Connecticut River shortnose sturgeon: a spectacular failure to protect
Copyright © 2020, by Karl Meyer. All rights reserved.

Photo Copyright © 2020, by Karl Meyer (click X3 to enlarge)
Well over 4 months since I registered my October 9, 2019 Comments describing critical erosion and polluting impacts on the Connecticut River at fragile habitat at the Rock Dam in Turners Falls–the sole documented natural spawning site for the federally endangered shortnose sturgeon in this river FirstLight Power Resources received instructions from the Federal Energy Regulatory Commission’s Christopher Cheney at the Office of Hydro Compliance. On February 21, 2020, they included the following:

“Dear Mr. Traester:

On October 9, 2019, we received a complaint regarding erosion in the bypassed reach of the Turners Falls Project No. 1889. According to the complaint, releases from the dam caused erosion in the area known as the Rock Dam in the project’s bypassedreach. For us to complete our review of the of the complaint, please file the followinginformation within 30 days of the date of this letter:

1. Photographs and the location(s) and an estimate of the extent(s) (e.g., height, width, depth) of the erosion in the bypassed reach identified in the October 9, 2019complaint.”

Here are some key points, verbatim, from my October 9, 2019 letter, including impacts on this fragile endangered-species spawning site and habitat—and addressing as well, federal and state laws and license conditions:

“In recent weeks I have noted increasingly steady water leakage in the riverbanks above the Rock Dam site, leading to constant water flow intrusions along these banks. Less than 400 feet away sits the downstream, outer-right banking curve of the Turners Falls power canal, which is the apparent source of these increasing water intrusions.
Photo Copyright © 2020, by Karl Meyer.

In a visit to the Rock Dam site on October 8, 2019, I noted the dramatic collapses of a long section of riverbank adjacent to the Rock Dam. This collapse, of some 25 feet in width and dropping down between 5 – 10 feet toward the river, is apparent in my attached photo. Please note that the draped yellow jacket in the foreground is approximately 3-1/2 feet across. This new bank collapse is just south, by perhaps 30 feet, from an earlier recent collapse of a smaller scale of some 6 feet across, occurring at approximately the same bank level. At both of these sites there has been a serious leaching of manganese, the red colored flow toward the river and the sand and cobbles that constitute the shortnose sturgeon spawning site and egg/embryo nursery unique to this reach. Photo Copyright © 2020, by Karl Meyer. (click X3 to enlarge)

Please take action requiring immediate remedy to this situation, which appears to concern license and statute infractions that run afoul of the federal Endangered Species Act, the Clean Water Act, and Article 17 concerning erosion; Article 19, concerning construction and maintenance; Article 18 concerning fishing access; and Article 35 concerning State Historic Preservation under the current license for P-1889.”
Photo Copyright © 2020, by Karl Meyer (click x3 to enlarge)

FirstLight responded on March 20, 2020. They included an all-but-useless satellite shot for a federal agency that has exact information on this site, and pictures of boulder-rubble that connect directly to their dumped rubble that is currently tumbling from their ancient attempts to shore up the failing Connecticut River banks above and adjacent to the TF power canal.
This is evidence of the power company’s failure in decades past. They now attempt infer that the tumbled rocks here are the work of the public and fishermen, not the failed detritus of their ongoing neglect.

FirstLight also failed to address the requested measurements from FERC. And, as to my original complaint, they leave out any mention of manganese, the intrusions and water—and it’s leaching and crumbling connections to the Turners Falls power canal; as well as failure to protect and maintain critical shortnose sturgeon spawning habitat. Nor does FL address the ESA, Clean Water Act, and current FERC license conditions required at this site. Below are excerpts from FL’s response, and below that is a link that you may be able to use to access FirstLight’s full response to FERC:

“FirstLight cannot provide dimensions of the extent of the erosion because there is no evidence of any recent erosion in this natural river channel.”
Above photo taken March 25, 2020 w/sturgeon expert Dr. Boyd Kynard at right, on the failed banks adjacent to Rock Dam. (click X3 to enlarge) Photo Copyright © 2020, by Karl Meyer.

Further, FL states, “Photographs were taken on October 29, 2019, after the October 9, 2019 complaint letter. Note moss on the rocks located within the side channel in Photos Nos. 1 and 2, indicating the preexistenceof a wet environment. Note also a Photo No. 3 showing ~12” rocks placed across the side channel. This section of the bypass reach is frequented by the public in summer months. The rocks aligned across the side channel appear to have been placed by unknown members of the general public, possibly to form a barrier or walk path across the side channel, suggesting that the channel is frequently wetted.”

You may be able to access FirstLight’s full response to FERC by copying an pasting the link below:https://elibrary.ferc.gov/idmws/file_list.asp?accession_num=20200318-5043

You may also want to Comment directly to the Federal Energy Regulatory Commission.
Here’s how:
Go to www.ferc.gov ; then to file E-Comment; from there to Documents and Filings; then to Hydro; then to Washington DC; then paste-in P-1889 for the Project # (you must have this), then check the little X Box; then address your comments to “Secretary Kimberly D. Bose” and comment away! Make sure to include your own contact information.

AND, from FERC Hydro Compliance: Christopher.Chaney@ferc.gov

Also, you may want to contact your agency representatives negotiating on the public’s behalf in the current FERC relicensing. They will assuredly forward your message to their Department Chiefs who are responsible for the CURRENT license and river conditions and enforcement:

For the National Marine Fisheries Service: julie.crocker@noaa.gov
For US Fish & Wildlife Service: ken_sprankle@fws.gov ; melissa_grader@fws.gov
For MA Div. of Fish & Wildlife: caleb.slater@state.ma.us

There’s also your federal and state/local reps: Warren, McGovern, Comerford, etc., all represent you! And, you can write to the local media—this effects all at the ground level, and into the future.

Also, a few recent radio spots addressing this issue, below, with thanks to Bob, d.o., and Glen!

The Enviro Show

The Shortnose Sturgeon are Coming to Spawn –in THIS?