landmark Supreme Court ruling indemnifying Holyoke Dam, all hydro facilities have been required to safely pass the public’s fish, upstream and down. But that 1967 agreement had this warning: “Based on the present fragmentary data available on the Northfield Mountain Pumped Storage Project, it appears that this project poses definite limitations to an anadromous fish restoration program. These limitations involve the physical loss of eggs, larvae and young fish of both resident and anadromous species, and an orientation problem for both upstream and downstream migrants attributed to pumping large volumes of water.” Today the 20 mile reach hosting Northfield remains a migration minefield—while some 30 miles of open Vermont/New Hampshire spawning habitat above Vernon Dam sits essentially empty.

Holyoke Dam has annually lifted hundreds of thousands of shad and herring upstream since the 1970s. In 2017 it recorded its second highest shad numbers ever, 537,000 fish. Each spring, half or more of those shad attempt to pass Turners Falls. Less than 10-in-100 will succeed. Of those, some 50% drop from tallies and are never re-counted at Vernon Dam after entering the 20 miles impacted by Northfield. The blueback herring record at Turners Falls was 9,600 in 1986, out of the 517,000 counted 36 miles downstream at Holyoke that year. Of those 9,600 Turners herrings, just 94 reached Vernon Dam. Turners Falls saw another 7,500 blueback herring in 1991; just 383 reappeared upstream at Vernon.

Any new long-term FERC license must comply with federal and state law protecting endangered and public-trust fish. In seeking a new license, PSP’s main proposal for limiting Northfield’s massive carnage has been the test-anchoring of a few yards of Kevlar netting in the riverbed in front of the plant’s suction-and-surge tunnel. Those flag-sized yards of mesh, after a few months deployment, are supposed to effectively model how a 1,000 foot-long “exclusion net”–deployed seasonally in the river over the next decades, might halt the entrainment deaths of out-migrating adult–and millions of juvenile young-of-the year fish, heading back to the sea. Presumably, Northfield’s mouth would remain wide open to the ecosystem’s fish throughout the rest of the year.

In light of longstanding research the US Fish & Wildlife Service, Atlantic States Marine Fisheries Commission and Connecticut River Atlantic Salmon Commission have set shad passage goals requiring that a minimum of 397,000 pass Turners Falls; and a minimum of 226,000 pass Vernon Dam. It’s a certainty that a new fish lift will be required at Turners Falls under any new license, modeled on the long-term success of Holyoke’s lifts. But the ultimate question is this: can Northfield comply with federal and state law protecting the four-state ecosystem’s fish in order to be granted a new FERC license?

END

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

VALID LICENSE REQUIRED

Posted by on 14 Jun 2018 | Tagged as: 5-year FERC licensing process, American shad, Connecticut River, Connecticut River migratory fisheries restoration, federally-endangered Connecticut River shortnose sturgeion, FERC, Fish and Aquatics Study Team, National Marine Fisheries Service, National Marine Fisheries Service, New Hampshire, Northfield Mountain Pumped Storage Station, shortnose sturgeon, Society of Environmental Journalists, US Fish & Wildlife Service, USFWS, Vermont

Copyright © 2018 by Karl Meyer

(Note: the following piece appeared under “News Analysis” on the front page of The Montague Reporter‘s May 24, 2018 issue. www.montaguereporter.org)

VALID LICENSE REQUIRED

Is FirstLight Power Resources attempting an end run around the Federal Energy Regulatory Commission relicensing process for its Northfield Mountain Pumped Storage station on the Connecticut River? FirstLight’s parent owner, Canada’s Public Sector Pension Investments, is now offering up use of the giant power re-generation and transfer machine in a bidding process that won’t begin delivering electricity until 2023. The actual bidder is Deepwater Wind, in a partnership with British energy giant National Grid. One option included in their proposal is to relay clean, renewable wind power generated off Martha’s Vineyard, 125 miles across New England to be stored for peak-price regeneration back into the grid at Northfield. This offer is being floated despite the fact that NMPS won’t have a new FERC license requiring long-overdue river protections under federal and state environmental law until at least mid-2019.


Above: surface boom on the Connecticut at the intake of the Northfield Mountain Pumped Storage Station which inhales the river at 15,000 cubic feet per second for hours on end. Results are the “functional extirpation” of all aquatic life pulled in–ultimately shot twice through the turbines on a Northfield Mountain sleighride. It’s sucking vortex reaches over halfway across the Connecticut. (Click, click again, and AGAIN to enlarge).

For 46 years Northfield Mountain has lived off the Connecticut River, its operations subsidized at public expense by the host of deadened aquatic life it chokes from a four-state ecosystem. Just days from now Massachusetts officials are expected to choose among a handful of proposals for the future delivery of up to 1600 future megawatts of “clean, renewable” wind power. But would an agreement including NMPS be legal and binding without a full vetting and understanding of those future license requirements for coming decades? Wouldn’t it be subject litigation by the state and federal agencies now working on studies and agreements for that license? Is there any connection to this proposal with the all-but-secret Valentine’s Day visit by embattled EPA chief Scott Pruitt and FERC Commissioner Neil Chatterjee with NMPS officials?

There’s great irony in this proposed “clean energy” marriage-of-convenience, given that NMPS virtually kills all life it encounters by sucking the Connecticut backward, aside and uphill at the ponderous rate of 15,000 cubic feet per second. Think 15,000 milk crates each second for hours at a time. Everything from tiny fish eggs to adult resident and migratory fish get sent on a two mile-long Northfield Mountain sleigh ride, twice through the turbines. The accepted term for everything drawn into that suction cone is “functionally extirpated.” Dead.

In 2010, Northfield sat stilled and broken for over half a year–sanctioned by the EPA for gross violation of the Clean Water Act and its FERC operating license. The region’s electric grid held together just fine, while American shad passage success skyrocketed at Turners Falls dam toward Vermont and New Hampshire. That migration run, profoundly impacted by NMPS operations, soared to 700 percent above the decade’s yearly averages.

Northfield’s extreme environmental downsides should render it an ineligible option for long-term, wind power storage at this time. A half decade from now, new distributed electricity generation and state-of-the-art micro-grid storage options will be standard configurations for combating the security risks of bulk grid power storage and climate disruption in energy delivery. Unlike pumped storage, these options will feature the instantaneous, millisecond reaction and response times necessary to balance computer-age power glitches.

Northfield, a one-trick pony, is a bulk system designed long ago to profit from a buy-low/sell-high scheme by running off the cheap, overproduced megawatts cranked out by the now-closed Vermont Yankee nuclear plant. In 2016, in the midst of relicensing, Canada’s PSP Investments became NMPS’s third venture capital purchaser in just over a decade. Today it runs on fossil fuel-produced electricity as it sucks massive gulps of the Connecticut into its 5 billion gallon reservoir. A hike to that reservoir will illustrate what the stilled-water sound of a silent spring is.

Little was known about Northfield’s deadly future when its construction began in 1967, in tandem with Vermont’s only nuclear plant. Despite that black hole, this plant that can literally suck the Connecticut into reverse for a mile downstream under low flow conditions began operating just 10 miles from the Vermont/New Hampshire border in 1972. The Federal Power Commission granted it what became a license to kill at public expense—without a basic knowledge of its crippling impacts on shad and blueback herring under the 1965 Anadromous Fish Conservation Act, or its role in imperiling the spawning success of the federally-endangered Connecticut River shortnose sturgeon under the Endangered Species Act.

When demand and prices are high, NMPS sends its deadened river water back downhill through the turbines again, cranking out a few hours of peak-priced, secondhand electricity in a final juicing of all it’s inhaled. That net-energy-loss process is wholly subsidized by mining the life from critical reaches of a four-state ecosystem. Once its reservoir is emptied, NMPS itself is literally dead in the water, and must import new, virgin electricity to begin the process again. Northfield is an energy consumer and will never produce a single watt of its own power. The more often it runs the more river life it will kill into the future.

FirstLight/PSP Investments would do well to understand their giant electric appliance cannot be relicensed without stakeholders–from federal and state fisheries agencies to the Federal Energy Regulatory Commission, ensuring a new license adheres to all federal and state environmental laws of the United States. Without a signed license, Bay State officials should leave this proposal on the table. There are other fish in the sea.

Karl Meyer has been a stakeholder and member of the Fish and Aquatics Study Team in the current FERC relicensing process for the Northfield Mountain and Turners Falls projects since 2012. He is a member of the Society of Environmental Journalists.

DON’T SHORT-SELL NEW ENGLAND’S GREAT RIVER

Posted by on 17 Mar 2017 | Tagged as: Alex Haro, American Whitewater, Andrew Fisk, Bob Nasdor, Caleb Slater, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, Connecticut River Watershed Council, CRWC, Dr. Boyd Kynard, ecosystem, Endangered Species Act, ESA, Federal Energy Regulatory Commission, federally-endangered Connecticut River shortnose sturgeon, federally-endangered shortnose sturgeon, FERC, FERC licensing process, FirstLight, Holyoke Gas & Electric, John Warner, MA Division of Fish and Wildlife, National Marine Fisheries Service, National Marine Fisheries Service, NMFS, NOAA, Northfield Mountain Pumped Storage Station, PSP Investments, public trust, Relicensing, Sean McDermott, Society of Environmental Journalists, The Nature Conservancy, Turners Falls, Turners Falls dam, US Fish & Wildlife Service, US Geological Survey

(Note: the following piece appeared in The Recorder, www.recorder.com, on March 11, 2017 under the heading: “Who will protect Connecticut River?”)

DON’T SHORT-SELL NEW ENGLAND’S GREAT RIVER

Copyright © 2017 by Karl Meyer

Canadian investors are looking to purchase the Connecticut River for a few decades, cheap and quick. Canada’s Public Sector Pension Investment Board bought up the Northfield Mountain Pumped Storage Station and Turners Falls hydro complex last year as part of PSP Investments. Their New England power play comes in the middle of the 5-year relicensing process for both facilities. That Federal Energy Regulatory Commission process will decide future conditions impacting this four-state ecosystem for decades.

The long-failed Cabot Station Fish Ladder on the Connecticut and competing flows flushing down the Turners Falls Power Canal’s Emergency Spillway. (Note:CLICK, THEN CLICK AGAIN TO ENLARGE.)

Thus, PSP may soon hold sway over what’s long been the most desolate 10-mile stretch of the entire Connecticut. It includes 2.1 miles of riverbed sitting empty for months at a time below Turners Falls Dam. It also includes the reach where, nearly 20 years back, federal fisheries expert Dr. Boyd Kynard found his boat being yanked backward—the Connecticut pulled into reverse by the suction of the Northfield Mountain Pumped Storage Station while he was drifting for bass a mile downstream near the French King Bridge. Looked at fully, it encompasses the entire reach where a 50 year federal migratory fisheries restoration program has long foundered.

On March 7th, after four years of meetings, thousands of pages of reports–and with volumes of study information incomplete and disputed, owners of these FirstLight-branded facilities are hoping select interests agree to take licensing talks underground. They’ll be fishing for backroom deals at a Boston area hotel well before this process has had a full public vetting. FL wants to take this little party private, fast. They’re asking invitees to agree to an embargo on public information about settlement talks, positions and decisions.

The key phrase in their invitation reads: “Because this meeting is intended to initiate confidential settlement discussions, it will not be open to the press or general public.” That’s FirstLight’s Director of Massachusetts Hydro Gus Bakas. His selected invitees include the National Oceanographic and Atmospheric Administration(Sean McDermott), US Fish & Wildlife Service(John Warner), US Geological Survey(Alex Haro), MA Fish & Wildlife(Caleb Slater), towns including Erving, Gill, Northfield, Montague, the Franklin Regional Council of Governments, The Nature Conservancy(Katie Kennedy), the Connecticut River Watershed Council(Andrew Fisk), and American Whitewater(Bob Nasdor).

That FirstLight stipulation is part of the quick-bait to get stakeholders thinking the time is right to cut deals. Sign-up, shut up; then we’ll talk. Cash out with what you can get for your agency, town, non-profit; or your fun-time rafting interests. Promises from this venture capitalist firm–in what’s become an ownership merry-go-round for these facilities, will surely all come true.

Ironically, many of these invitees descend directly from those who failed to step in and step up for the decimated river here decades back. They’re agencies and so-called watchdogs who failed to enforce laws and conditions negotiated when they were signatories to settlement talks for NMPS and Turners Falls nearly 40 years back–and for the 1999 FERC license negotiated for Holyoke Dam as well. At that site, Holyoke Gas & Electric just finally completed required improvements for endangered shortnose sturgeon last spring. Their license had mandated they be completed in 2008. Eight years, nine–no suits, no injunctions; no action.

Maybe that’s because the Watershed Council’s board chair works for HG & E, or because a significant number of board members are retirees from the region’s legacy power companies. Or, might it be because CRWC receives grant monies from National Marine Fisheries, US Fish & Wildlife, and MA Division of Fisheries, that these agencies were never taken to court for the withering spawning conditions and crippling flows experienced by federal trust American shad and federally endangered sturgeon in the reaches from Turners Falls to Northfield?

So who can our river look to for environmental protections under the National Environmental Policy Act, the Fish and Wildlife Coordination Act, the Endangered Species Act, and the Clean Water Act in the future?

Fourteen months remain in this relicensing. Key reports won’t be available until April, while other critical study information won’t be out until July. Some studies may need repeating. The best future for New England’s River will not be well served by quick-and-dirty agreements made in the shadows. Remember, Dear Stakeholders, it’s your names that will be forever associated with the conditions on a future Connecticut River—the river your grandchildren will be relying on. This is no time to sell the Connecticut short. What’s your price for a river’s soul?

Karl Meyer of Greenfield is on the Fish and Aquatics Study Team in the FERC relicensing for the Northfield Mountain and Turners Falls hydro facilities. He is a member of the Society of Environmental Journalists.

(Note: Bob Nasdor is former director of the Massachusetts Commission on Open Government.)

END