The following comments were submitted to the Federal Energy Regulatory Commission on November 13, 2015, respecting relicensing studies occurring at the Northfield Mountain Pumped Storage Station and at the Turners Falls Dam and Canal. They are designated, respectively as: P-2485; and P-1889.

Karl Meyer, M.S. Environmental Science
85 School Street # 3
Greenfield, MA, 01301
413-773-0006 November 13, 2014

The Honorable Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
88 First Street, NE
Washington, DC 20426

ILP COMMENTS on Updated Study Reports—including Disagreements/Modifications to Study/Propose New Study on Turners Falls Hydroelectric Project P- 1889, and Northfield Mountain Pumped Storage Project P-2485.

Dear Secretary Bose,

The Turners Falls Hydroelectric Project, P-1889, and the Northfield Mountain Pumped Storage Project, P-2485, are currently undergoing studies through the 5-year FERC relicensing process. The majority of the fish and aquatics studies remain incomplete at this time. However, having attended the recent study update meetings with FirstLight’s consultants, and as a member of the Fish & Aquatics Studies Team for P-2485 and P-1889, please accept these brief comments on the USR and proposals for modifications and new studies needed in the FERC ILP for these projects. As studies are brought to completion and data and results are shared with Stakeholders I will submit further comments.

3.3.2 Evaluate Upstream and Downstream Passage of American Shad

Needed information from this study: from personal observations I noted many days when Station 1 was in operation. I visited the site, took some photos, and interviewed a fisherman who was busy catching shad at the Station 1 Outflow on 5/24/2015. In good light, and without the advantage of polarizing sunglasses, I observed dozens of shad stacked up like cordwood, treading water there. The gentlemen noted that whenever Station 1 is running “there are always fish here.” The report should include information about tagged fish delayed in this false attraction water. It is also critical to delineate the number of days during testing that Station 1 was in operation.

3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the Area of the Northfield Mountain and Turners Falls Projects.

In their update the applicant’s team stated that “because minimal shad spawning was observed in the Turners Falls Canal, no spawning areas in the canal were identified for further examination.”

Needed information from this study: at what hour, on what dates, and under what conditions were these “minimal” spawning observations made? Did they return to the site again under different, or more favorable conditions? What was the water temperature? Was it raining? Windy? Cloudy? Was Cabot Station running at the time-and how many units? Was Station 1 in operation on the nights they made their observations?

These are basic questions that require adequate answers as the TF Canal has been the bottleneck for the shad run up through Northern Massachusetts and into Vermont and New Hampshire these last 40 years. The canal appears to be culling off part of the run as a spawning trap. A thorough understanding of why fish are lingering there, and clear assessment of the numbers and delays of fish attempting to spawn in the canal is necessary for informed decision making.

3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms.

Needed information from this study: This study needs to be extended for another year. On October 5, 2015, I took a 20-minute walk through a small segment of the canal at 7:00 a.m. on the morning the canal had drained. On the flats far–from the thalweg where most of the 2014 assessment appears to have taken place, thousands of fish lay struggling, stranded, and dead in the drying pools. These included juvenile American shad, yellow perch, juvenile and “transformer” sea lamprey, one 8-inch chain pickerel, one crayfish, and thousands of tiny, unidentified YOY fish in drying pools and rills that led to nowhere.

These observations were made crossing just a few—out of the many acres, of silt and muck “shoulder habitat” that occurs away from the main channel on both the east and west sides of the TF Canal. A more thorough mortality assessment needs to be made across these habitats to have a full understanding of the impacts of the canal drawdown migrating and resident fish.

REQUEST for New Study: Tagging and Spawning Study of the Connecticut River Shortnose Sturgeon at the Rock Dam Pool in Turners Falls.

The USFWS’s fish passage and dam specialist John Warner reports that both downstream and upstream modifications for fish passage at Holyoke Dam will be completed this winter. New entrances and exits allowing CT River SNS to move upstream beyond that site will be working in spring 2016.

In light of the construction at Holyoke and the 2016 continuation of test flows evaluations on spring migrants in the By-Pass Reach at Turners Falls, testing of spawning success for SNS should be done at their documented natural spawning site–the Rock Dam in Turners Falls, in spring 2016. Regardless of any fine tuning needed at the Holyoke facility, some SNS will return to the Rock Dam pool by the last week of April, and the chance to study their spawning success in light of regulated test flows presents a unique opportunity for the only federally endangered migratory fish on the Connecticut River.

If this fish is ever to benefit from new genetic input, a full understanding of suitable flows at Rock Dam to accommodate spawning is necessary information going forward for a fish that has been decades on the cusp of extinction. It’s an opportunity to restore a part of the public trust.

For further information on longstanding research at this site without required test flows, see Kynard, B. and Kieffer, M.C., et al: Life History and Behaviour of Connecticut River shortnose and other sturgeons, published in 2102 by the World Sturgeon Conservation Society, ISBN 978-3-8448-2801-6.

Thank you for the opportunity to comment on the USR for these projects.

Sincerely,
Karl Meyer, M.S. Environmental Science