Andrew Tittler

Archived Posts from this Category

The Connecticut River BUZZ: the NO LICENSE TO KILL podcast with WHMP host Buz Eisenberg, and the LATEST FERC citizen filings

Posted by on 30 Jan 2022 | Tagged as: Andrew Tittler, Buz Eisenberg, CommonWealth Magazine, Connecticut River, Connecticut River ecosystem, Connecticut River Refuge, Connecticut River shortnose sturgeon, CRC, crippled ecosystem, critical habitat, E-Comments, ecosystem, Endangered Species Act, ESA, Federal Energy Regulatory Commission, FERC, FERC Comments, FERC license, FirstLight, Jesse Leddick, Kathleen Theoharides, MA Department of Energy and Environmental Affairs, MA Division of Fish and Wildlife, MA Natural Heritage and Endangered Species Program, Martin Suuberg, Martin Suuberg: Commissioner MA Department of Environmental Protection, Mr. Jesse Leddick, Mr. Mark S. Tisa, Nation's best landscaped sewer, NMFS, Northfield Mountain, Northfield Mountain Pumped Storage Station, right-to-know, shortnose sturgeon, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, US Fish & Wildlife Service, USFWS, Wendi Weber, WHMP

The Connecticut River BUZZ: hear the NO LICENSE TO KILL podcast with WHMP host Buz Eisenberg, Greenfield Community College professor and attorney focused on civil liberties and human rights. Eisenberg represented detainees at Guantánamo Bay for 12 years beginning in 2004.

VALLEY CITIZENS CONTINUE TO HOLD OFF FirstLight’s plans in their fight for a living river; see their latest NO NEW NORTHFIELD FERC LICENSE on-the-record testimonies and the WHMP Afternoon Buz podcast link, BELOW:

1/27/2022: FirstLight’s crumbling, manganese-weeping Connecticut River banks adjacent to the Rock Dam river pool–beleaguered spawning and nursery site for the federally-endangered shortnose sturgeon.

* Legitimate watchdogs file INJUNCTIONS the second they find corporate infractions. They don’t look the other way in the face of ecosystem destruction for decades…

https://whmp.com/podcasts/the-afternoon-buzz-1-25-22/

Manganese-laced slurry directly entering critical habitat for the shortnose sturgeon. CRC refused to take water samples at this site, though they want to open it up to kayaks and rafts, and the attendant swimming that occurs here.

Document Accession #: 20220127-5119 Filed Date: 01/27/2022
Cynthia Lawton-Singer, Conway, MA.

“I strongly oppose the relicensing of the Northfield Mountain hydroelectric plant. The system requires more energy input to power itself than the energy that it will create. This contraption regularly disrupts and destroys the ecology of the river as it sucks every living organism out of the river and passes it through turbines. In doing this and then releasing the water from the mountain-top reservoir back into the river, the flow of the Connecticut River is reversed, once again disrupting the living creatures in the mile up and down stream from the outlet. The pump is powered by natural gas. A gas-powered pumping machine that seriously disrupts a MAJOR , four-state river’s ecology ( including endangered species, the Short-nosed Sturgeon), and is a net-energy CONSUMER, has no business calling itself a “green” or “sustainable.”

The damage done, in addition, to the river banks and to the aesthetic appeal of the Connecticut River leaves the Northfield community with a damaged and unappealing natural resource. The River should be an asset that will help the economy of the town bringing in tourists and sports-persons. Because of the disturbances on the river, none of the potential ecological or economic value of the Connecticut River is available to the Town of Northfield Massachusetts or to any of the upstream communities in Vermont and New Hampshire which would benefit from a return of the Short-nosed Sturgeon and a living river. We MUST not continue to make the mistake made 50 years ago and relicense this monstrosity. Another fifty years of this will seal the fates of countless species and deprive communities along the entire course of this river of a living beautiful, healthy Connecticut River. Again, PLEASE DO NOT relicense! Think of future generations. Thank you for your serious consideration of these objections.”
Any credible watchdog would have filed for an INJUNCTION for the deadly, suctioned and reversed river miles at Northfield Mountain, and the grim conditions for endangered sturgeon years ago. It would long-ago have been placed IN-THE-RECORD and prominent–as critical defense in this FERC relicensing. A poser would tell people that its fine to wait until AFTER federal and state agencies sign a secret 50-year settlement deal with FirstLight. A 70 year-old organization without a single staff lawyer would have people believe they can fix these little problems afterward

Document Accession #: 20220125-5000 Filed Date: 01/25/2022
Andy Rothschild, Greenfield, MA.

“Given the environmental challenges that our planet and its inhabitants face today and the increasing challenges that it will face over the next fifty years, it doesn’t make any sense to me to relicense the Northfield Station. The system requires more energy input to power itself than the energy that it will create. All the while, doing damage to the Connecticut River, its banks and the fish within it. Please think long and hard about the damage that would be done in the present and for the next crucial fifty years of our planet’s existence. Thank you.”

Document Accession #: 20220124-5001 Filed Date: 01/24/2022
Anna, Arlington, MA.

“I strongly oppose the relicensing of the Northfield Mountain hydroelectric plant. While shifting energy production to renewables is a pertinent step in battling the climate crisis, such a transition must be done in a manner that takes necessary precautions. This hydro plant reverses river flow and disrupts essential ecosystems of the Connecticut River. It is powered by natural gas. These two facts alone are reason enough to reconsider calling this project “green” or, even remotely sustainable. The Connecticut River, home to globally significant tidelands and 10 federally threatened aquatic species, is a watershed that spans four different states: VT, NH, MA, and CT. An estimated 2 million people live in the CR watershed. It is with utmost importance that we protect the river, not further degrade it’s well-being. The Northfield Mountain hydro plant should therefore be denied recertification.
Thank you.”

HERE ARE THE RESPONSIBLE DEPARTMENT OFFICIALS AND THEIR NEGOTIATION REPRESENTATIVES who are meeting behind closed doors with FirstLight:

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; Martin Suuberg, Commissioner of MA Dept. of Environmental Protection; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife.

AGAIN, if you haven’t yet submitted testimony–or know of others who want to defend our River’s right to survive as a living system, here’s the FERC formula to share:

Go to: www.ferc.gov; then to “Documents and Filings”; then click on the “Quick Links” tab for FERC Online on the right; and then to “eComment” on the page that opens. Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),” and BE SURE TO use Northfield’s FERC project number, P-2485, to enter your comments.

This is THE PUBLIC’S RIVER!

NOTE: River ecosystem protection is inextricably linked to uplands and forests: see this great piece from Commonwealth Magazine:
https://commonwealthmagazine.org/opinion/use-our-forests-to-fight-climate-change/

CONSENSUS BUILDS AGAINST RELICENSING NORTHFIELD MTN: YOU CAN STILL BE HEARD!!!

Posted by on 06 Dec 2021 | Tagged as: Andrew Tittler, Connecticut River, Connecticut River ecosystem, Connecticut River migratory fisheries restoration, E-Comments, Federal Energy Regulatory Commission, federal trust fish, FERC, FERC Secretary Kimberly D. Bose, FirstLight Power, Greenfield Recorder, Julie Crocker, MA Division of Fish and Wildlife, Massachusetts DEP, Massachusetts Division of Fish & Wildlife, Mr. Jesse Leddick, Mr. Mark S. Tisa, National Marine Fisheries Service, Northfield Mountain, Northfield Mountain Pumped Storage Station, P-2485, PSP Investments, public trust, Silvio O. Conte Connecticut River National Fish and Wildlife Refuge, The Daily Hampshire Gazette, US Fish & Wildlife Service, Wendi Weber


GREENFIELD MA. November 30, 5:58 am: River protector Dave Dersham of Northampton MA sets out on a 20 mile hike from Greenfield to deliver a “No License to Kill” message to the US Fish & Wildlife Service at their Hadley HQ. Photo Copyright © 2021 by Karl Meyer

YOU CAN STILL BE HEARD!!!!!

*BE PART OF THE “SAVE OUR RIVER” HOLIDAY CAMPAIGN: READ BELOW!*

Public demonstrations, public comments to the Federal Energy Regulatory Commission, and opinion pieces in the media all point to a gelling opposition to any FERC relicensing of FirstLight’s Northfield Mountain Pumped Storage Station. The coalescing opinions cite Northfield’s lethal impact on fish, it’s massive river-reversing ecosystem destruction–plus the profit motives of its Canadian venture capital owners. (* *See the 3 new public comment letters posted by FERC today, 12/06/2021, at the end of this message.)

Last Thursday, December 2, FirstLight gathered behind closed doors with the US Fish and Wildlife Service, National Marine Fisheries, MA Division of Fish and Wildlife, MA Department of Environmental Protection and American Whitewater in what the Canadian-owned company termed “final” settlement negotiations. There was no daylight for the public to bear witness, and no way to know how far they reached toward a final signing agreement on relicensing this disaster or ending heart-stopping ecosystem flow reversals and inhalation of 100s of millions of fish.


RECEPTION at USFWS HQ, Hadley MA, November 30, 4 pm. Photo Copyright © 2021 by Karl Meyer

What’s certain is the big horse-trading was on the table–with our public trust agencies holding our cards in the form of standing up for long-established environmental law and the ecosystem defense that future generations are counting on. Our River, our Refuge, OUR FISH!

Well it ain’t over till it’s over folks! Certainly there are issues not yet fully vetted, emails being exchanged, and last minute changes in the works from the agencies and FirstLight/PSP Investments’ big lawyers.

IN SHORT, nothing has been signed yet!

There remains time to get your comments in to the media, your public trust federal/state agency representatives (emails below), to FERC (address below), and cc’ed to your representatives—all of which are impactful.

HERE IS WHY: in FirstLight’s own words & schedule, filed with FERC November 12, 2021.

“FirstLight MA Hydro LLC submits request for FERC to delay issuance of Ready for Environmental Assessment Notice under P-1889, et al.”

AND, word-for-word, FirstLight’s Timeline to FERC:

“December 2021/January 2022 – parties schedule meeting or meetings of combined groups (fish/flows and recreation/cultural) to discuss overlapping issues. Parties provide status update to the Commission no later than December 31, 2021.

January 2022 – parties work toward achieving a conceptual agreement that can be filed with the Commission on or about January 31, 2022.”


At US Fish & Wildlife HQ, Hadley MA. Photo Copyright © 2021 by Karl Meyer

WHICH is to note FirstLight’s sending the settlement outline “to the Commission no later than DECEMBER 31, 2021.”

THUS, if you make your public statement NOW–ahead of when everyone heads home for the holiday break, you can impact this secret, looming train wreck and help make a difference for future generations. Northfield Mountain has been a half century long disaster. You have the information. Short, concise comments—-to the media, cc’ed to your public trust agency officials, and sent as comments to FERC is what matters NOW. There are 3 new public comments shared below.

Directly below are the federal and state department heads and the public trust officials with long-term seats at the negotiating table:

wendi_weber@fws.gov, Director Region 5 US Fish & Wildlife Service; andrew.tittler@sol.doi.gov, lead council at the table for USFWS; melissa_grader@fws.gov, at the table for our migratory fish; julie.crocker@noaa.gov, National Marine Fisheries Service Endangered Fish Recovery Branch Chief (endangered sturgeon); william.mcdavitt@noaa.gov, at the table for our migratory fish; mark.tisa@state.ma.us, Director of the Division of Fisheries and Wildlife, jesse.leddick@state.ma.us, Chief of Regulatory Review MA Division of Fisheries & Wildlife.

SEND them your Letter; forward it to the MEDIA for the public record—and…

THEN, file it with FERC for the OFFICIAL LICENSE RECORD.
Here’s the final step: TO FERC:

Go to www.ferc.gov . Go to Documents and Filings, or simply find the “file E-Comment” link if you see it. Once there, make sure you have this official number for Northfield Mountain Pumped Storage Station, and USE IT. “P-2485.” In E-Comment you are filing comments under Hydro, in the Washington DC office, c/o FERC Secretary Kimberly D. Boles–and that FERC Project number, again is P-2485. Write in your comments and then hit send. DONE!

THIS ONE IS NEW TODAY! Followed by the 3 filed over the weekend:

Document Accession #: 20211207-5027 Filed Date: 12/07/2021

Mike Cournyn, Sudbury, MA.
Please reject the application for this license. It is hard to express how wrong this system is on so many levels. It is even harder to try and justify usefulness. More power is USED than is CREATED. The death and disruption of the ecosystem for a few dollars profit. I am amazed it was even allowed inthe first place. Please do the right thing.

Document Accession #: 20211206-5059 Filed Date: 12/06/2021

Malcolm G Everett, NORTHAMPTON, MA.
I am writing to express my deep concern about the impact of the Northfield Mountain Pumped Storage Facility on the ecosystem of the Connecticut River. I believe the damage this system causes to species native to the river justifies the non-renewal of its license to operate. I understand it is viewed as a way to meet peak electricity demand, but I think there are better
ways being developed to solve this problem without causing damage to the life forms in the river. The owner of this facility has no right to cause such damage to the delicate systems of life that have evolved long before the facility existed. Thank you for considering my concern.

Document Accession #: 20211206-5009 Filed Date: 12/06/2021

C Grecsek, SUNDERLAND, MA.
I am writing to express my opposition to the re-licensing of the Northfield Mountain Pumped Storage facility. The system costs in energy, and especially in ecological damage, are too high.

The Connecticut River flows backward when the pumps are engaged, an unnatural and harmful process. In addition, the turbines kill countless fish and other river dwellers. The generation of electricity should not need to use so much energy to operate nor should it result in such senseless destruction of an ecosystem.

We have made great strides in the improvement of the Connecticut River from when it was essentially an open sewer, but there is more work to do to repair the harm we have caused, including the cessation of this damaging system.

Thank you

Document Accession #: 20211206-5008 Filed Date: 12/06/2021

robert arbib, cummington, MA.
Please reject the application of Firstlight to operate Northfield Mt.for another 50 years.This pumping station causes terrible disruption of the natural flow of the Connecticut River.I know as I canoe on this section of the river. Natural flows necessary for the life cycles of various vertebrates and invertebrates are disrupted, fish and other animals are shredded going up
through the pumps,the flow of the river is reversed during pumping and shallow areas are washed out and eroded as water is released.Firstlight will say they are addressing these concerns but they will promise anything to get a renewal. Please don’t believe their B.S,

Their model is to use massive amounts of power to pump water up. only to profit through ‘generation’ when rates are higher, It is not worth the damage to the river to generate not really new power but only profits for this Canadian company.

Photo Copyright © 2021 by Karl Meyer