CommonWealth Magazine

Archived Posts from this Category

The Connecticut River BUZZ: the NO LICENSE TO KILL podcast with WHMP host Buz Eisenberg, and the LATEST FERC citizen filings

Posted by on 30 Jan 2022 | Tagged as: Andrew Tittler, Buz Eisenberg, CommonWealth Magazine, Connecticut River, Connecticut River ecosystem, Connecticut River Refuge, Connecticut River shortnose sturgeon, CRC, crippled ecosystem, critical habitat, E-Comments, ecosystem, Endangered Species Act, ESA, Federal Energy Regulatory Commission, FERC, FERC Comments, FERC license, FirstLight, Jesse Leddick, Kathleen Theoharides, MA Department of Energy and Environmental Affairs, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Martin Suuberg, Martin Suuberg: Commissioner MA Department of Environmental Protection, Mr. Jesse Leddick, Mr. Mark S. Tisa, Nation's best landscaped sewer, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, right-to-know, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, US Fish & Wildlife Service, USFWS, Wendi Weber, WHMP

The Connecticut River BUZZ: hear the NO LICENSE TO KILL podcast with WHMP host Buz Eisenberg, Greenfield Community College professor and attorney focused on civil liberties and human rights. Eisenberg represented detainees at Guantánamo Bay for 12 years beginning in 2004.

VALLEY CITIZENS CONTINUE TO HOLD OFF FirstLight’s plans in their fight for a living river; see their latest NO NEW NORTHFIELD FERC LICENSE on-the-record testimonies and the WHMP Afternoon Buz podcast link, BELOW:

1/27/2022: FirstLight’s crumbling, manganese-weeping Connecticut River banks adjacent to the Rock Dam river pool–beleaguered spawning and nursery site for the federally-endangered shortnose sturgeon.

* Legitimate watchdogs file INJUNCTIONS the second they find corporate infractions. They don’t look the other way in the face of ecosystem destruction for decades…

https://whmp.com/podcasts/the-afternoon-buzz-1-25-22/

Manganese-laced slurry directly entering critical habitat for the shortnose sturgeon. CRC refused to take water samples at this site, though they want to open it up to kayaks and rafts, and the attendant swimming that occurs here.

Document Accession #: 20220127-5119 Filed Date: 01/27/2022
Cynthia Lawton-Singer, Conway, MA.

“I strongly oppose the relicensing of the Northfield Mountain hydroelectric plant. The system requires more energy input to power itself than the energy that it will create. This contraption regularly disrupts and destroys the ecology of the river as it sucks every living organism out of the river and passes it through turbines. In doing this and then releasing the water from the mountain-top reservoir back into the river, the flow of the Connecticut River is reversed, once again disrupting the living creatures in the mile up and down stream from the outlet. The pump is powered by natural gas. A gas-powered pumping machine that seriously disrupts a MAJOR , four-state river’s ecology ( including endangered species, the Short-nosed Sturgeon), and is a net-energy CONSUMER, has no business calling itself a “green” or “sustainable.”

The damage done, in addition, to the river banks and to the aesthetic appeal of the Connecticut River leaves the Northfield community with a damaged and unappealing natural resource. The River should be an asset that will help the economy of the town bringing in tourists and sports-persons. Because of the disturbances on the river, none of the potential ecological or economic value of the Connecticut River is available to the Town of Northfield Massachusetts or to any of the upstream communities in Vermont and New Hampshire which would benefit from a return of the Short-nosed Sturgeon and a living river. We MUST not continue to make the mistake made 50 years ago and relicense this monstrosity. Another fifty years of this will seal the fates of countless species and deprive communities along the entire course of this river of a living beautiful, healthy Connecticut River. Again, PLEASE DO NOT relicense! Think of future generations. Thank you for your serious consideration of these objections.”
Any credible watchdog would have filed for an INJUNCTION for the deadly, suctioned and reversed river miles at Northfield Mountain, and the grim conditions for endangered sturgeon years ago. It would long-ago have been placed IN-THE-RECORD and prominent–as critical defense in this FERC relicensing. A poser would tell people that its fine to wait until AFTER federal and state agencies sign a secret 50-year settlement deal with FirstLight. A 70 year-old organization without a single staff lawyer would have people believe they can fix these little problems afterward

Document Accession #: 20220125-5000 Filed Date: 01/25/2022
Andy Rothschild, Greenfield, MA.

“Given the environmental challenges that our planet and its inhabitants face today and the increasing challenges that it will face over the next fifty years, it doesn’t make any sense to me to relicense the Northfield Station. The system requires more energy input to power itself than the energy that it will create. All the while, doing damage to the Connecticut River, its banks and the fish within it. Please think long and hard about the damage that would be done in the present and for the next crucial fifty years of our planet’s existence. Thank you.”

Document Accession #: 20220124-5001 Filed Date: 01/24/2022
Anna, Arlington, MA.

“I strongly oppose the relicensing of the Northfield Mountain hydroelectric plant. While shifting energy production to renewables is a pertinent step in battling the climate crisis, such a transition must be done in a manner that takes necessary precautions. This hydro plant reverses river flow and disrupts essential ecosystems of the Connecticut River. It is powered by natural gas. These two facts alone are reason enough to reconsider calling this project “green” or, even remotely sustainable. The Connecticut River, home to globally significant tidelands and 10 federally threatened aquatic species, is a watershed that spans four different states: VT, NH, MA, and CT. An estimated 2 million people live in the CR watershed. It is with utmost importance that we protect the river, not further degrade it’s well-being. The Northfield Mountain hydro plant should therefore be denied recertification.
Thank you.”

HERE ARE THE RESPONSIBLE DEPARTMENT OFFICIALS AND THEIR NEGOTIATION REPRESENTATIVES who are meeting behind closed doors with FirstLight:

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; Martin Suuberg, Commissioner of MA Dept. of Environmental Protection; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife.

AGAIN, if you haven’t yet submitted testimony–or know of others who want to defend our River’s right to survive as a living system, here’s the FERC formula to share:

Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

This is THE PUBLIC’S RIVER!

NOTE: River ecosystem protection is inextricably linked to uplands and forests: see this great piece from Commonwealth Magazine:
https://commonwealthmagazine.org/opinion/use-our-forests-to-fight-climate-change/

CONNECTICUT RIVER pumped storage: assault and battery on an ecosystem at a tipping point

Posted by on 19 Apr 2018 | Tagged as: 5-year FERC licensing process, CommonWealth Magazine, Connecticut River, Connecticut River ecosystem, Connecticut River shortnose sturgeon, Conte National Fish & Wildlife Refuge, Drew Huthchison, Federal Energy Regulatory Commission Chairman, federally-endangered Connecticut River shortnose sturgeion, FERC, FirstLight, Local Bias, MA Division of Fish and Wildlife, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Station, pumped storage, Turners Falls, Turners Falls power canal, US Fish & Wildlife Service, wildlife refuge

Connecticut River Pumped Storage: assault and battery on an ecosystem at a tipping point

Copyright © 2018 by Karl Meyer. All rights reserved.

Downstream end of the starved and brutalized 10 mile reach of the Connecticut, looking upstream from just above the Deerfield River confluence. (Click, then click again to enlarge).

The following links offer the most up-to-date understanding of current and future conditions in the most embattled, crippled reach of the entire Connecticut River. It consists of the Massachusetts river corridor from Greenfield/Turners Falls above the Connecticut’s confluence with the Deerfield, to some 10 miles further upstream to beyond the immediate and deadly impacts of the Northfield Mountain Pumped Storage Station.

Most stakeholders in the ongoing 5-year (now into it’s 6th year) FERC licensing process for the Northfield Mountain Pumped Storage and Turners Falls hydro projects have signed confidentiality agreements with FirstLight. Though relicensing studies on the impacts of these facilities on fish and aquatic life will continue through this fall, signed-on stakeholders have now been participating in closed-door settlement discussions out of the public eye with FirstLight for nearly a year. Any negotiated–or FERC-mandated, river conditions under a new license will be permanently in place for decades on this key US ecosystem that is part and parcel of the watershed-wide Silvio O. Conte National Fish and Wildlife Refuge. They must comply with federal and state environmental law. FirstLight is a MA-registered, Canadian-owned subsidiary of PSP Investments–a 100% Canadian Crown-owned corporation.

Thus, the National Marine Fisheries Service, US Fish and Wildlife Service, MA Division of Fisheries & Wildlife, and state agency representatives from four New England states are charged with ensuring the Connecticut River ecosystem gets the long-awaited critical environmental protections for its US public trust fish and efforts to restore both the federally-endangered Connecticut River shortnose sturgeon, and the foundered half-century old mandate to bring migratory fish back to Vermont and New Hampshire–as both abundant resources for sport fishing, and seafood. That is their actual federal mandate, in place since 1967.

Given the embargo on public information in these closed-door settlement talks, people interested in the survival of the Connecticut River ecosystem and a viable four-state river for generations to come may find information contained in the following links helpful.

The first link is a piece published by CommonWealth Magazine in March. https://commonwealthmagazine.org/opinion/this-energy-storage-is-tough-on-connecticut-river/

The second is an interview by Drew Hutchison, creator of Local Bias, at Greenfield Community Television, also from March. Public participation information is included along with the credits at the end of the video. This is Local Bias production # 172.
https://www.youtube.com/watch?v=ivbXCGAwKWw