How to Submit Comments to the Federal Energy Regulatory Commission (FERC)

Posted by on 16 Mar 2016 | Tagged as: E-Comments, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC Comments

P1000433

PICTURED: The Rock Dam in Turners Falls; the sole documented natural spawning site for the Connecticut River shortnose sturgeon in this ecosystem. (Click to enlarge.)

SUBMITTING INDIVIDUAL COMMENTS TO FERC: This example is from my own recent E-Comments

Write up your Comments in Letter form, FIRST

Compose comments in a Word doc, simple and direct, you are allowed up to 6000 characters in a FERC E-Comment, which leaves room for 3 or 4, concise paragraphs, sample letter at bottom:

Include DATE, your name, address, and phone

Send them care of:

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

You must include Project numbers in your submission: in this case P-2485 and P-1889 (P-2485 is Northfield Mountain; P-1889 is Turners Falls Dam and Power Canal. You can do this after your salutation!) See next two lines.

Dear Secretary Bose,

RE: P-2485 and P-1889, protecting federally-endangered Connecticut River shortnose sturgeon

This is the opening paragraph from my Stakeholder Comment:

“I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.”

Complete your Word Doc, end with your “Thank you” name, and town

Below that: indicate any individuals, agency heads or representatives you are cc-ing:

Then …..

It is not required, but you might want to register for a FERC E-Subscription for you chosen Projects, in my case, P-2485 and P-1889: Register as an individual, no affiliation. This will take a little more time, and you may choose not to. But, this way you will be Notified, with a Link to all other’s new Stakeholder Comments as they get posted.

** Also, if you get hung up anywhere along the way call the FERC 800 phone #. They are very nice!
Somewhere along the way you will have had to click on HYDRO Projects. OK, to continue…

Go to: www.ferc.gov
Go to: Documents and Filings
Go to: E-Comment
Click on: E-Comment Bar (“Does not require e-Registration”)
Fill out on-line form: All required fields
Type in the googly characters: in the field at bottom
Hit the “Authorize” button

Then: Go to your email, where you will soon receive a FERC email
Click the link that takes you to your FERC e-Comment file
Your filled-in data: will appear in the boxes

Down below is: the empty TEXT Box–your name and town will appear at the top
(Again, somewhere along you will have had to choose HYDRO Projects, not Oil or Nuclear)
In the Text Box under Docket you will see: Hydro Project Search
Below that is the Box: Enter Docket Number
Type in full project number such as: P-2485, and hit Search
P-2485 comes up, saying Northfield—Tap Plus-Bar at right to SELECT; Plus disappears
Go back in THAT SAME text box and over-write: P-1889, HIT plus-Bar again, and SELECT

NOW: Simply scroll down to the empty TEXT BOX, paste in your comments and HIT: SEND COMMENT

You will pretty quick get a FERC email thanking you for Commenting.
You’ll pretty quick get an email saying it has been received.
If you have signed up for an e-Subscription to “hydro” projects P-2485 and P-1889, within an hour a notice of your comments being entered into the FERC record will appear in your mailbox. Voila!

Click on the link to them, and you can review them. This is pretty satisfying. After which, you will get yours and all everyone else’s Comments and Protests to view. They are now part of the public record, read and reviewed by FERC, the utility, and all other fed/state Stakeholders, as well as available to the public and media.

(NOTE: the full example Comment letter below came in at 4,263 characters, with spaces—so you have some room)

** DON’T forget to copy your letter and forward to any CCs you’ve noted via email.

Pat yourself on the back–your comments are now in the Public Files for these FERC decisions.

(Here is my full comment letter, as example)

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 March 4, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.

Though my FERC Stakeholder comments of January 28, 2016 specifically addressed this ESA issue, FirstLight did not respond to the endangerment issue in its RSP revisions. Further, I had made this issue clear to FirstLight and its agents, FERC staff, and key stakeholder agencies in an email delivered on January 20, 2016. I again reiterated the endangered species impacts to those same parties in an email delivered on February 24, 2016. Madam Secretary, I again made my concerns about spawning interference and failure to you and for the FERC record in a letter delivered February 26, 2016. All are available for perusal in the FERC record for P-2485 and P-1889.

Shortnose sturgeon gather at this spawning and nursery site annually between April 22 and May 25 for pre-spawning and spawning. Further, the complex of key biological characteristics of flow, varying depths, and cobble/sand habitat provide SNS with protective options that nurture developing Young of the Year throughout June into July.

According to 17 years of published studies at that site documented by Dr. Boyd Kynard and research colleagues, a continuous minimum flow of 2500 cfs is required to protect sturgeon spawning and rearing at this site. Therefore, I PROTEST the findings of the FERC Revised Study Plan determination issued by FERC on February 25, 2016, and request that only continuous protective minimum flows of 2500 cfs be allowed in this study, and throughout the 2016 SNS spawning and rearing season, as well as all ensuing springs.

The following publication has been referenced in the FERC ILP for these projects by both federal and state stakeholder agencies, FERC, as well as FirstLight and their agents.

“LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4

“Effect of hydroelectric operations on spawning”

Page 101, bottom: “During the 11 yr spawning failed (excluding the failed migration in 2002), when discharge levels were too low for 5 yr and too high for 4 yr. During one yr (2007), discharge during April was both to low and too high. When spawning failed at RockD due to low discharge during 4 yr (1995, 1998, 1999, and 2006)m discharge decreased to <70 m3 s-1 for at least 4 d by 30 April (Fig. 14), the earlier period of low discharge likely marked a threshold making the RockD unattractive to spawning fish.”

Further published data, tables, and required flows necessary in this reach appear on pages 101-102 of LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEIONS.

I would welcome a FERC hearing on this critical ESA issue and would make myself available for testimony. Thank you for your attention to this pressing matter.

Sincerely,
Karl Meyer
Fish and Aquatics Study Team, P-2485 and P-1889

Cc’d via email to:
Brandon Cherry, FERC
James Donohue, FirstLight
Julie Crocker, NOAA
John Warner, USFWS
Caleb Slater, MA Division of Fisheries & Wildlife

Stakeholder PROTEST of FERC Revised Study Plan finding endangering Connecticut River shortnose sturgeon

Posted by on 07 Mar 2016 | Tagged as: Connecticut River shortnose sturgeon, Dead Reach, Dr. Boyd Kynard, endangerd shortnose sturgeon, Endangered Species Act, ESA, Extinction, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NMFS, NOAA, Rock Dam, Secretary Kimberly Bose, US Fish & Wildlife Service, USFWS

(The following Stakeholder testimony was submitted to FERC on March 4, 2016)

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 March 4, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485, and federally-endangered Connecticut River shortnose sturgeon, (Acipenser brevirostrum)

PROTEST of FERC-sanctioned Revised Plan for Study 3.3.19, issued to FirstLight Power Resources, Inc, in a February 25, 2016 FERC letter to Mr. James P. Donohue of FirstLight, by Vince E. Yearick, FERC Director, Division of Hydropower Relicensing.

Dear Secretary Bose,

I protest the FERC finding issued on February 25, 2016 for P-2485 and P-1889 specifically because it sanctions test flows that are documented to cause spawning failure for the federally-endangered Connecticut River shortnose sturgeon (Acipenser brevirostrum) at its only documented natural spawning site, the Rock Dam, in the Connecticut River. FirstLight has proposed and FERC has accepted Study Plan test flows of 1500 cubic feet per second in the CT River’s By Pass Reach for April, May and June 2016. That low level of flow will displace and wipe out a full season’s spawning and rearing of Young of Year life stage SNS at their ancient Rock Dam nursery site.

Though my FERC Stakeholder comments of January 28, 2016 specifically addressed this ESA issue, FirstLight did not respond to the endangerment issue in its RSP revisions. Further, I had made this issue clear to FirstLight and its agents, FERC staff, and key stakeholder agencies in an email delivered on January 20, 2016. I again reiterated the endangered species impacts to those same parties in an email delivered on February 24, 2016. Madam Secretary, I again made my concerns about spawning interference and failure to you and for the FERC record in a letter delivered February 26, 2016. All are available for perusal in the FERC record for P-2485 and P-1889.

Shortnose sturgeon gather at this spawning and nursery site annually between April 22 and May 25 for pre-spawning and spawning. Further, the complex of key biological characteristics of flow, varying depths, and cobble/sand habitat provide SNS with protective options that nurture developing Young of the Year throughout June into July.

According to 17 years of published studies at that site documented by Dr. Boyd Kynard and research colleagues, a continuous minimum flow of 2500 cfs is required to protect sturgeon spawning and rearing at this site. Therefore, I PROTEST the findings of the FERC Revised Study Plan determination issued by FERC on February 25, 2016, and request that only continuous protective minimum flows of 2500 cfs be allowed in this study, and throughout the 2016 SNS spawning and rearing season, as well as all ensuing springs.

The following publication has been referenced in the FERC ILP for these projects by both federal and state stakeholder agencies, FERC, as well as FirstLight and their agents.

“LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEONS, 2012, by Boyd Kynard, Paolo Bronzi et al, World Sturgeon Conservation Society: Special Publication # 4

“Effect of hydroelectric operations on spawning”

Page 101, bottom: “During the 11 yr spawning failed (excluding the failed migration in 2002), when discharge levels were too low for 5 yr and too high for 4 yr. During one yr (2007), discharge during April was both to low and too high. When spawning failed at RockD due to low discharge during 4 yr (1995, 1998, 1999, and 2006)m discharge decreased to <70 m3 s-1 for at least 4 d by 30 April (Fig. 14), the earlier period of low discharge likely marked a threshold making the RockD unattractive to spawning fish.”

Further published data, tables, and required flows necessary in this reach appear on pages 101-102 of LIFE HISTORY AND BEHAVIOUR OF CONNECTICUT RIVER SHORTNOSE AND OTHER STURGEIONS.

I would welcome a FERC hearing on this critical ESA issue and would make myself available for testimony. Thank you for your attention to this pressing matter.

Sincerely,
Karl Meyer
Fish and Aquatics Study Team, P-2485 and P-1889

Cc’d via email to:
Brandon Cherry, FERC
James Donohue, FirstLight
Julie Crocker, NOAA
John Warner, USFWS
Caleb Slater, MA Division of Fisheries & Wildlife

FERC sanctions crippling flows for federally-endangered Connecticut River shortnose sturgeon

Posted by on 01 Mar 2016 | Tagged as: 5-year FERC licensing process, endangerd shortnose sturgeon, Endangered Species Act, Federal Energy Regulatory Commission, federally-endangered shortnose sturgeon, FERC, FirstLight, Fish and Aquatics Study Team, GDF-Suez FirstLight, MA Division of Fish and Wildlife, National Marine Fisheries Service, NOAA, US Fish & Wildlife Service

The following Stakeholder Comments concerning proposed study flows that will wipe out this season’s spawning for federally-endangered Connecticut River shortnose sturgeon at their only documented natural spawning site in the river system were submitted to FERC Secretary Cheryl on Friday, February 26, 2016. They include comments submitted on Wednesday, February 24, 2016 to FERC staff, federal and state fisheries agents responsible for endangered species protection, and FirstLight–who proposed to include the crippling 1500 cfs(cubic feet per second) flows in FERC-ordered Study 3.3.19.

On Thursday, February 24, 2016, Vince E. Yearik, FERC Director of the Division of Hydropower directed FirstLight’s James Donohue that the ruinous 1500 cfs flows will be allowed at the Connecticut River shortnose sturgeon’s only documented natural spawning site in the spring of 2016.

My Stakeholder Comment letter, on the FERC official record for P-2485 and P-1889, is directly below.

Karl Meyer, M.S.
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 February 26, 2016

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

RE: P-1889 and P-2485

Dear Secretary Bose,

The comments below respecting federally-endangered Connecticut River shortnose sturgeon and Study 3.3.19 were delivered via email to GDF-Suez FirstLight�s James Donohue, FERC staff including Brandon Cherry, and Caleb Slater(MA), Julie Crocker(NOAA), and John Warner(USFWS) on 2/24/2016.

Thank you,
Karl Meyer

Dear Chris et al,
I commented to you and in the FERC record on your RSP for Study 3.3.19, the Ultrasound Study in P-2485 and P-1889, to repel fish from Cabot Tailrace. Since I was somehow left off the email list in the �call for comments� that went out on 2/11/2016, I will take the opportunity to comment at this time.
In your newly-revised RSP you failed to reply to this comment of mine in particular:

�The final week should be at a minimum of 2,500 CFS�which, as FL has indicated in their response to a new Stakeholder Study suggested at the Rock Dam for shortnose sturgeon spawning: 2,500 CFS is the absolute minimum, uninterrupted flow necessary through the Bypass from April 25 � May 22, in order to not interfere with the spawning of a federally endangered species at Rock Dam. In their response, FL cited �Kynard� et al. Minimum flows to keep SNS embryos and eggs motile, watered, and viable are required there throughout the month of June.�

FirstLight has now indicated it intends to use test flows including 1500 cfs in its Ultrasound Study. This is unacceptable, as data shows this will harm a federally endangered species, the Connecticut River shortnose sturgeon. FirstLight has cited Kynard, Kieffer et al; Life History and Behaviour of the Connecticut River shortnose and other sturgeons, in their official FERC comments. Both FERC and the agencies are in possession of the scientific study data contained therein. An examination of Chapter 3 and the �Effects of hydroelectric operations on spawning� makes it quite clear that 2500 cfs is the minimum continuous flow needed to allow females to sustain a presence at the site and complete successful spawning. Flows go below that level�and 1500 cfs is far below that required threshold, will cause sturgeon spawning to fail.

A continuous flow of 2500 cfs is the only protective flow that should be allowed in the Ultrasound Study�it is also necessary throughout the month of June to protect the Early Life Stages of shortnose sturgeon. Please make the required modifications, as I�m certain the agencies and FERC will not give you license to run afoul of the federal Endangered Species Act, as well as similar state statutes.
A review of the FERC record, as well as your proposed Revisions for 3.3.19 are included below. Thanks.
Best,
Karl Meyer,
Fish and Aquatics Study Team

In 2015, FERC agreed with FirstLight and rejected requested snorkeling studies to determine the fish assemblage in the By Pass Reach out of an abundance of caution for impacts they might have on federally-endangered shortnose sturgeon whose only documented natural spawning site is the Rock Dam Pool in that reach.
Though the record clearly misstates that that snorkeling survey request was for the By Pass Reach downstream of Turners Falls Dam�written as �downstream of Cabot Station�, the protected status and determination to �do no harm� was quite clear in FERC�s reply. Excerpts from FERC Staff directly below.
From 01/22/2015, FERC Study Modifications Determination Letter

Study 3.3.11 – Fish Assemblage Assessment
�Requested Study Modifications

The U.S. Fish and Wildlife Service (Interior) proposes modifying the study to require FirstLight to conduct snorkeling surveys in the reach downstream of Cabot Station, in order to avoid all effects on shortnose sturgeon during the spawning season. The Nature Conservancy and Karl Meyer support Interior�s proposed study modification.

Comments on Requested Study Modifications

To avoid all effects on shortnose sturgeon during the April-June period in the reach downstream of Cabot Station, FirstLight states that it will rely on sampling from the project impoundment, sampling of the reach downstream of Cabot Station during other times of the year (after June 30), and existing data from a 2009 electrofishing survey of the area downstream of Cabot Station.

Discussion and Staff Recommendation

The goal of this study is to provide general information on fish species that are present in the impoundment and in the river downstream of the dam and Cabot Station. Based on the description in the modified study plan, FirstLight�s proposed method will provide information on species occurrence, species distribution, relative abundance, and habitat associations that will adequately describe the existing fish community. Because FirstLight�s proposed methods would achieve the goals of the study while avoiding effects on spawning sturgeon, we conclude that snorkeling is not necessary and the study plan filed with the ISR should be approved without modification.�

And�FirstLight�s current revised flow plan for 3.3.19:

�This study would establish a high frequency sound (ultrasound) array across the entire Cabot Station tailrace and determine the effect of the ensonified field on upstream migrating shad moving by Cabot Station. Bypass reach test flows during the study will include flows of 1,500 cfs, 2,500 cfs and 4,400 cfs. These flows will be released depending on river flow conditions. When possible, flows will alternate with the array on for one day then off for one day at 1,500 cfs, followed by one day on and one day off at 2,500 cfs, then one day on and one day off at 4,400 cfs. This sequence will be repeated throughout the study depending on river flow. The field study will include two components: a) DIDSON count of shad entering the Cabot fish ladder and b) detection of telemetered adult shad to determine their movements after they encounter the sound field.�